3 500 MENWORKER CAMP3 500 MENWORKER CAMP3.500 MEN WORKER CAMP 3.500 MEN WORKER CAMP RAS LAFFAN / RAS LAFFAN / QATARQATAR
3.500 MEN WORKER CAMP 3.500 MEN WORKER CAMP RAS LAFFAN / QATARRAS LAFFAN / QATAR
Type of Contract: Construction
Scope of Work: Building construction works, Electrical works, Mechanical works, Water heater units, A/Cunits
Total Building Area : 34 379 72 m²Total Building Area : 34.379,72 m
Duration of the Work: September 2006 ‐ January 2007
2 400 PERSON CAMP PROJECT FOR2 400 PERSON CAMP PROJECT FOR2.400 PERSON CAMP PROJECT FOR 2.400 PERSON CAMP PROJECT FOR SOUTH YOLOTEN PIPELINE INST. PROJECT SOUTH YOLOTEN PIPELINE INST. PROJECT
TURMENISTANTURMENISTAN
2.400 PERSON CAMP PROJECT FOR SOUTH 2.400 PERSON CAMP PROJECT FOR SOUTH YOLOTEN PIPELINE INST. PROJECT YOLOTEN PIPELINE INST. PROJECT TURMENISTAN TURMENISTAN
Type of Contract: Engineering & Supply
Scope of Work: Design works, Electrical works, Mechanical works, Water heater units, HVAC systems,Fire Fighting systems, Assembly supervision, Furnishing
Total Building Area: 30 188 86 m²Total Building Area: 30.188,86 m
Duration of the Work:May 2011‐ October 2011
PALOUGE OPERATION BASE CAMP PALOUGE OPERATION BASE CAMP EXTENSIONEXTENSION PROJECTPROJECTEXTENSION EXTENSION PROJECTPROJECT
SUDANSUDAN
OPERATING OPERATING BASE CAMP BASE CAMP ADAR / SUDANADAR / SUDAN
Type of ontract : Design & Build
Type of Work: Pre‐Engineered Steel Construction Buildings yp g g
Scope of Work : Building construction works, Electrical works, Mechanical works
Total Building Area: 5.835 m2g
Duration of the Work: January 2011‐April 2011
TENGIZ CHEVROIL MANAGEMENTTENGIZ CHEVROIL MANAGEMENTTENGIZ CHEVROIL MANAGEMENT TENGIZ CHEVROIL MANAGEMENT BUILDING BUILDING
TENGIZ / TENGIZ / KAZAKHSTANKAZAKHSTAN
TENGIZ CHEVROIL MANAGEMENT BUILDING TENGIZ CHEVROIL MANAGEMENT BUILDING TENGIZ / KAZAKHSTANTENGIZ / KAZAKHSTAN
Type of Contract: Engineering & Supply
Scope of Work: Electrical works, Mechanical works, Assembly supervision
Total Building Area: 6.700 m²
Duration of the Work: February 2004 ‐ April 2004
URANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTNIGERNIGER
URANIUM PLANT WORKER CAMP PROJECTURANIUM PLANT WORKER CAMP PROJECTNIGERNIGER
Type of Contract: Design & Build
S f W k B ildi i k El i l k M h i l k F i hiScope of Work: Building construction works, Electrical works, Mechanical works, Furnishing
Total Building Area: 1.848 m²
D i f h W k J l 2012 N b 2012Duration of the Work: July 2012‐November 2012
QIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQUAIBOE / QUAIBOE / NIGERIANIGERIA
QIT IOC OFFICE BUILDING PROJECTQIT IOC OFFICE BUILDING PROJECTQUAIBOE / QUAIBOE / NNIGERIAIGERIA
Type of Work : 6 Units of single‐storey Modular Sandwich Panel System Prefabricated Office & Canteen Buildings
Scope of Work : Supply of Modular Prefabricated Building including, floor covering, electrical and sanitary installation materials, A/C units & Water Heaters & Exhaust Fan Units, Addressable Fire Alarm System, transportation and supervision of erection
Total Building Area: 5.000 m2
Duration of the Work: April 2010 ‐ June 2010
HEAD OFFICE:Aşağı öveçler Mahallesi 1325. Sokak No:6, 06460, Ankara / TÜRKİYEPhone: +90 312 472 82 10 (pbx) Fax : +90 312 472 82 18‐19Web : www dorce com tr E‐mail: dorce@dorce com tr
FACTORY:
Ankara‐İstanbul Kara yolu, 29.km 06105 Sarayköy, Ankara / Türkiye
Phone: +90 312 815 51 65 ‐ 72 Fax : +90 312 815 51 71 Web : www.dorce.com.tr E mail: [email protected]