ramping-up to full capacity investor presentation february 2009
TRANSCRIPT
Ramping-up to Full CapacityRamping-up to Full CapacityInvestor Presentation
February 2009Investor Presentation
February 2009
DisclaimerDisclaimer
These materials include forward looking statements. Forward looking statements inherently involve subjective judgment & analysis & are subject to significant uncertainties, risks & contingencies, many of which are outside of the control of, & may be unknown to, the company.
Actual results and developments may vary materially from that expressed in these materials. The types of uncertainties which are relevant to the company may include, but are not limited to, commodity prices, political uncertainty, changes to the regulatory framework which applies to the business of the company & general economic conditions. Given these uncertainties, readers are cautioned not to place undue reliance on such forward looking statements.
Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, the company undertakes any obligation to publicly update or revise any of the forward looking statements, changes in events, conditions or circumstances on which any such statement is based.
These materials include forward looking statements. Forward looking statements inherently involve subjective judgment & analysis & are subject to significant uncertainties, risks & contingencies, many of which are outside of the control of, & may be unknown to, the company.
Actual results and developments may vary materially from that expressed in these materials. The types of uncertainties which are relevant to the company may include, but are not limited to, commodity prices, political uncertainty, changes to the regulatory framework which applies to the business of the company & general economic conditions. Given these uncertainties, readers are cautioned not to place undue reliance on such forward looking statements.
Forward looking statements in these materials speak only at the date of issue. Subject to any continuing obligations under applicable law or any relevant stock exchange listing rules, the company undertakes any obligation to publicly update or revise any of the forward looking statements, changes in events, conditions or circumstances on which any such statement is based.
Forward Looking Statements:Forward Looking Statements:
Additional DisclaimersAdditional Disclaimers
Information in this presentation that relates to Exploration Results, Mineral Resource and Ore Reserve estimates, geology, drilling and mineralisation, is based on information compiled by Ron James, who is an employee of the Kingsgate Group and is a member of The Australasian Institute of Mining and Metallurgy. Ron James is a Competent Person under the meaning of the JORC Code with respect to Exploration Results, Mineral Resource and Ore Reserve estimates, geology, drilling and mineralisation being presented. He has given his consent to the Public Reporting of these statements concerning Exploration Results, Mineral Resource and Ore Reserve estimates, geology, drilling and mineralisation, and is in agreement with the contents and format of this presentation.
Information in this presentation that relates to Exploration Results, Mineral Resource and Ore Reserve estimates, geology, drilling and mineralisation, is based on information compiled by Ron James, who is an employee of the Kingsgate Group and is a member of The Australasian Institute of Mining and Metallurgy. Ron James is a Competent Person under the meaning of the JORC Code with respect to Exploration Results, Mineral Resource and Ore Reserve estimates, geology, drilling and mineralisation being presented. He has given his consent to the Public Reporting of these statements concerning Exploration Results, Mineral Resource and Ore Reserve estimates, geology, drilling and mineralisation, and is in agreement with the contents and format of this presentation.
Competent Person’s Statement:Competent Person’s Statement:
Any statement or information relating to the potential quantity and grade of an exploration target, specifically the Chokdee Prospect, is based on recent public announcements and is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource.
Any statement or information relating to the potential quantity and grade of an exploration target, specifically the Chokdee Prospect, is based on recent public announcements and is conceptual in nature. There has been insufficient exploration to define a Mineral Resource and it is uncertain if further exploration will result in the determination of a Mineral Resource.
Reporting on Exploration Targets:Reporting on Exploration Targets:
Gold Production IncreasingFull capacity Mar Qtr125-150,000 oz/yr rateCash costs ~US$350/oz in
CY09 Large expanding asset
Growing reserves / resourcesExpanding to double throughput
Solid balance sheet & cashflow
Major new discovery in Gold Belt
Gold Production IncreasingFull capacity Mar Qtr125-150,000 oz/yr rateCash costs ~US$350/oz in
CY09 Large expanding asset
Growing reserves / resourcesExpanding to double throughput
Solid balance sheet & cashflow
Major new discovery in Gold Belt
Kingsgate’s Turn-around Kingsgate’s Turn-around
ChatreeChatree
GoldBelt
Thai focus - listed in ASX 200 Key asset - Chatree Gold Mine Gold producer for 7 years Mine life a further 7-10+ years Rural area; good infrastructure US$30 million debt facility ASX:KCN Mkt Cap: ~US$280M Shares: 93 million + 9M options Held: 15% USA, 25% Europe,
5% Asia, 49% Aust, 6% Directors
Thai focus - listed in ASX 200 Key asset - Chatree Gold Mine Gold producer for 7 years Mine life a further 7-10+ years Rural area; good infrastructure US$30 million debt facility ASX:KCN Mkt Cap: ~US$280M Shares: 93 million + 9M options Held: 15% USA, 25% Europe,
5% Asia, 49% Aust, 6% Directors
Growing Thai GoldGrowing Thai GoldChatree NorthMining LeasesChatree NorthMining Leases
1 mile1 mile
Production GrowthProduction Growth
Full production in Mar-June Qtr ‘09Increased grade to ~2g/tTransition: old to new mining areas
Full production in Mar-June Qtr ‘09Increased grade to ~2g/tTransition: old to new mining areas
Successful ramp-up to full capacitySuccessful ramp-up to full capacity
Costs reducingGrade increasingCosts reducingGrade increasing
Higher grade & higher tonnage will bring reduced costs: ~US$350/oz -> lowest quartile gold producer
Higher grade & higher tonnage will bring reduced costs: ~US$350/oz -> lowest quartile gold producer
Production rate125-150,000oz/yrProduction rate125-150,000oz/yr
Production rate 125-150,000oz/yr from Jan-March ‘09Improved cash flowsForecast ~100,000oz FY09 (to June)
Production rate 125-150,000oz/yr from Jan-March ‘09Improved cash flowsForecast ~100,000oz FY09 (to June)
Production Ramp-up SuccessProduction Ramp-up Success
New mining areas opening up
Dec’08 Qtr Production: 12,771 ozsJan’09 Production: 10,900 ozsJan’09 Cash Costs: US$370/oz Costs decrease to ~US$350/oz
Dec’08 Qtr Production: 12,771 ozsJan’09 Production: 10,900 ozsJan’09 Cash Costs: US$370/oz Costs decrease to ~US$350/oz
Successful Ramp-up to Full production
Successful Ramp-up to Full production
C NorthA Pit
K East
Access to Higher GradesAccess to Higher Grades
Mining A Hill -> A PitHigher grades to lift gold head gradeResource Development drilling for 1st time on west side
Mining A Hill -> A PitHigher grades to lift gold head gradeResource Development drilling for 1st time on west side
Mining A Pit / A Hill– Higher gradesMining A Pit / A Hill– Higher grades
Mining
A HillA Hill
Access to Higher GradesAccess to Higher Grades
Mining at C North
Higher grades (>3g/t)commence late in Mar Qtr’09
Mining at C North
Higher grades (>3g/t)commence late in Mar Qtr’09
Mining C North– Higher grades soonMining C North– Higher grades soon
Mining
High Grade>3g/t
Large Asset – Chatree NorthLarge Asset – Chatree North
Average LARGE gold deposits are ~4 Moz
Chatree system ~5 Moz (incl. mined to date)
Drilling will increase Resources/Reserves
Pits could become a Thai Super Pit
Current status: 1.4Moz Reserve 3.2Moz Resource
Average LARGE gold deposits are ~4 Moz
Chatree system ~5 Moz (incl. mined to date)
Drilling will increase Resources/Reserves
Pits could become a Thai Super Pit
Current status: 1.4Moz Reserve 3.2Moz Resource
3mi3mi
1mile1mile
Kalgoorlie Super Pit(same scale)
Kalgoorlie Super Pit(same scale)
Issara Mining Limited
Q East trendQ East trend
Resource Growth - in LeasesResource Growth - in Leases
Chatree North(Looking south)Chatree North
(Looking south)
PlannedPit shellsPlannedPit shells
Currentdrillingareas
Currentdrillingareas
QPitsQ
Pits
A PitA Pit
Issara Mining Limited
Q East trendQ East trend
A PitA Pit
Resource Growth - in LeasesResource Growth - in Leases
PlannedPit shellsPlannedPit shells
Currentdrillingareas
Currentdrillingareas
QPitsQ
Pits
Section
3199RC
Section
19750N Higher grades to lift goldHead Grade
Higher grades to lift goldHead Grade
“A” Pit – Chatree North“A” Pit – Chatree North
A EastA East
Highergrade
undergroundpotential
Highergrade
undergroundpotential
30m @ 16g/t gold30m @ 16g/t gold
12m @ 1oz gold + 10oz silver12m @ 1oz gold + 10oz silver
Immediate drill target
Immediate drill target
A PitA Pit
Resource ‘A’ Pit Reserve ‘A’ Pit1.8 Moz Gold
1.1 Moz Gold18 Moz Silver
Mining
World’s Safest Gold MineAusIMM award
World’s best ISO standards Only mining company granted
Social Accountability SA8000 Zero Environmental Incidents Community projects Training focus - 99% Thai
23% women in management High quality, stable workforce
World’s Safest Gold MineAusIMM award
World’s best ISO standards Only mining company granted
Social Accountability SA8000 Zero Environmental Incidents Community projects Training focus - 99% Thai
23% women in management High quality, stable workforce
Excellent Track RecordExcellent Track Record
Expansion: De-risking ProcessExpansion: De-risking Process
Plant Expansion+ 2.6 mtpa
Plant Expansion+ 2.6 mtpa
Expansion Plant AreaExpansion Plant Area
Current Plant2.4 mtpa
Current Plant2.4 mtpa
Expanded Total5 mtpa
Expanded Total5 mtpa
Review underway to de-risk expansion & financing Increase resource base during process Already purchased/delivered grinding mills
Review underway to de-risk expansion & financing Increase resource base during process Already purchased/delivered grinding mills
ResistivityAnomalous
Zones
ResistivityAnomalous
Zones
Chatree
North
Chatree
North
ChatreeChatree
42mi42mi
GrantedGranted
PendingPending
GrantedGranted
PendingPending
NakhonsawanProvince
PhitsanulokProvince
PhichitProvince
PhetchabunProvince
Chatree NorthChatree North
ChatreeChatree
Regional drilling started New discoveries as large
or greater than Chatree 1st discovery made in
initial drilling of high priority target
Large gold-in-soil anomaly: potential open cut mine
Other drill ready targets Potential for further
discoveries in gold belt
Regional drilling started New discoveries as large
or greater than Chatree 1st discovery made in
initial drilling of high priority target
Large gold-in-soil anomaly: potential open cut mine
Other drill ready targets Potential for further
discoveries in gold belt
New DiscoveriesNew Discoveries
Chatree Resource Growth
Chatree Resource Growth
ChatreeChatreeChokdeeProspectChokdeeProspect
Soil Geochemical Anomalies
Soil Geochemical Anomalies
3.6Moz3.6Moz 20052005
2.0Moz2.0Moz 20032003
4.6Moz4.6Moz 20062006
Potential 5-10MozPotential 5-10Moz
Chokdee Prospect - Chatree Size?Chokdee Prospect - Chatree Size?4
+ m
i4
+ m
i
4+ mi4+ mi
3 m
i3
mi
~2 mi~2 mi
1.2Moz1.2Moz 20002000
Chokdee Discovery
Chokdee Discovery
Section line
Rockchips up to 1,030 g/t gold
Future’s ImprovingFuture’s Improving
Successful Ramp-upFull Production during next 2 QtrsCosts will reduce to ~US$350/oz
Successful Ramp-upFull Production during next 2 QtrsCosts will reduce to ~US$350/oz
Production GrowthHigher GradesProduction GrowthHigher Grades
Resource GrowthExtend mining areasResource GrowthExtend mining areas
Drilling extensions to orebodiesAreas have never been drilledResource growth within leases
Drilling extensions to orebodiesAreas have never been drilledResource growth within leases
New Discoveries Chokdee Prospect1st of Many
New Discoveries Chokdee Prospect1st of Many
New discovery:Potential to be larger than ChatreeMany other drill ready targets
New discovery:Potential to be larger than ChatreeMany other drill ready targets
www.kingsgate.com.au