rap survey
DESCRIPTION
rabTRANSCRIPT
A.
2.1 2 eqp 37 day 350,000.00
2.2 1 eqp 15 day 1,000,000.00 Sub Total =
B.2.4 2 unit 37 day 50,000.00 2.5 6 unit 37 day 50,000.00
Sub Total =C. 20 bm 1 ls 200,000.00 D. 3 ls 1 ls 50,000.00 E. 3 man 1 ls 75,000.00
3.2 2 man 33 day 120,000.00 3.3 2 man 15 day 100,000.00 3.4 1 man 33 day 90,000.00 3.6 4 man 33 day 60,000.00 3.7 4 man 15 day 60,000.00 3.8 2 man 33 day 60,000.00
Sub Total =
ITEM/ URAIAN QUANTITY/ QUANTITY
UNIT RATE/ HARGA SATUAN
(Rp)/MAN/DAY
2. EQUIPEMENT AND MATERIAL/ PERALATAN DAN MATERIAL
TOPOGRAPHIC EQUIPEMENT/ PERALATAN TOPOGRAPI
Total Station including accessories/ Total Station dengan aksesori
DGPS including accessories/ DGPS dengan aksesori
ADDITIONAL TOPOGRAPHIC EQUIPMENT/ PERLENGKAPAN TAMBAHAN
Handheld GPS/ Hand GPS
Radio/ Radio
BM Material Contruction (Cement, Sand, Gravel, Rebar, Bolt)/ Material BM (semen, pasir, batu, baud, dll.)Survey Consumables (flag, nail, paint, hammer, etc.)/ perlengkapan penunjang survey (pita, cat, paku, palu, dll.)Personel Consumables (field book, ballpoint, boots, raincoats, etc.)/ perlengkapan personil (buku lapangan, ballpoint, sepatu boot, jas hujan, dll.)
3. MEALS AND ACCOMODATION/ MAKAN DAN AKOMODASI
Topographic Surveyor/ Surveyor Topograpi
DGPS Surveyor/ Surveyor DGPS
Topographic CAD Operator/ Juru gambar Topograpi
Topographic Helper/ Tenaga Lokal Topograpi
DGPS Helper/ Tenaga Lokal DGPS
Driver/ Supir
TOTALLY/ JUMLAH HARGA KESELURUHAN
60,075,000.00
25,900,000.00
15,000,000.00 40,900,000.00
3,700,000.00 11,100,000.00 14,800,000.00 4,000,000.00 150,000.00 225,000.00
29,370,000.00
7,920,000.00 3,000,000.00 2,970,000.00 7,920,000.00 3,600,000.00 3,960,000.00 29,370,000.00
93,820,000.00
AMOUNT/ TOTAL HARGA (Rp) REMARK/ KETERANGAN
x