railways ordinance (chapter 519) hong …...1:1000 (a1) drawing no. scale the government of the hong...
TRANSCRIPT
1:1000 (A1)
DRAWING NO. SCALE
THE GOVERNMENT OF THE HONG KONG
SPECIAL ADMINISTRATIVE REGION
HIGHWAYS DEPARTMENT
RAILWAY DEVELOPMENT OFFICE
»›ä·SflO§æ
ô‚F
K¯ô‚Ý
ˇ„ æ⁄
OR
AS SHOWN
˛'pƒ
LEGEND
BOUNDARY OF THE SCHEME
Ł⁄×fi
ˇ„
PROPOSED BORED / MINED /
DRILL AND BLAST TUNNEL
ÀÀØ«”“p˘ı«˛'ı
PROPOSED TEMPORARY UNDERGROUND
CONSTRUCTION ACCESS
ÀÀØ«”“aƒU⁄{
PROPOSED FOOTBRIDGE
ÀÀØ«”“æ
EXISTING FOOTBRIDGE TO BE AFFECTED
ÀÀØ«”“ò”æ«fi¤ł
PROPOSED FOOTPATH
ÀÀØ«”“
PROPOSED STATION AND
OTHER RAILWAY FACILITIES
ÀÀØ«”“{`ÉfiæƒH⁄Ñ⁄ôPROPOSED TEMPORARY FOOTBRIDGE /
AT-GRADE PEDESTRIAN CROSSING
{†‡ƒ”“æƒH⁄Ñ
i¥àflbƒä¤W⁄i¶æƒu⁄{µ”“F‹†'GOVERNMENT FORESHORE OR SEABED
OVER OR UPON WHICH RECLAMATION OR
OTHER WORKS MAY BE CARRIED OUT
ÀÀØ«”“fi¤‚fl˛⁄
ÀÀ˜–˛¥œ'ı«^ƒæ¶k“‡¿PROPOSED RAILWAY FACILITIES/TUNNEL BY
CUT-AND-COVER METHOD
PROPOSED EMERGENCY VEHICULAR ACCESS
AND CARRIAGEWAY
ÀÀØ«”“fi¤‚fl˛⁄ä¤L¥PROPOSED STATION AND
OTHER RAILWAY FACILITIES (UNDERGROUND)
i¥àflˆ¥[⁄˚«‹‡”“D„ô‚(�ROADS (INCLUDING CARRIAGEWAY AND FOOTPATH)
WHICH MAY BE CLOSED PERMANENTLY
DRAWING TITLE
DATE OF ISSUE
APPROVED FOR ISSUE
REV SUB APPBY
TABLE OF AMENDMENTS
Ø⁄ ‚ˆ Öfi t›×› ¡»
DESCRIPTION
ˇ„h«
òÀª›
oµX¥
×›q
ô‚FK¯ô‚Ý'ifiB‡˘
DATE
GOVERNMENT ENGINEER/
RAILWAY DEVELOPMENT (2)
HIGHWAYS DEPARTMENT
ÀÀØ«ìƒó'ŁƒPROPOSED TERMINUS IN WEST KOWLOON
ÀÀØ«æPROPOSED
ROAD
PROPOSED NOISE BARRIER
ÀÀØ«j„
PROPOSED
UNDERPASS
ÀÀØ«aƒU
PROPOSED
ROAD
ÀÀæƒfi
APPROXIMATE
GROUND LEVEL +6.9mPD
aƒ–›j⁄
SECTION BR-
µ– �Ø
üfiô⁄â'J⁄f⁄M'˘–
-
BR
-
-
BS
NOTE : ANCILLARY RETAIL SPACE WITHIN THE PROPOSED TERMINUS IN WEST KOWLOON TO SUPPORT RAILWAY OPERATION IS APPROXIMATELY 30,000m 2
PROPOSED
TEMPORARY
WORKS AREA
PORTION OF EXISTING AUSTIN ROAD SUBWAY
TO BE TEMPORARILY REMOVED & RECONSTRUCTED
ÀÀ{`Éfiî'£°{†‡ƒ_‹h⁄l¤
PROPOSED UNDERPASS
ÀÀØ«”“aƒ
PROPOSED PEDESTRIAN DECK
ÀÀØ«æƒ
PROPOSED NOISE BARRIER / NOISE ENCLOSURE
ÀÀØ«”“j„µ›Ì
-
BS
SECTION BS-
SECTION BS1-
@ڼfl GENERAL NOTES
GEOMETRY AND CONFIGURATION OF RAILWAY FACILITIES
SHOWN IN SECTIONS ARE SCHEMATIC.
`⁄–›ˇ„Ò'Ü¥K¯ô‚]‡I‹”“˛§
XRL/G45/0027/2
SECTION BS2-
NOTES¡»
TEMPORARY CLOSURE OF A SLIP ROAD FROMLIN CHEUNG ROAD TO CROSS-BORDER COACH TERMINUSAT MTR KOWLOON STATION, AND SECTIONS OFLIN CHEUNG ROAD AND AUSTIN ROAD WEST
„ƒˇ„ÚfiÚ¾˜†X�R�L�-�G�4�5�„‚(�
N–¨…Éfi˚«‹‡Ñ¥s‡¾µD„܃ä·K¯E⁄
˛⁄À⁄O§H¥æ”âƒM'ı‹âƒ—…œ'
M'_‹h⁄l¤D
THIS DRAWING IS PREPARED BASED ON DRAWING NO.
XRL-G45 (REVISION 2) AND IS INTENDED TO SHOW THE
TEMPORARY CLOSURE OF THE SLIP ROAD FROM
LIN CHEUNG ROAD TO CROSS-BORDER COACH TERMINUS
AT MTR KOWLOON STATION (HIGHLIGHTED IN YELLOW),
AND THE TEMPORARY PARTIAL CLOSURE OF SECTIONS
OF LIN CHEUNG ROAD AND AUSTIN ROAD WEST
(HIGHLIGHTED IN GREEN AND RED RESPECTIVELY).
¨…Éfi˚«‹‡Ñ¥s‡¾µD„܃ä·
”“s‡µ–ô‚ � �H¥˛⁄s‡¾