ratebook-2012_miwrm (1)

38
MINISTRY OF IRRIGATION AND WATER RESOURCES MANAGEMENT ENGINEER’S UNIT RATES FOR CONSTRUCTION WORKS Rates Committee ; Ministry of Irrigation and Water Resources Management, No. 500, T.B. Jayah Mawatha, Colombo -10, Sri Lanka. New Rates are applicable from 01 January 2012

Upload: dxindra

Post on 26-Nov-2015

16 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: ratebook-2012_miwrm (1)

MINISTRY OF IRRIGATION AND WATER RESOURCES MANAGEMENT

ENGINEER’S UNIT RATES

FOR

CONSTRUCTION WORKS

Rates Committee ;

Ministry of Irrigation and Water Resources Management,

No. 500, T.B. Jayah Mawatha,

Colombo -10,

Sri Lanka.

New Rates are applicable from

01 January 2012

Page 2: ratebook-2012_miwrm (1)

- 1 -

ABBREVIATIONS

A - Ampere ac - Acres avg - Average C.I. - Cast iron CIF - Cost, Insurance and Freight CT - Crawler Tractor cu - Cube (100 cubic feet) cu.ft - Cubic feet cu.yd - Cubic yard cwt - Hundredweight D-Box - Distribution box dia. - Diameter DPC - Damp Proof Coarse ft. - Feet G.I. - Galvanized Iron gl - Gallon gpm - Gallons per minute ha - Hectare HP - Horse Power hrs - Hours kg - Kilo gramme kVA - Kilo Volt Ampere lb - Pound l - Litre m - Metre m2 - Square metre m3 - Cubic metre max. - Maximum mm - Milli metre M.S. - Mild steel Nos. - Numbers PVC - Poly Vinyl Chloride RCC - Reinforced Cement Concrete r/f - Reinforcement Rs. - Rupees sq - Square (100 square feet) sq.ft - Square feet W - Watt yd - Yard

Page 3: ratebook-2012_miwrm (1)

- 2 -

PREAMBLE 1. SCOPE

The rates listed here are to enable preparation of "Engineer's Estimates" for irrigation and settlement projects. The total specifications for the rates herein are described in "Technical Specifications".

2. CONSTRUCTION AGENCIES

As purchase of Machinery and equipment will be made by State or Private sector and as Sri Lankan labour will be employed, the basic unit rates are applicable for domestic construction Agencies in the Public sector and Private sectors, according to the classification given below. Class A - Large firms bound by "Collective Agreement" and State Corporations operating

on a commercial basis. Class B - Medium firms not bound by "Collective Agreement" generally executing with

casual labour except for permanent operators for heavy equipment and small scale contractors with earth moving machinery.

Class C - Government Departments & non-commercial State Corporations executing on

force account with casual labour except for permanent operators for heavy equipment and Small Scale Contractors largely supplying casual labour.

3. ASSIGNMENT OF WORKS

It is recommended that Machinery intensive jobs be assigned to Class "A" and labour intensive works to Class "C" construction agencies respectively. Class "B" construction agencies may be assigned jobs requiring less Machinery power and more manpower.

Conversion Factors

1m = 3.2808 ft 1 ft = 0.3048 m

1 Kg = 2.2046 lb 1 lb = 0.4536 kg

1 ha = 2.47 ac 1 ac = 0.4048 ha

1 cu.m = 0.353 cu 1 cu = 2.833 cu.m

1 sq.m = 0.1076 sq 1 sq = 9.2937 sq.m

1 M.ton = 0.9842 ton 1 ton = 1.016 M.ton

1 lit = 0.22 gl 1 gl = 4.54 lit

1 bushel = 1.2844 cu.ft 1 cu.ft = 0.7786 bushel

Page 4: ratebook-2012_miwrm (1)

- 3 -

4. OVERHEADS AND PROFIT FACTOR (OH & PF)

The overheads and profit factor by which the Basic Unit Rate is multiplied to obtain the Unit Rates for the above classes of construction agencies is as follows.

CLASS OF

CONSTRUCTION AGENCY

OVERHEADS & PROFIT FACTOR

Civil Works (Canals, Roads etc) Building

Works

A

B C

1.23 1.17 1.14

1.36 1.18 1.18

Note:

(i) VAT is not included in the overheads & profit factor. (ii) The rates are based on basic prices prevalent in January 2012. (iii) The calculated unit rates have been rounded off as follows: When Unit Rate amount is, Between 0 to Rs. 100, to nearest 5 cts. Over Rs. 100 to Rs. 500, to nearest 25, 50, 75 cts. Over Rs. 500 to Rs.1000, to nearest 50 cts 5 VALUE ADDED TAX (VAT)

VAT has not been included in the unit rates, in order to avoid complications arising from the fact that only contractors who have registered themselves at the Department of Inland Revenue for VAT are eligible for claims on VAT. To include VAT in the Engineer’s estimate, it could be added as a sum (12% of the estimate without VAT) to the estimate prepared based on the appropriate unit rates.

Page 5: ratebook-2012_miwrm (1)

Engineer's Unit Rates - Applicable from 01 January 2012

No. Category

1 Unskilled labour

2 Semi-skilled labour

3 Skilled (ordinary)

4 Skilled (carpenters, masons)

5 Skilled (heavy equipment operators)

6 Mechanics, electricians and welders

No. Item Unit Price (Rs.)

1 Lanka Auto diesel l 84.00

2 Lanka Petrol l 137.00

3 Gelignite 60-80% lb 338.00

4 Electric detonators each 98.21

5 Jumper steel, 7/8" dia.(2.5 lb/ft) ft 125.00

6 Set Exploder, Ohm meter & Hand siren 10000cu 322,000.00

7 Bitumen 80/100 gl 460.00

8 R/F bars, mild steel (all sizes) lb 49.61

9 R/F bars, tor steel (all sizes) lb 50.41

10 Class II shuttering planks, 1"x12" m 114.00

11 Wire nails kg 352.00

12 4" dia.Round timber for scaffolding (0.2 cu.ft/ft.) ft 12.50

13 Portland cement - 50 kg bags each 660.00

14 Pre-stressed conc. Bridge Beam 53'x5.07 ton each 126,000.00

15 -do- 44'x4.22 t each 93,000.00

16 -do- 40'x3.80 t each 84,500.00

17 -do- 35'x2.86 t each 73,000.00

18 -do- 32'x2.59 t each 62,000.00

19 -do- 23'x2.26 t each 46,000.00

20 -do- 20'x2.08 t each 40,700.00

21 -do- 17'x1.57 t each 31,000.00

22 -do- 14'x1.13 t each 24,000.00

23 -do- 11'x0.89 t each 21,000.00

24 12" dia.Polythene displacer with sawdust & tie rods per beam 2,250.00

25 3"x1/2" Neoprene pad and Dowels per beam 1,130.00

26 Kerb slab 3'x91.64 Kg each 1,200.00

27 Fascia slab 1 1/2"x3'x4'x105.89 Kg with tie wires each 2,700.00

28 -do- 1 1/2"x2'x4'x46.32 Kg with tie wires each 2,200.00

29 Upright for hand rail 3'3"x71.93 Kg each 1,450.00

30 Hand rail 3"dia.x7' 8 1/2"x 84.37 Kg each 1,500.00

31 Rainwater channel 3"x6"x24"x 14.25 Kg each 200.00

32 Steel plates & anchors in expansion joints lb 120.00

33 9" dia.C.I gate & screw lift hoist with spindles each 24,438.00

34 12" dia. -do- each 26,800.00

35 15" dia. -do- each 46,058.00

36 18" dia. -do- each 52,786.00

660.00

1,050.00

1,075.00

1,100.00

PRICES OF CONSTRUCTION MATERIALS FOR CIVIL WORKS USED IN THE

ANALYSIS OF RATES

LABOUR WAGES USED IN THE ANALYSIS OF RATES

900.00

725.00

Wages per 9 hrs day (Rs.)

- 4 -

Page 6: ratebook-2012_miwrm (1)

Engineer's Unit Rates - Applicable from 01 January 2012

No. Item Unit Price (Rs.)

37 24" dia. -do- each 72,490.00

38 30" dia. -do- each 120,253.00

39 6" dia. RCC spun pipes ft 362.50

40 9" dia. -do- ft 525.00

41 12" dia. -do- ft 625.00

42 15" dia. -do- ft 737.50

43 18" dia. -do- ft 868.75

44 24" dia. -do- ft 1,100.00

45 30" dia. -do- ft 1,343.75

46 36" dia. -do- ft 1,700.00

47 42" dia. -do- ft 2,182.00

48 48" dia. -do- ft 2,550.00

49 54" dia. -do- ft 2,915.00

50 6" Collar for RCC pipes each 325.00

51 9" dia. -do- each 400.00

52 12" dia. -do- each 550.00

53 15" dia. -do- each 600.00

54 18" dia. -do- each 750.00

55 24" dia. -do- each 900.00

56 30" dia. -do- each 975.00

57 36" dia. -do- each 1,150.00

58 42" dia. -do- each 1,550.00

59 48" dia. -do- each 1,800.00

60 54" dia. -do- each 2,200.00

No. Item Unit Price (Rs.)

1 Burnt Clay Bricks 8 5/8" x 4 1/8" x 2 5/8" 1000 Nos. 6500.00

2 Slaked lime (wt= 50 lb/cu.ft) cu ft 450.00

3 Portland cement ( 50 kg bags) each 660.00

4 DPC tar gl 757.10

5 150x150mm Glazed wall tiles each 42.00

6 200x200mm .floor tiles each 65.00

7 300x300 Floor tiles each 116.00

8 Class 1 timber 4"x3" m 738.00

9 -do- 3"x1" m 246.00

10 -do- 9"x1" m 750.00

11 -do- 4"x1" m 328.00

12 -do- 4"x2" m 505.00

13 -do- 6"x1" m 500.00

14 -do- 12"x3/4" Planks m 625.00

15 Ordinary Plywood door 2'9"x6'9" each 2200.00

16 PVC Toilet door including door frames each 4950.81

17 Brass butt hinges 4"x3" or 4"x2 1/2" each 130.00

18 Hold fasts 9"x1"x1/8" each 25.00

19 Brass barrel bolts 10" each 260.00

20 -do- 6" each 240.00

21 -do- 4" each 160.00

PRICES OF CONSTRUCTION MATERIALS FOR BUILDING WORKS USED IN THE

ANALYSIS OF RATES

- 5 -

Page 7: ratebook-2012_miwrm (1)

Engineer's Unit Rates - Applicable from 01 January 2012

No. Item Unit Price (Rs.)

22 Nickel door handle each 175.00

23 Mortice door lock each 3900.00

24 Brass screws, assorted sizes in 100/pkt pkt 660.00

25 3 mm thick figured glass sheet sq.ft 50.00

26 Brass centre pivot (Hinge), 2 1/2" each 60.00

27 Door rings each 85.00

28 Hasp & staple, GI 4" each 110.00

29 Pad lock, Brass 2"(Viro) each 550.00

30 Brass casement stays, 10" each 130.00

31 Brass casement fastners 4" each 100.00

32 Brass window rings each 75.00

33 Panel pins (3/4") 100 g 190.00

34 Brass fanlight catch each 120.00

35 G.I.(2"x2") Welded mesh (12'x7') sheet 3125.00

36 Class 1 timber 6"x2" m 853.00

37 -do- 4"x4" m 1150.0038 -do- 6"x4" m 1805.00

39 -do- 5"x4" m 1250.00

40 -do- 5"x3" m 875.00

41 -do- 2"x1" (Reepers) m 75.00

42 -do- 2"x2" m 135.00

43 -do- 10"x1" m 830.00

44 -do- 8"x1" m 558.00

45 Lunumidella ceiling planks 8"x3/4" m 165.00

46 1 1/2"x3/8" Beading m 91.86

47 1 1/4"x3/4" Moulding m 137.80

48 Wood preservative, clear l 290.00

49 Calicut pattern tiles - Gr.1 each 38.00

50 Calicut ridge tiles each 50.00

51 Corrugated Asbestos sheets 10'x3'7" sheet 1665.00

52 Corrugated Asbestos Ridge sheet pair 600.00

53 4 1/2" GI roofing nuts, bolts & washers 50 Nos. 400.00

54 6" dia. half©round, country tiles each 20.00

55 Boiled lime (wt 50 lb/cu.ft) cu.ft 680.00

56 Flat Asbestos sheets 4'x4' sheet 460.00

57 Aluminium Plain sheet (gauge 17) sq ft 45.00

58 6" dia.half round/4 1/2" square PVC eaves gutter. ft 73.33

59 PVC gutter joiners each 111.00

60 PVC gutter end caps each 92.00

61 Gutter brackets each 24.00

62 3 1/2" dia.PVC down pipe (in 12' length) ft 51.00

63 -do- elbow each 156.00

64 -do- joiners each 115.00

65 Down pipe clips (straps) each 24.00

66 Roll Plugs to fix screws each 1.50

67 4 1/2" PVC running gutter head each 256.00

68 -do- gutter box each 609.00

69 Glue for binding lime/samara kg 150.00

- 6 -

Page 8: ratebook-2012_miwrm (1)

Engineer's Unit Rates - Applicable from 01 January 2012

No. Item Unit Price (Rs.)

70 Coir brush for cleaning ext. walls each 65.00

71 3 knot wash brush for lime/samara each 100.00

72 Wall filler kg 135.00

73 Weather shield 4l 3360.00

74 Emulsion paint 4l 2600.00

75 Sand paper sheets (assorted sizes) each 45.00

76 Distemper brush 5" each 620.00

77 Enamel paint 4l 3142.00

78 Floor paint l 964.00

79 Thinner 4l 760.00

80 Paint brush (3") each 420.00

81 Varnish (external) 4l 3265.00

82 Aluminum paint 4l 3152.00

83 4" dia. PVC pipes (type 400) ft 166.00

84 -do- bends each 1280.00

85 -do- pipe junction each 1553.00

86 Ceramic low level commode with all fittings each 12860.00

87 Ceramic squatting pan (large) with "P"/"S" trap each 1850.00

88 Foot rests pair 450.00

89 Plastic High level cistern & down pipe each 2150.00

90 1000x500mm s/s kitchen sink complete with flushing

plug & strainer

each 2925.00

91 22"x15" Ceramic wash basin with tap, flushing plug &

strainer

each 3200.00

92 Solvent cement for joining PVC g 2.25

93 1/2" PVC pipe ft 12.92

94 -do- elbow each 16.00

95 -do- faucet socket each 22.00

96 3/4" PVC pipe ft 36.38

97 -do- elbow each 30.00

98 -do- faucet socket each 31.00

99 1" PVC pipe ft 57.23

100 -do- elbow each 43.00

101 -do- faucet socket each 40.00

102 1 1/2" PVC pipe ft 70.76

103 -do- elbow each 95.07

104 -do- faucet socket each 75.10

105 2" PVC pipe ft 124.58

106 -do- elbow each 148.84

107 -do- faucet socket each 115.16

108 PVC shower rose 1/2" each 110.00

109 PVC valve socket 1/2" each 22.00

110 1/2" globe valve, PVC each 154.00

111 1/2" bib cock , brass each 420.00

112 3/4" globe valve, PVC each 235.00

113 3/4" bib cock, brass each 800.00

114 1" globe valve, PVC each 315.00

115 1 1/2" gate valve, brass each 1700.00

- 7 -

Page 9: ratebook-2012_miwrm (1)

Engineer's Unit Rates - Applicable from 01 January 2012

No. Item Unit Price (Rs.)

116 2" gate valve, brass each 2400.00

117 Ceramic urinal pan each 2400.00

118 Roll plugs each 1.50

119 Chromium plated soap holder each 325.00

120 Chromium plated tooth brush holder each 550.00

121 Chromium plated towel holder (pair) each 1200.00

122 Bathroom mirror, size 500x400 mm. each 1990.00

123 Nikel plated Glass tray holders (pair) each 500.00

124 5 mm thick glass tray (16"x5") each 650.00

125 Chromium plated 6"x6" toilet paper holder each 1200.00

126 Ceramic 4"x4" robe hook each 1250.00

127 6"x6" PVC grating each 150.00

128 PVC gulley each 575.00

129 2" dia.,6' long, PVC pipes , 400 each 425.00

130 4" dia.,6' -do- each 995.00

131 Fixing brackets 2" - PVC each 60.00

132 -do- 4" - PVC each 100.00

133 2" dia. pipe clips each 29.00

134 4" dia. PVC pipe (type 400) ft 166.00

135 4" dia. pipe clips each 110.00

136 Copper wiredome for vent pipe each 250.00

137 Electric cable 1/044 EPL-single m 19.85

138 5/8" conduit ft 6.30

139 Wiring clips 1 1/4" to 2" in 100/pkt pkt 25.00

140 Panel pins 3/4" kg 190.00

141 Round blocks each 20.00

142 Embedded mounting box (Plastic) each 20.00

143 Brass screws pkt 930.00

144 Surface switch each 125.00

145 Lamp shade - plastic each 120.00

146 60 W electric bulb (230 V) each 71.00

147 Batten lamp holder each 80.00

148 Ceiling rose each 60.00

149 Pendant lamp holder each 60.00

150 Electric cable 14/0076 twin - (2 core cable) m 48.66

151 -do- 7/044 twin - service mains m 290.63

152 6-way MCB encloser each 375.00

153 Electric cable 7/029 single (earth) m 66.00

154 5A,3 pin plug base with switch each 295.00

155 10-way MCB encloser each 375.00

156 6A MCBs each 183.04

157 10A MCBs each 183.04

158 16A MCBs each 183.04

159 20A MCBs each 183.04

160 32A MCBs each 183.04

161 40A MCBs each 183.04

- 8 -

Page 10: ratebook-2012_miwrm (1)

Engineer's Unit Rates - Applicable from 01 January 2012

No. Item Unit Price (Rs.)

162 12-way MCB encloser each 758.92

163 63A Isolator (2 Pole) each 776.79

164 40A Isolator (2 Pole) each 656.25

165 8-way MCB encloser each 450.00

166 40A 30mA 2 Pole RCD (ELCB) each 2205.36

167 63A 30mA 2 Pole RCD (ELCB) each 2366.07

168 Roll plugs each 1.50

169 2" dia. G.I. pipe for earth electrode ft 140.00

170 G.I. bracket with insulator etc. (3") each 420.00

171 Swan neck holder each 125.00

172 Ceiling lamp fittings (without bulb) each 550.00

173 Suspension chains m 105.00

174 Hooks & eyes (set) each 35.00

175 Florescent lamp fittings 2' (set) each 550.00

176 -do- 4' (set) each 625.00

177 Florescent lamp tube (20 W) each 90.00

178 -do- (40 W) each 80.00

179 15 A, 3 pin plug base with switch each 430.00

180 Ceiling fan with regulator each 4500.00

181 Hook to hang ceiling fan 3/4" dia. T.S. each 110.00

182 Electric bell each 295.00

183 4-way MCB encloser each 375.00

184 Bell push each 285.00

185 Lamp ballast each 285.00

186 125W Mercury bulb each 187.50

187 40/0076 Flexible cable (2 core) m 78.00

188 3/4" G.I. pipe ft 60.00

189 G.I. bracket with insulator etc. ( 3/4") each 300.00

190 Aluminium connectors each 65.00

191 13 A, Squire pin plug base with switch each 330.36

192 6"x8"x15" cement blocks each 48.00

193 River Sand Cu 4500.00

194 Electric cable 7/0036 Twin m 199.20

195 Electric cable 7/0029 Twin m 126.40

Plant Hourly Plant

RN Rate (Rs.)

1A 11,772.03

2A 19,518.46

3A 638.18

4A 446.72

5 223.36

6 325.60

7 9,540.35

8 6,603.02

10 5,666.01

11A 3,461.45

11B 765.37

13 2,481.81

14A 19,606.33

Back-Hoe cum hydraulic excavator (1 cu.yd)

Rear Dumper - 15 t (working)

Crawler tractor 180-200 HP (10000 hrs Dep.)

Machinery/Equipment

HOURLY PLANT RATES

Motor grader, 120-150 HP

CT 300 HP (10000 hrs Dep.)

Straight blade dozer attachment for CT (10000hrs Dep.)

Ripper attachment to CT (10000 hrs Dep.)

Pusher cap attachment (10000 hrs Dep.)

SFR attachment, twin drum(10000 hrs Dep.)

Motorized scraper, 14/20 cu.yd

-do- (idle)

Water bowser with sprinkler attachment (1200 gal)

Mobile crane 10 t, wheel mounted (working) - 9 -

Page 11: ratebook-2012_miwrm (1)

Engineer's Unit Rates - Applicable from 01 January 2012

14B 9,182.13

16 2,289.61

17 1,610.10

18 213.11

24 5,463.18

25A 5,040.22

25B 5,781.62

26 597.27

27 391.72

29 102.36

30A 1,873.34

30B 2,302.79

30C 412.97

31A 1,924.87

31B 2,354.32

31C 732.24

32A 1,647.42

32B 1,933.02

32C 642.70

33A 7,938.56

33B 8,891.96

33C 2,637.58

37 2,941.24

38 496.66

43 2,962.94

44 586.29

45 9,771.30

Air compressor (600 cfm)

-do- (300 cfm)

Secondary stone crusher (15 t/hr)

Note: The above hourly plant rates are used in the analysis of rates in this report. These are

not meant to be used for hiring of plants. But these plant rates can be used to prepare estimates for

evaluation of Tenders or Quotations for hiring of plants on hourly basis.

However, under special cases where m/c & equipment has to be hired on hourly basis such as

very urgent needs & where works cannot be quantified, these plant rates could be used with

the prior approval of the head of the organization.

Pneumatic jack hammer (1 1/2" bit,50 lb) or Rock drill (w/o AC)

35 t Low Bed Trailer with prime mover (without load)

Tractor(60 HP) & trailer (without load)

Front end loader 1.5-2.5 cu.yd

-do- 2.5-3.5 cu.yd

Concrete mixer 14/10 cu.ft

-do- 5/3 cu.ft

Pneumatic vibrator - 2" dia. (without AC)

-do- (idle)

-do- (idle)

Explosives van - 3 t (without load)

-do- (with load)

-do- (idle)

-do- (with load)

-do- (idle)

Lorry - 5 t (without load)

-do- (with load)

Dump truck - 5 cu.yd (working)

-do- (idle)

220 HP crawler excavator (2-3m3)

-do- (with load)

-do- (idle)

Road roller (10-15 t)

4" dia. centrifugal pump (450 gpm)

- 10 -

Page 12: ratebook-2012_miwrm (1)

En

gin

eer's

Un

it R

ates

- A

pp

lica

ble

fro

m 0

1

Jan

uar

y 2

01

2

Tra

nsp

ort

& L

oa

din

g/U

nlo

ad

ing

Co

sts

of

Co

nst

ruct

ion

Ma

teri

als

Ma

in T

ran

spo

rt L

oca

l T

ran

spo

rtL

oad

ing

/T

ota

l C

ost

No

.

Mat

eria

l

Un

it

M

/C

Cap

acit

y

Dis

tan

ce

Co

st

M

/C

Cap

acit

y

Dis

tan

ce

Co

st

To

tal

Un

load

ing

(Tra

nsp

ort

+

Tra

nsp

ort

la

bo

ur

Lo

ad/

Un

Lo

ad)

(Un

its)

(Mil

es)

(Rs.

)

(U

nit

s)(M

iles

)(R

s.)

Co

st (

Rs.

)C

ost

(R

s.)

(Rs.

)

1 C

emen

t (5

0 k

g B

ags)

bag

L

orr

y

13

015

019

6.60

T

ract

or

Tra

iler

608

47.8

624

4.46

10.3

125

4.77

2 R

/F

Ste

el

cwt

L

orr

y

10

015

025

5.58

T

ract

or

Tra

iler

568

51.2

730

6.86

16.5

032

3.36

3 S

and

, G

rav

elcu

-

-

-

T

ract

or

Tra

iler

0.7

31,

846.

911,

846.

911,

031.

252,

878.

16

4 M

etal

, R

ub

ble

cu

-

-

-

Tra

cto

r T

rail

er

0.

63

2,15

4.72

2,15

4.72

1,03

1.25

3,18

5.97

5 S

and

, G

rav

elcu

-

-

-

Rea

r D

um

per

+F

ron

t E

nd

Lo

ader

2.

35

991.

6399

1.63

991.

63

6 M

etal

, R

ub

ble

cu

-

-

-

R

ear

Du

mp

er+

Fro

nt

En

d L

oad

er

2.2

51,

156.

871,

156.

871,

156.

87

7 R

ub

ble

& R

ip-R

ap o

ver

9"

cu

-

-

-

Rea

r D

um

per

+F

ron

t E

nd

Lo

ader

2

51,

302.

061,

302.

061,

302.

06

8 T

urf

in

3"

sod

s

sq

-

-

-

T

ract

or

Tra

iler

2.5

239

0.85

390.

8533

0.00

720.

85

9 E

xp

losi

ves

lb

E

xp

losi

ves

Va

n

50

0020

044

.14

E

xp

losi

ves

Van

100

150.

9445

.07

0.09

45.1

7

10 S

awn

tim

ber

cu

.ft

L

orr

y

22

050

44.2

6

Tra

cto

r T

rail

er

12

58

22.9

767

.23

6.60

73.8

3

11 B

rick

s

e

ach

Lo

rry

4000

201.

25

-

-

-

1.

250.

551.

80

12 T

iles

e

ach

Lo

rry

2500

604.

53

-

-

-

4.

530.

555.

08

13 C

.I.G

ates

9"

e

ach

Lo

rry

7515

034

0.78

T

ract

or

Tra

iler

428

68.3

740

9.15

20.6

342

9.77

14 C

.I.G

ates

12,

15,1

8" e

ach

Lo

rry

3715

069

0.77

T

ract

or

Tra

iler

218

136.

7382

7.50

41.2

586

8.75

15 C

.I.G

ates

24,

30"

& W

oo

den

Gat

es e

ach

Lo

rry

1815

014

19.9

1

Tra

cto

r T

rail

er

11

826

1.03

1,68

0.95

82.5

01,

763.

45

16 R

CC

Pip

es u

pto

15"

dia

.

ft

L

orr

y

22

415

011

4.10

T

ract

or

Tra

iler

126

822

.79

136.

894.

5814

1.47

17 R

CC

Pip

es o

ver

15

up

to 2

4" d

ia.

ft

Lo

rry

8815

029

0.44

T

ract

or

Tra

iler

488

59.8

235

0.26

10.3

136

0.57

18 R

CC

Pip

es o

ver

24

up

to 3

6" d

ia.

ft

Lo

rry

4815

053

2.47

T

ract

or

Tra

iler

328

89.7

362

2.20

20.6

364

2.82

19 R

CC

Pip

es o

ver

36

up

to 5

4" d

ia.

ft

Lo

rry

2415

010

64.9

4

Tra

cto

r T

rail

er

16

817

9.46

1,24

4.41

41.2

51,

285.

66

20W

ater

fo

r co

nst

ruct

ion

g

l

-

-

-

Tra

cto

r T

rail

er

70

01.

52.

422.

420.

923.

34

21B

itu

men

gl

L

orr

y

90

015

028

.40

T

ract

or

Tra

iler

520

87.

2035

.60

1.38

36.9

8

22H

eav

y L

oad

s

to

n

Lo

w B

ed T

rail

er

-

200

7086

.63

-

-

-

7,08

6.63

neg

lig

ible

-

23

-d

o-

ton

L

ow

Bed

Tra

iler

-

(

load

ing

& u

nlo

adin

g b

y C

ran

e )

-

138.

16 n

egli

gib

le

-

24A

sbes

tos

shee

ts

cu

.ft

L

orr

y

20

015

012

7.79

T

ract

or

Tra

iler

100

837

.46

165.

2520

1.08

366.

33

25O

ther

co

nst

ruct

ion

mat

eria

ls

-

-

-

-

-

-

-

-

-

-

-

(2

5% o

f th

e

Mat

eria

l

Co

st )

- 11

-

Page 13: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

(1

) C

LE

AR

ING

AN

D G

RU

BB

ING

1.1

Cle

ari

ng a

nd

Gru

bb

ing H

eavy J

un

gle

ha

CT

30

0H

P

12

0,6

95

.00

1

48

,45

5.0

0

14

1,2

13

.00

1

37

,59

2.0

0

-

-

-

-

1.1

1.2

-d

o-

Com

mon

Ju

ngle

ha

-d

o-

11

3,7

98

.00

1

39

,97

2.0

0

13

3,1

44

.00

1

29

,73

0.0

0

-

-

-

-

1.2

1.3

-d

o-

Med

ium

Ju

ngle

ha

CT

20

0H

P

81

,74

1.0

0

1

00

,54

2.0

0

95

,63

7.0

0

9

3,1

85

.00

-

-

-

-

1.3

1.4

-d

o-

Lig

ht

Jun

gle

ha

-d

o-

61

,30

6.0

0

7

5,4

06

.00

71

,72

8.0

0

6

9,8

89

.00

61

,30

6.0

0

75

,40

6.0

0

7

1,7

28

.00

69

,88

9.0

0

1

.4

1.5

Sec

on

dary

Gro

wth

Ju

ngle

cle

ari

ng

ha

-d

o-

30

,65

3.0

0

3

7,7

03

.00

35

,86

4.0

0

3

4,9

44

.00

30

,65

3.0

0

37

,70

3.0

0

3

5,8

64

.00

34

,94

4.0

0

1

.5

(2

) R

IPP

ING

, C

RO

SS

RIP

PIN

G,

LA

ND

LE

VE

LL

ING

& S

OIL

CO

NS

ER

VA

TIO

N B

UN

DS

2.1

Rip

pin

g f

or

lan

d l

evel

lin

g o

f fa

rms

ha

CT

30

0H

P

54

,79

3.0

0

6

7,3

95

.00

64

,10

8.0

0

6

2,4

64

.00

-

-

-

-

2.1

2.2

Rip

pin

g a

nd

cro

ss-r

ipp

ing f

or

lan

d l

evel

lin

g o

f fa

rms

ha

-d

o-

10

7,2

04

.00

1

31

,86

1.0

0

12

5,4

29

.00

1

22

,21

2.0

0

-

-

-

-

2.2

2.3

Lan

d l

evel

lin

g o

f fa

rms

ha

-d

o-

16

,59

5.0

0

2

0,4

12

.00

19

,41

6.0

0

1

8,9

19

.00

-

-

-

-

2.3

2.4

Form

ing s

oil

con

serv

ati

on

bu

nd

s in

farm

sh

a C

T2

00

HP

8

,88

4.0

0

10

,92

8.0

0

1

0,3

95

.00

10

,12

8.0

0

-

-

-

-

2

.4

2.5

Rip

pin

g,

level

lin

g a

nd

form

ing S

CB

in

farm

sh

a C

T3

00

HP

&

CT

20

0H

P

80

,27

3.0

0

9

8,7

36

.00

93

,92

0.0

0

9

1,5

12

.00

-

-

-

-

2.5

(3

) E

AR

TH

EX

CA

VA

TIO

N

3.1

A

Eart

h e

xca

vati

on

or

borr

ow

an

d s

poil

to w

ast

e or

fill

mate

rial,

cu

t 0

-

3 f

t li

ft u

pto

3ft

, sp

read

10

0ft

.m

3 B

-Ho

e 1

85

.75

22

8.5

0

21

7.5

0

2

11

.75

5

17

.50

63

7.0

0

6

05

.50

59

0.0

0

3

.1A

3.1

As

in R

ate

3.1

A b

ut

cut

3-5

', li

ft u

pto

5

', sp

read

10

0'

m3

-d

o-

18

5.7

5

2

28

.50

2

17

.50

21

1.7

5

61

3.0

0

7

54

.00

71

7.5

0

6

99

.00

3.1

3.2

As

in R

ate

3.1

A b

ut

cut

5-1

0',

lift

up

to 1

0',

spre

ad

10

0'

m3

-d

o-

18

9.5

0

2

33

.00

2

21

.75

21

6.0

0

97

1.5

0

1

,19

5.0

0

1,1

37

.00

1

,10

8.0

0

3.2

3.3

As

in R

ate

3.1

A b

ut

cut

10

-15

', li

ft u

pto

1

5',

spre

ad

10

0'

m3

-d

o-

19

4.2

5

2

38

.75

2

27

.25

22

1.2

5

1,0

01

.00

1,2

32

.00

1

,17

2.0

0

1,1

42

.00

3

.3

3.4

As

in R

ate

3.1

A b

ut

cut

15

-20

', li

ft u

pto

20

', sp

read

10

0'

m3

-d

o-

19

8.7

5

2

44

.25

2

32

.50

22

6.5

0

1,0

37

.00

1,2

75

.00

1

,21

3.0

0

1,1

82

.00

3

.4

3.5

As

in R

ate

3.1

A b

ut

cut

20

-25

', li

ft u

pto

25

', sp

read

10

0'

m3

B

-Ho

e/ R

ear

Dum

per

27

4.7

5

3

38

.00

3

21

.50

31

3.2

5

1,0

79

.00

1,3

27

.00

1

,26

3.0

0

1,2

30

.00

3

.5

3.6

As

in R

ate

3.1

A b

ut

cut

25

-30

', li

ft u

pto

30

', sp

read

10

0'

m3

-d

o-

28

0.0

0

3

44

.50

3

27

.75

31

9.2

5

1,1

31

.00

1,3

91

.00

1

,32

3.0

0

1,2

89

.00

3

.6

3.7

As

in R

ate

3.1

A b

ut

cut

30

-35

', li

ft u

pto

35

', sp

read

10

0'

m3

-d

o-

28

6.5

0

3

52

.50

3

35

.25

32

6.7

5

1,1

65

.00

1,4

33

.00

1

,36

3.0

0

1,3

28

.00

3

.7

3.8

As

in R

ate

3.1

A b

ut

cut

35

-40

', li

ft u

pto

40

', sp

read

10

0'

m3

-d

o-

29

3.0

0

3

60

.50

3

43

.00

33

4.2

5

1,2

10

.00

1,4

89

.00

1

,41

6.0

0

1,3

80

.00

3

.8

3.9

As

in R

ate

3.1

A b

ut

cut

40

-45

', li

ft u

pto

45

', sp

read

10

0'

m3

-d

o-

30

7.7

5

3

78

.50

3

60

.00

35

1.0

0

1,2

54

.00

1,5

42

.00

1

,46

7.0

0

1,4

29

.00

3

.9

3.1

0A

s in

Rate

3.1

A b

ut

cut

45

-50

', li

ft u

pto

50

', sp

read

10

0'

m3

-d

o-

31

3.5

0

3

85

.75

3

66

.75

35

7.5

0

-

-

-

-

3.1

3.1

1A

s in

Rate

3.1

A b

ut

cut

50

-55

', li

ft u

pto

55

', sp

read

10

0'

m3

-d

o-

32

0.7

5

3

94

.50

3

75

.25

36

5.7

5

-

-

-

-

3.1

1

3.1

2A

s in

Rate

3.1

A b

ut

cut

55

-60

', li

ft u

pto

60

', sp

read

10

0'

m3

-d

o-

32

7.7

5

4

03

.25

3

83

.50

37

3.7

5

-

-

-

-

3.1

2

3.2

5H

au

l ea

rth

1/4

mil

em

3 R

ear

Dum

per

7

7.0

0

94

.70

90

.10

8

7.8

0

-

-

-

-

3

.25

3.2

6H

au

l ea

rth

1/2

mil

em

3 R

ear

Dum

per

9

7.5

5

11

9.7

5

11

4.0

0

1

11

.00

-

-

-

-

3

.26

3.2

7H

au

l ea

rth

3/4

mil

em

3 R

ear

Dum

per

1

18

.75

14

6.0

0

13

9.0

0

1

35

.25

-

-

-

-

3

.27

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

- 1

2 -

Page 14: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

3.2

8H

au

l ea

rth

1 m

ile

m3

Rea

r D

um

per

1

38

.75

17

0.7

5

16

2.2

5

1

58

.25

-

-

-

-

3

.28

3.2

9H

au

l ea

rth

1/4

mil

e in

each

ste

p b

eyon

d 1

mil

e(A

dd

l. t

o R

ate

Nu

mb

er 3

.28

)m

3 R

ear

Dum

per

1

9.9

5

24

.55

23

.35

2

2.7

5

3

.29

3.4

3H

au

l E

art

h 1

00

ft

in e

ach

ste

p u

pto

maxim

um

of

30

0 f

tm

3

-

-

-

-

-

1

29

.25

15

9.2

5

1

51

.25

14

7.5

0

3

.43

(4

) C

OM

MO

N E

XC

AV

AT

ION

4.1

A

Com

mon

exca

vati

on

an

d s

poil

to w

ast

e or

fill

mate

rial,

cu

t 0

-3 f

t, l

ift

up

to 3

ft,

sp

read

10

0 f

t.m

3 B

-Ho

e 2

07

.00

25

4.7

5

24

2.2

5

2

36

.00

5

82

.50

71

6.5

0

6

81

.50

66

4.0

0

4

.1A

4.1

As

in R

ate

4.1

A b

ut

cut

3-5

', li

ft u

pto

5',

spre

ad

10

0'

m3

-d

o-

20

7.0

0

2

54

.75

2

42

.25

23

6.0

0

68

5.5

0

8

43

.00

80

2.0

0

7

81

.00

4.1

4.2

As

in R

ate

4.1

A b

ut

cut

5-1

0',

lift

up

to 1

0',

spre

ad

10

0'

m3

-d

o-

21

1.2

5

2

59

.75

2

47

.00

24

0.7

5

1,0

44

.00

1,2

84

.00

1

,22

1.0

0

1,1

90

.00

4

.2

4.3

As

in R

ate

4.1

A b

ut

cut1

0-1

5',

lift

up

to 1

5',

spre

ad

10

0'

m3

-d

o-

21

6.2

5

2

66

.00

2

53

.00

24

6.5

0

1,0

73

.00

1,3

20

.00

1

,25

6.0

0

1,2

24

.00

4

.3

4.4

As

in R

ate

4.1

A b

ut

cut1

5-2

0',

lift

up

to 2

0',

spre

ad

10

0'

m3

-d

o-

22

1.5

0

2

72

.50

2

59

.00

25

2.5

0

1,1

09

.00

1,3

64

.00

1

,29

7.0

0

1,2

64

.00

4

.4

4.5

As

in R

ate

4.1

A b

ut

cut

20

-25

', li

ft u

pto

25

', sp

read

10

0'

m3

B-H

oe/

Rea

r

Dum

per

29

9.2

5

3

68

.00

3

50

.00

34

1.0

0

1,1

51

.00

1,4

16

.00

1

,34

7.0

0

1,3

12

.00

4

.5

4.6

As

in R

ate

4.1

A b

ut

cut

25

-30

', li

ft u

pto

30

', sp

read

10

0'

m3

-d

o-

30

4.7

5

3

75

.00

3

56

.75

34

7.5

0

1,2

03

.00

1,4

80

.00

1

,40

8.0

0

1,3

71

.00

4

.6

4.7

As

in R

ate

4.1

A b

ut

cut

30

-35

', li

ft u

pto

35

', sp

read

10

0'

m3

-d

o-

31

1.7

5

3

83

.50

3

64

.75

35

5.5

0

1,2

37

.00

1,5

22

.00

1

,44

7.0

0

1,4

10

.00

4

.7

4.8

As

in R

ate

4.1

A b

ut

cut

35

-40

', li

ft u

pto

40

', sp

read

10

0'

m3

-d

o-

31

9.2

5

3

92

.50

3

73

.50

36

3.7

5

1,2

83

.00

1,5

78

.00

1

,50

1.0

0

1,4

62

.00

4

.8

4.9

As

in R

ate

4.1

A b

ut

cut

40

-45

', li

ft u

pto

45

', sp

read

10

0'

m3

-d

o-

33

4.5

0

4

11

.25

3

91

.25

38

1.2

5

1,3

26

.00

1,6

31

.00

1

,55

1.0

0

1,5

12

.00

4

.9

4.1

0A

s in

Rate

4.1

A b

ut

cut

45

-50

', li

ft u

pto

50

', sp

read

10

0'

m3

-d

o-

34

0.7

5

4

19

.00

3

98

.50

38

8.2

5

-

-

-

-

4.1

4.1

1A

s in

Rate

4.1

A b

ut

cut

50

-55

', li

ft u

pto

55

', sp

read

10

0'

m3

-d

o-

34

8.2

5

4

28

.50

4

07

.50

39

7.0

0

-

-

-

-

4.1

1

4.1

2A

s in

Rate

4.1

A b

ut

cut

55

-60

', li

ft u

pto

60

', sp

read

10

0'

m3

-d

o-

35

6.2

5

4

38

.25

4

17

.00

40

6.2

5

-

-

-

-

4.1

2

4.2

5 H

au

l co

mm

on

exca

vati

on

m3

Rea

r D

um

per

4

.25

4.2

6C

om

mon

exca

vati

on

an

d s

poil

to w

ast

e or

fill

mate

rial,

cu

t 0

-5 f

t, l

ift

5 f

t, h

au

l 1

/4 m

ile.

m3

Scr

aper

1

67

.50

20

6.0

0

19

6.0

0

1

91

.00

-

-

-

-

4

.26

4.2

7 A

s in

Rate

4.2

6,

bu

t h

au

l 1

/2 m

ile

m3

-d

o-

23

6.2

5

2

90

.75

2

76

.50

26

9.2

5

-

-

-

-

4.2

7

4.2

8 A

s in

Rate

4.2

6,

bu

t h

au

l 3

/4 m

ile

m3

-d

o-

30

6.2

5

3

76

.75

3

58

.25

34

9.0

0

-

-

-

-

4.2

8

4.2

9A

s in

Rate

4.2

6,

bu

t cu

t 5

-10

', li

ft 1

0',

hau

l 1

/4 m

ile

m3

-d

o-

17

1.2

5

2

10

.75

2

00

.50

19

5.2

5

-

-

-

-

4.2

9

4.3

0A

s in

Rate

4.2

6,

bu

t cu

t 5

-10

', li

ft 1

0',

hau

l 1

/2 m

ile

m3

-d

o-

24

1.7

5

2

97

.25

2

82

.75

27

5.5

0

-

-

-

-

4.3

4.3

1A

s in

Rate

4.2

6,

bu

t cu

t 5

-10

', li

ft 1

0',

hau

l 3

/4 m

ile

m3

-d

o-

31

3.2

5

3

85

.25

3

66

.50

35

7.2

5

-

-

-

-

4.3

1

4.3

2A

s in

Rate

4.2

6,

bu

t cu

t 1

0-1

5',

lift

15

', h

au

l 1

/4 m

ile

m3

-d

o-

17

5.2

5

2

15

.50

2

05

.00

19

9.7

5

-

-

-

-

4.3

2

4.3

3A

s in

Rate

4.2

6,

bu

t cu

t 1

0-1

5',

lift

15

', h

au

l 1

/2 m

ile

m3

-d

o-

24

7.5

0

3

04

.25

2

89

.50

28

2.0

0

-

-

-

-

4.3

3

4.3

4A

s in

Rate

4.2

6,

bu

t cu

t 1

0-1

5',

lift

15

', h

au

l 3

/4 m

ile

m3

-d

o-

32

0.5

0

3

94

.50

3

75

.25

36

5.5

0

-

-

-

-

4.3

4

4.3

5A

s in

Rate

4.2

6,

bu

t cu

t 1

5-2

0',

lift

20

', h

au

l 1

/4 m

ile

m3

-d

o-

17

9.5

0

2

20

.75

2

10

.00

20

4.5

0

-

-

-

-

4.3

5

4.3

6A

s in

Rate

4.2

6,

bu

t cu

t 1

5-2

0',

lift

20

', h

au

l 1

/2 m

ile

m3

-d

o-

25

3.2

5

3

11

.75

2

96

.50

28

8.7

5

-

-

-

-

4.3

6

4.3

7A

s in

Rate

4.2

6,

bu

t cu

t 1

5-2

0',

lift

20

', h

au

l 3

/4 m

ile

m3

-d

o-

32

8.2

5

4

03

.75

3

84

.25

37

4.2

5

-

-

-

-

4.3

7

As

in R

ate

3.2

5 t

o 3

.29

& R

ate

3.4

3

- 1

3 -

Page 15: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

4.3

8A

s in

Rate

4.2

6,

bu

t cu

t 2

0-2

5',

lift

25

', h

au

l 1

/4 m

ile

m3

-d

o-

18

8.2

5

2

31

.75

2

20

.25

21

4.7

5

-

-

-

-

4.3

8

4.3

9A

s in

Rate

4.2

6,

bu

t cu

t 2

0-2

5',

lift

25

', h

au

l 1

/2 m

ile

m3

-d

o-

26

5.7

5

3

26

.75

3

11

.00

30

3.0

0

-

-

-

-

4.3

9

4.4

0A

s in

Rate

4.2

6,

bu

t cu

t 2

0-2

5',

lift

25

', h

au

l 3

/4 m

ile

m3

-d

o-

34

5.0

0

4

24

.25

4

03

.50

39

3.2

5

-

-

-

-

4.4

4.4

1A

s in

Rate

4.2

6,

bu

t cu

t 2

5-3

0',

lift

30

', h

au

l 1

/4 m

ile

m3

Scr

aper

1

93

.25

23

7.5

0

22

6.0

0

2

20

.25

-

-

-

-

4

.41

4.4

2A

s in

Rate

4.2

6,

bu

t cu

t 2

5-3

0',

lift

30

', h

au

l 1

/2 m

ile

m3

-d

o-

27

2.5

0

3

35

.25

3

19

.00

31

0.7

5

-

-

-

-

4.4

2

4.4

3A

s in

Rate

4.2

6,

bu

t cu

t 2

5-3

0',

lift

30

', h

au

l 3

/4 m

ile

m3

-d

o-

35

3.7

5

4

35

.25

4

14

.00

40

3.5

0

-

-

-

-

4.4

3

4.4

4A

s in

Rate

4.2

6,

bu

t cu

t 3

0-3

5',

lift

35

', h

au

l 1

/4 m

ile

m3

-d

o-

19

5.5

0

2

40

.75

2

29

.00

22

3.0

0

-

-

-

-

4.4

4

4.4

5A

s in

Rate

4.2

6,

bu

t cu

t 3

0-3

5',

lift

35

', h

au

l 1

/2 m

ile

m3

-d

o-

27

6.5

0

3

40

.00

3

23

.50

31

5.2

5

-

-

-

-

4.4

5

4.4

6A

s in

Rate

4.2

6,

bu

t cu

t 3

0-3

5',

lift

35

', h

au

l 3

/4 m

ile

m3

-d

o-

35

8.5

0

4

41

.00

4

19

.50

40

8.7

5

-

-

-

-

4.4

6

4.4

7A

s in

Rate

4.2

6,

bu

t cu

t 3

5-4

0',

lift

40

', h

au

l 1

/4 m

ile

m3

-d

o-

20

0.7

5

2

47

.00

2

35

.00

22

9.0

0

-

-

-

-

4.4

7

4.4

8A

s in

Rate

4.2

6,

bu

t cu

t 3

5-4

0',

lift

40

', h

au

l 1

/2 m

ile

m3

-d

o-

28

3.2

5

3

48

.50

3

31

.50

32

3.0

0

-

-

-

-

4.4

8

4.4

9A

s in

Rate

4.2

6,

bu

t cu

t 3

5-4

0',

lift

40

', h

au

l 3

/4 m

ile

m3

-d

o-

36

8.2

5

4

52

.75

4

30

.75

41

9.7

5

-

-

-

-

4.4

9

4.5

0A

s in

Rate

4.2

6,

bu

t cu

t 4

0-4

5',

lift

45

0',

hau

l 1

/4 m

ile

m3

-d

o-

20

9.5

0

2

57

.75

2

45

.00

23

8.7

5

-

-

-

-

4.5

4.5

1A

s in

Rate

4.2

6,

bu

t cu

t 4

0-4

5',

lift

45

0',

hau

l 1

/2 m

ile

m3

-d

o-

29

5.5

0

3

63

.75

3

46

.00

33

7.0

0

-

-

-

-

4.5

1

4.5

2A

s in

Rate

4.2

6,

bu

t cu

t 4

0-4

5',

lift

45

0',

hau

l 3

/4 m

ile

m3

-d

o-

38

3.7

5

4

72

.00

4

49

.00

43

7.5

0

-

-

-

-

4.5

2

4.5

3A

s in

Rate

4.2

6,

bu

t cu

t 4

5-5

0',

lift

50

', h

au

l 1

/4 m

ile

m3

-d

o-

21

2.2

5

2

61

.25

2

48

.50

24

2.0

0

-

-

-

-

4.5

3

4.5

4A

s in

Rate

4.2

6,

bu

t cu

t 4

5-5

0',

lift

50

', h

au

l 1

/2 m

ile

m3

-d

o-

29

9.5

0

3

68

.50

3

50

.50

34

1.5

0

-

-

-

-

4.5

4

4.5

5A

s in

Rate

4.2

6,

bu

t cu

t 4

5-5

0',

lift

50

', h

au

l 3

/4 m

ile

m3

-d

o-

38

9.2

5

4

78

.75

4

55

.25

44

3.7

5

-

-

-

-

4.5

5

(5

) G

RA

VE

L E

XC

AV

AT

ION

5.1

A

Gra

vel

exca

vati

on

an

d s

poil

to w

ast

e or

use

as

con

stru

ctio

n m

ate

rial,

cut

0-3

ft,

lif

t u

pto

5

ft,

sp

read

10

0 f

t.m

3 B

-Ho

e 2

15

.25

26

4.7

5

25

1.7

5

2

45

.25

5

82

.50

71

6.5

0

6

81

.50

66

4.0

0

5

.1A

5.1

As

in R

ate

Nu

mb

er 5

.1A

bu

t cu

t 3

-5',

lift

up

to 5

', sp

read

10

0'

m3

-d

o-

21

5.2

5

2

64

.75

2

51

.75

24

5.2

5

68

5.5

0

8

43

.00

80

2.0

0

7

81

.00

5.1

5.2

As

in R

ate

Nu

mb

er 5

.1A

bu

t cu

t 5

-10

', li

ft u

pto

10

', sp

read

10

0'

m3

-d

o-

21

9.0

0

2

69

.50

2

56

.25

24

9.7

5

1,0

44

.00

1,2

84

.00

1

,22

1.0

0

1,1

90

.00

5

.2

5.3

As

in R

ate

Nu

mb

er 5

.1A

bu

t cu

t 1

0-1

5',

lift

up

to 1

5',

spre

ad

10

0'

m3

-d

o-

22

3.7

5

2

75

.25

2

61

.75

25

5.0

0

1,0

73

.00

1,3

20

.00

1

,25

6.0

0

1,2

24

.00

5

.3

5.4

As

in R

ate

Nu

mb

er 5

.1A

bu

t cu

t 1

5-2

0',

lift

up

to 2

0',

spre

ad

10

0'

m3

-d

o-

22

8.0

0

2

80

.50

2

67

.00

26

0.0

0

1,1

09

.00

1,3

64

.00

1

,29

7.0

0

1,2

64

.00

5

.4

5.5

As

in R

ate

Nu

mb

er 5

.1A

bu

t cu

t 2

0-2

5',

lift

up

to 2

5',

spre

ad

10

0'

m3

-d

o-

30

8.5

0

3

79

.25

3

60

.75

35

1.5

0

1,1

51

.00

1,4

16

.00

1

,34

7.0

0

1,3

12

.00

5

.5

5.6

As

in R

ate

Nu

mb

er 5

.1A

bu

t cu

t 2

5-3

0',

lift

up

to 3

0',

spre

ad

10

0'

m3

-d

o-

31

3.7

5

3

86

.00

3

67

.00

35

7.7

5

1,2

03

.00

1,4

80

.00

1

,40

8.0

0

1,3

71

.00

5

.6

5.7

As

in R

ate

Nu

mb

er 5

.1A

bu

t cu

t 3

0-3

5',

lift

up

to 3

5',

spre

ad

10

0'

m3

-d

o-

32

0.2

5

3

94

.00

3

74

.75

36

5.2

5

1,2

37

.00

1,5

22

.00

1

,44

7.0

0

1,4

10

.00

5

.7

5.8

As

in R

ate

Nu

mb

er 5

.1A

bu

t cu

t 3

5-4

0',

lift

up

to 4

0',

spre

ad

10

0'

m3

-d

o-

32

6.7

5

4

02

.00

3

82

.25

37

2.5

0

1,2

83

.00

1,5

78

.00

1

,50

1.0

0

1,4

62

.00

5

.8

5.9

As

in R

ate

Nu

mb

er 5

.1A

bu

t cu

t 4

0-4

5',

lift

up

to 4

5',

spre

ad

10

0'

m3

-d

o-

34

4.5

0

4

23

.75

4

03

.00

39

2.7

5

1,3

26

.00

1,6

31

.00

1

,55

1.0

0

1,5

12

.00

5

.9

5.1

0A

s in

Rate

Nu

mb

er 5

.1A

bu

t cu

t 4

5-5

0',

lift

up

to 5

0',

spre

ad

10

0'

m3

-d

o-

35

0.2

5

4

31

.00

4

10

.00

39

9.5

0

-

-

-

-

5.1

5.1

1A

s in

Rate

Nu

mb

er 5

.1A

bu

t cu

t 5

0-5

5',

lift

up

to 5

5',

spre

ad

10

0'

m3

-d

o-

35

7.7

5

4

40

.00

4

18

.50

40

7.7

5

-

-

-

-

5.1

1

- 1

4 -

Page 16: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

5.1

2A

s in

Rate

Nu

mb

er 5

.1A

bu

t cu

t 5

5-6

0',

lift

up

to 6

0',

spre

ad

10

0'

m3

-d

o-

36

4.5

0

4

48

.50

4

26

.75

41

5.7

5

-

-

-

-

5.1

2

5.1

3 H

au

l G

ravel

Rea

r D

um

per

5

.13

(6

) S

OF

T R

OC

K E

XC

AV

AT

ION

6.1

Soft

rock

exca

vati

on

& s

poil

to w

ast

e, c

ut

0-5

', li

ft u

pto

5',

spre

ad

10

0'

m3

B-H

oe

31

6.5

0

3

89

.25

3

70

.25

36

0.7

5

1,0

59

.00

1,3

03

.00

1

,23

9.0

0

1,2

07

.00

6

.1

6.2

As

in R

ate

Nu

mb

er 6

.1 b

ut

cut

05

-10

', li

ft u

pto

10

', sp

read

10

0'

m3

-d

o-

32

1.7

5

3

96

.00

3

76

.50

36

7.0

0

1,4

18

.00

1,7

44

.00

1

,65

9.0

0

1,6

16

.00

6

.2

6.3

As

in R

ate

Nu

mb

er 6

.1 b

ut

cut

10

-15

', li

ft u

pto

15

', sp

read

10

0'

m3

-d

o-

32

7.5

0

4

02

.75

3

83

.00

37

3.2

5

1,4

47

.00

1,7

80

.00

1

,69

4.0

0

1,6

50

.00

6

.3

6.4

As

in R

ate

Nu

mb

er 6

.1 b

ut

cut

15

-20

', li

ft u

pto

20

', sp

read

10

0'

m3

-d

o-

33

3.7

5

4

10

.50

3

90

.50

38

0.5

0

1,4

83

.00

1,8

24

.00

1

,73

5.0

0

1,6

90

.00

6

.4

6.5

As

in R

ate

Nu

mb

er 6

.1 b

ut

cut

20

-25

', li

ft u

pto

25

', sp

read

10

0'

m3

B-H

oe/

Rea

r

Dum

per

42

4.0

0

5

21

.50

4

96

.25

48

3.5

0

1,5

25

.00

1,8

76

.00

1

,78

4.0

0

1,7

39

.00

6

.5

6.6

As

in R

ate

Nu

mb

er 6

.1 b

ut

cut

25

-30

', li

ft u

pto

30

', sp

read

10

0'

m3

-d

o-

43

1.2

5

5

30

.50

5

04

.50

49

1.7

5

1,5

77

.00

1,9

40

.00

1

,84

5.0

0

1,7

98

.00

6

.6

6.7

As

in R

ate

Nu

mb

er 6

.1 b

ut

cut

30

-35

', li

ft u

pto

35

', sp

read

10

0'

m3

-d

o-

43

9.0

0

5

39

.50

5

13

.50

50

0.0

0

1,6

11

.00

1,9

82

.00

1

,88

5.0

0

1,8

37

.00

6

.7

6.8

As

in R

ate

Nu

mb

er 6

.1 b

ut

cut

35

-40

', li

ft u

pto

40

', sp

read

10

0'

m3

-d

o-

44

7.5

0

5

50

.50

5

23

.50

51

0.0

0

1,6

57

.00

2,0

38

.00

1

,93

8.0

0

1,8

89

.00

6

.8

6.9

As

in R

ate

Nu

mb

er 6

.1 b

ut

cut

40

-45

', li

ft u

pto

45

', sp

read

10

0'

m3

-d

o-

47

1.0

0

5

79

.50

5

51

.00

53

7.0

0

1,7

00

.00

2,0

91

.00

1

,98

9.0

0

1,9

38

.00

6

.9

6.1

0A

s in

Rate

Nu

mb

er 6

.1 b

ut

cut

45

-50

', li

ft u

pto

50

', sp

read

10

0'

m3

-d

o-

47

9.0

0

5

89

.00

5

60

.00

54

6.0

0

-

-

-

-

6.1

6.1

1A

s in

Rate

Nu

mb

er 6

.1 b

ut

cut

50

-55

', li

ft u

pto

55

', sp

read

10

0'

m3

-d

o-

48

7.2

5

5

99

.50

5

70

.00

55

5.5

0

-

-

-

-

6.1

1

6.1

2A

s in

Rate

Nu

mb

er 6

.1 b

ut

cut

55

-60

', li

ft u

pto

60

', sp

read

10

0'

m3

-d

o-

49

6.7

5

6

11

.00

5

81

.00

56

6.0

0

-

-

-

-

6.1

2

6.1

3 H

au

l so

ft r

ock

m3

Rea

r D

um

per

6

.13

(7

) R

OC

K E

XC

AV

AT

ION

7.1

Rock

exca

vati

on

an

d s

poil

to w

ast

e/qu

arr

y p

rod

uct

s, c

ut

0-5

ft,

lif

t

up

to 5

ft.

m3

{A

ir C

om

pre

sso

r+

Jack

Ham

er+

Do

zer+

FE

L}

96

8.5

0

1

,19

1.0

0

1,1

33

.00

1

,10

4.0

0

1,5

92

.00

1,9

58

.00

1

,86

2.0

0

1,8

14

.00

7

.1

7.2

-d

o-

m3

-d

o-

69

1.5

0

8

51

.00

8

09

.50

78

8.5

0

1,1

37

.00

1,3

98

.00

1

,33

0.0

0

1,2

96

.00

7

.2

7.3

Ad

dit

ion

al

rate

for

cut

5-1

0',

lift

up

to 1

0'

m3

{-d

o-

+ R

ear

Dum

per

}

38

.85

4

7.8

0

4

5.5

0

44

.30

35

8.5

0

4

41

.00

41

9.5

0

4

08

.75

7.3

7.4

Ad

dit

ion

al

rate

for

cut

10

-15

', li

ft u

pto

15

'm

3 -

do

- 4

2.6

5

52

.50

49

.95

4

8.6

5

3

88

.25

47

7.7

5

4

54

.25

44

2.7

5

7

.4

7.5

Ad

dit

ion

al

rate

for

cut

15

-20

', li

ft u

pto

20

'm

3 -

do

- 4

5.8

0

56

.35

53

.60

5

2.2

5

4

23

.75

52

1.0

0

4

95

.75

48

3.0

0

7

.5

7.6

Ad

dit

ion

al

rate

for

cut

20

-25

', li

ft u

pto

25

'm

3 -

do

- 4

8.8

5

60

.05

57

.15

5

5.7

0

4

66

.00

57

3.0

0

5

45

.00

53

1.0

0

7

.6

7.7

Ad

dit

ion

al

rate

for

cut

25

-30

', li

ft u

pto

30

'm

3 -

do

- 5

1.8

0

63

.75

60

.65

5

9.0

5

5

17

.50

63

7.0

0

6

05

.50

59

0.0

0

7

.7

7.8

Ad

dit

ion

al

rate

for

cut

30

-35

', li

ft u

pto

35

'm

3 -

do

- 5

4.4

0

66

.90

63

.65

6

2.0

0

5

52

.00

67

8.5

0

6

45

.50

62

9.0

0

7

.8

As

in R

ate

Nos.

3.2

5 t

o 3

.29

& 3

.43

As

in R

ate

Nos.

3.2

5 t

o 3

.29

& R

N 3

.43

- 1

5 -

Page 17: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

7.9

Ad

dit

ion

al

rate

for

cut

35

-40

', li

ft u

pto

40

'm

3 -

do

- 5

7.1

5

70

.30

66

.85

6

5.1

5

5

97

.50

73

5.0

0

6

99

.00

68

1.0

0

7

.9

7.1

0A

dd

itio

nal

rate

for

cut

40

-45

', li

ft u

pto

45

'm

3 -

do

- 5

9.5

5

73

.20

69

.65

6

7.8

5

6

40

.50

78

8.0

0

7

49

.50

73

0.5

0

7

.1

7.1

1A

dd

itio

nal

rate

for

cut

45

-50

', li

ft u

pto

50

'm

3 -

do

- 6

1.7

0

75

.90

72

.20

7

0.3

5

-

-

-

-

7

.11

7.1

2A

dd

itio

nal

rate

for

cut

50

-55

', li

ft u

pto

55

'm

3 -

do

- 6

3.9

0

78

.60

74

.80

7

2.8

5

-

-

-

-

7

.12

7.1

3A

dd

itio

nal

rate

for

cut

55

-60

', li

ft u

pto

60

'm

3 -

do

- 6

6.0

0

81

.20

77

.25

7

5.2

5

-

-

-

-

7

.13

7.1

4H

au

l ro

ck 1

/4 m

ile

m3

Rea

r D

um

per

1

87

.75

23

0.7

5

21

9.5

0

2

14

.00

-

-

-

-

7

.14

7.1

5H

au

l ro

ck 1

/2 m

ile

m3

Rea

r D

um

per

2

02

.00

24

8.5

0

23

6.2

5

2

30

.25

-

-

-

-

7

.15

7.1

6H

au

l ro

ck 3

/4 m

ile

m3

Rea

r D

um

per

2

16

.25

26

6.2

5

25

3.2

5

2

46

.75

-

-

-

-

7

.16

7.1

7H

au

l ro

ck 1

mil

em

3 R

ear

Dum

per

2

30

.75

28

3.7

5

27

0.0

0

2

63

.00

-

-

-

-

7

.17

7.1

7A

Hau

l ro

ck 1

1/4

mil

em

3 R

ear

Dum

per

2

45

.00

30

1.5

0

28

6.7

5

2

79

.50

-

-

-

-

7

.17

A

7.1

8H

au

l ro

ck 1

1/2

mil

em

3 R

ear

Dum

per

2

59

.50

31

9.2

5

30

3.5

0

2

95

.75

-

-

-

-

7

.18

7.1

8A

Hau

l ro

ck 1

3/4

mil

em

3 R

ear

Dum

per

2

73

.75

33

6.7

5

32

0.5

0

3

12

.25

-

-

-

-

7

.18

A

7.1

9H

au

l ro

ck 2

mil

em

3 R

ear

Dum

per

2

88

.25

35

4.5

0

33

7.2

5

3

28

.50

-

-

-

-

7

.19

7.2

0 H

au

l r

ock

10

0 f

t i

n e

ach

ste

p u

pto

maxim

um

of

30

0 f

tm

3

-

-

-

-

1

29

.25

15

9.2

5

1

51

.25

14

7.5

0

7

.2

(8

) E

AR

TH

FIL

L I

N E

MB

AN

KM

EN

TS

AN

D A

RO

UN

D

ST

RU

CT

UR

ES

8.1

Str

ipp

ing t

op

soil

, h

au

l 1

/4 m

ile

m3

Scr

aper

1

51

.25

18

6.2

5

17

7.0

0

1

72

.50

-

-

-

-

8

.1

8.2

Str

ipp

ing t

op

soil

, h

au

l 1

/2 m

ile

m3

-d

o-

21

3.7

5

2

62

.75

2

50

.00

24

3.7

5

-

-

-

-

8.2

8.3

Str

ipp

ing t

op

soil

, h

au

l 3

/4 m

ile

m3

-d

o-

27

7.0

0

3

40

.50

3

24

.00

31

5.7

5

-

-

-

-

8.3

8.4

Str

ipp

ing t

op

soil

, h

au

l 1

mil

em

3 -

do

- 3

28

.75

40

4.2

5

38

4.5

0

3

74

.75

-

-

-

-

8

.4

8.5

Str

ipp

ing t

op

soil

, h

au

l 1

00

ft.

m3

-

-

-

-

-

5

17

.50

63

7.0

0

6

05

.50

59

0.0

0

8

.5

8.6

Borr

ow

eart

h f

rom

borr

ow

are

as,

cu

t 0

-10

' lif

t u

pto

10

', h

au

l 1

/4

mil

em

3

Scr

aper

1

66

.50

20

4.7

5

19

4.7

5

1

89

.75

-

-

-

-

8

.6

8.7

Borr

ow

eart

h f

rom

borr

ow

are

as,

cu

t 0

-10

' lif

t u

pto

10

', h

au

l 1

/2

mil

em

3 -

do

- 2

34

.75

28

9.0

0

27

4.7

5

2

67

.75

-

-

-

-

8

.7

8.8

Borr

ow

eart

h f

rom

borr

ow

are

as,

cu

t 0

-10

' lif

t u

pto

10

', h

au

l 3

/4

mil

e.m

3 -

do

- 3

05

.00

37

5.0

0

35

6.7

5

3

47

.50

-

-

-

-

8

.8

8.9

Borr

ow

eart

h f

rom

borr

ow

are

as,

cu

t 0

-10

' lif

t u

pto

10

', h

au

l 1

mil

e.m

3 -

do

- 3

61

.75

44

5.0

0

42

3.2

5

4

12

.50

-

-

-

-

8

.9

8.1

0B

orr

ow

eart

h f

rom

borr

ow

are

as,

cu

t 0

-10

' lif

t u

pto

10

', h

au

l 1

1/4

mil

e.m

3 S

tone

Cru

sher

/B-

Ho

e+R

ear

Dum

per

32

6.5

0

4

01

.50

3

82

.00

37

2.2

5

-

-

-

-

8.1

- 1

6 -

Page 18: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

8.1

1B

orr

ow

eart

h f

rom

borr

ow

are

as,

cu

t 0

-10

' lif

t u

pto

10

', h

au

l 1

1/2

mil

e.m

3

B-H

oe

+ R

ear

Dum

per

34

3.5

0

4

22

.50

4

01

.75

39

1.5

0

-

-

-

-

8.1

1

8.1

1A

Borr

ow

eart

h f

rom

borr

ow

are

as,

cu

t 0

-10

' lif

t u

pto

10

', h

au

l 1

3/4

mil

e.m

3

B-H

oe

+ R

ear

Dum

per

38

6.5

0

4

75

.25

4

52

.00

44

0.5

0

-

-

-

-

8.1

1A

8.1

2B

orr

ow

eart

h f

rom

borr

ow

are

as,

cu

t 0

-10

' lif

t u

pto

10

', h

au

l 2

mil

e.m

3 -

do

- 3

60

.50

44

3.2

5

42

1.7

5

4

10

.75

-

-

-

-

8

.12

8.1

3B

orr

ow

eart

h f

rom

borr

ow

are

as,

cu

t 0

-5 f

t, l

ift

up

to 5

ft,

hau

l 2

00

ft.

m3

-

-

-

-

-

58

2.5

0

7

16

.50

68

1.5

0

6

64

.00

8.1

3

8.1

4B

orr

ow

eart

h f

rom

Sp

oil

Du

mp

, cu

t 0

-10

' lif

t u

pto

10

', h

au

l 1

/4 m

ile.

m3

S

crap

er

14

4.7

5

1

78

.00

1

69

.25

16

5.0

0

-

-

-

-

8.1

4

8.1

5B

orr

ow

eart

h f

rom

Sp

oil

Du

mp

, cu

t 0

-10

' lif

t u

pto

10

', h

au

l 1

/2 m

ile.

m3

-d

o-

20

4.2

5

2

51

.25

2

39

.00

23

3.0

0

-

-

-

-

8.1

5

8.1

6B

orr

ow

eart

h f

rom

Sp

oil

Du

mp

, cu

t 0

-10

' lif

t u

pto

10

', h

au

l 3

/4

mil

e.m

3 -

do

- 2

64

.75

32

5.7

5

31

0.0

0

3

02

.00

-

-

-

-

8

.16

8.1

7B

orr

ow

eart

h f

rom

Sp

oil

Du

mp

, cu

t 0

-10

' lif

t u

pto

10

', h

au

l 1

mil

e.m

3 -

do

- 3

14

.50

38

7.0

0

36

8.0

0

3

58

.50

-

-

-

-

8

.17

8.1

8B

orr

ow

eart

h f

rom

Sp

oil

Du

mp

, cu

t 0

- 5

ft,

lif

t u

pto

5 f

t, h

au

l 2

00

ft.

m3

-

-

-

-

-

49

5.7

5

6

09

.50

58

0.0

0

5

65

.00

8.1

8

8.1

9P

laci

ng &

com

pact

ing e

art

h i

n d

am

in

clu

din

g w

ate

rin

g (

wate

r h

au

l

1.5

mil

e)m

3 S

hee

p F

oo

t R

oll

er +

Wat

er B

ow

ser

12

8.0

0

1

57

.50

1

49

.75

14

5.7

5

25

6.0

0

3

15

.00

29

9.5

0

2

92

.00

8.1

9

8.2

0P

laci

ng &

com

pact

ing e

art

h i

n c

an

al/

back

fill

in

clu

din

g w

ate

rin

g

(wate

r h

au

l 1

.5 m

ile)

m3

-d

o-

10

0.5

0

1

23

.75

1

17

.75

11

4.7

5

20

5.7

5

2

53

.00

24

0.7

5

2

34

.50

8.2

8.2

1P

laci

ng &

com

pact

ing e

art

h i

n c

an

al/

back

fill

excl

ud

ing w

ate

rin

g.

m3

Shee

p F

oo

t R

oll

er

76

.60

9

4.2

0

8

9.6

0

87

.30

13

2.7

5

1

63

.25

15

5.2

5

1

51

.25

8.2

1

8.2

2P

laci

ng &

com

pact

ing e

art

h i

n l

an

dfi

ll e

xcl

ud

ing w

ate

rin

g.

m3

-d

o-

48

.15

5

9.2

5

5

6.3

5

54

.90

-

-

-

8.2

2

(9

) Q

UA

RR

YIN

G S

AN

D,

GR

AV

EL

9.1

Qu

arr

yin

g n

atu

ral

river

/pit

san

d,

cut

0-5

'.m

3 B

-Ho

e

1

41

.25

17

3.5

0

16

5.2

5

1

61

.00

1

41

.25

17

3.5

0

1

65

.25

16

1.0

0

9

.1

9.2

Qu

arr

yin

g g

ravel

, cu

t 0

-5'

m3

B-H

oe

40

3.7

5

4

96

.75

4

72

.50

46

0.2

5

40

3.7

5

4

96

.75

47

2.5

0

4

60

.25

9.2

(1

0)

PR

OD

UC

TIO

N O

F R

IP-R

AP

, R

UB

BL

E A

ND

ME

TA

L

INC

LU

DIN

G R

OC

K B

LA

ST

ING

10

.1R

ock

bla

stin

g &

pro

du

ctio

n o

f 1

8"

size

rip

-rap

.m

3 {

Air

Co

mp

ress

or+

Jack

Ham

mer

+

Man

ual

}

1,3

09

.00

1

,61

0.0

0

1,5

31

.00

1

,49

2.0

0

1,3

09

.00

1,6

10

.00

1

,53

1.0

0

1,4

92

.00

1

0.1

10

.2R

ock

bla

stin

g &

pro

du

ctio

n o

f 1

2"

size

rip

-rap

.m

3 -

do

- 1

,58

8.0

0

1,9

54

.00

1

,85

9.0

0

1,8

11

.00

1

,58

8.0

0

1

,95

4.0

0

1,8

59

.00

1

,81

1.0

0

10

.2

- 1

7 -

Page 19: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

10

.3R

ock

bla

stin

g &

pro

du

ctio

n o

f 6

-9"

size

rip

-rap

/ru

bb

le.

m3

-d

o-

1,8

91

.00

2

,32

7.0

0

2,2

13

.00

2

,15

6.0

0

1,8

91

.00

2,3

27

.00

2

,21

3.0

0

2,1

56

.00

1

0.3

10

.3A

R

ock

bla

stin

g &

pro

du

ctio

n o

f 4

" m

etal.

m3

{A

ir C

om

pre

sso

r+

Jack

Ham

mer

+

Sto

ne

Cru

sher

}

2,0

08

.00

2

,47

0.0

0

2,3

49

.00

2

,28

9.0

0

2,0

08

.00

2,4

70

.00

2

,34

9.0

0

2,2

89

.00

1

0.3

A

10

.4R

ock

bla

stin

g &

pro

du

ctio

n o

f 2

" m

etal.

m3

-d

o-

2,6

84

.00

3

,30

2.0

0

3,1

41

.00

3

,06

0.0

0

2,6

84

.00

3,3

02

.00

3

,14

1.0

0

3,0

60

.00

1

0.4

10

.5R

ock

bla

stin

g &

pro

du

ctio

n o

f 1

.5"

met

al.

m3

-d

o-

2,8

77

.00

3

,53

9.0

0

3,3

66

.00

3

,28

0.0

0

2,8

77

.00

3,5

39

.00

3

,36

6.0

0

3,2

80

.00

1

0.5

10

.6R

ock

bla

stin

g &

pro

du

ctio

n o

f 1

" m

etal.

m3

-d

o-

3,2

05

.00

3

,94

2.0

0

3,7

50

.00

3

,65

4.0

0

3,2

05

.00

3,9

42

.00

3

,75

0.0

0

3,6

54

.00

1

0.6

10

.7R

ock

bla

stin

g &

pro

du

ctio

n o

f 3

/4"

met

al.

m3

-d

o-

3,5

14

.00

4

,32

2.0

0

4,1

11

.00

4

,00

6.0

0

3,5

14

.00

4,3

22

.00

4

,11

1.0

0

4,0

06

.00

1

0.7

10

.8R

ock

bla

stin

g &

pro

du

ctio

n o

f 1

/2"

met

al

m3

-d

o-

4,0

54

.00

4

,98

7.0

0

4,7

43

.00

4

,62

2.0

0

4,0

54

.00

4,9

87

.00

4

,74

3.0

0

4,6

22

.00

1

0.8

(11

) F

ILT

ER

S F

OR

DA

M E

MB

AN

KM

EN

TS

11

.1F

urn

ish

ing,

pla

cin

g &

com

pact

ing s

an

d i

n f

ilte

rs e

xcl

ud

ing h

au

l.m

3

B-H

oe

+ C

T

1,7

25

.00

2

,12

2.0

0

2,0

18

.00

1

,96

7.0

0

29

3.7

5

3

61

.50

34

3.7

5

3

35

.00

11

.1

11

.2F

urn

ish

ing,

pla

cin

g &

com

pact

ing

1/2

" m

etal

in f

ilte

rs e

xcl

ud

ing

hau

l.m

3 {

Air

Co

mp

ress

or

+Ja

ck H

amm

er+

CT

+ M

anual

}

4,3

27

.00

5

,32

2.0

0

5,0

62

.00

4

,93

3.0

0

4,4

43

.00

5,4

65

.00

5

,19

9.0

0

5,0

65

.00

1

1.2

11

.3F

urn

ish

ing,

pla

cin

g &

com

pact

ing

3/4

" m

etal

in f

ilte

rs e

xcl

ud

ing

hau

l.m

3 -

do

- 3

,75

9.0

0

4,6

24

.00

4

,39

9.0

0

4,2

86

.00

3

,87

6.0

0

4

,76

8.0

0

4,5

35

.00

4

,41

9.0

0

11

.3

11

.4F

urn

ish

ing,

pla

cin

g &

com

pact

ing

1 1

/2"

met

al

in f

ilte

rs e

xcl

ud

ing

hau

l.m

3 -

do

- 3

,09

1.0

0

3,8

02

.00

3

,61

7.0

0

3,5

24

.00

3

,20

7.0

0

3

,94

5.0

0

3,7

53

.00

3

,65

7.0

0

11

.4

11

.5F

urn

ish

ing,

pla

cin

g &

com

pact

ing 6

-9"

rub

ble

in

fil

ters

/toe

dra

ins,

excl

ud

ing h

au

l.m

3 -

do

- 2

,05

6.0

0

2,5

29

.00

2

,40

6.0

0

2,3

44

.00

2

,17

3.0

0

2

,67

2.0

0

2,5

42

.00

2

,47

7.0

0

11

.5

11

.6H

au

l sa

nd

for

filt

er,

0.5

mil

e in

clu

din

g l

oad

ing.

m3

Tra

cto

r T

rail

er

25

6.7

5

3

16

.00

3

00

.50

29

2.7

5

-

-

-

-

11

.6

11

.7H

au

l sa

nd

for

filt

er,

1 m

ile

incl

ud

ing l

oad

ing.

m3

Tra

cto

r T

rail

er

33

6.7

5

4

14

.25

3

94

.00

38

3.7

5

-

-

-

-

11

.7

11

.8H

au

l sa

nd

for

filt

er,

1.5

mil

e in

clu

din

g l

oad

ing.

m3

Tra

cto

r T

rail

er

41

6.5

0

5

12

.50

4

87

.50

47

5.0

0

-

-

-

-

11

.8

11

.9H

au

l sa

nd

for

filt

er,

2 m

ile

incl

ud

ing l

oad

ing.

m3

Tra

cto

r T

rail

er

49

6.5

0

6

10

.50

5

81

.00

56

6.0

0

-

-

-

-

11

.9

11

.10

Hau

l sa

nd

for

filt

er,

2.5

mil

e in

clu

din

g l

oad

ing.

m3

Tra

cto

r T

rail

er

57

6.0

0

7

09

.00

6

74

.00

65

7.0

0

-

-

-

-

11

.1

11

.11

Hau

l sa

nd

for

filt

er,

3 m

ile

incl

ud

ing l

oad

ing.

m3

Tra

cto

r T

rail

er

65

6.0

0

8

07

.00

7

67

.50

74

8.0

0

-

-

-

-

11

.11

11

.12

Hau

l sa

nd

for

filt

er,

3.5

mil

e in

clu

din

g l

oad

ing.

m3

Tra

cto

r T

rail

er

73

6.0

0

9

05

.50

8

61

.00

83

9.0

0

-

-

-

-

11

.12

11

.13

Hau

l sa

nd

for

filt

er,

4 m

ile

incl

ud

ing l

oad

ing.

m3

Tra

cto

r T

rail

er

81

6.0

0

1

,00

3.0

0

95

4.5

0

9

30

.00

-

-

-

-

1

1.1

3

11

.14

Hau

l sa

nd

for

filt

er,

4.5

mil

e in

clu

din

g l

oad

ing.

m3

Tra

cto

r T

rail

er

89

5.5

0

1

,10

2.0

0

1,0

48

.00

1

,02

1.0

0

-

-

-

-

11

.14

11

.15

Hau

l sa

nd

for

filt

er,

5 m

ile

incl

ud

ing l

oad

ing.

m3

Tra

cto

r T

rail

er

97

5.5

0

1

,20

0.0

0

1,1

41

.00

1

,11

2.0

0

-

-

-

-

11

.15

- 1

8 -

Page 20: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

11

.6A

As

in R

ate

Nu

mb

er 1

1.6

m3

Rea

r D

um

per

1

30

.75

16

0.7

5

15

3.0

0

1

49

.00

-

-

-

-

1

1.6

A

11

.7A

A

s in

Rate

Nu

mb

er 1

1.7

m3

Rea

r D

um

per

1

55

.25

19

0.7

5

18

1.5

0

1

76

.75

-

-

-

-

1

1.7

A

11

.8A

A

s in

Rate

Nu

mb

er 1

1.8

m3

Rea

r D

um

per

1

79

.50

22

1.0

0

21

0.0

0

2

04

.75

-

-

-

-

1

1.8

A

11

.9A

A

s in

Rate

Nu

mb

er 1

1.9

m3

Rea

r D

um

per

2

04

.00

25

1.0

0

23

8.7

5

2

32

.50

-

-

-

-

1

1.9

A

11

.10

A A

s in

Rate

Nu

mb

er 1

1.1

0m

3 R

ear

Dum

per

2

28

.50

28

1.0

0

26

7.2

5

2

60

.50

-

-

-

-

1

1.1

0A

11

.11

A A

s in

Rate

Nu

mb

er 1

1.1

1m

3 R

ear

Dum

per

2

53

.00

31

1.0

0

29

6.0

0

2

88

.25

-

-

-

-

1

1.1

1A

11

.12

A A

s in

Rate

Nu

mb

er 1

1.1

2m

3 R

ear

Dum

per

2

77

.25

34

1.2

5

32

4.5

0

3

16

.25

-

-

-

-

1

1.1

2A

11

.13

A A

s in

Rate

Nu

mb

er 1

1.1

3m

3 R

ear

Dum

per

3

01

.75

37

1.2

5

35

3.2

5

3

44

.00

-

-

-

-

1

1.1

3A

11

.14

AA

s in

Rate

Nu

mb

er 1

1.1

4m

3 R

ear

Dum

per

3

26

.25

40

1.2

5

38

1.7

5

3

72

.00

-

-

-

-

1

1.1

4A

11

.15

AA

s in

Rate

Nu

mb

er 1

1.1

5m

3 R

ear

Dum

per

3

50

.75

43

1.5

0

41

0.2

5

3

99

.75

-

-

-

-

1

1.1

5A

11

.16

Hau

l m

etal/

rub

ble

/rip

-rap

for

filt

er,

0.5

mil

e in

clu

din

g l

oad

ing

m3

Tra

cto

r T

rail

er

29

9.7

5

3

68

.50

3

50

.75

34

1.7

5

-

-

-

-

11

.16

11

.17

Hau

l m

etal/

rub

ble

/rip

-rap

for

filt

er,

1 m

ile

incl

ud

ing l

oad

ing

m3

Tra

cto

r T

rail

er

39

2.7

5

4

83

.25

4

59

.75

44

7.7

5

-

-

-

-

11

.17

11

.18

Hau

l m

etal/

rub

ble

/rip

-rap

for

filt

er,

1.5

mil

e in

clu

din

g l

oad

ing

m3

Tra

cto

r T

rail

er

48

6.0

0

5

97

.50

5

68

.50

55

4.0

0

-

-

-

-

11

.18

11

.19

Hau

l m

etal/

rub

ble

/rip

-rap

for

filt

er,

2 m

ile

incl

ud

ing l

oad

ing

m3

Tra

cto

r T

rail

er

57

9.0

0

7

12

.50

6

77

.50

66

0.0

0

-

-

-

-

11

.19

11

.20

Hau

l m

etal/

rub

ble

/rip

-rap

for

filt

er,

2.5

mil

e in

clu

din

g l

oad

ing

m3

Tra

cto

r T

rail

er

67

2.5

0

8

27

.00

7

86

.50

76

6.5

0

-

-

-

-

11

.20

11

.21

Hau

l m

etal/

rub

ble

/rip

-rap

for

filt

er,

3.0

mil

e in

clu

din

g l

oad

ing

m3

Tra

cto

r T

rail

er

76

5.5

0

9

41

.50

8

95

.50

87

2.5

0

-

-

-

-

11

.21

11

.22

Hau

l m

etal/

rub

ble

/rip

-rap

for

filt

er,

3.5

mil

e in

clu

din

g l

oad

ing

m3

Tra

cto

r T

rail

er

85

8.5

0

1

,05

6.0

0

1,0

04

.00

9

79

.00

-

-

-

-

1

1.2

2

11

.23

Hau

l m

etal/

rub

ble

/rip

-rap

for

filt

er,

4.0

mil

e in

clu

din

g l

oad

ing

m3

Tra

cto

r T

rail

er

95

2.0

0

1

,17

1.0

0

1,1

13

.00

1

,08

5.0

0

-

-

-

-

11

.23

11

.24

Hau

l m

etal/

rub

ble

/rip

-rap

for

filt

er,

4.5

mil

e in

clu

din

g l

oad

ing

m3

Tra

cto

r T

rail

er

1,0

45

.00

1

,28

5.0

0

1,2

22

.00

1

,19

1.0

0

-

-

-

-

11

.24

11

.25

Hau

l m

etal/

rub

ble

/rip

-rap

for

filt

er,

5.0

mil

e in

clu

din

g L

oad

ing

m3

Tra

cto

r T

rail

er

1,1

38

.00

1

,40

0.0

0

1,3

31

.00

1

,29

7.0

0

-

-

-

-

11

.25

11

.16

AA

s in

Rate

Nu

mb

er 1

1.1

6m

3 R

ear

Dum

per

1

78

.25

21

9.2

5

20

8.5

0

2

03

.00

-

-

-

-

1

1.1

6A

11

.17

AA

s in

Rate

Nu

mb

er 1

1.1

7m

3 R

ear

Dum

per

2

03

.75

25

0.7

5

23

8.5

0

2

32

.25

-

-

-

-

1

1.1

7A

11

.18

AA

s in

Rate

Nu

mb

er 1

1.1

8m

3 R

ear

Dum

per

2

29

.50

28

2.2

5

26

8.5

0

2

61

.75

-

-

-

-

1

1.1

8A

11

.19

AA

s in

Rate

Nu

mb

er 1

1.1

9m

3 R

ear

Dum

per

2

55

.25

31

3.7

5

29

8.5

0

2

91

.00

-

-

-

-

1

1.1

9A

11

.20

AA

s in

Rate

Nu

mb

er 1

1.2

0m

3 R

ear

Dum

per

2

80

.75

34

5.5

0

32

8.5

0

3

20

.25

-

-

-

-

1

1.2

0A

11

.21

AA

s in

Rate

Nu

mb

er 1

1.2

1m

3 R

ear

Dum

per

3

06

.50

37

7.0

0

35

8.5

0

3

49

.50

-

-

-

-

1

1.2

1A

11

.22

AA

s in

Rate

Nu

mb

er 1

1.2

2m

3 R

ear

Dum

per

3

32

.25

40

8.5

0

38

8.7

5

3

78

.75

-

-

-

-

1

1.2

2A

11

.23

AA

s in

Rate

Nu

mb

er 1

1.2

3m

3 R

ear

Dum

per

3

57

.75

44

0.2

5

41

8.7

5

4

08

.00

-

-

-

-

1

1.2

3A

11

.24

AA

s in

Rate

Nu

mb

er 1

1.2

4m

3 R

ear

Dum

per

3

83

.50

47

1.7

5

44

8.7

5

4

37

.25

-

-

-

-

1

1.2

4A

11

.25

AA

s in

Rate

Nu

mb

er 1

1.2

5m

3 R

ear

Dum

per

4

09

.25

50

3.0

0

47

8.7

5

4

66

.50

-

-

-

-

1

1.2

5A

- 1

9 -

Page 21: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

(

12

) S

LO

PE

PR

OT

EC

TIO

N F

OR

EA

RT

H W

OR

K

12

.1F

urn

ish

ing,

pla

nti

ng &

wate

rin

g t

urf

excl

ud

ing h

au

lm

2

-

-

-

-

-

7

5.4

5

92

.80

8

8.3

0

86

.05

1

2.1

12

.2F

urn

ish

ing &

pla

cin

g g

ravel

bed

din

g e

xcl

ud

ing h

au

l.m

3 B

-Ho

e +

CT

4

56

.50

56

1.5

0

53

4.0

0

5

20

.00

5

17

.00

63

6.0

0

6

05

.00

58

9.5

0

1

2.2

12

.3F

urn

ish

ing &

pla

cin

g 6

-9"

rub

ble

/rip

-rap

excl

ud

ing h

au

l.m

3 (

Air

Co

mp

ress

or

+Ja

ck H

amm

er+

CT

}

2,0

36

.00

2

,50

5.0

0

2,3

83

.00

2

,32

2.0

0

2,1

17

.00

2,6

03

.00

2

,47

6.0

0

2,4

13

.00

1

2.3

12

.4F

urn

ish

ing &

pla

cin

g1

2"

rip

-rap

ex

clu

din

g h

au

l.m

3 -

do

- 1

,71

8.0

0

2,1

14

.00

2

,01

0.0

0

1,9

59

.00

1

,80

5.0

0

2

,22

1.0

0

2,1

12

.00

2

,05

8.0

0

12

.4

12

.5F

urn

ish

ing &

pla

cin

g1

8"

rip

-rap

ex

clu

din

g h

au

l.m

3 -

do

- 1

,42

5.0

0

1,7

52

.00

1

,66

7.0

0

1,6

24

.00

1

,53

0.0

0

1

,88

2.0

0

1,7

91

.00

1

,74

5.0

0

12

.5

12

.6H

au

l tu

rf f

or

slop

e p

rote

ctio

n,

0.5

mil

e in

clu

din

g l

oad

ing.

m2

Tra

cto

r T

rail

er

94

.30

1

16

.00

1

10

.25

10

7.5

0

-

--

-1

2.6

12

.6A

Hau

l tu

rf f

or

slop

e p

rote

ctio

n,

1 m

ile

incl

ud

ing l

oad

ing.

m2

Tra

cto

r T

rail

er

11

6.5

0

1

43

.50

1

36

.50

13

3.0

0

-

--

-1

2.6

A

12

.7H

au

l tu

rf f

or

slop

e p

rote

ctio

n,

1.5

mil

e in

clu

din

g l

oad

ing.

m2

Tra

cto

r T

rail

er

13

9.0

0

1

71

.00

1

62

.50

15

8.5

0

-

--

-1

2.7

12

.7A

Hau

l tu

rf f

or

slop

e p

rote

ctio

n,

2 m

ile

incl

ud

ing l

oad

ing.

m2

Tra

cto

r T

rail

er

16

1.2

5

1

98

.50

1

88

.75

18

4.0

0

-

--

-1

2.7

A

12

.8H

au

l tu

rf f

or

slop

e p

rote

ctio

n,

2.5

mil

e in

clu

din

g l

oad

ing.

m2

Tra

cto

r T

rail

er

18

3.7

5

2

26

.00

2

15

.00

20

9.2

5

-

--

-1

2.8

12

.8A

Hau

l tu

rf f

or

slop

e p

rote

ctio

n,

3 m

ile

incl

ud

ing l

oad

ing.

m2

Tra

cto

r T

rail

er

20

6.0

0

2

53

.50

2

41

.00

23

4.7

5

-

--

-1

2.8

A

12

.9H

au

l gra

vel

for

slop

e p

rote

ctio

n.

m3

Tra

cto

r T

rail

er &

Rea

r D

um

per

12

.9

12

.10

Hau

l 6

"-9

" ru

bb

le /

rip

-rap

for

slop

e p

rote

ctio

n.

m3

Tra

cto

r T

rail

er &

Rea

r D

um

per

12

.10

12

.11

Hau

l ri

p-r

ap

over

9"

for

slop

e p

rote

ctio

n,

0.5

mil

e in

clu

din

g l

oad

ing.

m3

Rea

r D

um

per

2

02

.00

24

8.5

0

23

6.2

5

2

30

.25

-

-

--

12

.11

12

.12

Hau

l ri

p-r

ap

over

9"

for

slop

e p

rote

ctio

n,

1.0

mil

e in

clu

din

g l

oad

ing.

m3

Rea

r D

um

per

2

30

.75

28

3.7

5

27

0.0

0

2

63

.00

-

-

--

12

.12

12

.13

Hau

l ri

p-r

ap

over

9"

for

slop

e p

rote

ctio

n,

1.5

mil

e in

clu

din

g l

oad

ing.

m3

Rea

r D

um

per

2

59

.50

31

9.2

5

30

3.5

0

2

95

.75

-

-

--

12

.13

12

.14

Hau

l ri

p-r

ap

over

9"

for

slop

e p

rote

ctio

n,

2.0

mil

e in

clu

din

g l

oad

ing.

m3

Rea

r D

um

per

2

88

.25

35

4.5

0

33

7.2

5

3

28

.50

-

-

--

12

.14

12

.15

Hau

l ri

p-r

ap

over

9"

for

slop

e p

rote

ctio

n,

2.5

mil

e in

clu

din

g l

oad

ing.

m3

Rea

r D

um

per

3

17

.00

38

9.7

5

37

0.7

5

3

61

.25

-

-

--

12

.15

12

.16

Hau

l ri

p-r

ap

over

9"

for

slop

e p

rote

ctio

n,

3.0

mil

e in

clu

din

g l

oad

ing.

m3

Rea

r D

um

per

3

45

.75

42

5.2

5

40

4.5

0

3

94

.00

-

-

--

12

.16

12

.17

Hau

l ri

p-r

ap

over

9"

for

slop

e p

rote

ctio

n,

3.5

mil

e in

clu

din

g l

oad

ing.

m3

Rea

r D

um

per

3

74

.25

46

0.5

0

43

8.0

0

4

26

.75

-

-

--

12

.17

12

.18

Hau

l ri

p-r

ap

over

9"

for

slop

e p

rote

ctio

n,

4.0

mil

e in

clu

din

g l

oad

ing.

m3

Rea

r D

um

per

4

03

.00

49

5.7

5

47

1.7

5

4

59

.50

-

-

--

12

.18

12

.19

Hau

l ri

p-r

ap

over

9"

for

slop

e p

rote

ctio

n,

4.5

mil

e in

clu

din

g l

oad

ing.

m3

Rea

r D

um

per

4

31

.75

53

1.0

0

50

5.0

0

4

92

.25

-

-

--

12

.19

12

.20

Hau

l ri

p-r

ap

over

9"

for

slop

e p

rote

ctio

n,

5.0

mil

e in

clu

din

g l

oad

ing.

m3

Rea

r D

um

per

4

60

.50

56

6.5

0

53

8.5

0

5

25

.00

-

-

--

12

.20

(1

3)

GR

AV

EL

/TA

RM

AC

SU

RF

AC

ING

FO

R R

OA

DW

AY

13

.1F

urn

ish

ing &

pla

cin

g g

ravel

Wea

rin

g S

urf

ace

(WS

), e

xcl

ud

ing h

au

l.m

3 B

-Ho

e+C

T

45

6.5

0

5

61

.50

5

34

.00

52

0.0

0

51

7.0

0

6

36

.00

60

5.0

0

5

89

.50

13

.1

13

.2F

urn

ish

ing p

laci

ng &

com

pact

ing g

ravel

su

b b

ase

excl

ud

ing h

au

l.m

3 d

o-+

Shee

p F

oo

t

Ro

ller

48

0.7

5

5

91

.00

5

62

.50

54

8.0

0

56

9.5

0

7

00

.50

66

6.5

0

6

49

.50

13

.2

As

in R

ate

Nos.

11

.6 t

o 1

1.1

5 &

11

.6A

to 1

1.1

5A

As

in R

ate

Nos.

11

.16

to 1

1.2

5 &

11

.16

A t

o 1

1.2

5A

- 2

0 -

Page 22: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

13

.3F

urn

ish

ing p

laci

ng &

com

pact

ing 6

"-9

" ru

bb

le b

ase

excl

ud

ing h

au

l.m

3 {

Air

Co

mp

ress

o

+Ja

ck

Ham

mer

+R

oad

Ro

ller

}

2,4

66

.00

3

,03

4.0

0

2,8

86

.00

2

,81

2.0

0

2,4

66

.00

3,0

34

.00

2

,88

6.0

0

2,8

12

.00

1

3.3

13

.3A

Fu

rnis

hin

g p

laci

ng &

com

pact

ing 4

" m

etal

base

excl

ud

ing h

au

l.m

3

-d

o-

2,5

89

.00

3

,18

4.0

0

3,0

29

.00

2

,95

1.0

0

2,4

66

.00

3,0

34

.00

2

,88

6.0

0

2,8

12

.00

1

3.3

A

13

.4F

urn

ish

ing p

laci

ng &

com

pact

ing 2

" m

etal

excl

ud

ing h

au

l.m

3

-d

o-

3,4

62

.00

4

,25

9.0

0

4,0

51

.00

3

,94

7.0

0

3,4

62

.00

4,2

59

.00

4

,05

1.0

0

3,9

47

.00

1

3.4

13

.5F

urn

ish

ing p

laci

ng &

com

pact

ing 1

/2"

met

al

in v

oid

s e

xcl

ud

ing

hau

l.m

3

-d

o-

4,9

24

.00

6

,05

6.0

0

5,7

61

.00

5

,61

3.0

0

4,9

24

.00

6,0

56

.00

5

,76

1.0

0

5,6

13

.00

1

3.5

13

.6F

urn

ish

ing &

pla

cin

g 1

st b

itu

men

Wea

rin

g S

urf

ace

in

clu

din

g s

an

d

bli

nd

ing e

xcl

ud

ing h

au

l.

m3

B

-Ho

e+R

oad

Ro

ller

25

4.2

5

3

12

.75

2

97

.50

29

0.0

0

24

1.0

0

2

96

.50

28

2.0

0

2

74

.75

13

.6

13

.7F

urn

ish

ing &

pla

cin

g 2

nd b

itu

men

Wea

rin

g S

urf

ace

in

clu

din

g s

an

d

bli

nd

ing e

xcl

ud

ing h

au

l.

m2

-do

- 1

59

.25

19

5.7

5

18

6.2

5

1

81

.50

1

46

.00

17

9.5

0

1

70

.75

16

6.5

0

1

3.7

13

.8H

au

l sa

nd

/gra

vel

for

road

way s

urf

aci

ng.

m2

T

T &

Rea

r D

um

per

A

s in

Rate

11

.6 t

o 1

1.1

5 &

11

.6A

to 1

1.1

5A

13

.8

13

.9H

au

l ru

bb

le/m

etal

for

road

su

rfaci

ng.

m3

-do

- A

s in

Rate

11

.16

to 1

1.2

5 &

11

.16

A t

o 1

1.2

5A

13

.9

(1

4)

RE

INF

OR

CE

ME

NT

14

.1C

utt

ing,

ben

din

g &

pla

cin

g m

ild

ste

el r

ein

forc

emen

t, l

ift

0-5

ft.

hau

l

15

0 m

iles

Lorr

y a

nd

8 m

iles

Tra

ctor

Tra

iler

.

Kg

-

-

-

-

-3

2.5

5

40

.05

3

8.1

0

37

.15

1

4.1

14

.2A

s in

Rate

Nu

mb

er 1

4.1

bu

t fo

r T

or

stee

l.K

g

-

-

-

-

-

32

.65

4

0.1

5

38

.20

3

7.2

0

14

.2

14

.3F

urn

ish

ing,

cutt

ing,

ben

din

g &

pla

cin

g m

ild

ste

el r

ein

forc

emen

t, l

ift

0-5

ft,

hau

l 1

50

mil

es L

orr

y &

8 m

iles

Tra

ctor-

trail

or.

Kg

-

-

-

-

-1

60

.75

19

7.7

5

1

88

.25

18

3.2

5

1

4.3

14

.4A

s in

Rate

Nu

mb

er 1

4.3

bu

t fo

Tor

stee

l.K

g

-

-

-

-

-

16

2.7

5

2

00

.25

19

0.5

0

1

85

.50

14

.4

14

.5L

ift

rein

forc

emen

t in

each

ste

p 0

-5 f

t.K

g

-

-

-

-

-

0.4

5

0

.55

0.5

0

0

.50

14

.5

(1

5)

FO

RM

WO

RK

IN

TIM

BE

R A

ND

SC

AF

FO

LD

ING

-

15

.1M

ak

ing f

orm

work

for

each

of

3 u

ses.

m2

-

-

-

-

-1

84

.00

22

6.2

5

2

15

.25

20

9.7

5

1

5.1

15

.2F

ixin

g &

rem

ovin

g f

orm

work

on

ce.

m2

-

-

-

-

-3

97

.00

48

8.5

0

4

64

.50

45

2.7

5

1

5.2

15

.3F

urn

ish

ing &

mak

ing f

orm

work

for

each

3 u

ses.

m2

-

-

-

-

-1

,28

0.0

0

1

,57

5.0

0

1,4

98

.00

1

,46

0.0

0

15

.3

15

.4F

urn

ish

ing &

mak

ing f

orm

work

for

each

of

3 u

ses

incl

ud

ing f

ixin

g

& r

emovin

g s

am

e on

ce.

m2

-

-

-

-

-1

,67

7.0

0

2

,06

3.0

0

1,9

63

.00

1

,91

2.0

0

15

.4

15

.5E

rect

ion

an

d d

ism

an

tlin

g s

caff

old

for

each

0-5

ft

lift

in

ris

e 1

0'-2

0'

(each

of

10

use

s of

scaff

old

).m

2

-

-

-

-

-

45

.70

5

6.2

0

53

.50

5

2.1

0

15

.5

15

.6A

s in

Rate

Nu

mb

er 1

5.5

bu

t fo

r ri

se o

ver

20

ft.

up

to 4

0 f

t.m

2

-

-

-

-

-

61

.45

7

5.6

0

71

.90

7

0.0

5

15

.6

15

.7A

s in

Rate

Nu

mb

er 1

5.5

bu

t fo

r ri

se o

ver

40

ft.

up

to 6

0ft

.m

2

-

-

-

-

-

76

.85

9

4.5

0

89

.90

8

7.6

0

15

.7

- 2

1 -

Page 23: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

(1

6)

CO

NC

RE

TE

AN

D R

UB

BL

E M

AS

ON

AR

Y

16

.11

:4:8

(2")

ct.

con

cret

e ex

clu

din

g f

orm

work

, li

ft 0

-5',

hau

l m

ix.

10

0',

cem

ent

15

8 m

iles

(1

50

mls

Lorr

y &

8 m

iles

T-T

), a

ggre

gate

5 m

ls.

& w

ate

r 1

.5 m

ls.

m3

{A

ir

Co

mp

ress

or+

Jack

Ham

mer

+C

oncr

ete

Mix

ture

+V

ibra

tor+

9,9

72

.00

1

2,2

65

.00

11

,66

7.0

0

1

1,3

68

.00

10

,99

2.0

0

13

,52

0.0

0

1

2,8

60

.00

12

,53

1.0

0

1

6.1

16

.21

:4:8

(1'1

/2")

ct.

con

c. e

xcl

ud

ing f

orm

work

as

in R

ate

Nu

mb

er 1

6.1

m3

-do

- 1

0,1

96

.00

12

,54

1.0

0

1

1,9

29

.00

11

,62

3.0

0

1

1,2

16

.00

1

3,7

95

.00

13

,12

2.0

0

1

2,7

86

.00

16

.2

16

.31

:3:6

(1 1

/2")

ct.

con

c.ex

clu

din

g f

orm

work

as

in R

ate

Nu

mb

er 1

6.1

m3

-do

- 1

0,9

30

.00

13

,44

4.0

0

1

2,7

88

.00

12

,46

0.0

0

1

1,9

50

.00

1

4,6

98

.00

13

,98

1.0

0

1

3,6

23

.00

16

.3

16

.41

:3:6

(1")

ct.

con

c. e

xcl

ud

ing f

orm

work

as

in R

ate

Nu

mb

er 1

6.1

m3

-do

- 1

1,2

87

.00

13

,88

4.0

0

1

3,2

06

.00

12

,86

8.0

0

1

2,3

07

.00

1

5,1

38

.00

14

,40

0.0

0

1

4,0

30

.00

16

.4

16

.51

:2:4

(1 1

/2")

c

t. c

on

c. e

xcl

ud

ing f

orm

work

as

in R

ate

Nu

mb

er 1

6.1

m3

-do

- 1

1,9

35

.00

14

,68

1.0

0

1

3,9

64

.00

13

,60

6.0

0

1

2,9

55

.00

1

5,9

35

.00

15

,15

8.0

0

1

4,7

69

.00

16

.5

16

.61

:2:4

(1")

ct.

con

c. e

xcl

ud

ing f

orm

work

as

in R

ate

Nu

mb

er 1

6.1

m3

-do

- 1

2,2

50

.00

15

,06

8.0

0

1

4,3

33

.00

13

,96

5.0

0

1

3,2

70

.00

1

6,3

22

.00

15

,52

6.0

0

1

5,1

28

.00

16

.6

16

.71

:2:4

(3/4

") c

t. c

on

c. e

xcl

ud

ing f

orm

work

as

in R

ate

Nu

mb

er 1

6.1

m3

-do

- 1

2,5

46

.00

15

,43

2.0

0

1

4,6

79

.00

14

,30

3.0

0

1

3,5

66

.00

1

6,6

87

.00

15

,87

3.0

0

1

5,4

66

.00

16

.7

16

.81

:1 1

/2:3

(3/4

") c

t. c

on

c. e

xcl

ud

ing f

orm

work

as

in R

ate

Nu

mb

er

16

.1.

m3

-do

- 1

3,7

54

.00

16

,91

7.0

0

1

6,0

92

.00

15

,67

9.0

0

1

4,7

74

.00

1

8,1

72

.00

17

,28

5.0

0

1

6,8

42

.00

16

.8

16

.9A

dd

itio

nal

for

form

work

for

1:3

:6 c

t. c

on

cret

e.m

3

-

-

-

-

-3

,30

2.0

0

4

,06

2.0

0

3,8

64

.00

3

,76

5.0

0

16

.9

16

.10

Ad

dit

ion

al

for

form

work

for

1:2

:4 c

t. c

on

cret

e.m

3

-

-

-

-

-4

,40

3.0

0

5

,41

6.0

0

5,1

52

.00

5

,02

0.0

0

16

.10

16

.11

Ad

dit

ion

al

for

form

work

for

1:1

1/2

:3 c

t. c

on

cret

e.m

3

-

-

-

-

-2

,75

2.0

0

3

,38

5.0

0

3,2

20

.00

3

,13

7.0

0

16

.11

16

.12

Ad

dit

ion

al

for

lift

of

con

cret

e over

5ft

. u

pto

1

0 f

t.m

3

-

-

-

-

-4

60

.75

56

6.5

0

5

39

.00

52

5.0

0

1

6.1

2

16

.13

Ad

dit

ion

al

for

lift

of

con

cret

e over

10

ft.

up

to 1

5ft

.m

3

-

-

-

-

-4

89

.00

60

1.5

0

5

72

.00

55

7.5

0

1

6.1

3

16

.14

Ad

dit

ion

al

for

lift

of

con

cret

e over

15

ft.

up

to 2

0ft

.m

3

-

-

-

-

-5

08

.50

62

5.5

0

5

95

.00

57

9.5

0

1

6.1

4

16

.15

Ad

dit

ion

al

for

lift

of

con

cret

e over

20

ft.

up

to 2

5 f

t.m

3

-

-

-

-

-5

69

.50

70

0.5

0

6

66

.50

64

9.5

0

1

6.1

5

16

.16

Ad

dit

ion

al

for

lift

of

con

cret

e over

25

ft.

up

to 3

0ft

.m

3

-

-

-

-

-5

81

.00

71

4.5

0

6

79

.50

66

2.5

0

1

6.1

6

16

.17

Ad

dit

ion

al

for

lift

of

con

cret

e over

30

ft.

up

to 3

5ft

.m

3

-

-

-

-

-5

86

.00

72

1.0

0

6

85

.50

66

8.0

0

1

6.1

7

16

.18

Ad

dit

ion

al

for

lift

of

con

cret

e over

35

ft.

up

to 4

0ft

.m

3

-

-

-

-

-5

93

.50

73

0.0

0

6

94

.50

67

6.5

0

1

6.1

8

16

.19

Ad

dit

ion

al

for

lift

of

con

cret

e over

40

ft.

up

to 4

5ft

.m

3

-

-

-

-

-6

47

.00

79

6.0

0

7

57

.00

73

7.5

0

1

6.1

9

16

.20

Ad

dit

ion

al

for

lift

of

con

cret

e over

45

ft.

up

to 5

0ft

.m

3

-

-

-

-

-6

51

.50

80

1.5

0

7

62

.50

74

2.5

0

1

6.2

0

16

.21

Ad

dit

ion

al

for

lift

of

con

cret

e over

50

ft.

up

to 5

5ft

.m

3

-

-

-

-

-6

85

.00

84

2.5

0

8

01

.00

78

0.5

0

1

6.2

1

16

.22

Ad

dit

ion

al

for

lift

of

con

cret

e over

55

ft.

up

to 6

0ft

.m

3

-

-

-

-

-7

18

.00

88

3.5

0

8

40

.00

81

8.5

0

1

6.2

2

16

.23

Ad

dit

ion

al

for

hau

l of

con

cret

e m

ix i

n e

ach

10

0ft

. st

ep (

max.3

00

ft).

m3

-

-

-

-

-

16

9.5

0

2

08

.25

19

8.2

5

1

93

.00

16

.23

16

.24

6"-

9"

ran

dom

ru

bb

le m

aso

nary

in

1:5

ct.

mt.

, li

ft 0

-5 f

t, h

au

l m

ort

ar

mix

an

d m

ate

rials

as

in R

ate

Nu

mb

er 1

6.1

.m

3 (

Air

Co

mp

ress

or+

Jack

Ham

mer

+ M

anual

)

7,4

00

.00

9

,10

2.0

0

8,6

58

.00

8

,43

6.0

0

6,8

79

.00

8,4

61

.00

8

,04

8.0

0

7,8

42

.00

1

6.2

4

16

.25

1/2

" th

ick

rou

gh

ct.

pla

ster

ing i

n 1

:3 c

t. m

ort

ar

for

rub

ble

maso

nary

face

s fo

r all

lif

ts.

m2

(B

-Ho

e +

Man

ual

) 3

43

.25

42

2.2

5

40

1.7

5

3

91

.50

3

18

.50

39

2.0

0

3

72

.75

36

3.2

5

1

6.2

5

16

.26

Ad

dit

ion

al

for

lift

of

rub

ble

maso

nary

.m

31

6.2

6A

s in

Rate

Nu

mb

er 1

6.1

2 t

o 1

6.2

2

- 2

2 -

Page 24: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

(1

7)

LIN

ING

AN

D P

ITC

HIN

G

17

.12

" th

ick

lin

ing i

n 1

:8 c

t. s

an

d p

re-c

ast

sla

bs

in 1

:5 c

t. m

t. w

ith

1/8

"

float

for

inte

rnal

surf

ace

s, l

ift

0-5

ft,

hau

l as

in R

ate

Nu

mb

er 1

6.1

.m

2

-

-

-

-

-

61

4.0

0

7

55

.50

71

8.5

0

7

00

.00

17

.1

17

.23

" th

ick

in

situ

lin

ing i

n 1

:3:6

(1")

ct.

con

c.,

excl

ud

ing f

orm

s, l

ift

0-5

ft h

au

l as

in R

ate

Nu

mb

er 1

6.1

.m

2 (

Air

Co

mp

ress

or+

Jack

Ham

mer

+C

M+

V+

Man

ual

)

86

0.0

0

1

,05

7.0

0

1,0

06

.00

9

80

.50

9

37

.50

1,1

53

.00

1

,09

7.0

0

1,0

69

.00

1

7.2

17

.3A

s in

Rate

Nu

mb

er 1

7.2

in

clu

din

g f

orm

work

.m

2

-d

o-

96

0.5

0

1

,18

1.0

0

1,1

24

.00

1

,09

5.0

0

1,0

38

.00

1,2

77

.00

1

,21

5.0

0

1,1

83

.00

1

7.3

17

.49

" th

ick

pit

chin

g i

n 6

"-9

" ru

bb

le i

n 1

:5 c

t. m

t.,

lift

0-5

ft,

hau

l as

in

Rate

Nu

mb

er 1

6.1

.m

2 (

Air

Co

mp

ress

or+

Jack

Ham

mer

+ M

anual

)

1,6

76

.00

2

,06

2.0

0

1,9

61

.00

1

,91

1.0

0

1,5

57

.00

1,9

15

.00

1

,82

2.0

0

1,7

75

.00

1

7.4

17

.51

/2"

thic

k r

ou

gh

ct.

pla

ster

ing i

n 1

:3 c

t. m

t.,

on

ru

bb

le p

itch

ing

face

s.m

2

(B

-Ho

e+ M

anual

) 1

7.5

(1

8)

PR

E-S

TR

ES

SE

D /

PR

E-C

AS

T B

RID

GE

DE

CK

18

.1F

urn

ish

an

d i

nst

all

bri

dge

bea

m 5

3'x

5.0

7 t

, tr

an

sport

20

0 m

iles

,

inst

all

ati

on

cra

ne

travel

20

0 m

iles

.

Each

L

ow

Bed

Tra

iler

+C

R

19

2,9

65

.00

237,

347.

00

22

5,76

9.00

219,

980.

00

-

-

--

18

.1

18

.2A

s in

Rate

Nu

mb

er 1

8.1

bu

t fo

r b

rid

ge

bea

m 4

4'x

4.2

2 t

. E

ach

-do

- 1

51

,05

9.0

0

1

85

,80

3.0

0

17

6,7

39

.00

1

72

,20

7.0

0

-

--

-1

8.2

18

.3A

s in

Rate

Nu

mb

er 1

8.1

bu

t fo

r b

rid

ge

bea

m 4

0'x

3.8

0 t

. E

ach

-do

- 1

38

,15

9.0

0

1

69

,93

5.0

0

16

1,6

46

.00

1

57

,50

1.0

0

-

--

-1

8.3

18

.4A

s in

Rate

Nu

mb

er 1

8.1

bu

t fo

r b

rid

ge

bea

m 3

5'x

2.8

6 t

. E

ach

-do

- 1

16

,81

0.0

0

1

43

,67

6.0

0

13

6,6

67

.00

1

33

,16

3.0

0

-

--

-1

8.4

18

.5A

s in

Rate

Nu

mb

er 1

8.1

bu

t fo

r b

rid

ge

bea

m 3

2'x

2.5

9 t

. E

ach

-do

- 1

02

,98

1.0

0

1

26

,66

7.0

0

12

0,4

88

.00

1

17

,39

8.0

0

-

--

-1

8.5

18

.6A

s in

Rate

Nu

mb

er 1

8.1

bu

t fo

r b

rid

ge

bea

m 2

3x 2

.26

t.

Each

-do

- 8

3,5

23

.00

10

2,7

34

.00

9

7,7

22

.00

95

,21

7.0

0

-

-

--

18

.6

18

.7A

s in

Rate

Nu

mb

er 1

8.1

bu

t fo

r b

rid

ge

bea

m 2

0x 2

.08

t.

Each

-do

- 7

6,3

37

.00

93

,89

5.0

0

8

9,3

15

.00

87

,02

5.0

0

-

-

--

18

.7

18

.7A

As

in R

ate

Nu

mb

er 1

8.1

bu

t fo

r b

rid

ge

bea

m 1

7x 1

.57

t.

Each

-do

- 6

1,2

94

.00

75

,39

1.0

0

7

1,7

14

.00

69

,87

5.0

0

-

-

--

18

.7A

18

.7B

As

in R

ate

Nu

mb

er 1

8.1

bu

t fo

r b

rid

ge

bea

m 1

4x 1

.13

t.

Each

-do

- 4

9,6

84

.00

61

,11

1.0

0

5

8,1

30

.00

56

,63

9.0

0

-

-

--

18

.7B

18

.7C

As

in R

ate

Nu

mb

er 1

8.1

bu

t fo

r b

rid

ge

bea

m 1

1x 0

.89

t.

Each

-do

- 4

4,1

69

.00

54

,32

8.0

0

5

1,6

78

.00

50

,35

3.0

0

-

-

--

18

.7C

18

.8F

urn

ish

& i

nst

all

ker

b s

lab

3'x

1.0

8 c

wt.

,tra

nsp

ort

20

0 m

iles

,

inst

all

ati

on

cra

ne

travel

20

0 m

iles

.

Each

-do

- 2

,51

4.0

0

3,0

93

.00

2

,94

2.0

0

2,8

66

.00

-

-

--

18

.8

18

.9A

s in

Rate

Nu

mb

er 1

8.8

bu

t fo

r fa

cia s

lab

of

1 1

/2"x

3'x

4'x

2.0

8

cwt.

Each

-do

- 4

,58

0.0

0

5,6

33

.00

5

,35

9.0

0

5,2

21

.00

-

-

--

18

.9

18

.10

As

in R

ate

Nu

mb

er 1

8.8

bu

t fo

r fa

cia s

lab

of

1 1

/2"x

2'x

4'x

0.9

1

cwt.

Each

-do

- 3

,50

3.0

0

4,3

09

.00

4

,09

9.0

0

3,9

94

.00

-

-

--

18

.10

18

.11

As

in R

ate

Nu

mb

er 1

8.8

bu

t fo

r u

pri

gh

t fo

r h

an

d r

ail

s o

f 3

'3"x

1.0

9

cwt.

Each

-do

- 2

,84

2.0

0

3,4

96

.00

3

,32

5.0

0

3,2

40

.00

-

-

--

18

.11

As

in R

ate

Nu

mb

er 1

6.2

5

- 2

3 -

Page 25: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

18

.12

As

in R

ate

Nu

mb

er 1

8.8

bu

t fo

r h

an

d r

ail

s o

f 3

" d

ia x

7' 8

1

/2"

x0

.94

cw

t.

Each

-do

- 2

,81

8.0

0

3,4

66

.00

3

,29

7.0

0

3,2

12

.00

-

-

--

18

.12

18

.13

As

in R

ate

Nu

mb

er 1

8.8

bu

t fo

r ra

in w

ate

r ch

an

nel

of

3"

dia

x

6"x

24

"x0

.28

cw

t.

Each

-do

- 7

65

.50

94

1.5

0

89

5.5

0

8

72

.50

-

-

--

18

.13

18

.14

Fu

rnis

h &

in

stall

ste

el e

xp

an

sion

join

t.m

-

-

-

-

-

11

,66

3.0

0

14

,34

5.0

0

1

3,6

46

.00

13

,29

6.0

0

1

8.1

4

(2

1)

LIG

HT

DU

TY

CA

ST

CA

ST

IR

ON

GA

TE

S F

OR

TU

RN

OU

TS

21

.1F

urn

ish

& i

nst

all

in

tu

rnou

t 9

" d

ia.

cast

iro

n g

ate

& h

ois

t co

mp

lete

wit

h s

pin

dle

, h

an

dle

etc

. as

per

typ

e p

lan

No.C

50

1-2

-6D

tra

nsp

ort

20

0 m

ls.

Each

-

-

-

-

-2

6,2

90

.00

3

2,3

36

.00

30

,75

9.0

0

2

9,9

70

.00

21

.1

21

.2A

s in

Rate

Nu

mb

er 2

1.1

bu

t fo

r 1

2"

dia

. si

ze a

s in

Typ

e P

lan

No.

C5

01

-2-6

D.

Each

-

-

-

-

-2

9,3

42

.00

3

6,0

91

.00

34

,33

0.0

0

3

3,4

50

.00

21

.2

21

.3A

s in

Rate

Nu

mb

er 2

1.1

bu

t fo

r 1

5"

dia

. si

ze a

s in

Typ

e P

lan

No.

C5

01

-2-6

D.

Each

-

-

-

-

-4

8,6

00

.00

5

9,7

78

.00

56

,86

2.0

0

5

5,4

04

.00

21

.3

21

.4A

s in

Rate

Nu

mb

er 2

1.1

bu

t fo

r 1

8"

dia

. si

ze a

s in

Typ

e P

lan

No.

C5

01

-2-6

D.

Each

-

-

-

-

-5

7,2

03

.00

7

0,3

60

.00

66

,92

7.0

0

6

5,2

11

.00

21

.4

21

.5A

s in

Rate

Nu

mb

er 2

1.1

bu

t fo

r 2

4"

dia

. si

ze a

s in

Typ

e P

lan

No.

C5

01

-2-6

D.

Each

-

-

-

-

-7

8,9

29

.00

9

7,0

83

.00

92

,34

7.0

0

8

9,9

79

.00

21

.5

21

.6A

s in

Rate

Nu

mb

er 2

1.1

bu

t fo

r 3

0"

dia

. si

ze a

s in

Typ

e P

lan

No.

C5

01

-2-6

D.

Each

-

-

-

-

-1

28

,53

7.0

0

15

8,1

00

.00

1

50

,38

8.0

0

14

6,5

32

.00

2

1.6

(2

2)

LIG

HT

DU

TY

WO

OD

EN

GA

TE

S F

OR

RE

GU

LA

TO

RS

22

.1In

stall

in

reg

ula

tor

3.0

0'x

3.2

5' w

ood

en g

ate

s an

d h

ois

t as

in T

yp

e

Pla

n N

o.

C5

03

-2-6

D.

Each

-

-

-

-

-2

,04

0.0

0

2

,50

9.0

0

2,3

86

.00

2

,32

5.0

0

22

.1

22

.2A

s in

Rate

Nu

mb

er 2

2.1

bu

t fo

r si

ze 3

.50

'x3

.50

'/5.0

0'x

2.5

0'.

Each

-

-

-

-

-2

,37

0.0

0

2

,91

5.0

0

2,7

72

.00

2

,70

1.0

0

22

.2

22

.3

-do-

5.0

0'x

2.7

5 '

Each

-

-

-

-

-2

,70

0.0

0

3

,32

1.0

0

3,1

59

.00

3

,07

8.0

0

22

.3

22

.4

-do-

4.0

0'x

3.7

5'

Each

-

-

-

-

-3

,19

5.0

0

3

,92

9.0

0

3,7

38

.00

3

,64

2.0

0

22

.4

22

.5

-do-

4.0

0'x

4.0

0'

Each

-

-

-

-

-3

,36

0.0

0

4

,13

2.0

0

3,9

31

.00

3

,83

0.0

0

22

.5

22

.6

-do-

4.5

0'x

4.0

0'

Each

-

-

-

-

-3

,85

5.0

0

4

,74

1.0

0

4,5

10

.00

4

,39

4.0

0

22

.6

22

.7

-do-

4.0

0'x

5.0

0'/4

.25

'x4

.75

'/4.5

0'x

4.5

0'.

Each

-

-

-

-

-4

,61

2.0

0

5

,67

3.0

0

5,3

96

.00

5

,25

8.0

0

22

.7

22

.8

-do-

4.2

5'x

5.0

0'

Each

-

-

-

-

-4

,77

7.0

0

5

,87

6.0

0

5,5

89

.00

5

,44

6.0

0

22

.8

22

.9

-do-

4.2

5'x

5.1

7/5

.00

'x4

.50

'. E

ach

-

-

-

-

-4

,94

2.0

0

6

,07

9.0

0

5,7

82

.00

5

,63

4.0

0

22

.9

22

.10

-d

o-

5.0

0'x

4.7

5'

Each

-

-

-

-

-5

,27

2.0

0

6

,48

5.0

0

6,1

68

.00

6

,01

0.0

0

22

.10

- 2

4 -

Page 26: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

22

.11

-d

o-

5.5

0'x

4.5

0/5

.25

'x4

.75

'. E

ach

-

-

-

-

-5

,43

7.0

0

6

,68

8.0

0

6,3

61

.00

6

,19

8.0

0

22

.11

22

.12

-d

o-

5.1

7'x

5.5

8'

Each

-

-

-

-

-5

,60

2.0

0

6

,89

1.0

0

6,5

54

.00

6

,38

6.0

0

22

.12

22

.13

-d

o-

5.7

5'x

5.5

0/5

.58

'x5

.67

'. E

ach

-

-

-

-

-5

,93

2.0

0

7

,29

6.0

0

6,9

41

.00

6

,76

3.0

0

22

.13

(2

3)

RC

C S

PU

N P

IPE

S A

ND

CO

LL

AR

S I

N S

TR

UC

TU

RE

S

23

.1F

urn

ish

, la

y &

join

t 6

"dia

. R

CC

sp

un

pip

e in

clu

din

g t

ren

chin

g a

nd

back

fil

l, h

au

l p

ipes

15

0 m

ls l

orr

y &

8 m

ls T

-T,

oth

er m

ate

rials

as

in

Rate

Nu

mb

er 1

6.1

.

m

-

-

-

-

-

2,4

12

.00

2,9

67

.00

2

,82

2.0

0

2,7

50

.00

2

3.1

23

.2A

s in

Rate

Nu

mb

er 2

3.1

bu

t fo

r si

ze i

n 9

" d

ia.

m

-

-

-

-

-

3,2

33

.00

3,9

77

.00

3

,78

3.0

0

3,6

86

.00

2

3.2

23

.3

-

do-

12

" d

ia.

m

-

-

-

-

-

3,9

19

.00

4,8

21

.00

4

,58

6.0

0

4,4

68

.00

2

3.3

23

.4

-

do-

15

" d

ia.

m

-

-

-

-

-

4,3

15

.00

5,3

08

.00

5

,04

9.0

0

4,9

20

.00

2

3.4

23

.5

-

do-

18

" d

ia.

m

-

-

-

-

-

5,9

89

.00

7,3

66

.00

7

,00

7.0

0

6,8

27

.00

2

3.5

23

.6

-

do-

24

" d

ia.

m

-

-

-

-

-

7,1

85

.00

8,8

37

.00

8

,40

6.0

0

8,1

91

.00

2

3.6

23

.7

-

do-

30

" d

ia.

m

-

-

-

-

-

9,7

37

.00

11

,97

6.0

0

1

1,3

92

.00

11

,10

0.0

0

2

3.7

23

.8

-

do-

36

" d

ia.

m

-

-

-

-

-

11

,56

7.0

0

14

,22

7.0

0

1

3,5

33

.00

13

,18

6.0

0

2

3.8

23

.9

-

do-

42

" d

ia.

m

-

-

-

-

-

16

,75

0.0

0

20

,60

3.0

0

1

9,5

98

.00

19

,09

6.0

0

2

3.9

23

.10

-d

o-

48

" d

ia.

m

-

-

-

-

-

18

,53

6.0

0

22

,79

9.0

0

2

1,6

87

.00

21

,13

1.0

0

2

3.1

0

23

.11

-d

o-

54

" d

ia.

m

-

-

-

-

-

21

,06

1.0

0

25

,90

5.0

0

2

4,6

41

.00

24

,00

9.0

0

2

3.1

1

(2

4)

E

XC

AV

AT

ION

OF

WE

LL

S

24

.1E

art

h e

xca

va

tio

n 0

- 5

ft

m3

-

-

-

-

-6

13

.00

75

4.0

0

7

17

.50

69

9.0

0

2

4.1

24

.2G

rav

el e

xca

va

tio

n 0

- 5

ft

m3

-

-

-

-

-6

85

.50

84

3.0

0

8

02

.00

78

1.0

0

2

4.2

24

.3S

oft

Ro

ck e

xca

va

tio

n 0

- 5

ft

m3

-

-

-

-

-1

,05

9.0

0

1

,30

3.0

0

1,2

39

.00

1

,20

7.0

0

24

.3

24

.4E

art

h e

xca

va

tio

n 5

- 1

0ft

m3

-

-

-

-

-1

,04

9.0

0

1

,29

1.0

0

1,2

28

.00

1

,19

6.0

0

24

.4

24

.5G

rav

el e

xca

va

tio

n 5

- 1

0ft

m3

-

-

-

-

-1

,12

7.0

0

1

,38

6.0

0

1,3

19

.00

1

,28

5.0

0

24

.5

24

.6S

oft

Ro

ck e

xca

va

tio

n 5

- 1

0ft

m3

-

-

-

-

-1

,53

1.0

0

1

,88

3.0

0

1,7

91

.00

1

,74

5.0

0

24

.6

24

.7G

rav

el e

xca

va

tio

n 1

0 -

15

ftm

3

-

-

-

-

-

1,2

35

.00

1,5

19

.00

1

,44

5.0

0

1,4

07

.00

2

4.7

24

.8S

oft

Ro

ck e

xca

va

tio

n 1

0 -

15

ft

m3

-

-

-

-

-1

,66

5.0

0

2

,04

8.0

0

1,9

48

.00

1

,89

8.0

0

24

.8

24

.9H

ard

Ro

ck

exca

va

tio

n 1

0 -

15

ftm

3

-

-

-

-

-

1,7

54

.00

2,1

58

.00

2

,05

2.0

0

2,0

00

.00

2

4.9

24

.10

Gra

vel

ex

cav

ati

on

15

-2

0ft

m3

-

-

-

-

-1

,33

1.0

0

1

,63

7.0

0

1,5

57

.00

1

,51

7.0

0

24

.1

24

.11

Wet

Gra

vel

ex

cav

ati

on

15

-2

0ft

m3

-

-

-

-

-1

,46

4.0

0

1

,80

1.0

0

1,7

13

.00

1

,66

9.0

0

24

.11

- 2

5 -

Page 27: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nuar

y 2

012

Cla

ss-A

Cla

ss-B

Cla

ss-C

Cla

ss-A

Cla

ss-B

Cla

ss-C

CIV

IL W

OR

KS

- S

UM

MA

RY

O

F

BA

SIC

R

AT

ES

&

UN

IT R

AT

ES

Ma

nu

al

Ra

te

No

.

Rat

e

No

.D

esc

rip

tio

n o

f W

ork

U

nit

P

rin

cip

al

M/C

Ma

ch

inery

Ba

sic U

nit

Ra

te(R

s.)

U

nit

Ra

te (

Rs.

)

U

nit

Ra

te (

Rs.

) B

asi

c U

nit

Ra

te(R

s.)

24

.12

So

ft R

ock

ex

cav

ati

on

15

-2

0ft

m3

-

-

-

-

-1

,77

9.0

0

2

,18

9.0

0

2,0

82

.00

2

,02

9.0

0

24

.12

24

.13

Wet

So

ft R

ock

ex

cav

ati

on

15

-2

0ft

m3

-

-

-

-

-1

,95

7.0

0

2

,40

8.0

0

2,2

90

.00

2

,23

1.0

0

24

.13

24

.14

Ha

rd R

ock

ex

cav

ati

on

15

-2

0ft

m3

-

-

-

-

-1

,87

3.0

0

2

,30

4.0

0

2,1

91

.00

2

,13

5.0

0

24

.14

24

.15

Gra

vel

ex

cav

ati

on

20

-2

5ft

m3

-

-

-

-

-1

,43

9.0

0

1

,77

0.0

0

1,6

84

.00

1

,64

1.0

0

24

.15

24

.16

Wet

Gra

vel

ex

cav

ati

on

20

-2

5ft

m3

-

-

-

-

-1

,58

3.0

0

1

,94

7.0

0

1,8

52

.00

1

,80

5.0

0

24

.16

24

.17

So

ft R

ock

ex

cav

ati

on

20

-2

5ft

m3

-

-

-

-

-1

,90

6.0

0

2

,34

5.0

0

2,2

31

.00

2

,17

3.0

0

24

.17

24

.18

Wet

So

ft R

ock

ex

cav

ati

on

20

-2

5ft

m3

-

-

-

-

-2

,09

7.0

0

2

,58

0.0

0

2,4

54

.00

2

,39

1.0

0

24

.18

24

.19

Ha

rd R

ock

ex

cav

ati

on

20

-2

5ft

m3

-

-

-

-

-2

,00

4.0

0

2

,46

5.0

0

2,3

44

.00

2

,28

4.0

0

24

.19

24

.20

Gra

vel

ex

cav

ati

on

25

-3

0ft

m3

-

-

-

-

-1

,56

4.0

0

1

,92

4.0

0

1,8

30

.00

1

,78

3.0

0

24

.2

24

.21

Wet

Gra

vel

ex

cav

ati

on

25

-3

0ft

m3

-

-

-

-

-1

,72

0.0

0

2

,11

6.0

0

2,0

13

.00

1

,96

1.0

0

24

.21

24

.22

So

ft R

ock

ex

cav

ati

on

25

-3

0ft

m3

-

-

-

-

-2

,05

0.0

0

2

,52

2.0

0

2,3

99

.00

2

,33

7.0

0

24

.22

24

.23

Wet

So

ft R

ock

ex

cav

ati

on

25

-3

0ft

m3

-

-

-

-

-2

,25

5.0

0

2

,77

4.0

0

2,6

39

.00

2

,57

1.0

0

24

.23

24

.24

Ha

rd R

ock

ex

cav

ati

on

25

-3

0ft

m3

-

-

-

-

-2

,15

1.0

0

2

,64

6.0

0

2,5

17

.00

2

,45

2.0

0

24

.24

(

25

)

DE

SIL

TIN

G A

ND

WE

ED

ING

25

.1D

esil

tin

g i

n c

an

als

an

d s

po

il t

o w

ast

e,

ha

ul

10

0'

m3

-

-

-

-

-4

66

.00

57

3.0

0

5

45

.00

53

1.0

0

2

5.1

25

.2W

eed

ing

in

ca

na

ls /

bu

nd

s.m

2

-

-

-

-

-

2.5

5

3

.15

3.0

0

2

.90

25

.2

- 2

6 -

Page 28: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nu

ary 2

01

2

BU

ILD

ING

W

OR

KS

Cla

ss-A

Cl-

B &

C

(3

4)

EX

CA

VA

TO

R

34.1

Co

mm

on

ex

cav

atio

n &

sp

oil

to

was

te a

nd

/o

r b

ack

fill

ing

in

fo

un

dat

ion

m3

685.5

093

2.00

808.

50

34

.1

34.2

Bo

rro

w e

arth

fo

r f

illi

ng

un

der

flo

or

m3

582.5

079

2.00

687.

50

34

.2

34.3

Pla

cin

g a

nd

co

mp

acti

ng

fil

l u

nd

er f

loo

r in

clu

din

g w

ater

ing

m

3205.7

527

9.75

242.

75

34

.3

(3

5)

CO

NC

RE

TE

R

35.1

1:3:

6 (4

0mm

) ce

men

t co

ncr

ete

wit

ho

ut

form

s in

fo

un

dat

ion

.m

311,9

50.0

016

,252

.00

14,1

01.0

0

35

.1

35.1

A1:

3:6

(40m

m)

cem

ent

con

cret

e w

ith

fo

rms

in f

ou

nd

atio

n.

m3

15,2

53.0

020

,744

.00

17,9

98.0

0

35

.1A

35.2

150m

m d

eep

115

mm

wid

e li

nto

l in

1:2

:4 (

20m

m)

ct.

co

ncr

ete

rein

forc

ed

wit

h 2

No

s. 1

0 m

m d

ia.

To

r S

teel

Bar

s.m

1,1

23.0

01,

527.

00

1,

325.

00

35.2

35.3

150m

m d

eep

225

mm

w

ide

lin

tol

in 1

:2:4

(20

mm

) ct

. co

ncr

ete

rei

nfo

rced

wit

h 2

No

s. 1

2 m

m d

ia.

To

r S

teel

Bar

s.m

1,6

21.0

02,

204.

00

1,

913.

00

35.3

35.3

A15

0mm

dee

p 2

25m

m w

ide

lin

tol

in 1

:2:4

(20

mm

) ct

. co

ncr

ete

rein

forc

ed w

ith

3 N

os.

12 m

m d

ia.T

or

Ste

el B

ars.

m1,7

66.0

02,

401.

00

2,

084.

00

35.3

A

35.4

225m

m d

eep

225

mm

wid

e li

nto

l in

1:2

:4 (

20m

m)

ct.

con

cret

e re

info

rced

wit

h 3

No

s. 1

2 m

m d

ia.

To

r S

teel

Bar

s.m

2,2

40.0

03,

046.

00

2,

644.

00

35.4

35.5

300m

m d

eep

225

mm

wid

e li

nto

l in

1:2

:4 (

20m

m)

ct.c

on

cret

e re

info

rced

wit

h 4

No

s.12

mm

dia

.To

r S

teel

Bar

s.m

2,8

59.0

03,

888.

00

3,

374.

00

35.5

35.6

75m

m t

hic

k R

CC

Sla

b f

or

ho

od

s, S

un

shad

es,

Fla

t R

oo

fs e

tc.

in 1

:2:4

(20m

m)

ct.

con

cret

e ra

info

rced

wit

h 1

0mm

dia

.

To

r S

teel

Bar

s at

225

mm

c/

c b

oth

way

s.m

23,6

94.0

05,

023.

00

4,

359.

00

35.6

0

35.7

75m

m t

hic

k 1

:3:6

(40

mm

) c

t. c

on

cret

e in

flo

ors

, ra

mp

s et

c. f

inis

hed

wit

h 1

6mm

th

ick

1:3

ct.

mo

rtar

sm

oo

th

ren

der

ing

m2

1,4

03.0

01,

908.

00

1,

656.

00

35.7

(3

6)

ST

ON

E M

AS

ON

AN

D B

RIC

KL

AY

OR

36.1

Ran

do

m R

ub

ble

Mas

on

ry i

n 1

:5 c

t. m

ort

ar i

n f

ou

nd

atio

n.

m3

6,8

79.0

09,

355.

00

8,

117.

00

36.1

36.2

Ran

do

m R

ub

ble

Mas

on

ry i

n 1

:5 c

t. m

ort

ar i

n s

up

er s

tru

ctu

re (

aver

age

hei

gh

t 4.

5m.)

m3

7,3

39.0

09,

981.

00

8,

661.

00

36.2

36.3

Bri

ck m

aso

nry

in

1:5

ct.

mo

rtar

in

fo

un

dat

ion

.m

38,7

17.0

011

,855

.00

10,2

86.0

0

36

.3

36.4

Bri

ck m

aso

nry

in

1:5

ct.

mo

rtar

in

su

per

str

uct

ure

(av

erag

e h

eig

ht

4.5m

).m

39,1

77.0

012

,480

.00

10,8

29.0

0

36

.4

36.5

115m

m t

hic

k b

rick

mas

on

ry i

n 1

:5 c

t. m

ort

ar i

n s

up

er s

tru

ctu

re (

aver

age

hei

gh

t 4.

5m).

m2

1,1

33.0

01,

540.

00

1,

337.

00

36.5

36.6

115m

m

thic

k H

on

eyco

mb

bri

ck w

ork

in

1:5

ct.

mo

rtar

in

su

per

stru

ctu

re (

aver

age

hei

gh

t 4.

5m)

m2

785.5

01,

068.

00

92

7.00

36.6

36.6

A15

0mm

th

ick

blo

ck w

ork

in

1:5

cem

ent

mo

rtar

.m

21,0

12.0

01,

376.

00

1,

194.

00

36.6

A

36.7

75m

m t

hic

k p

re-c

ast

gri

lle

in 1

:3 c

t. m

ort

ar i

n s

up

erst

ruct

ure

(av

erag

e h

eig

ht

4.5m

).m

2985.0

01,

339.

00

1,

162.

00

36.7

36.8

75m

m t

hic

k b

rick

pav

ed f

loo

r/ra

mp

in

1:5

ct.

mo

rtar

, fi

nis

hed

wit

h 1

6mm

th

ick

1:3

ct.

mo

rtar

sm

oo

th r

end

erin

g.

m2

1,2

09.0

01,

644.

00

1,

427.

00

36.8

Basi

c U

nit

Rate

(Rs.

)U

nit

Rate

No.

Desc

rip

tio

n o

f W

ork

Un

it R

ate

(R

s.)

Rate

No

.

- 27

-

Page 29: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nu

ary 2

01

2

BU

ILD

ING

W

OR

KS

Cla

ss-A

Cl-

B &

C

Basi

c U

nit

Rate

(Rs.

)U

nit

Rate

No.

Desc

rip

tio

n o

f W

ork

Un

it R

ate

(R

s.)

Rate

No

.

36.9

150m

m a

v.

dee

p,

225m

m w

ide

dra

in i

n b

rick

mas

on

ry i

n 1

:5 c

t. m

ort

ar,

wit

h 1

15m

m t

hic

k s

ide

wal

ls &

in

ver

t,

fin

ish

ed w

ith

16m

m t

hic

k 1

:3 c

t. m

ort

ar s

mo

oth

ren

der

ing

.m

1,3

31.0

01,

810.

00

1,

570.

00

36.9

0

36.1

030

0mm

T x

150

mm

R s

ing

le s

tep

in

bri

ck m

aso

nry

in

1:5

ct.

mo

rtar

, fi

nis

hed

wit

h 1

6mm

th

ick

, 1:

3 ct

. m

ort

ar

smo

oth

ren

der

ing

.m

902.0

01,

226.

00

1,

064.

00

36.1

0

36.1

130

0mm

T x

150

mm

R d

ou

ble

ste

p i

n b

rick

mas

on

ry i

n 1

:5 c

t. m

ort

ar,

fin

ish

ed w

ith

16m

m t

hic

k,

1:3

ct.

mo

rtar

sm

oo

th r

end

erin

g.

m2,1

71.0

02,

952.

00

2,

562.

00

36.1

1

(3

7)

PL

AS

TE

RE

R A

ND

PA

VIO

R

37.1

Cem

ent

mo

rtar

pla

ster

ing

wit

h 1

2mm

th

ick

, 1:

3 m

ix,

fin

ish

ed r

ou

gh

.m

2343.2

546

6.75

405.

25

37

.1

37.2

d

o

12m

m t

hic

k,

1:3

mix

, fi

nis

hed

sm

oo

th.

m2

453.0

061

6.00

534.

50

37

.2

37.3

d

o

16m

m t

hic

k,

1:3

mix

, fi

nis

hed

ro

ug

h.

m2

383.2

552

1.00

452.

00

37

.3

37.4

d

o

16m

m t

hic

k,

1:3

mix

, fi

nis

hed

sm

oo

th.

m2

493.0

067

0.00

581.

50

37

.4

37.5

d

o

16m

m t

hic

k,

1:2

mix

, fi

nis

hed

ro

ug

h.

m2

407.5

055

4.00

481.

00

37

.5

37.6

d

o

16m

m t

hic

k,

1:2

mix

, fi

nis

hed

sm

oo

th.

m2

517.5

070

3.50

610.

50

37

.6

37.7

A

do

20

mm

th

ick

, 1:

3 m

ix,

fin

ish

ed r

ou

gh

.m

2423.5

057

5.50

499.

75

37

.7A

37.8

A

do

20

mm

th

ick

, 1:

3 m

ix,

fin

ish

ed s

mo

oth

.m

2533.0

072

4.50

629.

50

37

.8A

37.7

d

o

20m

m t

hic

k,

1:2

mix

, fi

nis

hed

ro

ug

h.

m2

456.5

062

0.50

538.

50

37

.7

37.8

d

o

20m

m t

hic

k,

1:2

mix

, fi

nis

hed

sm

oo

th.

m2

566.0

076

9.50

668.

00

37

.8

37.9

Cem

ent

& l

ime

mo

rtar

pla

ster

ing

wit

h 1

6mm

th

ick

, 1:

1:5

mix

, fi

nis

hed

ro

ug

h.

m2

449.0

061

0.50

530.

00

37

.9

37.1

0C

emen

t &

lim

e m

ort

ar p

last

erin

g w

ith

16m

m t

hic

k,

1:1:

5 m

ix,

fin

ish

ed s

mo

oth

.m

2612.0

083

2.00

722.

50

37

.10

37.1

120

mm

th

ick

Dam

p P

roo

f C

ou

rse

in 1

:2 c

t. m

ort

ar,

fin

ish

ed r

ou

gh

wit

h t

wo

co

ats

of

Ho

t ta

r b

lin

ded

wit

h s

and

.m

2564.5

076

7.50

666.

00

37

.11

37.1

210

0mm

x 2

0mm

pla

in s

kir

tin

g i

n 1

:2 c

emen

t m

ort

ar,

fin

ish

ed s

mo

oth

.m

66.9

090

.95

78

.90

37

.12

37.1

315

0 x

150

mm

gla

zed

wal

l ti

lin

g (

wh

ite

or

colo

ur)

.m

22,7

92.0

03,

797.

00

3,

295.

00

37.1

3

37.1

420

0 x

200

mm

F

loo

r ti

lin

g.

m2

2,9

95.0

04,

073.

00

3,

534.

00

37.1

4

37.1

530

0 x

300

mm

Flo

or

tili

ng

m2

2,1

77.0

02,

960.

00

2,

568.

00

37.1

5

37.1

615

0mm

- 2

25m

m w

ide

cop

yin

g o

n b

rick

wal

ls w

ith

1:2

ct.

mo

rtar

, fi

nis

hed

sm

oo

th.

m200.5

027

2.50

236.

75

37

.16

- 28

-

Page 30: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nu

ary 2

01

2

BU

ILD

ING

W

OR

KS

Cla

ss-A

Cl-

B &

C

Basi

c U

nit

Rate

(Rs.

)U

nit

Rate

No.

Desc

rip

tio

n o

f W

ork

Un

it R

ate

(R

s.)

Rate

No

.

(

38)

CA

RP

EN

TE

R,

JOIN

ER

AN

D G

LA

ZIE

R

38.1

Do

or

in 1

00x

75m

m f

ram

e w

ith

75x

25m

m s

lats

, o

rdin

ary

ply

wo

od

sas

h,

bra

ss f

itti

ng

s in

cl.

3 N

os.

bu

tt h

ing

es,

2 N

os.

Bar

rel

Bo

lts

and

qu

alit

y m

ort

ice

lock

wit

h k

eys

in d

up

lica

te,

all

co

mp

lete

to

wo

rkin

g o

rder

.m

210,0

67.0

013

,691

.00

11,8

79.0

0

38

.10

38.2

PV

C T

oil

et D

oo

r in

804

x20

60m

m s

ize

wit

h P

VC

do

or

fram

e i

ncl

un

din

g 2

No

s. b

utt

hin

ges

, 2

No

s. B

arre

l B

olt

s an

d

qu

alit

y

lock

wit

h k

eys

in d

up

lica

te,

all

co

mp

lete

to

wo

rkin

g o

rder

.m

28,5

67.0

011

,651

.00

10,1

09.0

0

38

.2

38.3

Do

or

in 1

00x

75m

m f

ram

e w

ith

a f

ull

y g

laze

d f

anli

gh

t o

n t

op

(th

ick

nes

s o

f g

lass

to

be

3mm

) w

ith

cen

ter

piv

ot

arra

ng

emen

t &

lo

ckin

g d

evic

e, o

rdin

ary

ply

wo

od

sas

h,

Bra

ss f

itti

ng

s in

clu

din

g 3

No

s. B

utt

hin

ges

, 2

No

s. B

arre

l B

olt

s &

qu

alit

y m

ort

ice

lock

wit

h k

eys

in d

up

lica

te,

all

com

ple

te t

o w

ork

ing

ord

er.

m2

9,8

79.0

013

,435

.00

11,6

58.0

0

38

.3

38.4

As

in R

ate

No

. 38

.3 b

ut

wit

h m

arin

e (w

ater

pro

of

) p

lyw

oo

d s

ash

.m

211,4

22.0

015

,533

.00

13,4

78.0

0

38

.4

38.5

Do

or

in 1

00x

75m

m f

ram

e w

ith

ou

t sl

ats

or

fan

lig

ht

and

wit

h o

rdin

ary

ply

wo

od

sas

h,

bra

ss f

itti

ng

s in

clu

din

g 3

No

s.

bu

tt h

ing

es,

2 N

os.

Bar

rel

Bo

lts

and

qu

alit

y m

ort

ice

lock

wit

h k

eys

in d

up

lica

te,

all

com

ple

te t

o w

ork

ing

ord

er.

m2

9,8

59.0

013

,408

.00

11,6

34.0

0

38

.5

38.6

As

in R

ate

No

. 38

.5 b

ut

wit

h m

arin

e (w

ater

pro

of)

ply

wo

od

sas

h.

m2

11,6

22.0

015

,805

.00

13,7

14.0

0

38

.6

38.7

Do

or

in 1

00x

75m

m f

ram

e, w

ith

ou

t sl

ats

or

fan

lig

ht

and

wit

h 2

5mm

th

ick

led

ged

, b

race

d &

bat

ten

ed s

ash

, b

rass

fi

ttin

gs

incl

. 3

No

s. B

utt

Hin

ges

, 2

No

s. B

arre

l B

olt

s an

d q

ual

ity

mo

rtic

e lo

ck w

ith

key

s in

du

pli

cate

(A

150

mm

h

asp

& s

tap

le a

nd

50m

m V

iro

pad

lock

wit

h k

eys

may

be

pro

vid

ed i

n p

lace

of

mo

rtic

e lo

ck w

her

e ap

pli

cab

le),

all

co

mp

lete

to

wo

rkin

g o

rder

.

m2

13,1

97.0

017

,947

.00

15,5

73.0

0

38

.7

38.8

Gar

age

do

or

in 1

00x

50m

m f

ram

e, p

anal

led

sas

h c

om

pri

sin

g 3

0mm

th

ick

rai

ls &

sty

les

and

12m

m t

hic

k p

anel

s,

bra

ss f

itti

ng

s in

clu

din

g 1

2 N

os.

Bu

tt h

ing

es,

6 N

os.

Bar

rel

Bo

lts

(fo

r a

10'x

8' d

oo

r) 1

No

.150

mm

has

p &

sta

ple

an

d 1

N

o.5

0mm

Qu

alit

y P

adlo

ck

wit

h k

eys

all

com

ple

te t

o w

ork

ing

ord

er.

m2

6,6

10.0

08,

989.

00

7,

800.

00

38.8

38.9

Win

do

w i

n 1

00x

75m

m f

ram

e w

ith

75x

25m

m s

lats

, 25

mm

th

ick

sas

h c

om

pri

sin

g 3

mm

th

ick

gla

ss,

bra

ss f

itti

ng

s in

clu

din

g 2

No

s. b

utt

hin

ges

, 2

No

s. B

arre

l B

olt

s, 1

No

. C

asem

ent

stay

an

d 1

No

. C

asem

ent

Fas

ten

er f

or

each

sas

h

all

com

ple

te t

o w

ork

ing

ord

er.

m2

10,9

19.0

014

,849

.00

12,8

84.0

0

38

.9

38.1

0W

ind

ow

in

100

x75

mm

fra

me

wit

h g

laze

d f

anli

gh

t o

n t

op

co

mp

risi

ng

cen

tre

piv

ot

arra

ng

emen

t an

d l

ock

ing

dev

ice,

25

mm

th

ick

sas

h c

om

pri

sin

g 3

mm

th

ick

gla

ss,

bra

ss f

itti

ng

s in

clu

din

g 2

No

s. b

utt

hin

ges

, 2

No

s. B

arre

l B

olt

s, 1

No

.

case

men

t st

ay a

nd

1 N

o.

case

men

t fa

sten

er f

or

each

sas

h a

ll c

om

ple

te t

o w

ork

ing

ord

er.

m2

10,8

36.0

014

,736

.00

12,7

86.0

0

38

.10

38.1

1W

ind

ow

in

100

x75

mm

fra

me

wit

ho

ut

slat

s/fa

n l

igh

t, w

ith

25m

m t

hic

k s

ash

co

mp

risi

ng

3m

m t

hic

k g

lass

, b

rass

fi

ttin

gs

incl

ud

ing

2 N

os.

Bu

tt h

ing

es,

2 N

os.

Bar

rel

Bo

lts,

all

co

mp

lete

to

wo

rkin

g o

rder

.m

210,6

41.0

014

,471

.00

12,5

56.0

0

38

.11

- 29

-

Page 31: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nu

ary 2

01

2

BU

ILD

ING

W

OR

KS

Cla

ss-A

Cl-

B &

C

Basi

c U

nit

Rate

(Rs.

)U

nit

Rate

No.

Desc

rip

tio

n o

f W

ork

Un

it R

ate

(R

s.)

Rate

No

.

38.1

2W

ind

ow

in

100

x75

mm

fra

me

wit

ho

ut

slat

s/fa

nli

gh

t, w

ith

25m

m t

hic

k l

edg

ed,

bra

ced

& b

atte

ned

sas

h,

bra

ss

fitt

ing

s in

clu

din

g 2

No

s. b

utt

/p

arli

men

tary

hin

ges

, 2

No

s. B

arre

l B

olt

s, 1

No

. C

asem

ent

stay

& 1

No

. C

asem

ent

fast

ener

fo

r ea

ch s

ash

, al

l co

mp

lete

to

wo

rkin

g o

rder

.

m2

12,3

65.0

016

,816

.00

14,5

90.0

0

38

.12

- 30

-

Page 32: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nu

ary 2

01

2

BU

ILD

ING

W

OR

KS

Cla

ss-A

Cl-

B &

C

Basi

c U

nit

Rate

(Rs.

)U

nit

Rate

No.

Desc

rip

tio

n o

f W

ork

Un

it R

ate

(R

s.)

Rate

No

.

38.1

3Is

ola

ted

Fan

lig

ht

in 1

00x

75m

m f

ram

e w

ith

32m

m t

hic

k s

ash

co

mp

risi

ng

3m

m t

hic

k g

lass

, b

rass

fit

tin

gs

incl

ud

ing

2

No

s. C

ente

r p

ivo

ts &

2 N

os.

fan

lig

ht

catc

hes

, al

l co

mp

lete

to

wo

rkin

g o

rder

.m

213,3

59.0

018

,168

.00

15,7

64.0

0

38

.13

38.1

4T

rell

is w

ork

in

900

x90

0mm

fra

me

wo

rk o

f 10

0x50

mm

tim

ber

, w

ith

44m

m b

atte

ns

fix

ed t

o f

ram

ewo

rk a

t 75

mm

c/

c b

oth

way

.m

25,7

83.0

07,

864.

00

6,

824.

00

38.1

4

38.1

550

x50

mm

Gal

van

ized

iro

n w

eld

ed m

esh

fix

ed t

o 9

00x

900m

m f

ram

e w

ork

of

100x

50m

m t

imb

er,

by

mea

ns

of

38x

12m

m b

ead

ing

s.m

22,9

95.0

04,

073.

00

3,

534.

00

38.1

5

(

39)

RO

OF

ER

39.1

Cal

icu

t T

ile

roo

f o

n s

awn

tim

ber

fra

me,

tre

ated

wit

h 2

co

ats

of

wo

od

pre

serv

ativ

e, i

ncl

ud

ing

rid

ge

pla

tes,

wal

l

pla

tes,

pu

rlin

s, b

eam

s, s

tru

ts,

raft

ers

fix

ed a

t an

in

terv

al o

f 60

0mm

, re

eper

s et

c.m

22,9

81.0

04,

054.

00

3,

518.

00

39.1

39.1

AC

alic

at P

atte

rn R

idg

e T

iles

bed

ded

in

cem

ent

lim

e m

ort

ar 1

:1:5

mix

.m

508.0

069

0.50

599.

50

39

.1A

39.2

Co

rru

gat

ed A

sbes

tos

Ro

of

on

saw

n t

imb

er f

ram

e tr

eate

d w

ith

2 c

oat

s o

f w

oo

d p

rese

rvat

ive,

in

clu

din

g r

idg

e p

late

s, w

all

pla

tes,

pu

rlin

s, b

eam

s, s

tru

ts,

raft

ers

fix

ed a

t an

in

terv

al o

f 4

ft a

nd

ree

per

s et

c.

m2

2,1

99.0

02,

990.

00

2,

595.

00

39.2

39.2

AC

orr

ug

ated

Asb

esto

s ri

dg

ing

.m

708.0

096

2.50

835.

00

39

.2A

39.3

Hal

f ro

un

d s

ing

le t

ile

cov

erin

g o

n C

orr

ug

ated

Asb

esto

s R

oo

f (A

sbes

tos

roo

f p

aid

sep

arat

ely

).m

21,0

64.0

01,

447.

00

1,

256.

00

39.3

39.4

20m

m T

hic

k L

un

um

idel

la p

lan

k c

eili

ng

fix

ed t

o r

oo

f ra

fter

s, i

ncl

ud

ing

ap

pli

cati

on

of

wo

od

pre

serv

ativ

e in

2 c

oat

s.m

21,1

65.0

01,

584.

00

1,

374.

00

39.4

39.5

20m

mT

hic

k f

lat

Lu

nu

mid

ella

cei

lin

g,

fix

ed t

o s

awn

tim

ber

fra

me

wo

rk,

incl

ud

ing

ap

pli

cati

on

of

wo

od

p

rese

rvat

ive

in 2

co

ats.

m2

1,9

96.0

02,

714.

00

2,

355.

00

39.5

39.6

Fla

t A

sbes

tos

ceil

ing

, fi

xed

to

saw

n t

imb

er f

ram

e w

ork

, in

clu

din

g a

pp

lica

tio

n o

f w

oo

d p

rese

rvat

ive

in 2

co

ats.

m2

1,8

18.0

02,

472.

00

2,

145.

00

39.6

39.6

AA

sbes

tos

ceil

ing

fix

ed t

o r

oo

f ra

fter

s, i

ncl

ud

ing

ap

pli

cati

on

of

wo

od

pre

serv

ativ

e in

2 c

oat

s.m

2992.5

01,

349.

00

1,

171.

00

39.6

A

39.7

200x

25m

m v

alan

ce &

bar

ge

bo

ard

s fi

xed

to

ro

of

raft

ers

wit

h b

rass

scr

ews

incl

ud

ing

ap

pli

cati

on

of

wo

od

p

resa

vat

ive

in 2

co

ats.

m830.0

01,

128.

00

97

9.50

39.7

39.7

A

As

in R

ate

No

. 39

.7,

bu

t fo

r 25

0x25

mm

val

ance

& b

arg

e b

oar

d.

m1,1

28.0

01,

534.

00

1,

332.

00

39.7

A

39.8

Val

ley

gu

tter

in

Alu

min

ium

sh

eet,

fix

ed t

o 2

5mm

th

ick

pla

nk

s tr

eate

d w

ith

2 c

oat

s o

f w

oo

d p

rese

rvat

ive.

m2

9,4

43.0

012

,842

.00

11,1

43.0

0

39

.8

39.9

150m

m h

alf

rou

nd

or

115m

m s

qu

are

PV

C e

aves

gu

tter

fix

ed t

o v

alan

ce b

oar

d w

ith

alu

min

ium

bra

cket

s &

bra

ss

scre

ws.

m485.7

566

0.50

573.

00

39

.9

39.1

090

mm

dia

. P

VC

do

wn

pip

es i

ncl

usi

ve

of

ben

ds,

join

ers

etc.

fix

ed t

o w

all

wit

h e

mb

edd

ed p

lug

s &

PV

C s

trap

s an

d

wit

h p

rop

er c

on

nec

tio

n t

o e

aves

gu

tter

s.

m596.5

081

1.00

704.

00

39

.10

- 31

-

Page 33: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nu

ary 2

01

2

BU

ILD

ING

W

OR

KS

Cla

ss-A

Cl-

B &

C

Basi

c U

nit

Rate

(Rs.

)U

nit

Rate

No.

Desc

rip

tio

n o

f W

ork

Un

it R

ate

(R

s.)

Rate

No

.

39.1

1F

urn

ish

ing

& f

ixin

g P

VC

ru

nn

ing

hea

d f

or

eav

es g

utt

ers.

ea

ch

605.0

082

2.50

713.

50

39

.11

39.1

2F

urn

ish

ing

& f

ixin

g P

VC

Gu

tter

Hea

d B

ox

fo

r ea

ves

gu

tter

.

each

1,1

88.0

01,

615.

00

1,

402.

00

39.1

2

(

40)

DE

CO

RA

TO

R

N

OT

E:

Mu

ltip

ly d

oo

r/ w

ind

ow

are

as (

op

enin

g i

n w

all)

by

th

e p

ain

tin

g c

oef

fici

ents

giv

en b

elo

w t

o o

bta

in p

ain

tin

g

area

s fo

r w

hic

h

foll

ow

ing

un

it r

ates

are

ap

pli

cab

le.

Th

e co

effi

cien

ts i

ncl

ud

e th

e p

ain

tin

g o

f b

oth

sid

es o

f d

oo

r/

win

do

w.

D

oo

r w

ith

fan

lig

ht

& p

lyw

oo

d s

ash

= 2

.15,

Tre

llis

wo

rk w

ith

fra

me

= 2

.50,

Win

do

w w

ith

sla

ts &

gla

zed

sas

h =

2.

40,

G.I

. w

ire

mes

h w

ith

fra

me

= 1

.50,

Win

do

w w

ith

fan

lig

ht

& g

laze

d s

ash

= 2

.10,

L

ou

ver

s w

ith

sla

ts =

3.0

0 an

d W

ind

oo

r w

ith

gla

zed

sas

h =

1.2

5.

40.1

Ap

pli

cati

on

of

two

co

ats

of

wh

ite

was

h i

n l

ime,

in

clu

din

g p

rep

arat

ion

of

surf

ace.

m2

68.1

592

.65

80

.40

40

.1

40.2

Ap

pli

cati

on

of

Wal

l fi

ller

in

clu

din

g p

rep

arat

ion

of

surf

ace.

m2

144.5

019

6.50

170.

50

40

.2

40.3

Ap

pli

cati

on

of

two

co

ats

of

Wea

ther

shei

ld o

f ap

pro

ved

tin

t &

qu

alit

y i

ncl

ud

ing

pre

par

atio

n o

f su

rfac

e.m

2189.5

025

7.50

223.

50

40

.3

40.4

Ap

pli

cati

on

of

two

co

ats

of

gre

y c

emen

t w

ash

to

pli

nth

in

tw

o c

oat

s in

clu

din

g p

rep

arat

ion

of

surf

ace.

m2

45.0

561

.25

53

.15

40

.4

40.5

Ap

pli

cati

on

of

two

co

ats

of

Em

uls

ion

Pai

nt

of

app

rov

ed t

int

& q

ual

ity

in

clu

din

g p

rep

arat

ion

of

surf

ace.

m2

163.7

522

2.50

193.

25

40

.5

40.6

Ap

pli

cati

on

of

two

co

ats

of

En

amal

Pai

nt

of

app

rov

ed t

int

& q

ual

ity

in

clu

din

g p

rep

arat

ion

of

surf

ace.

m2

218.7

529

7.50

258.

25

40

.6

40.7

Ap

pli

cati

on

of

two

co

ats

of

Var

nis

h o

f ap

pro

ved

qu

alit

y i

ncl

ud

ing

pre

par

atio

n o

f su

rfac

e.m

2227.0

030

8.50

268.

00

40

.7

40.8

Ap

pli

cati

on

of

two

co

ats

of

Alu

min

ium

pai

nt

of

app

rov

ed q

ual

ity

in

clu

din

g p

rep

arat

ion

of

surf

ace

m2

198.0

026

9.25

233.

75

40

.8

(

41)

PL

UM

BE

R

-

-

41.2

Fu

rnis

hin

g,

lay

ing

& jo

inti

ng

110

mm

dia

. P

VC

pip

es i

ncl

ud

ing

tre

nch

ing

& b

ack

fill

wit

h n

eces

sary

ben

ds

etc.

m1,1

46.0

01,

558.

00

1,

352.

00

41.2

41.3

Fu

rnis

hin

g &

in

stal

lin

g c

eram

ic l

ow

lev

al s

uit

co

mp

lete

wit

h c

eram

ic c

iste

rn,

lid

, co

ntr

ol

val

ve,

sy

ph

on

, p

last

ic

seat

& c

ov

er,

trap

, sy

ph

on

lev

er e

tc.

wit

h n

eces

sary

co

nn

ecti

on

s to

sew

age

& w

ater

su

pp

ly s

yst

ems.

each

16,9

30.0

023

,024

.00

19,9

77.0

0

41

.3

41.4

Fu

rnis

hin

g &

in

stal

lin

g c

eram

ic s

qu

atti

ng

pan

(st

and

erd

siz

e) c

om

ple

te w

ith

cas

t ir

on

cis

tern

, li

d,

con

tro

l v

alv

e,

syp

ho

n,

trap

, d

ow

n p

ipe,

fo

ot

rest

s, s

yp

ho

n l

ever

& c

hai

n e

tc.

wit

h n

eces

sary

co

nn

ecti

on

s to

sew

age

& w

ater

su

pp

ly s

yst

em.

each

6,4

17.0

08,

727.

00

7,

572.

00

41.4

- 32

-

Page 34: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nu

ary 2

01

2

BU

ILD

ING

W

OR

KS

Cla

ss-A

Cl-

B &

C

Basi

c U

nit

Rate

(Rs.

)U

nit

Rate

No.

Desc

rip

tio

n o

f W

ork

Un

it R

ate

(R

s.)

Rate

No

.

41.4

A

Fu

rnis

hin

g &

in

stal

lin

g c

eram

ic s

qu

atti

ng

pan

wit

h t

rap

, fo

ot

rest

s &

nec

essa

ry c

on

nec

tio

n t

o s

ewag

e sy

stem

, ex

clu

din

g c

iste

rn.

each

3,7

30.0

05,

072.

00

4,

401.

00

41.4

A

41.5

Fu

rnis

hin

ig &

in

stal

lin

g 1

000x

500m

m s

/s

kit

chen

sin

k c

om

ple

te w

ith

str

ain

er,

flu

shin

g p

lug

, P

VC

was

te w

ater

p

ipe

etc

each

4,6

03.0

06,

260.

00

5,

431.

00

41.5

41.6

Fu

rnis

hin

g &

in

stal

lin

g 5

50x

380m

m c

eram

ic w

ash

bas

in

was

te w

ater

pip

e &

wit

h n

eces

sary

co

nn

ecti

on

to

wat

er

sup

ply

sy

stem

.ea

ch4,9

47.0

06,

727.

00

5,

837.

00

41.6

41.7

Fu

rnis

hin

g &

in

stal

lin

g

20m

m d

ia.

PV

C p

ipe

lin

e fo

r in

tern

al w

ater

ser

vic

e in

clu

din

g a

ll n

eces

sary

ben

ds,

so

cket

s,

tees

etc

.m

81.7

511

1.00

96.4

5

41.7

41.8

As

in R

ate

No

. 41

.7,

bu

t fo

r 25

mm

dia

. P

VC

pip

e li

ne.

m194.7

526

4.75

229.

75

41

.8

41.9

As

in R

ate

No

. 41

.7,

bu

t fo

r 32

mm

dia

. P

VC

pip

e li

ne.

m470.2

563

9.50

554.

50

41

.9

41.1

0A

s in

Rat

e N

o.

41.7

, b

ut

for

40m

m d

ia.

PV

C p

ipe

lin

e.m

560.0

076

1.50

661.

00

41

.10

41.1

1A

s in

Rat

e N

o.

41.7

, b

ut

for

50m

m d

ia.

PV

C p

ipe

lin

e.m

822.5

01,

118.

00

97

0.50

41.1

1

41.1

2F

urn

ish

ing

& i

nst

alli

ng

20

mm

PV

C s

ho

wer

ro

se a

nd

1/

2" b

rass

co

ntr

ol

val

ve

wit

h n

eces

sary

val

ve

& F

auce

t so

cket

s et

c.

each

757.0

01,

029.

00

89

3.50

41.1

2

41.1

3F

urn

ish

ing

& i

nst

alli

ng

20

mm

b

rass

bib

cock

wit

h n

eces

sary

Fau

cet

sock

ets.

each

796.5

01,

083.

00

93

9.50

41.1

3

41.1

4F

urn

ish

ing

& i

nst

alli

ng

25

mm

b

rass

sto

p v

alv

e w

ith

nec

essa

ry s

ock

ets.

ea

ch

1,2

30.0

01,

672.

00

1,

451.

00

41.1

4

41.1

5F

urn

ish

ing

& i

nst

alli

ng

32

mm

b

rass

sto

p v

alv

e w

ith

nec

essa

ry s

ock

ets.

ea

ch

1,7

81.0

02,

422.

00

2,

102.

00

41.1

5

41.1

6F

urn

ish

ing

& i

nst

alli

ng

40

mm

bra

ss g

ate

val

ve

wit

h n

eces

sary

so

cket

s.

each

3,6

06.0

04,

904.

00

4,

255.

00

41.1

6

41.1

7F

urn

ish

ing

& i

nst

alli

ng

5

0mm

bra

ss g

ate

val

ve

wit

h n

eces

sary

so

cket

s.

each

4,8

27.0

06,

564.

00

5,

696.

00

41.1

7

41.1

8F

urn

ish

ing

& i

nst

alli

ng

20

mm

b

rass

sto

p v

alv

e w

ith

nec

essa

ry s

ock

ets.

ea

ch

934.0

01,

270.

00

1,

102.

00

41.1

8

41.1

9F

urn

ish

ing

& i

nst

alli

ng

25

mm

bra

ss b

ibco

ck w

ith

nec

essa

ry s

ock

ets.

ea

ch

1,4

69.0

01,

997.

00

1,

733.

00

41.1

9

41.2

0F

urn

ish

ing

& i

nst

alli

ng

cer

amic

Uri

nal

pan

wit

h l

ead

-aw

ay p

ipe.

ea

ch

4,0

36.0

05,

488.

00

4,

763.

00

41.2

0

41.2

1F

urn

ish

ing

& i

nst

alli

ng

cer

amic

so

ap h

old

er.

ea

ch

676.0

091

9.00

797.

50

41

.21

41.2

2F

urn

ish

ing

& i

nst

alli

ng

200

x10

0mm

hal

f ro

un

d c

eram

ic T

oo

th B

rush

Ho

lder

.

each

957.5

01,

302.

00

1,

129.

00

41.2

2

41.2

3F

urn

ish

ing

& i

nst

alli

ng

Ch

rom

ium

pla

ted

To

wel

Rai

l w

ith

cer

amic

Bra

cket

s.

each

1,7

70.0

02,

407.

00

2,

088.

00

41.2

3

41.2

4F

urn

ish

ing

& i

nst

alli

ng

500

x40

0mm

(R

ecta

ng

ula

r o

r o

val

sh

ape)

Bat

hro

om

Mir

ror

wit

h 5

mm

th

ick

400

x38

0mm

p

late

gla

ss s

hel

f fi

xed

to

wal

l w

ith

T

ray

Ho

lder

s.

each

2,2

32.0

03,

035.

00

2,

633.

00

41.2

4

- 33

-

Page 35: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nu

ary 2

01

2

BU

ILD

ING

W

OR

KS

Cla

ss-A

Cl-

B &

C

Basi

c U

nit

Rate

(Rs.

)U

nit

Rate

No.

Desc

rip

tio

n o

f W

ork

Un

it R

ate

(R

s.)

Rate

No

.

41.2

5F

urn

ish

ing

& i

nst

alli

ng

150

x15

0mm

cer

amic

To

ilet

Pap

er H

old

er.

ea

ch

1,7

70.0

02,

407.

00

2,

088.

00

41.2

5

41.2

6 F

urn

ish

ing

& i

nst

alli

ng

100

x10

0mm

cer

amic

Ro

be

Ho

ok

.

each

1,8

32.0

02,

491.

00

2,

162.

00

41.2

6

41.2

7P

rov

idin

g W

aste

wat

er C

atch

pit

wit

h 1

50x

150m

m P

VC

Gra

tin

g a

nd

PV

C L

ead

-aw

ay p

ipe.

ea

ch

1,1

97.0

01,

627.

00

1,

413.

00

41.2

7

41.2

8P

rov

idin

g S

egm

enta

l o

pen

ch

ann

el (

75m

m w

ide)

on

co

ncr

ete

or

bri

ck p

aved

flo

or.

m163.7

522

2.50

193.

50

41

.28

41.2

9P

rov

idin

g 1

00m

m d

ia.

PV

C G

ull

ey w

ith

"P

" o

r "S

" tr

ap a

nd

150

x15

0mm

PV

C G

rati

ng

.

each

2,1

48.0

02,

921.

00

2,

534.

00

41.2

9

41.3

0F

urn

ish

ing

an

d i

nst

alli

ng

50m

m d

ia.

PV

C V

ent

pip

e, f

ixed

to

wal

l w

ith

bra

cket

s.m

628.0

085

4.00

741.

50

41

.30

41.3

1A

s in

Rat

e N

o.

41.3

0 b

ut

for

100m

m d

ia.

PV

C V

ent

pip

e.m

1,0

72.0

01,

457.

00

1,

265.

00

41.3

1

41.3

2F

urn

ish

ing

an

d i

nst

alli

ng

50m

m d

ia.

PV

C V

ent

pip

e, f

ixed

to

wal

l w

ith

bra

cket

s.m

791.0

01,

075.

00

93

3.50

41.3

2

41.3

3F

urn

ish

ing

an

d i

nst

alli

ng

100

mm

dia

. (T

yp

e 40

0) P

VC

Ven

t p

ipe,

fix

ed t

o w

all

wit

h b

rack

ets.

m1,0

87.0

01,

478.

00

1,

283.

00

41.3

3

41.3

4F

urn

ish

ing

an

d i

nst

alli

ng

Co

per

Wir

e D

om

e fo

r V

ent

pip

e.

each

353.7

548

1.00

417.

25

41

.34

41.3

5C

on

stru

ctio

n o

f 75

0x75

0x90

0mm

Man

Ho

le (

inte

rnal

dim

ensi

on

s) i

n B

rick

wo

rk w

ith

2"

thic

k R

CC

co

ver

sla

b.

ea

ch

12,4

74.0

016

,964

.00

14,7

19.0

0

41

.35

(

42)

EL

EC

TR

ICIA

N

42.1

Pro

vid

ing

Bat

ten

Lam

p w

ith

co

nce

aled

/se

mi-

con

ceal

ed W

irin

g,

con

nec

tio

ns

to m

ain

cir

cuit

, S

wit

ch,

Ho

lder

, S

had

e &

Bu

lb a

nd

co

mp

lete

in

all

res

pec

t.

ea

ch

3,3

68.0

04,

580.

00

3,

974.

00

42.1

42.2

As

in R

ate

No

. 42

.1 b

ut

for

Pen

den

t L

amp

.

each

3,5

09.0

04,

772.

00

4,

141.

00

42.2

42.3

Pro

vid

ing

5 A

. S

wit

ched

So

cket

ou

tlet

wit

h c

on

ceal

ed/

sem

i-co

nce

aled

Wir

ing

, co

nn

ecti

on

s to

th

e m

ain

cir

cuit

&

Ear

th l

eak

age

syst

em,

com

ple

te i

n a

ll r

esp

ect.

ea

ch

4,6

58.0

06,

334.

00

5,

497.

00

42.3

42.4

Pro

vid

ing

co

nce

aled

/se

mi-

con

ceal

ed t

yp

e W

irin

g w

ith

co

nn

ecti

on

s to

th

e m

ain

cir

cuit

, fo

r C

eili

ng

Fan

&

Reg

ula

tor,

in

clu

din

g s

usp

ensi

on

ho

ok

, ro

un

d b

lock

s, s

wit

ch e

tc.

(Su

pp

lyin

g a

nd

fix

ing

of

Cei

lin

g F

an &

Reg

ula

tor

no

t in

clu

ded

).

ea

ch

3,6

68.0

04,

988.

00

4,

328.

00

42.4

42.5

Pro

vid

ing

1m

lo

ng

E

arth

ele

ctro

de

(Co

pp

er)

wit

h n

eces

sary

Wir

ing

an

d C

on

nec

tio

n t

o E

arth

Lea

kag

e C

ircu

it

Bre

aker

.

each

3,2

33.0

04,

396.

00

3,

814.

00

42.5

42.6

AS

up

ply

ing

& i

nst

alli

ng

sin

gle

ph

ase

2 w

ay D

-Pan

el w

ith

nec

essa

ry c

on

nec

tio

ns

to m

ain

& b

ran

ch c

ircu

its.

ea

ch

1,7

88.0

02,

431.

00

2,

110.

00

42.6

A

42.6

BA

s in

Rat

e N

o.

42.6

A b

ut

for

4 w

ay d

istr

ibu

tio

n P

anel

.

each

2,2

46.0

03,

054.

00

2,

650.

00

42.6

B

42.6

CA

s in

Rat

e N

o.

42.6

A b

ut

for

6 w

ay d

istr

ibu

tio

n P

anel

.

each

2,7

97.0

03,

803.

00

3,

301.

00

42.6

C

- 34

-

Page 36: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 0

1 Ja

nu

ary 2

01

2

BU

ILD

ING

W

OR

KS

Cla

ss-A

Cl-

B &

C

Basi

c U

nit

Rate

(Rs.

)U

nit

Rate

No.

Desc

rip

tio

n o

f W

ork

Un

it R

ate

(R

s.)

Rate

No

.

42.6

DA

s in

Rat

e N

o.

42.6

A b

ut

for

8 w

ay d

istr

ibu

tio

n P

anel

.

each

3,1

61.0

04,

298.

00

3,

730.

00

42.6

D

42.6

EA

s in

Rat

e N

o.

42.6

A b

ut

for

10 w

ay d

istr

ibu

tio

n P

anel

.

each

4,0

99.0

05,

574.

00

4,

836.

00

42.6

E

42.6

FA

s in

Rat

e N

o.

42.6

A b

ut

for

12 w

ay d

istr

ibu

tio

n P

anel

.

each

4,5

56.0

06,

196.

00

5,

376.

00

42.6

F

42.7

AS

up

ply

ing

& i

nst

alli

ng

40

A S

ing

le p

has

e Is

ola

tor

wit

h n

eces

sary

co

nn

ecti

on

s to

mai

n c

ircu

it

each

1,9

39.0

02,

637.

00

2,

289.

00

42.7

A

42.7

BA

s in

Rat

e N

o.4

2.7A

bu

t fo

r 63

A.

Iso

lato

r.

each

1,7

89.0

02,

433.

00

2,

111.

00

42.7

B

42.8

AS

up

ply

ing

& i

nst

alli

ng

40

A.

Sin

gle

Ph

ase

Ear

th L

eak

age

Cir

cuit

Bre

aker

w

ith

nec

essa

ry c

on

nec

tio

ns

to m

ain

ci

rcu

it &

Ear

th E

lect

rod

e et

c.

ea

ch

3,7

25.0

05,

066.

00

4,

396.

00

42.8

A

42.8

B

As

in R

ate

No

. 42

.8A

bu

t fo

r 63

A E

arth

Lea

kag

e C

ircu

it B

reak

er.

ea

ch

3,9

26.0

05,

339.

00

4,

633.

00

42.8

B

42.9

Fu

rnis

hin

g 7

/04

4 E

lect

ric

Cab

les,

75m

m d

ia.

G.I

. p

ipe

for

inte

rmed

iate

po

st,

G.I

bra

cket

s w

ith

in

sula

tors

&

oth

er

nec

essa

ry m

ater

ials

an

d p

rov

idin

g S

erv

ice

con

nec

tio

n f

rom

mai

n s

up

ply

.m

479.7

565

2.00

566.

00

42

.9

42.1

0P

rov

idin

g B

rack

et L

amp

wit

h c

on

ceal

ed o

r se

mi

con

ceal

ed t

yp

e W

irin

g,

con

nec

tio

n t

o t

he

mai

n c

ircu

it,

swit

ch,

ho

lder

, sh

ade,

Bu

lb e

tc.

and

co

mp

lete

in

all

res

pec

t.

ea

ch

3,4

84.0

04,

738.

00

4,

111.

00

42.1

0

42.1

1A

s in

Rat

e N

o.

42.1

0 b

ut

for

Cei

lin

g L

amp

wit

h r

ou

nd

or

squ

are

typ

e P

last

ic c

ov

er.

ea

ch

3,7

75.0

05,

134.

00

4,

455.

00

42.1

1

42.1

2A

s in

Rat

e N

o.

42.1

0 b

ut

for

20 W

, 2

ft l

on

g D

ayli

gh

t ty

pe

Flu

ore

scen

t la

mp

.

each

4,1

23.0

05,

607.

00

4,

865.

00

42.1

2

42.1

3A

s in

Rat

e N

o.

42.1

0 b

ut

for

40 W

, 4

ft l

on

g D

ayli

gh

t ty

pe

Flu

oer

esce

nt

lam

p.

ea

ch

4,7

05.0

06,

398.

00

5,

552.

00

42.1

3

42.1

4P

rov

idin

g 1

5 A

Sw

itch

ed S

ock

et O

utl

et w

ith

co

nea

led

or

sem

i-co

nce

aled

ty

pe

wir

ing

(u

sin

g 7

/03

6 ca

ble

s) a

nd

co

nn

ecti

on

s to

mai

n c

ircu

it &

Ear

th L

eak

age

syst

em c

om

ple

te i

n a

ll r

esp

ect.

ea

ch

8,7

51.0

011

,901

.00

10,3

26.0

0

42

.14

42.1

5S

up

ply

ing

an

d i

nst

alli

ng

56"

Sw

eep

Cei

lin

g F

an &

Reg

ula

tor

(ex

clu

din

g w

irin

g).

ea

ch

5,8

38.0

07,

939.

00

6,

889.

00

42.1

5

42.1

6F

urn

ish

ing

an

d i

nst

alli

ng

Ele

ctri

c B

ell

& B

ell

Pu

sh,

wit

h n

eces

sary

wir

ing

(co

nce

aled

or

sem

i-co

nce

aled

ty

pe)

an

d

con

nec

tio

n t

o m

ain

cir

cuit

.ea

ch4,1

40.0

05,

630.

00

4,

885.

00

42.1

6

42.1

7F

urn

ish

ing

an

d i

nst

alli

ng

Str

eet

Lam

p c

om

ple

te w

ith

125

W M

ercu

ry V

apo

ur

Bu

lb,

Lam

p B

alla

st,

40/

0076

co

nn

ecti

ng

cab

les

and

20m

m d

ia.

G.I

. p

ipe

fix

ed t

o l

amp

po

st w

ith

G.I

. b

rack

ets

ea

ch

2,8

53.0

03,

880.

00

3,

366.

00

42.1

7

42.1

8P

rov

idin

g 1

3 A

Sq

uar

e p

in S

ock

et O

utl

et w

ith

co

nea

led

or

sem

i-co

nce

aled

ty

pe

wir

ing

(u

sin

g 7

/02

9 ca

ble

s) a

nd

co

nn

ecti

on

s to

mai

n c

ircu

it &

Ear

th L

eak

age

syst

em c

om

ple

te i

n a

ll r

esp

ect.

ea

ch

7,5

59.0

010

,280

.00

8,92

0.00

42

.18

2.

U

nit

Ra

tes

for

Co

nst

ruct

ion

Wo

rks-

Au

gest

200

1 :

Min

istr

y o

f M

ah

aw

eli

Dev

elo

pm

ent.

Ref

eren

ces:

1.

Da

ta f

or

Co

stin

g -

1980

: R

ate

s su

b C

om

mit

tee

ap

po

inte

d b

y S

ecre

tary

, M

inis

try

of

Ma

ha

wel

i D

evel

op

men

t.

- 35

-

Page 37: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 1

Jan

uar

y 2

01

2

Cla

ss-A

Cl-

B &

C

43S

up

ply

and

fix

Iro

ng

rill

wit

h20

x6

mm

flat

iro

no

ute

rfr

ame

and

ho

rizo

nta

lb

raci

ng

sat

300

mm

inte

rval

sco

mp

lete

wit

h12

x6

mm

flat

iro

nv

erti

cals

at75

mm

c/c

asin

stru

cted

incl

ud

ing

two

coat

so

f an

tico

rro

siv

e p

ain

t an

d e

nam

el p

ain

t.m

25,1

10.8

3

6,95

0.00

6,03

0.00

43

44S

up

ply

and

fix

Cer

amic

Sin

k,

24"x

15"x

7"co

mp

lete

wit

hm

on

oty

pe,

chro

miu

mp

late

dlo

ng

nec

kty

pe

sin

k t

ap

- (M

om

ali,

Hu

ai o

r eq

uiv

alen

t) -

in

clu

din

g a

ll n

eces

sary

fit

tin

gs.

No

.7,3

10.0

0

9,94

1.00

8,62

5.00

44

45S

up

ply

an

d f

ix A

ng

le v

alv

e (M

om

ali,

Hu

ai o

r eq

uiv

alen

t)N

o.

1,2

62.5

0

1,71

7.00

1,48

9.00

45

46S

up

ply

an

d f

ix C

hro

miu

m p

late

d f

lex

ible

cab

le (

Mo

mal

i, H

uai

or

equ

ival

ent)

, le

ng

th 1

2" o

r 18

".N

o.

755.0

0

1,

026.

00

89

0.50

46

47M

anh

ole

wit

hin

tern

ald

imen

sio

n45

0x45

0x60

0mm

dee

p,

150m

mth

ick

1:3:

6(40

mm

)co

ncr

ete

fou

nd

atio

n,

225m

mth

ick

bri

ckw

ork

in1:

5ct

.sa

nd

,12

mm

thic

kce

men

tsa

nd

ren

der

ing

in1:

2w

ith

form

ing

can

nel

s an

d 7

5mm

th

ick

R

.C.C

. sl

ab a

s p

er D

raw

ing

s

No

.7,8

33.3

3

10,6

53.0

0

9,24

3.00

47

48S

up

ply

and

inst

all

65x

65x

6m

man

gle

iro

n,

serv

ice

bra

cket

,D

bra

cket

and

Insu

lato

rw

ith

nec

essa

ryn

uts

and

bo

lts

for

mai

nw

ire

fix

edto

wal

lo

rro

of

fram

ein

clu

din

gtw

oco

ats

of

anti

corr

osi

ve

pai

nt

and

en

amel

pai

nt-

Sin

gle

Ph

ase

No

.2,9

36.6

7

3,99

3.00

3,46

5.00

48

49S

up

ply

and

fix

Alu

min

um

win

do

wF

ixed

typ

e,b

ead

ing

stic

kw

ith

sili

con

gu

mB

row

n/

Sil

ver

A

lum

inu

m m

emb

ers

co

mp

lete

to

th

e ac

cep

ted

En

gin

eeri

ng

sta

nd

ard

sm

26,5

10.0

0

8,85

3.00

7,68

1.00

49

50S

up

ply

and

fix

Alu

min

ium

win

do

wF

ixed

typ

e,b

ead

ing

stic

kw

ith

sili

con

gu

mP

ow

der

coat

edA

lum

inu

m m

emb

ers

co

mp

lete

to

th

e ac

cep

ted

En

gin

eeri

ng

sta

nd

ard

sm

26,2

14.1

7

8,45

1.00

7,33

2.00

50

51S

up

ply

and

fix

Alu

min

um

Cas

emen

tw

ind

ow

wit

h5m

mfl

oat

gla

ss,

rub

ber

bea

din

gst

ick

wit

hsi

lico

n g

um

Bro

wn

/S

ilv

er A

lum

inu

m m

emb

ers

com

ple

te t

o t

he

acce

pte

d E

ng

inee

rin

g s

tan

dar

ds

m2

9,6

20.8

3

13,0

84.0

0

11,3

52.0

0

51

52S

up

ply

and

fix

Alu

min

um

Cas

emen

tw

ind

ow

wit

h5m

mfl

oat

gla

ss,

rub

ber

bea

din

gst

ick

wit

hsi

lico

n g

um

Po

wd

er c

oat

ed A

lum

inu

m m

emb

ers

com

ple

te t

o t

he

acce

pte

d E

ng

inee

rin

g s

tan

dar

ds

m2

12,8

22.5

0

17

,438

.00

15

,130

.00

52

53S

up

ply

and

fix

Alu

min

um

Do

or

wit

h5m

mfl

oat

gla

sso

nto

pan

dP

VC

coat

ed5m

mp

lyw

oo

d

bo

ard

atb

ott

om

,ru

bb

erb

ead

ing

stic

kw

ith

sili

con

gu

mB

row

n/

Sil

ver

Alu

min

um

mem

ber

sw

ith

lock

, st

ain

less

ste

el h

ing

ers,

sta

inle

ss s

teel

do

or

han

dle

, d

oo

r cl

ose

r an

d

all

acce

sso

ries

.m

211,3

42.5

0

15

,425

.00

13

,384

.00

53

54S

up

ply

and

fix

Alu

min

um

Do

or

wit

h5m

mfl

oat

gla

sso

nto

pan

dP

VC

coat

ed5m

mp

lyw

oo

db

oar

dat

bo

tto

m,

rub

ber

bea

din

gst

ick

wit

hsi

lico

ng

um

Po

wd

erco

ated

Alu

min

um

mem

ber

sw

ith

lock

, st

ain

less

ste

el h

ing

ers,

sta

inle

ss s

teel

do

or

han

dle

, d

oo

r cl

ose

r an

d

all

acce

sso

ries

.m

215,5

84.1

7

21

,194

.00

18

,389

.00

54

Rate

No

.B

asi

c U

nit

Rate

(Rs.

)U

nit

Un

it R

ate

(R

s.)

Rate

No

.D

esc

rip

tio

n o

f W

ork

- 35 -

Page 38: ratebook-2012_miwrm (1)

Engin

eer's

Unit

Rat

es -

Appli

cable

fro

m 1

Jan

uar

y 2

01

2

Cla

ss-A

Cl-

B &

CR

ate

No

.B

asi

c U

nit

Rate

(Rs.

)U

nit

Un

it R

ate

(R

s.)

Rate

No

.D

esc

rip

tio

n o

f W

ork

55S

up

ply

and

fix

Alu

min

um

Do

or

wit

h5m

mfl

oat

gla

sso

nto

pan

d0.

47m

mZ

n-A

lco

ver

edp

lyw

oo

db

oar

dat

bo

tto

m,

rub

ber

bea

din

gst

ick

wit

hsi

lico

ng

um

Po

wd

erco

ated

Alu

min

um

mem

ber

sw

ith

lock

, st

ain

less

ste

el h

ing

ers,

sta

inle

ss s

teel

do

or

han

dle

, d

oo

r cl

ose

r an

d

all

acce

sso

ries

.

m2

17,3

59.1

7

23

,608

.00

20

,483

.00

55

56S

up

ply

and

fix

2.1m

hei

gh

tA

lum

inu

mP

arti

tio

nu

sin

g76

x23

mm

sect

ion

sw

ith

5mm

flo

atg

lass

on

top

and

PV

Cco

ated

5mm

ply

wo

od

bo

ard

atb

ott

om

,ru

bb

erb

ead

ing

stic

kw

ith

sili

con

gu

mB

row

n/

Sil

ver

Alu

min

um

mem

ber

s c

om

ple

te

to t

he

acce

pte

d E

ng

inee

rin

g s

tan

dar

ds

m2

4,5

37.5

0

6,17

1.00

5,35

4.00

56

57S

up

ply

and

fix

Alu

min

um

Par

titi

on

usi

ng

76x

23m

mse

ctio

ns

wit

h5m

mfl

oat

gla

ssru

bb

erb

ead

ing

stic

kw

ith

sili

con

gu

mP

ow

der

coat

edA

lum

inu

mm

emb

ers

com

ple

teto

the

acce

pte

dE

ng

inee

rin

gst

and

ard

sm

27,3

97.5

0

10,0

60.0

0

8,72

9.00

57

Ref

eren

ces:

Un

it R

ate

s o

f P

rov

isio

na

l E

ngi

nee

rin

g D

epa

rtm

ent

- N

ort

h C

entr

al

Pro

vin

ce

- 36 -