A. 2.1 2 eqp 37 day 2.2 1 eqp 15 day B. 2.4 2 unit 37 day 2.5 6 unit 37 day C. 20 bm 1 ls D. 3 ls 1 ls E. 3 man 1 ls 3.2 2 man 33 day 3.3 2 man 15 day 3.4 1 man 33 day 3.6 4 man 33 day 3.7 4 man 15 day 3.8 2 man 33 day ITEM/ URAIAN QUANTITY/ QUANTITY 2. EQUIPEMENT AND MATERIAL/ PERALATAN DAN MATERIAL TOPOGRAPHIC EQUIPEMENT/ PERALATAN TOPOGRAPI Total Station including accessories/ Total Station dengan aksesori DGPS including accessories/ DGPS dengan aksesori ADDITIONAL TOPOGRAPHIC EQUIPMENT/ PERLENGKAPAN TAMBAHAN Handheld GPS/ Hand GPS Radio/ Radio BM Material Contruction (Cement, Sand, Gravel, Rebar, Bolt)/ Material BM (semen, pasir, batu, baud, dll.) Survey Consumables (flag, nail, paint, hammer, etc.)/ perlengkapan penunjang survey (pita, cat, paku, palu, dll.) Personel Consumables (field book, ballpoint, boots, raincoats, etc.)/ perlengkapan personil (buku lapangan, ballpoint, sepatu boot, jas hujan, dll.) 3. MEALS AND ACCOMODATION/ MAKAN DAN AKOMODASI Topographic Surveyor/ Surveyor Topograpi DGPS Surveyor/ Surveyor DGPS Topographic CAD Operator/ Juru gambar Topograpi Topographic Helper/ Tenaga Lokal Topograpi DGPS Helper/ Tenaga Lokal DGPS Driver/ Supir TOTALLY/ JUMLAH HARGA KESELURUHAN

Upload: beurit-anonim

Post on 29-Dec-2015

4 views

Category:

Documents


0 download

DESCRIPTION

rab

TRANSCRIPT

Page 1: Rap Survey

A.

2.1 2 eqp 37 day 350,000.00

2.2 1 eqp 15 day 1,000,000.00 Sub Total =

B.2.4 2 unit 37 day 50,000.00 2.5 6 unit 37 day 50,000.00

Sub Total =C. 20 bm 1 ls 200,000.00 D. 3 ls 1 ls 50,000.00 E. 3 man 1 ls 75,000.00

3.2 2 man 33 day 120,000.00 3.3 2 man 15 day 100,000.00 3.4 1 man 33 day 90,000.00 3.6 4 man 33 day 60,000.00 3.7 4 man 15 day 60,000.00 3.8 2 man 33 day 60,000.00

Sub Total =

ITEM/ URAIAN QUANTITY/ QUANTITY

UNIT RATE/ HARGA SATUAN

(Rp)/MAN/DAY

2. EQUIPEMENT AND MATERIAL/ PERALATAN DAN MATERIAL

TOPOGRAPHIC EQUIPEMENT/ PERALATAN TOPOGRAPI

Total Station including accessories/ Total Station dengan aksesori

DGPS including accessories/ DGPS dengan aksesori

ADDITIONAL TOPOGRAPHIC EQUIPMENT/ PERLENGKAPAN TAMBAHAN

Handheld GPS/ Hand GPS

Radio/ Radio

BM Material Contruction (Cement, Sand, Gravel, Rebar, Bolt)/ Material BM (semen, pasir, batu, baud, dll.)Survey Consumables (flag, nail, paint, hammer, etc.)/ perlengkapan penunjang survey (pita, cat, paku, palu, dll.)Personel Consumables (field book, ballpoint, boots, raincoats, etc.)/ perlengkapan personil (buku lapangan, ballpoint, sepatu boot, jas hujan, dll.)

3. MEALS AND ACCOMODATION/ MAKAN DAN AKOMODASI

Topographic Surveyor/ Surveyor Topograpi

DGPS Surveyor/ Surveyor DGPS

Topographic CAD Operator/ Juru gambar Topograpi

Topographic Helper/ Tenaga Lokal Topograpi

DGPS Helper/ Tenaga Lokal DGPS

Driver/ Supir

TOTALLY/ JUMLAH HARGA KESELURUHAN

Page 2: Rap Survey

60,075,000.00

25,900,000.00

15,000,000.00 40,900,000.00

3,700,000.00 11,100,000.00 14,800,000.00 4,000,000.00 150,000.00 225,000.00

29,370,000.00

7,920,000.00 3,000,000.00 2,970,000.00 7,920,000.00 3,600,000.00 3,960,000.00 29,370,000.00

93,820,000.00

AMOUNT/ TOTAL HARGA (Rp) REMARK/ KETERANGAN