Raul Puig VP International Sales IUSA Mexico

Upload: others

Post on 23-Aug-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

Raul PuigVP International

SalesIUSAMexico

Page 2: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

Mexican Case:

The Simple Solution in Energy and Water Metering

Page 3: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� Covers almost 2 million square

kilometers.

� It is the fifth largest country in

the Americas.

� The 14th largest independent

nation in the world.

Mexico's Data

Page 4: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� With an estimated population

of 111 million, it is the 11th

most populous country.

� The national power utility is

CFE (Federal Commission of

Electricity).

Mexico's Data

Page 5: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� CFE has 177 generator plants with capacity of 50,200 MW.

� Mexico has 33 million of electricity meters, 20% are poly-phase meters.

� The average consumption of the 80% of the consumers is 150kWh/month, 5kWh/day. This represents the 20% of the utility's income.

CFE Characteristics

Page 6: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� Currently employ 12,000 reading employees.

CFE Characteristics

Page 7: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� Billing process is every 2 months, average billing is 300 kWh.

� The consumer base grows 1.3 million each year.

� 12% non-technical losses.

� For several years CFE looked for the best technology suitable to the Mexican market.

CFE Characteristics

Page 8: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� 80% of customers are low income.

� 80% of customers have a low consumption of energy (3-5 kWh/day).

� Most customers receive their income payments per week.

� Customers commute long distances to the utility office to make the energy service payment.

Mexican Customers´Characteristics

Page 9: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� The system's objective is to diminish the financial and operating costs of distribution among companies.

� The system facilitates a better consumption control for the consumer, as well as allowing the user more payment options.

Simply Smart Solution

Page 10: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� Is composed by a solid state meter and a contactless smart card that works in a two-way communication.

Simply Smart Solution

Page 11: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

Benefits for the Utility

� Eliminates reading and billing costs.

� Eliminates the connection and disconnection costs.

� The Utility does not loose contact with the customer, as the meter data updates each time the customer recharges the smart card.

Page 12: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� The meter detects tampering, using the management system based on the frequency the customer buys the service and consumes it.

� The meter is installed in the same base of the actual meters, it doesn't require any preparation nor any new communication system costs.

� The management system can transfer the meter’s data to the billing system of the utility.

Benefits for the Utility

Page 13: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� The customer CONTROLS the payment and consumption in accordance to their income.

� This system promotes the culture of: “if you save resources (energy, water or gas) you save money”.

� This system avoids surprises of high invoiced amounts.

Benefits for the Customers

Page 14: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� The customer can buy services with small amounts of money.

� The system is very easy to use.

Benefits for the Customers

Page 15: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� The meter turns on the LED alarm to remind that credit is running out.

� The consumer goes to the Point of Sale to purchase energy, water or gas.

� The Point of Sale sends information to Central Servers at the Utility so they authorize the sale.

Pre-Payment

Page 16: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� The consumer goes back home with new credit charged on his/her smart card and discharges the purchased credit into the meter.

� These transactions can also be done through Internet, at the customer’s home or office.

Pre-Payment

Page 17: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� At the end of each 30 day period, the consumer sets his/her smart card on top of the meter in order to read last month's usage.

� The consumer goes to the nearest Point of Sale to pay his/her service. He can also complete this transaction through Internet.

Post-Payment

Page 18: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� After the consumer makes the payment, he sets the smart card on top of the meter to confirm the payment, so it will not shut down the service.

� The customer may have access to his/her statistical information as defined by the utility, both in pre-payment and post-payment modes.

Post-Payment

Page 19: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� Connect and disconnect the service supply with the same smart card.

�Manual service supply: The consumer may connect and disconnect the service any time he wants.

� Automatic service supply: The meter will connect the service supply when its has credit and will disconnect the supply when it runs out of credit.

Main Features

Page 20: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

Main Features

� Warnings for recharges:The system can configure a warning level for each consumer, so the LED turns on when the consumer needs to recharge his/her meter.

Page 21: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� Display Screens: The screens on line are current voltage, power factor, frequency, disconnections and inversions of the meter. The utility can select all or some of them to have them shown on the display, including the accumulated monetary value of consumption during a 30 day period.

� Test mode: The meter can be configured in test mode to validate its functions and calibration.

Main Features

Page 22: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� All parameters mentioned are independent for each final consumer and they can be configured using the smart card by changing the software at the utility.

Main Features

Page 23: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� CFE (Federal Electric Commission) installed several deployments and pilots in order to choose among several technologies: AMR, AMI, Smart Meters and Smart Grids.

� The AMR pilots were successful technically, but not economically, because the cost of equipment and operation was too high to make a big deployment.

Choosing a System

Page 24: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� We want to share with you the following comparative charts between Smart Meters and AMR as follows.

Choosing a System

Page 25: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� Low product cost.

� Does not require a communication network, saving on maintenance costs.

� There is no installation network cost.

� Does not require the emission and delivery of an invoice.

Advantages of the SSMM System vs AMR

Page 26: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� The collection time is reduced

since the consumer doesn’t have to

wait for the invoice.

� As the consumer has a close

contact with the meter, he/she

may control his/her consumption

and therefore a saving culture is

generated.

Advantages of the SSMM System vs AMR

Page 27: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� The consumer can restrict the use of the service.

� When being away from home, by the manual operation function through the card.

Advantages of the SSMM System vs AMR

Page 28: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� The utility may restrict the

service if the consumer exceeds

the contracted demand, at the

same time, the consumer can

restore it by means of the card

without calling the utility.

� The consumer is responsible for

keeping his/her service flowing.

Advantages of the SSMM System vs AMR

Page 29: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� Reading in real time, in a periodic form.

� Remote shut down of service.

� Tampering detection in real time.

� Payments can be made through Internet, charging a credit card or other banking alternatives.

Advantages of the SSMM System vs AMR

Page 30: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� At the beginning of 2009, CFE made an international bid to select the best technology to substitute the actual electromechanical meters. The Simply Smart Solution won the bid.

� During 2009 to 2010, CFE bought During 2009 to 2010, CFE bought

5,280,000 of these simply smart 5,280,000 of these simply smart

meters.meters.

New deployment in Mexico

Page 31: Raul Puig VP International Sales · 2019. 9. 2. · CFE has 177 generator plants with capacity of 50,200 MW. Mexico has 33 million of electricity meters, 20% are poly-phase meters

� Benefits obtained to date.

� Important reduction cost of billing process.

� Better cash flow.

� Tamper reduction to avoid technical losses.

� Saving energy with consumer participation.

� Technology modernization in the country.

New deployment in Mexico