1 Rajpur‐Sonarpur Municipality Harinavi‐ Feb, 2016 www.rajpursonarpurmuncipality.in Page‐12 Surface Water Scheme under AMRUT Our Municipality have already submitted to KMDA of value Rs 2,57.05 Crore. It is expected that it will be placed in State Level Meeting on 10.12.2016. Proposal of this surface water scheme is as following: Surface Water will be lifted from river Ganga and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality area has been divided in to 23 no separate zones. .Each zone will have a dedicated ERS to serve the population of the respective zone. There is one (1) number existing UGR (At Ward No. 31) , another 3 nos UGRs is given proposed to pump the clear water to the ERSs.) . Zone wise division according to UGR is given in DAG No. JB/KMDA/RSM‐02 Vol.2 of this DPR. UGRs will be designed as per IS: 3370 latest version and will be constructed with pile foundation. In this project proposed and existing ESRs feed by the respective UGRs are given in the following table: Table UGR No. Location ESR Served 1 At W‐31 (Payerabagan) (Existing), 1 MG capacity *ESR ‐1 (W‐06), *ESR‐2 (W‐ 28), ESR‐5 (W‐29), ESR‐6 (W‐ 30), 2 At W‐31 (WTP Site) , CWR‐ 4MG capacity *ESR‐3 (W‐31), *ESR‐4 (W‐32), ESR‐7 (W‐31), ESR‐8 (W‐34), ESR‐9 (W‐35), ESR‐18 (W‐25) 3 At W‐8 (Future Engg College), 1.25 MG capacity ESR‐10 (W‐7), ESR‐11 (W‐13), ESR‐12 (27), ESR‐13 (W‐17), ESR‐14 (W‐15), ESR‐15 (W‐ 20), ESR‐16 (W‐ 21), ESR‐17 (W‐23), ESR‐22 (W‐11), ESR‐ 23 (W‐12) 4 At W‐ 4, 0.5 MG capacity ESR‐19 (W‐2), ESR‐ 20 (W‐4), ESR‐21 (W‐5)

Upload: others

Post on 19-Mar-2020

5 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

1  

Rajpur‐SonarpurMunicipality

Harinavi‐Feb,2016 www.rajpursonarpurmuncipality.in Page‐12

SurfaceWaterSchemeunderAMRUT

OurMunicipalityhavealreadysubmittedtoKMDAofvalueRs2,57.05Crore.ItisexpectedthatitwillbeplacedinStateLevelMeetingon10.12.2016.

Proposalofthissurfacewaterschemeisasfollowing:SurfaceWaterwillbeliftedfromriverGangaandwillbedeliveredtotheproposedwatertreatmentplantatLaskarpur.

UnderGroundReservoirs

InthisschemetotalRajpur‐SonarpurMunicipalityareahasbeendividedinto23noseparatezones..EachzonewillhaveadedicatedERStoservethepopulationoftherespectivezone.Thereisone(1)number existingUGR (AtWardNo. 31) , another 3 nosUGRs is given proposed to pump the clearwatertotheERSs.).ZonewisedivisionaccordingtoUGRisgiveninDAGNo.JB/KMDA/RSM‐02Vol.2of thisDPR.UGRswill bedesignedasper IS:3370 latest versionandwill be constructedwithpilefoundation.

In this project proposed and existing ESRs feed by the respective UGRs are given in the followingtable:

Table

UGRNo. Location ESRServed1 AtW‐31(Payerabagan)

(Existing),1MGcapacity*ESR‐1(W‐06),*ESR‐2(W‐28),ESR‐5(W‐29),ESR‐6(W‐30),

2 AtW‐31(WTPSite),CWR‐4MGcapacity

*ESR‐3(W‐31),*ESR‐4(W‐32),ESR‐7(W‐31),ESR‐8(W‐34),ESR‐9(W‐35),ESR‐18(W‐25)

3 AtW‐8(FutureEnggCollege),1.25MGcapacity

ESR‐10(W‐7),ESR‐11(W‐13),ESR‐12(27),ESR‐13(W‐17),ESR‐14(W‐15),ESR‐15(W‐20),ESR‐16(W‐21),ESR‐17(W‐23),ESR‐22(W‐11),ESR‐23(W‐12)

4 AtW‐ 4,0.5MGcapacity ESR‐19(W‐2),ESR‐20(W‐4),ESR‐21(W‐5)

Page 2: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

2  

*AllExists

HOUSINGFORALL

PradhanMantriAwasYojona(PMAY)aimsthat,providinghousingforallby2022whenthenationcomplete75yearsofitsindependence.Thepeopleofthemunicipality,theelectedCouncillors,thestaffmembers,thesurveyors,thetechnicalpersonshaveextendedtheirfullestcooperationinpreparingthewholeprocessofHousingforAllDPR,foryearof2015‐16.Outof178slums,44nosofslumsandits1334nos.beneficiariesareselectedforthe“BeneficiaryledConstruction”schemeforthisfinancialyear.ThetotalsanctionamountisRs.5400.03lakhasperrelevantdept&P.W.Dschedulerates.Theinfrastructuralexpenditurefortheyearof2015‐16,490.91lakh.ThetotalprojectcostisdistributedamongGovtOfIndia,GovtOfWestBengal,ULBandindividualbeneficiary.FundflowpatternisgivenbelowFundFlowforthehousingforall,2015‐16

Estimatedcost

GOI GOWB ULB Beneficiaries Total

5400.03 2001.00 2820.08 245.46 333.50 5400.03

HousingforUrbanPoorupdatedprogress

HousingforUrbanPoorPhIIIAisabouttobecompletedinwhich44NumberhouseshavebeendoneatRs22900perUnit.

DetailedProjectReportforHousingforUrbanPoorPhIIIBisbeingpreparedandbeneficiarieshavealreadybeingpreparedandbeneficiarieshavealreadybeenselectedforthepurpose.TheDPRwillbesubmittedwithinafewdaystotherespectiveauthorityforapproval.

Page 3: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

3  

Repairing&RenovationofParksunderRajpur‐SonarpurMunicipality

SomeoftheparksaregoingtoberepairedandrenovatedunderRajpur‐SonarpurMunicipalityunderAMRUTSchemethisyear.Thoseare:

1. SrinagarGiribalaSchoolPark(Ward‐1)‐EstimatedCostRs.8.96Lakh2. MissionPallyPark(Ward‐8)‐EstimatedCostRs.9.26Lakh3. BidyaBhusanPark(Ward‐19)‐EstimatedCostRs.9.64Lakh4. GariaPlacePark(Ward‐29)‐EstimatedCostRs.7.20Lakh5. SrikrishnaPally/MohiniPally(Ward‐32)‐EstimatedCostRs.14.98Lakh

Astheseparksareold,thereareplentyofscopesforrenovationandrepairing.Someoftheexamplesthataretobeaddedintheseparks are:PavedPathways,Waterareas,Eating&DrinkingFacilities,BoundaryWalls, Landscaping, Sitting or resting features etc. The pictures of these parks are beingattachedfollowed.

Aswecanseefromthesepictures,thepresentconditionoftheseparksisnotverywell.So,thesearegoingtoberenovatedintoamodernageparkswithnewageinfrastructuresandfacilities.Theworkwillbestartedverysoon.

Page 4: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

4  

InaugurationofSolarSystematSonarpurLocalOfficeRooftop

ThenewSolarpowerGeneratingSystemwillbeinauguratedon10thFeb,2016inourMunicipalityattherooftopofSonarpurLocalOffice.HonorableMinisterinChargeMrShriManishGupta,Minister‐in‐charge,DepartmentofPower&NonConventionalEnergySources,Govt.ofWestBengalalongwith2MLAs,ChairmanofRajpur‐SonarpurMunicipalityDr.PallabDas,ViceChairmanSmtSantaSarkarandall the 5 CIC members will be present during the inauguration program. It is a on grid SolarConnectionSystem,whichisanonconventionalenergysource.Theenergysourceisoneofitskindinthis area. It is the first step in getting self sufficient in case of energy and this type of nonconventional, environment friendly energy sources are to be encouraged for pollution freesurroundings. Another advantage of this new system is that, the generated power will go to thedistributionlikeofWBSEDCLthroughnetmeteringsystem.Thiswillreducethecostofelectricity.

Page 5: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

5  

Educationrelatedongoingprojects

Nos.ofSaboojSathibenificiariesUnderRajpurSonarpurMunicipalJurisdiction

Class‐XI,X&XII‐13724(BothBoys&Girls)Class‐IX‐‐‐3198(OnlyGirls)

Total‐16922

Alreadydistributed‐8680(upto31.01.2016)

Page 6: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

6  

Nos.ofKannayashreebenificiariesUnderRajpurSonarpurMunicipalJurisdiction(2015)

KannayashreePrakalpa–StipendfromtheStateGovt.‐6252KannayashreePrakalpa–Ornaments(Bala)3245KannayashreePrakalpa‐By‐Cycle35

Nos.ofCookedMid‐Day‐MealbenificiariesUnderRajpurSonarpurMunicipalJurisdiction

PrimarySection(Class‐ItoIV)‐12194of77nos.ofprimary&2nosofNCLPSchools

UpperPrimarySection(ClassVtoVIII)‐25398of36nos.ofUPschools

NoofCook‐helperengaged‐257forPrimaryschools&

277forUpperPrimaryschools

Page 7: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

7  

LITERACYPercentageofRajpur‐SonarpurMunicipalityasperCENSUS‐2011

WARDWISELITERACYPERCENTAGEOFR.S.MASPERCENSUS‐2011

WARDNO.

TOTALLITERATE(%) MALE(%) FEMALE(%)

1 92.9 95.5 90.3

2 95.0 97.4 92.6

3 86.6 91.7 81.3

4 89.4 93.0 85.7

5 88.1 93.4 82.7

6 93.5 96.0 91.0

7 87.5 91.9 82.9

8 91.5 94.6 88.4

9 81.8 89.3 73.4

10 93.5 96.6 90.3

11 93.4 96.6 90.0

12 93.4 96.6 90.1

13 95.0 97.1 92.9

14 92.9 95.6 90.2

15 85.2 91.9 79.0

16 97.6 98.9 96.3

17 94.9 97.3 92.5

18 95.8 97.9 93.7

19 96.3 98.1 94.5

20 93.2 95.8 90.7

21 85.0 88.9 81.2

22 86.2 90.9 81.4

23 92.9 96.3 89.4

24 92.8 96.3 89.1

25 91.6 94.7 87.6

26 91.2 94.7 87.6

27 90.4 93.3 86.5

28 93.4 95.9 90.9

29 95.3 96.4 94.2

30 96.1 97.9 94.5

31 94.5 96.7 92.3

32 91.1 93.6 88.5

33 88.0 90.3 85.6

34 90.3 92.5 88.0

35 82.7 89.1 76.3

R.S.M91.0%94.3%87.7%

Page 8: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

8  

ENROLLMENTFIGUREREPORTASONLATEST

SL.NO

SCHOOLTYPE Class

TOTALNO.OF

INSTITUTIONS

CLASS

I II III IV V VI VII VIII PRE‐PRIMARY

1 Govt.Aided(V‐VIII) 36

5791

5917

5977

6240

2 Govt.Aided(I‐VIII) 0

3 Govt.Aided (I‐IV)72

2898

1821

3178

3541 1316

4 Govt.Aided (I‐V) 5 135 138 92 171 53 104

5 Govt.Aided (VI‐VIII) 0

6 SSK (I‐IV)

7 MSK (V‐VIII) 0

8

SPECIALTRAININGSCHOOL(CWSN)

ALL

0

9 Madarsas/Maqtab

(I‐VIII) 0

10Madarsas/Maqtab (I‐IV) 0

11Madarsas/Maqtab

(V‐VIII) 0

12 NCLP ALL 2 100 45 43 32

TOTAL 1153133

2004

3313

3744

5844

5917

5977

6240 1420

COOKHELPERENGAGED SC ST OBC Minority Others Tot

al1 2 3 4 5 6 7

Male 2 2Female 532 532

Total 534 534

Page 9: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

9  

StatusOfEducationOfRajpurSonarpurMunicipality

SL.NO. PARTICULARS RAJPURSONARPURMUNICIPALITY

REMARKS

1 POPULATION 336707(2001CENSUS)

423724(2011Census)

2 PERCENTAGEOFLITERACY 85.68%(2001CENSUS)

91%(2011Census)

3 NO.OFPRIMARYSCHOOL 77 4 NO.OFUPPERPRIMARYSCHOOL(JR.

HIGH,MADHYAMIK,H.S)36

5 NO.OFCOLLEGE 1 +1(N.SOpenUniver.)6 S.S.R(PRIMARY) 10 7 P.T.R(PRIMARY) 38.74 8 S.S.R(UPPERPRIMARY) 24.59 9 P.T.R(UPPERPRIMARY) 51.82 10 TOTALNO.OFCHILDRENENROLLED(5‐9) 15458 11 TOTALNO.OFCHILDRENENROLLED(10‐14) 25186 12 %OFINSCHOOLCHILDREN 93.75% 13 %OFOUTOFSCHOOLCHILDREN 6.25% 14 %OFDROPOUTCHILDREN(PRIMARY) 3%‐4%

15 %OFDROPOUTCHILDREN(UPPERPRIMARY) 4% 16 NO.OFANGANWADICENTRE(I.C.D.S) 118 17 NO.OFC.E.C(S) 11 18 NO.OFPREPRIMARYSCHOOL(NONGOVT.) 75 19 NO.OFPRIMARYSCHOOL(NONGOVT.) 60 20 NO.OFUPPERPRIMARYSCHOOL(NONGOVT.) 13 21 NO.OFVOCATIONALTRAININGINSTITUTE

(NON.GOVT.)3 ManagementCollege,

EngineeringCollege22 NO.OFCHILDRENOFAGEGROUP(0‐6) 36950 31583(2011Census)23 NoofWardEducationCommittee 35

Page 10: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

10  

ArrangementofaBloodDonationCamp

Blood donation is said to be the most valued service to mankind.Nothing is comparable to thepreciousness of humanblood.“The gift of blood is the gift of life.”Keeping thosewords inmind aBloodDonationCamphasbeenarrangedon11thDec,2015.TheTotalarrangementhavebeendonebyMunicipalAuthorityandRajpur‐SonarpurMunicipalityBiswakarmaPujaCommittee.LifeCareBloodBankwasengagedtocollecttheblood.Thisyearatotalof70peopledonatedtheirblood.Everyyearthisblooddonationcamphasbeenarranged.

EmploymentthroughSkillTraining&Placement(EST&P)

In collaboration with State Urban Development Agency (SUDA) and Rajpur‐SonarpurMunicipality has been arranged a placement oriented Vocational Training Course, ‘NursingAides’bySocietyforSchoolofMedicalTechnology(SSMT).Thetrainingwascommencedon16/06/2014 and completed on 10/01/2015. After completion of course an interview wasarranged at B.P. Poddar Hospital & Research Centre, 71/1, Humayun Kabir Sarani, NewAlipore,Block‐G,Kol‐53.Thisrenownedcalledourtrainees(NursingAides)20(Twenty)nos.forinterview.Fourteentraineesouttwentyhavebeenselectedafterinterview.Thisfourteenhavejoinedthisreputedhospitalon23/01/2015.

Page 11: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

11  

MunicipalCricketTournamenton29th&30thJan,2016

A Cricket Tournament happened on 29th & 30th Jan, 2016 among all the offices under Rajpur‐Sonarpurmunicipality.TheCrickettournamentoccurseveryyear.Thisyearalsoithasbeengreatlysuccessfullikepreviousyears.Atotalof10teamsparticipatedinthistournament.Theywere:

1. HarinaviATeam2. HarinaviBTeam3. RajpurATeam4. RajpurBTeam5. MahamayatalaTeam6. SonarpurTeam7. GariaTeam8. BoralTeam9. ContractorsTeam10. EBSTeam

After1stround4teamswereselectedtoplayintheSemiFinalroundon30thJan,2016.Theyare1. HarinaviATeam2. RajpurATeam3. MahamayatalaTeam4. EBSTeam

IntheendFinalMatchhappenedbetweenHarinaviATeam&MahamayatalaTeamon30thJan,2016.ItwasaverycompetitivematchbutfinallyHarinaviATeamclinchedthevictoryandwonthetournament.ManoftheMatchfortheFinalmatchwasNilNayekofHarinaviATeamforhisexcellentperformanceintheFinalsandManoftheSerieswasRinkuDasfromHarinaviATeamforhissuperlativeallroundperformancethroughouttheseries.

Page 12: Rajpur‐Sonarpur Municipality · and will be delivered to the proposed water treatment plant at Laskarpur. Under Ground Reservoirs In this scheme total Rajpur‐Sonarpur Municipality

12  

DramaFestivalsinJai‐Hindauditorium

Jai‐Hindauditorium,oneofthefineststateofartinourstate,hasbeeninauguratedlessthanoneyearfromnow.But it has alreadybecomeoneof thebiggest focusof attraction for art lovers. Plentyofcultural programs have been arranged in this little period. Paschimbanga Natya Academy hasarrangedsome famousdramas likeAinsiddho,Charu,FMMahanagar,AjmonCheyecheandSundorBibirPalaDuring24thNov,2015to29thNov,2015.

Morethanthat,DramafestivalbySonarpurAbirvabhasbeenarrangedfrom16thto22ndJan,2016inJaiHindAuditorium.ManyFamousdramatists likeBratyoBosu,ArpitaGhosh, Chanmdan senhaveperformed in this Natyo Utsab. Famous dramas like Surjo Pora Chai, Achalayatan, Ipsa, GraherChitranatyo,RuddhaSangeet,ThakurmarJhulioBordaandArdhanginihavebeenarrangedbetween16thJan,2016to22ndJan,2016.BesidesrenownedsingerslikeVinodRathore,Lopamudra,NachiketaandmanymorehavealreadyperformedinJaiHindAuditorium.