RAINIER MIDDLE SCHOOL RA-SI-01 Rainier Middle School Page 1 of 8 Additional parking stalls needed for disabled individuals and to meet ADA requirements. Connection of irrigation system to the school’s energy manage- ment system will reduce water consumption and utility costs. Traffic signage needed at west parking lot for traffic control. Additional cinders needed at running track to fill low areas, improve drainage and provide a safe running surface. Additional pavement markings needed for traffic control and out- door game lines. Installation of clay block soil material at pitcher’s mound and home plate areas will improve drainage and reduce maintenance. Facility Improvements ACCESSIBLE PARKING STAFF ADDITIONS RA-SI-12 CINDER TRACK UPGRADE RA-SI-19 IRRIGATION SYSTEM UPGRADE RA-SI-28 RA-SI-20 PAVEMENT MARKING UPGRADE BASEBALL & SOFTBALL INFIELD CLAYBLOCK July 20, 2009 RA-SI-26 TRAFFIC CONTROL SIGNS ADDITION

Upload: others

Post on 24-Jul-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: RAINIER MIDDLE SCHOOL Facility Improvements...Rainier Middle School Page 6 of 8 Replacement of toilets and sink faucets with water efficient fixtures will reduce water consumption

RAINIER MIDDLE SCHOOL

RA-SI-01

Rainier Middle School Page 1 of 8

Additional parking stalls needed for disabled individuals and to meet ADA requirements.

Connection of irrigation system to the school’s energy manage-ment system will reduce water consumption and utility costs.

Traffic signage needed at west parking lot for traffic control.

Additional cinders needed at running track to fill low areas, improve drainage and provide a safe running surface.

Additional pavement markings needed for traffic control and out-door game lines.

Installation of clay block soil material at pitcher’s mound and home plate areas will improve drainage and reduce maintenance.

Facility Improvements

ACCESSIBLE PARKING STAFF ADDITIONS RA-SI-12 CINDER TRACK UPGRADE

RA-SI-19 IRRIGATION SYSTEM UPGRADE

RA-SI-28

RA-SI-20 PAVEMENT MARKING UPGRADE

BASEBALL & SOFTBALL INFIELD CLAYBLOCK

July 20, 2009

RA-SI-26 TRAFFIC CONTROL SIGNS ADDITION

Page 2: RAINIER MIDDLE SCHOOL Facility Improvements...Rainier Middle School Page 6 of 8 Replacement of toilets and sink faucets with water efficient fixtures will reduce water consumption

RAINIER MIDDLE SCHOOL

RA-EX-01

Rainier Middle School Page 2 of 8

Installation of an automatic door opener at the front entry will improve access for disabled individuals.

Water repellent needed at exterior masonry walls to protect walls from moisture penetration.

Fall arrest anchors needed at roof to provide protection for work-ers performing inspections and roof maintenance.

New exterior door locks will improve building security.

New roof shingles needed to replace existing shingles that are deteriorating and allowing the roof to leak.

New carpeting needed in Library, main office and computer class-rooms to replace existing carpet that is 19 years old and worn.

Facility Improvements

AUTOMATIC DOOR OPENER ADD. - MAIN ENTRANCE RA-EX-03 EXTERIOR DOOR HARDWARE UPGRADE

RA-EX-06 MASONRY WATER REPELLANT APPLICATION

RA-IN-02

RA-EX-07 ROOF REPLACEMENT - SHINGLES

CARPET REPLACEMENT

July 20, 2009

RA-EX-09 ROOF FALL ARREST ANCHOR ADDITION

Page 3: RAINIER MIDDLE SCHOOL Facility Improvements...Rainier Middle School Page 6 of 8 Replacement of toilets and sink faucets with water efficient fixtures will reduce water consumption

RAINIER MIDDLE SCHOOL

RA-IN-05

Rainier Middle School Page 3 of 8

Modifications needed at coiling doors to improve operations and reduce maintenance costs.

Additional chairs and tables needed in classrooms for students to use.

New appliances needed in Foods classroom to replace equipment that is 19 years old and does not operate reliably.

Lever handles needed at some door locations to improve access for disabled individuals and to meet ADA requirements.

Computer furniture is needed to properly accommodate students and computer equipment.

Volleyball posts and nets that anchor into the floor are needed for physical education classes and athletic team use.

Facility Improvements

COILING DOOR MODIFICATIONS RA-IN-07 DOOR HARDWARE UPGRADE

RA-EQ-01 CLASSROOM FURNITURE ADDITION

RA-EQ-05

RA-EQ-02 COMPUTER FURNITURE UPGRADE

GYM VOLLEYBALL POST ADDITION

July 20, 2009

RA-EQ-04 FOODS CLASSROOM EQUIPMENT REPLACEMENT

Page 4: RAINIER MIDDLE SCHOOL Facility Improvements...Rainier Middle School Page 6 of 8 Replacement of toilets and sink faucets with water efficient fixtures will reduce water consumption

RAINIER MIDDLE SCHOOL

RA-EQ-08

Rainier Middle School Page 4 of 8

New combination oven and dishwasher needed to replace exist-ing equipment for improved operations and reliability.

Improvements to mechanical system controls will reduce mainte-nance costs, energy consumption and utility costs.

Installation of CO2 controls for ventilation systems in Commons, Gym and Library will reduce energy consumption and utility costs.

Installation of return air grill in Storage Room will reduce over-heating, energy consumption and utility costs.

Installation of demand limiting controls on boiler and hot water heaters will reduce energy consumption and utility costs.

Replacement of electric hot water heaters with heat pump type heaters will reduce energy consumption and utility costs.

Facility Improvements

KITCHEN EQUIPMENT UPGRADE RA-ME-01 ART ROOM STORAGE RETURN AIR ADDITION

RA-ME-02 AUTOMATIC CONTROLS UPGRADE

RA-ME-05

RA-ME-03 BOILER & HOT WATER HEATER DEMAND LIMITING

ELECTRIC HOT WATER HEATER REPLACEMENT

July 20, 2009

RA-ME-04 CO2 CONTROL ADDITION

Page 5: RAINIER MIDDLE SCHOOL Facility Improvements...Rainier Middle School Page 6 of 8 Replacement of toilets and sink faucets with water efficient fixtures will reduce water consumption

RAINIER MIDDLE SCHOOL

RA-ME-07

Rainier Middle School Page 5 of 8

Installation of variable speed drive on ventilation equipment at Gym will reduce energy consumption and utility costs.

New control valves needed at heating system to replace existing valves that leak and do not operate reliably.

Installation of occupancy sensors for the heating system will reduce energy consumption and utility costs.

Replacement of heat pumps that are failing with boilers will im-prove comfort and reduce maintenance costs.

Commissioning of mechanical systems will improve operations while reducing energy consumption and utility costs.

Installation of a switch that shuts off heat when the overhead door is open will reduce energy consumption and utility costs.

Facility Improvements

GYM VARIABLE SPEED DRIVE ADDITION RA-ME-08 HEAT PUMP REPLACEMENT - BOILERS

RA-ME-10 HEATING SYSTEM CONTROL VALVE REPLACEMENT

RA-ME-14

RA-ME-11 HVAC CONTROL SYSTEM COMMISSIONING

OVERHEAD DOOR SWITCH ADDITION

July 20, 2009

RA-ME-13 OCCUPANCY SENSOR TEMP. CONTROL ADDITION

Page 6: RAINIER MIDDLE SCHOOL Facility Improvements...Rainier Middle School Page 6 of 8 Replacement of toilets and sink faucets with water efficient fixtures will reduce water consumption

RAINIER MIDDLE SCHOOL

RA-ME-15

Rainier Middle School Page 6 of 8

Replacement of toilets and sink faucets with water efficient fixtures will reduce water consumption and utility costs.

Air conditioning needed in Telecom. Room to eliminate overheat-ing and to protect computer equipment from damage.

Replacement of EXIT signs with LED fixtures will reduce energy consumption and utility costs.

Modifications needed at walk-in cooler and freezer refrigeration lines to eliminate condensation occurring within walls and ceilings.

Installation of variable speed drives at VAV air handling equip-ment will reduce energy consumption and utility costs.

Replacement of exterior lights with energy efficient fixtures will improve lighting and reduce energy consumption and utility costs.

Facility Improvements

PLUMBING FIXTURE RETROFIT RA-ME-16 REFRIGERANT PIPING MODIFICATION

RA-ME-17 TELECOM. RMS. COOLING & VENTILATION ADDITION

RA-EL-12

RA-ME-18 VAV UNIT VARIABLE SPEED DRIVE ADDITION

EXTERIOR LIGHTING UPGRADE

July 20, 2009

RA-EL-10 EXIT SIGN REPLACEMENT

Page 7: RAINIER MIDDLE SCHOOL Facility Improvements...Rainier Middle School Page 6 of 8 Replacement of toilets and sink faucets with water efficient fixtures will reduce water consumption

RAINIER MIDDLE SCHOOL

RA-EL-13

Rainier Middle School Page 7 of 8

New smoke detectors needed to replace existing detectors that are obsolete and do not have available replacement parts.

Replacement of lights in Gym and Commons with energy efficient fixtures will reduce energy consumption and utility costs.

Replacement of interior lights with energy efficient fixtures will improve lighting and reduce energy consumption and utility costs.

New sound system equipment needed in Gym and Commons to replace existing equipment that has poor sound quality.

Additional data and electrical outlets needed in Industrial Technol-ogy classroom for student computers.

Additional data and electrical outlets needed in Library for student work stations.

Facility Improvements

FIRE ALARM SMOKE DETECTOR REPLACEMENT RA-EL-14 GYM & COMMONS SOUND SYSTEM UPGRADE

RA-EL-15 HID LIGHTING REPLACEMENT

RA-EL-21

RA-EL-16 INDUS. TECH. DATA & ELECT. OUTLET ADDITION

LIBRARY DATA & ELECTRICAL OUTLET ADDITION

July 20, 2009

RA-EL-18 INTERIOR LIGHTING UPGRADE

Page 8: RAINIER MIDDLE SCHOOL Facility Improvements...Rainier Middle School Page 6 of 8 Replacement of toilets and sink faucets with water efficient fixtures will reduce water consumption

RAINIER MIDDLE SCHOOL

RA-EL-22

Rainier Middle School Page 8 of 8

Additional electrical outlets needed in Library for information search stations.

A larger restroom is needed at the Health Room to provide wheel-chair access and to meet ADA requirements.

Modifications needed to provide additional storage within building and to improve staff restrooms to meet ADA requirements.

Installation of occupancy sensors to control interior lights will re-duce energy consumption and utility costs.

Expansion of Kitchen serving area will improve operations and reduce amount of time students must wait in line during lunch.

Facility Improvements

LIBRARY SEARCH STATION ELECTRICAL OUTLETS RA-EL-23 OCCUPANCY SENSOR LIGHITNG CONTROL ADDITION

RA-MD-03 HEALTH RESTROOM MODERNIZATION

RA-MD-05 KITCHEN SERVING AREA IMPROVEMENT

July 20, 2009

RA-MD-17 STAFF RESTROOM / STORAGE MOD. & ADDITIONS