Page 1: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Random Random Sampling Sampling

Chapter 6Chapter 6

Page 2: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Same Materials

Same Process

Same Opportunity to be Selected

Page 3: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected
Page 4: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected
Page 5: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Lot will be tested in two Lot will be tested in two processesprocesses

• As mixed by the plant: Plant As mixed by the plant: Plant Produced MaterialProduced Material

• As laid down and compacted by As laid down and compacted by the contractor: Field Placed the contractor: Field Placed MaterialMaterial

Page 6: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Definition of a LotDefinition of a Lot

• One Day’s production ≤ 2000 TonsOne Day’s production ≤ 2000 Tons

• Half Day’s production when Day Half Day’s production when Day Production is 2000 < Day > 4000 TonsProduction is 2000 < Day > 4000 Tons

Page 7: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Sampling on a LotSampling on a Lot

•Divide Lot into 4 Equal sublots except Divide Lot into 4 Equal sublots except for Test Strip were the lot is divided by for Test Strip were the lot is divided by 33

•Take sample form each sublotTake sample form each sublot

Page 8: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Partial Lot Partial Lot Plant Produced materialPlant Produced material

•3-4 samples were taken, 3-4 samples were taken, sublots Constitute a Lotsublots Constitute a Lot

•1-2 sublots add to next day1-2 sublots add to next day

•Next day production would Next day production would have 3-6 sublotshave 3-6 sublots

Page 9: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

SamplingSamplingPlant Produced MaterialsPlant Produced Materials

•Sample by TimeSample by Time

•Sample by weight Sample by weight (Tonnage)(Tonnage)

Page 10: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Sampling by TimeSampling by Time

• Production Duration 10 HRSProduction Duration 10 HRS

• Sublots: 10/4 = 2 ½ Hrs = 150 minutesSublots: 10/4 = 2 ½ Hrs = 150 minutes

• Assuming trucks will leave every 10 Min.Assuming trucks will leave every 10 Min.

• Increment 150 /10 = 15 trucksIncrement 150 /10 = 15 trucks

• Form 15 numbered pieces and put them in Form 15 numbered pieces and put them in a bowla bowl

• Draw one per SublotDraw one per Sublot

• Sample the truck at time selectedSample the truck at time selected

Example

Page 11: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Sampling by weight Sampling by weight (Tonnage)(Tonnage)

• Lot size 2000 TonsLot size 2000 Tons

• Assuming load on Trucks = 20 TonsAssuming load on Trucks = 20 Tons

• Sublots size 2000/4 = 500 TonsSublots size 2000/4 = 500 Tons

• Increment 500/20 = 25 trucks per sublotIncrement 500/20 = 25 trucks per sublot

• Form 25 numbered pieces and put them Form 25 numbered pieces and put them in a bowlin a bowl

• Select one for each sublotSelect one for each sublot

• Sample the selected truckSample the selected truck

Example

Page 12: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

SamplingSamplingField Placed MaterialsField Placed Materials

• Lot side equal to Plant Produced Lot side equal to Plant Produced Material, however the Plant Produced Material, however the Plant Produced Material may have 3-6 sublotsMaterial may have 3-6 sublots

• Divide the lot into 4 sublots (regardless Divide the lot into 4 sublots (regardless of the Plant Produced Material sublots) of the Plant Produced Material sublots)

• Use Random Sampling Table 1 on Use Random Sampling Table 1 on Pages 40/41 of ERLPMPages 40/41 of ERLPM

• Form 28 Numbered PiecesForm 28 Numbered Pieces

Page 13: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected
Page 14: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected
Page 15: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected
Page 16: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected
Page 17: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Sampling Sampling Field Placed MaterialsField Placed Materials

• Column Column AA is the Sublot number is the Sublot number

• Column Column BB is the longitudinal factor used to identify is the longitudinal factor used to identify location along the length of sublotlocation along the length of sublot

• Column Column CC is the lateral factor used to identify is the lateral factor used to identify location from referenced side of sublotlocation from referenced side of sublot

• If the same number is drawn, use the following set If the same number is drawn, use the following set of 4of 4

Page 18: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Field Placed Field Placed MaterialsMaterials

ExamplExample e

Page 19: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected
Page 20: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

ExampleExample

• From bowl with 28 numbered pieces, From bowl with 28 numbered pieces, number 12 is Drawnnumber 12 is Drawn

• From Column “From Column “AA” Select Lines 01, 02, ” Select Lines 01, 02, 03 and 0403 and 04

• From columnFrom column B B: .320, .489, .542, .153: .320, .489, .542, .153

• From ColumnFrom Column C C: .212, .827, .352, .163: .212, .827, .352, .163

Page 21: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

•Pavement Width - 12-1/2 Feet

•Select Reference Side (left)

•Divide lot length1600/4 = 400 Feet

• Samples to be taken no Closer Than 1 Foot from a Joint

Page 22: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Example – Cont.Example – Cont.Sublot 1 Sublot 1

Length 400x .320 = 128’ Length 400x .320 = 128’

Width 12.5x .212 = 3’Width 12.5x .212 = 3’

Sublot 2 Sublot 2

Length 400x .489 = 196’ Length 400x .489 = 196’

Width 12.5x .827 = 10’Width 12.5x .827 = 10’

Page 23: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Sublot 3 Length 400x .542 = 217’ Width 12.5x .352 = 4’

Sublot 4 Length 400x .153 = 61’ Width 12.5x .163 = 2’

Page 24: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected
Page 25: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

JointsJoints• Could be within same lot or abutting Could be within same lot or abutting

lotslots

• When within two different lots use the When within two different lots use the lwest specific gravitylwest specific gravity

• Divide length into 4 equal sublotsDivide length into 4 equal sublots

• Directly on the joint Directly on the joint

• Minimum diameter 5”Minimum diameter 5”

• Penalty on joint densityPenalty on joint density

Page 26: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint testing exampleJoint testing example

1000 feet

300 feet

300 feet

1000 feet

700 feet

700 feet

Page 27: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint LengthJoint Length• 1000 – 300 = 700 feet (between lines 1 and 1000 – 300 = 700 feet (between lines 1 and

2)2)

• 1000-300 = 700 feet (between lines 2 and 3)1000-300 = 700 feet (between lines 2 and 3)

• Total length 700 + 700 = 1400Total length 700 + 700 = 1400

• 1400/4 = 350 feet1400/4 = 350 feet

Page 28: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint Testing – Cont.Joint Testing – Cont.

• From the bowl with 28 numbered pieces we From the bowl with 28 numbered pieces we drawn number 16drawn number 16

• BB values for column 16 values for column 16

• .331, .739, 548, .516.331, .739, 548, .516

• Sublot 1; 350x0.331 = 115.85 =116’Sublot 1; 350x0.331 = 115.85 =116’

• Sublot 2; 350x0.739 + 350 = 608.65 = 609Sublot 2; 350x0.739 + 350 = 608.65 = 609

• Sublot 3; 350x0.548 = 191.8 = 192’Sublot 3; 350x0.548 = 191.8 = 192’

• Sublot 3; 350x0.516 + 350 = 530.6 =531’Sublot 3; 350x0.516 + 350 = 530.6 =531’

Page 29: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint testingJoint testing

1000 feet

300 feet

300 feet

1000 feet

116 feet

Page 30: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint testingJoint testing

1000 feet

300 feet

300 feet

1000 feet

609 feet

Page 31: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint testingJoint testing

1000 feet

300 feet

300 feet

1000 feet

192 feet

Page 32: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint testingJoint testing

1000 feet

300 feet

300 feet

1000 feet

531 feet

Page 33: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint testing – second laneJoint testing – second lane

1000 feet

300 feet

300 feet

1000 feet

116 feet

300 feet

600 feet

Page 34: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Total Joint length

600 + 300 = 900 feet

900/4 = 225 feet

Number 20 is selected

Sublot 01 -.415

Sublot 2 - .958

Sublot 3 - .150

Sublot 4 - .154

Page 35: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Distances along the joint

Sublot 1 225x .415 = 93.38 = 93

Sublot 2 225x .958 = 215.55 = 216

Sublot 3 225x.150 = 33.75 = 34

Sublot 4 225x 34.65 = 35

Page 36: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint testing – second laneJoint testing – second lane

300 feet

300 feet

1000 feet300 feet

93 feet

Page 37: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint testing – second laneJoint testing – second lane

300 feet

300 feet

1000 feet300 feet

441 feet

Page 38: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint testing – second laneJoint testing – second lane

300 feet

300 feet

1000 feet300 feet

484 feet

Page 39: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Joint testing – second laneJoint testing – second lane

300 feet

300 feet

1000 feet300 feet

110 feet

Page 40: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Any Question?

Page 41: Random Sampling Chapter 6. Same Materials Same Process Same Opportunity to be Selected

Next Topic

Quality Assurance