6.5.2 Two examples of review of teaching learning process
The IQAC has been instrumental in developing and implementing various academic reforms
since its inception.
IQAC meetings are conducted at regular basis to review teaching learning process,
methodologies and learning outcomes from the activities organized by the institute.
Following are the two examples of review of teaching learning process.
1) Review of Academic Monitoring system through Regular Meeting of
IQAC - Attendance, Assignment checking, Course file completion, ERP
Update, lesson plan etc.
2) Online Feedback system for students
*********************
Institute has formed Academic Monitoring Committee (AMC) which consists of
Director, Head of Department, MBA-I Faculty Class Coordinator and MBA-II Faculty
Class Coordinator.
At the beginning of every semester HOD inform all staff members regarding their duties
and responsibilities.AMC conducts frequent meetings .The control charts are prepared by
HOD to follow up if academic duties are followed by all teachers which includes
following activities.
Review of Academic Monitoring system through Regular
Meeting of IQAC - Attendance, Assignment checking, Course
file completion, ERP Update, lesson plan etc.
Objective Academic Monitoring Committee:
To provide clear guidelines to all teaching staff regarding curriculum planning and
implementation
To develop a mechanism for academic monitoring to ensure effective implementation of
academic planner.
ACADEMIC MONITORING COMMITTEE FLOWCHART
Duties and responsibilities of Academic Monitoring Committee
To conduct regular meeting 1. Before the beginning of semester - for academic planning
and 2. At the end of the semester- Review of the academic process.
To prepare of academic calendar every year
To prepare time table for MBA-I year and MBA-II year
To provide guidelines regarding preparation of course files to all faculty members
To provide guidelines regarding ERP data entry and check whether all teaching staff
updates ERP regularly.
AMC keep a track of ERP software is used by students and teachers on regular basis for
Attendance, Time table, Assignments, lesson plan, online examination question paper
preparation.
To form annual committees and distribute the portfolio among all staff members
To allocate subjects for teaching among all staff members
To distribute the workload as per norms of Savitribai Phule Pune University/AICTE
To keep a track of syllabus completion within stipulated time period
To prepare monitoring sheet to track the progress of academic activities.
To provide guidelines regarding mentorship programme.
To appoint the mentors and allocate mentees
To keep track of students absentees and counsel them through mentoring process.
To ensure that teachers and students are using ICT facilities for smart classroom facility
for teaching learning.
To check whether all lectures are conducted as per the time table
Examinations results are analyzed remedial session are planned if required.
To adjust missing lectures
To write minutes of meeting of academic monitoring committee
To organize various co curricular events relevant to MBA programme
To submit record of academic monitoring committee to IQAC
IQAC coordinates and monitor effectiveness of academic monitoring committee which helps in
maintaining robustness, academic integrity and discipline in teaching learning . Given below are
the minutes of meeting of Academic Monitoring Committee (AMC)
Feedback is an essential part of education and training programmes. Institute gives importance to
students’ feedback for bringing improvements in academic and administrative areas. Feedback
increases self-awareness, offers guidance and encourages development in the institute. Every
semester Institute collects and analyses feedback of students about teacher, MBA Syllabus,
Concurrent Evaluation and overall MBA Programme.
Before academic year 2018-19, the system of feedback was taken manually from different
stakeholders. Institute has recently implemented iCloud ERP system. Students are provided with
login IDs and passwords. In academic year 2018-19 online feedback was taken from the
students. Online Feedback system includes following type of feedback.
Teaching Feedback
MBA syllabus Review
Examination &Concurrent Evaluation Feedback (CE)
Physical facilities feedback
Administration feedback
Overall MBA Programme Feedback
Online Feedback system for students – Example
of Review of Teaching Learning
Feedback is taken every semester from students, analysed and shared with faculty and
management for improvement.
ERP FEEDBACK PROCESS FLOWCHART
TEACHER WISE REPORT
Questionnaire for Course Teacher Feedback in ERP
Sr.No Type Question Status Seq Id
Academic Year
Edit Delete
Feedback questions for Course Teacher
1 Theory Preparedness and well organised lecture delivery
Active 1 2018-2019
2 Theory Use of ICT tools while teaching
Active 2 2018-2019
3 Theory
Communication course
objectives before lecture delivery and verify the outcome of same
Active 3 2018-2019
4 Theory Communication skills Active 4 2018-2019
5 Theory Punctuality in the class Active 5 2018-
2019
6 Theory
Give examples, use case studies, MCQs, reference material during lecture
delivery
Active 6 2018-2019
7 Theory
Helps students in providing
study material which is not readily available in the text
books
Active 7 2018-2019
8 Theory
Helping approach towards
varied learning levels, academic interests of students/ethnicity/background
Active 8 2018-2019
9 Theory Depth & Extent of syllabus
coverage of course Active 9
2018-
2019
10 Theory
Encouragement and
participation of students in teaching learning activities
Active 10 2018-2019
11 Theory
Rigorous concurrent evaluation of the course
Assignment/internal exam/GD/Presentation etc.
Active 11 2018-
2019
12 Theory Overall performance of the faculty
Active 12 2018-2019
Screenshot of Online Course Teacher Feedback
Screenshot of Questionnaire for Concurrent Evaluation Feedback
and Administration Feedback
CONCURRENT EVALUATION FEEDBACK
13 Event/Overall
(CONCURRENT INTERNAL
EVALUATION -CIE)Feedback- Rate the overall mechanism of conduct of
examination & concurrent evaluation at the institute
Active 40 2018-2019
15 Event/Overall CIE Feedback-Rate the concurrent evaluation at the institute
Active 39 2018-2019
15 Event/Overall
CIE Feedback-Mechanism of internal assessment is transparent and robust
in terms of criterion and marking scheme
Active 38 2018-
2019
16 Event/Overall
CIE Feedback-Weigtage to MCQs/GD/Orals/Industrial
visits/Assignments/presentations/case studies etc.
Active 37 2018-
2019
ADMINISTRATION FEEDBACK
16 Event/Overall ADMIN OFFICE FEEDBACK-Help extended by all admin staff at the
institute
Active 37 2018-
2019
17 Event/Overall
Admin Office Feedback-Immediate Support and query resolved from Students section for e.g. original
documents etc.
Active 36 2018-2019
18 Event/Overall Admin Office Feedback-Immediate Support and query resolved from Accounts section
Active 35 2018-2019
19 Event/Overall Admin Office Feedback-Immediate Support and query resolved from
Scholarship section
Active 34 2018-
2019
CONCURRENT EVALUATION & ADMINISTRATION FEEDBACK
MBA CURRICULUM FEEDBACK
INFRASTRCTURAL FEEDBACK
20 Event/Overall
INFRASTRUCTURAL FEEDBACK-
Availability of physical facilities such as classrooms,computer lab, library,lift,seminar hall, common
room,play ground etc.
Active 33 2018-2019
21 Event/Overall
Infrastructure Feedback- ICT enabled Teaching Learning-Smart Classrooms/LCD/NPTEL/You
Tube/e-Resources etc.
Active 32 2018-2019
22 Event/Overall
Infrastructure Feedback- Availability
of Internet and wi-fi with Adequate bandwidth
Active 31 2018-2019
23 Event/Overall Infrastructure Feedback-Well maintained Computer lab and
Language Lab
Active 30 2018-
2019
24 Event/Overall Infrastructure Feedback-Well maintained Library with ample of Books/periodicals/journals etc.
Active 29 2018-2019
LIBRARY FEEDBACK
25 Event/Overall
Library Feedback - Services offered
in library such as library software-issue return, digital library,Access
to JGATE,NDL,DELNET etc.
Active 28 2018-2019
26 Practical Library Feedback- Flexible Library
and Computer lab Timings Active 13
2018-
2019
INDUSTRY ACADEMIA INTERFACE FEEDBACK
27 Event/Overall INDUSTRY ACADEMIA INTERFACE FEEDBACK-Institute regularly
organise industrial visits
Active 26 2018-
2019
28 Event/Overall
Industry Academia Interface Feedback-Regular interaction with corporate and academic expert
through guest lectures/seminars/workshops/skill
Active 27 2018-2019
development programme etc.
29 Event/Overall
Industry Academia Interface
Feedback-through Organising Alumni Meet,Alumni Engagement through guidance
session,SIP,Placement etc.
Active 25 2018-2019
30 Event/Overall
Industry Academia Interface
Feedback-Activities conducted under Startup and Innovation (ED
Cell)
Active 24 2018-2019
EXTRA CURRICULAR ACTIVITIES FEEDBACK
31 Event/Overall
EXTRA CURRICULAR ACTIVITIES FEEDBACK- Organising extra curricular activities such as
srujan(annual social gathering ,sports events,various cultural
days,competitions etc.)
Active 23 2018-
2019
32 Event/Overall
Extra Curricular Activities Feedback-
Conduct of social activities by social souls cell
Active 22 2018-2019
MENTORHSIP FEEDBACK
33 Event/Overall
MENTORHSIP FEEDBACK-Individual
attention, personal Counselling and career guidance through Student Mentorship Programme (SMP)
Active 20 2018-2019
34 Event/Overall Mentorship Programme-Regular
meetings of Mentor and Mentee Active 21
2018-