VISICOM PRODUCTS DIVISION
Successful Application of RRT to Successful Application of RRT to Reducing Obsolescence & Reducing Obsolescence &
Ownership CostOwnership Cost
ALQ-126BALQ-126B
Navy Logistics Research and Development ProgramNavy Logistics Research and Development Program
Rapid Retargeting (RRT)Rapid Retargeting (RRT)
2
VISICOM PRODUCTS DIVISION
OutlineOutline
Background RRT Defined Process ALQ-126B System ALQ-126B RRT Experience Results Business Case Other Benefits Summary
3
VISICOM PRODUCTS DIVISION
BackgroundBackground Desired Life Time for Military Systems is Several Times
Greater Than Obsolescence Cycle for Electronics Results in:
– Supportability problems for both legacy systems and new COTS systems
Typical Solutions:– Life-of-type buys– Qualify alternative parts and / or manufacturing sources– Secondary markets– Component redesign
Typical Solutions Increase Total Ownership Cost
4
VISICOM PRODUCTS DIVISION
RRT DefinedRRT Defined
VisiCom Approach to Obsolescence: Rapid Retargeting– Capture functionality at CCA or higher (subsystem) level
– Characterize design in software; implement in programmable devices
– Provide form fit and functional replacement for CCAs
Advantages of Rapid Retargeting :– Avoids future obsolescence
– Improves reliability (lower part counts)
– Multiple CCA functionality can be implemented in a single hardware design
– Can re-use software models
– Can add functionality to a given design
5
VISICOM PRODUCTS DIVISION
RRT ProcessRRT Process Candidate Identification - System or R&D Concept
– Initial screening/discussions, “Quick Look” Submitted to NAVSUP
Preliminary Assessment of candidate systems/concepts
– Potential for solutions via Rapid Retargeting
– Proposed cost and schedule for retargeting
– Business Case Analyses
Detailed Analyses and Designs
– VHDL models, simulations,
Prototype / Proof-of-Concept Hardware
Field Testing
Part Numbers assigned / ECPs / supply system support
6
VISICOM PRODUCTS DIVISION
The ALQ-126B SystemThe ALQ-126B System DESCRIPTION: Deceptive Electronic Countermeasures
System Providing Increased Aircraft Survivability by Denying Accurate Range and Position Data against Pulse Modulated Air Defense Systems.
ACQUISITION PHASE: Operational/Out of Production APPLICABLE AIRCRAFT: INVENTORY
U. S. NAVY F/A-18, F-14, AV-8B 750
FMS F/A-18,AV-8B 260
PRIME CONTRACTOR: Sanders, A Lockheed Martin Co. Last Contract 3/15/95
FMS:
• CONTRACT: N00383-91-G-220 FFP VALUE: $14.7M
• PRODUCT: 14 AN/ALQ-126B Systems (Delivery Complete) 8 AN/ALQ-164 Pods (Delivery Complete)
• PRIME: Sanders, A Lockheed Martin Co.
• CUSTOMER: Malaysia, Italy, Kuwait
CURRENT SOFTWARE:
OFP 12 Released to Fleet July 1996
UDF 23 Released to Fleet July 1996 ISSUES:
– AV8B ALQ-126B Software
– Parts Obsolescence
ALQ-126B
7
VISICOM PRODUCTS DIVISION
Previous Study (DMEA) 41 Unique CCA’s; 199 Unique Microcircuits Overall System Health is YELLOW 28 Microcircuits are RED 21 Microcircuits are YELLOW Predicted Health in 2005: 3 CCA’s RED
We had Functionally-Equivalent VHDL Models for 23 of 28 RED Microcircuits 20 of 21 YELLOW Microcircuits
Developed a UniModule That Can Replace Each of 8 Different ALQ-126B CCA’s
ALQ-126B ExperienceALQ-126B Experience
The ALQ-126B UniModule (center)
and 8 Modules it can replace
8
VISICOM PRODUCTS DIVISION
Retargeted UniModule has been Validated at NAS JAX
Environmental Testing at NUWC Keyport and Boeing Underway
ECP Package Prepared
Production Validation and FOT&E This Summer
< 1 Year Effort
ALQ-126B UniModuleALQ-126B UniModule
The ALQ-126B UniModule (center)
and 8 Modules it can replace
9
VISICOM PRODUCTS DIVISION
The Business CaseThe Business Case
The usual assumption is:– “Because of NRE cost, reengineering is the most expensive
alternative to solving the obsolescence problem” But traditional obsolescence solutions (LOT, substitute, etc)
only increase TOC
BUT: Rapid Retargeting of the ALQ-126B– solved obsolescence problems for 8 CCAs
– Significantly Reduced System Total Ownership Costs(TOC)
Independent cost analysis showed RRT solution yielded a benefit to cost ratio of 1.71– Almost qualifies for LECP under BOSS III
10
VISICOM PRODUCTS DIVISION
The Business CaseThe Business Case
For the AN/ALQ-126 Rapid Retargeting has proven to be
– a desirable technical solution– a viable cost saving alternative– the preferred solution
Doing nothing is not a viable option in the world of obsolescence
11
VISICOM PRODUCTS DIVISION
The Business Case The Business Case (Cont’d)(Cont’d)
NRE costs are the largest portion of cost to retarget
“So, how do you make RRT cost effective?” The ALQ-126B model
– All cards replaced have usage– 15 years service life remaining– UniModule design
• Reuse VHDL - reduces NRE cost
• $1,500 card replaces $13,000 cards
• Improved reliability - reduced component count
• Eliminate depot repair costs - UniModule consumable
NRE Becomes Investment to Reduce Total Ownership Cost…
as Well as Solving the Obsolescence Problem
12
VISICOM PRODUCTS DIVISION
Logisitics ImpactsLogisitics Impacts UniModule becomes a substitute for replacement cards Reduced spares investment - seven fewer line items No change to ATE Minimal change to “I” level maintenance procedures
– Implemented through Avionics Change– Changes to manuals at next routine change release
No changes to maintenance training
13
VISICOM PRODUCTS DIVISION
SUMMARYSUMMARY
The experience with the ALQ-126B demonstrates
Rapid retargeting is a viable technical solution to component obsolescence
that can be easily implemented
and
Is a cost effective approach that can reduce Total Ownership Cost
14
VISICOM PRODUCTS DIVISION
FundingFunding If you are thinking…
“Rapid Retargeting looks like it could solve my obsolescence problem and reduce my system
ownership costs, but my bare-bones budget will just not support that up-front NRE expense.”
Contact…Navy Logistics Research and Development Program
Jim Fitzgibbon, NAVSUP 4B2UJim Fitzgibbon, NAVSUP 4B2U
(717) 605-1300(717) 605-1300
Tony Van Houweling
Titan Systems, VisiCom Products Division