rcac jan 2012€¦ · pws rcac board meeting 19 & 20 january 2012 ... • servs operations (31...
TRANSCRIPT
![Page 1: RCAC Jan 2012€¦ · PWS RCAC Board Meeting 19 & 20 January 2012 ... • SERVS Operations (31 DEC 2011) – 80 Non-Emergency Tanker Assists: • Maintaining 6 knots in the Narrows](https://reader034.vdocuments.us/reader034/viewer/2022042414/5f2e202dc08e951ca127e7db/html5/thumbnails/1.jpg)
1/17/12
1
Valdez Operations
PWS RCAC Board Meeting 19 & 20 January 2012
● HSE: Safety/Spill Stats ● Projects ● Operations ● Preparedness – for Response
Valdez Operations
![Page 2: RCAC Jan 2012€¦ · PWS RCAC Board Meeting 19 & 20 January 2012 ... • SERVS Operations (31 DEC 2011) – 80 Non-Emergency Tanker Assists: • Maintaining 6 knots in the Narrows](https://reader034.vdocuments.us/reader034/viewer/2022042414/5f2e202dc08e951ca127e7db/html5/thumbnails/2.jpg)
1/17/12
2
HSE Valdez
Safety As of 30 NOV 2011
Days Away From Work Cases .04
Recordable Incident Rate .20
Environment As of 30 NOV 2011
Spill Volume (Gallons) <24 Gal.
Number of Spills 13
Projects • VMT Operations (OM&S & Marine)
– IWWS System Install liners – Berth 4 – New Arms – API Std 653 Insp: Crude Tanks 13, 14 & 16
• VMT Utilities BWT – Ballast Water Tank 93
– BWT Renovation Continues
• SERVS Operations – Prince William Sound Communication System Upgrades:
– Reef Island power and radio system – Mount Etches power and radio system
– Vessel Quarters Lifecycle Replacement – Barge 450-8 & Mineral Creek living quarters replacement – Planned follow-on barge annually
– Open Water Skimmer Standardization – Barge 450-3 and 450-8 Gram-Rec skimmer replacement
![Page 3: RCAC Jan 2012€¦ · PWS RCAC Board Meeting 19 & 20 January 2012 ... • SERVS Operations (31 DEC 2011) – 80 Non-Emergency Tanker Assists: • Maintaining 6 knots in the Narrows](https://reader034.vdocuments.us/reader034/viewer/2022042414/5f2e202dc08e951ca127e7db/html5/thumbnails/3.jpg)
1/17/12
3
Operations 2011 As of
31 December 2011
Tankers Loaded 268
Tankers Escorted 283 (15 IB)
Barrels Loaded 193.8 MM
Since Start-up As of 31 December 2011
Tankers Loaded 20,655 Tanker Escorted 11,867 Barrels Loaded 15,857 MM
Operations • SERVS Operations (31 DEC 2011)
– 80 Non-Emergency Tanker Assists: • Maintaining 6 knots in the Narrows
– 15 Tether Exercises Conducted – 8 Towing Exercises conducted – 327 Training Events
![Page 4: RCAC Jan 2012€¦ · PWS RCAC Board Meeting 19 & 20 January 2012 ... • SERVS Operations (31 DEC 2011) – 80 Non-Emergency Tanker Assists: • Maintaining 6 knots in the Narrows](https://reader034.vdocuments.us/reader034/viewer/2022042414/5f2e202dc08e951ca127e7db/html5/thumbnails/4.jpg)
1/17/12
4
Operations Preparedness for Response
• C-Plan: • VMT Plan rewrite - Ongoing
• Drills & Exercises – 2011:
• 14 Apr: ADEC IMT No Notice Call Out Drill • 18-20 Apr: ADEC Nearshore Drill • Jul: VMT Exercise • Sep: BP Exercise • Spring & Fall: F/V (VOO) Training
Questions?