Railway Engineering
Submitted by:
Akshay Kaushal (110134)
Jaspreet Singh (110138)
![Page 2: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/2.jpg)
https://www.youtube.com/watch?v=pvg3e2P2TAo
History of Indian Railway
![Page 3: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/3.jpg)
Railway Engineering
• It is a branch of civil engineering concerned with the design, construction, maintenance, and operation of railways.
• Railway engineering includes elements of civil, mechanical, industrial, and electrical engineering.
• Railway engineers handle the design, construction, and operation of railroads and mass transit systems that use a fixed guideway(such as light rail or even monorails).
• Typical tasks would include determining horizontal and vertical alignment design, station location and design, construction cost estimating, and establishment of signaling & controlling system.
• Railroad engineers can also move into the specialized field of train dispatching which focuses on train movement control.
![Page 4: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/4.jpg)
Section of Permanent Way
![Page 5: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/5.jpg)
RAIL GAUGE
The gauge of a railway track is defined as the clear minimum perpendicular distance between the inner faces of the two rails.
![Page 6: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/6.jpg)
Dimension of gauges
1. Broad Gauge(BG) 1676mm(5’6”)
2. Standard Gauge(SG) 1435mm
3. Metre Gauge(MG) 1000mm
4. Narrow Gauge(NG) 762mm(2’6”)
5. Light Gauge 610mm
![Page 7: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/7.jpg)
Coning of Wheels
• Coning of wheels – The distance between the inside edges ofwheel flanges is generally kept less than the gauge. Gap isabout 38 mm on Either side. Normally the tyre is absolutelyahead centre on the head of the rail, as the wheel is coned tokeep it in this central position automatically. These wheel areconed at a slope
• Theory of coning:- On a level track, as soon as the axle movestowards one rail, the diameter of the wheel tread over the railincreases, while It decreases over the other rail. This preventsto further movement And axle retreats back to its originalposition (with equal dia or both rails and equal pressure onboth rails).
![Page 8: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/8.jpg)
Coning of Wheel on Level-track
![Page 9: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/9.jpg)
RAILS
The high carbon rolled steel sections, which are laidend-to-end, in two parallel lines over sleepers toprovide continuous and leveled surface for the trainsto move and for carrying axle loads of the rollingstock are called rails.
`
![Page 10: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/10.jpg)
Functions of the rails:
To provide continuous and level surface for the movement of trains with minimum friction with steel wheels of the rolling stock;
Provide strength, durability and lateral guidance to the track;
Transmit the axle loads to sleepers which transfer the same load to the underlying ballast and formation;
Bear the stresses developed due to heavy vertical loads, breaking forces and temperature variance.
![Page 11: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/11.jpg)
RAILSTypes of rails:
1. Double Headed Rails (DH Rails)
2. Bull Headed Rails (BH Rails)
3. Flat-footed Rails (FF Rails)
![Page 12: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/12.jpg)
Length of Rails
On Indian Railways the standard lengths are the following:
Length = 12.80 m. (42 ft.) for BG (say 13 m) andLength = 11.89 m. (39 ft.) for MG (say 12 m)
![Page 13: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/13.jpg)
Corrugated or Roaring Rails
In certain places, head of rails are found to becorrugated rather than smooth and straight,when the vehicles pass over such rails, a roaringsound is created which is intense enough to beunpleasant.
![Page 14: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/14.jpg)
Hogged RailsDue to battering action of wheels over the end of the rails, therails get bent down and get deflected at the ends. These rails arecalled hogged rails.
Measures taken to rectify the hogged rails are:
1. Cropping
2. Replacing
3. Welding
4. Dehogging
![Page 15: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/15.jpg)
Reason of Hogging!
https://www.youtube.com/watch?v=9njqDgjIcWQ
![Page 16: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/16.jpg)
Kinks In RailsWhen the ends of adjoining rails move slightly out of position, “shoulders” or “kinks” are formed.
Measures taken to rectify kinks in rails:
1. By correcting alignment at joints and at curved locations.
2. Proper packing of joints.
3. Proper maintenance of the track periodically in repect of cross levels, gauge, alignment, welding of worn out portions etc.
![Page 17: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/17.jpg)
Buckling of RailsBuckling means the track has gone out of its original position or alignment due to prevention of expansion of rails in hot weather on account of temperature variations.
![Page 18: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/18.jpg)
Damaged Rails
These are the rails which should be removed on account of their becoming unsafe for a railway track.
![Page 19: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/19.jpg)
Rail Features
• Crushed Heads
• Square or Angular Break
• Split Heads
• Split Web
• Horizontal Fissures
• Transverse Fissures
• Flowing Metal in Heads
• Horizontal Cracks
![Page 20: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/20.jpg)
Crushed Head
![Page 21: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/21.jpg)
Split Heads
![Page 22: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/22.jpg)
Horizontal and Transverse Fissures
![Page 23: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/23.jpg)
Flowing Metal in Heads
![Page 24: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/24.jpg)
![Page 25: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/25.jpg)
Rail Joints
• Supported Rail Joint• Suspended Rail Joint• Bridge Joint• Base Joint• Welded Rail Joint• Staggered or Broken Joint• Square or Even Joint• Compromise Joint• Insulated Joint• Expansion Joint`
![Page 26: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/26.jpg)
Rail Joint
![Page 27: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/27.jpg)
![Page 28: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/28.jpg)
Insulated Joint
![Page 29: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/29.jpg)
Expansion Joint
![Page 30: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/30.jpg)
Creep of RailsCreep is defined as the longitudinal movement of the rail with respect to the sleepers.
![Page 31: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/31.jpg)
Defects of Creep
(i) Sleepers move out of position thereby the rail gauge.
(ii) Position of points and crossings are disturbed.
(iii) Interlocking mechanism getsdisturbed.
![Page 32: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/32.jpg)
Remedies or Prevention of Creep
• Pulling back of rails
• Provision of Anchors or Anticreepers.
• Use of steel sleepers.
Anticreeper
![Page 33: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/33.jpg)
Sleepers
Sleepers are the transverse ties that are laid to support the rails. They transmit wheel load from the rails to the ballast.
![Page 34: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/34.jpg)
Classification of sleepers
(i) Wooden sleeper
(ii) Metal sleeperCast iron sleeper
Steel sleeper
(iii) Concrete sleeperReinforced concreteSleeper (R.C.C)
Prestressed ConcreteSleeper .
![Page 35: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/35.jpg)
Wooden Sleepers
• Hard wood such as, sal and teak
• Soft wood such as, chir and deodar
![Page 36: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/36.jpg)
Metal Sleepers
![Page 37: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/37.jpg)
Concrete Sleepers
![Page 38: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/38.jpg)
Sleeper Density
Sleeper density is the number of sleepers Perrail length. It is specified as (M+x) or (N+x),where M or N is the length of the rail in metersand x is a number that varies according tofactors such as axle load, speed, type & sectionof the rail etc.
It varies in India from M+4 to M+7 for maintracks.
![Page 39: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/39.jpg)
Track Fittings & Fastenings• Fish plates
• Spikes
– Dog spikes
– Screw spikes
– Round spikes
– Standard spikes
– Elastic spikes
• Bolts– Dog or Hook bolt– Fish bolt– Rag bolt– Fang nut and bolt
• Keys– Wooden key for C.I. Chair– M.S. key and steel trough
sleepers– Stuart’s key– Morgan key– Cotter and tie bars
• Chairs
– Cast steel chairs
– Mild steel and Cast Iron Slide Chairs
![Page 40: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/40.jpg)
• Blocks
– Heel blocks
– Distance blocks
– Crossing blocks
– Check blocks
• Plates
– Bearing Plates
– Saddle Plates
Track Fittings & Fastenings contd..
![Page 41: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/41.jpg)
Fish Plate
![Page 42: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/42.jpg)
Dog Spike
![Page 43: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/43.jpg)
Screw spikes
![Page 44: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/44.jpg)
Chair
![Page 45: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/45.jpg)
Bearing Plate
![Page 46: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/46.jpg)
Ballast
To provide structural support for the track, holding it in good line and surface
To distribute the load evenly to the subballast and subgrade and thus help to provide stability
Provide for drainage
Ballast in railroad terminology is durable granular material placed between
the crosstie and the sub ballast to hold the track in line and grade.
The primary purposes of ballast are:
![Page 47: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/47.jpg)
BALLAST
SUBBALLAST SUBGRADE
BALLAST SECTION
![Page 48: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/48.jpg)
Types of Ballast
• Broken Stone• Gravel or River Pebbles or Shingle• Ashes or Cinders• Sand• Mooram• Kankar• Brick Ballast• Blast Furnace Slag• Selected Earth
![Page 49: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/49.jpg)
Ballast Size
• For wooden sleepers = 5.1 cm
• For steel sleepers = 3.8 cm
• For under switches & crossings = 2.54 cm
![Page 50: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/50.jpg)
Points & Crossings
• Points and crossings provide flexibility ofmovement by connecting one line to anotheraccording to requirements.
• They also help for imposing restrictions overturnouts which necessarily retard themovements.
• From safety aspect, it is also important as pointsand crossings are weak kinks or points in thetrack and vehicles are susceptible to derailmentsat these places.
![Page 51: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/51.jpg)
Turnouts• It’s the simplest combination of points and crossings which
enables one track either a branch line or a siding, to take off from another track.
• Parts of a turnout:– A pair of points or switches– A pair of stockrails– A Vee crossing– Two check rails– Four lead rails– Switch tie plate– Studs or stops– Bearing plates, slide chairs, stretcher bars etc.– For operating the points – rods, cranks, levers etc.– For locking system – locking box, lock bar, plunger bar etc.
![Page 52: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/52.jpg)
![Page 53: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/53.jpg)
![Page 54: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/54.jpg)
Types of Switches
![Page 55: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/55.jpg)
CrossingsA crossing or a frog is a device which provides two flangewaysthrough which the wheels of the flanges may move, when tworails intersect each other at an angle.
![Page 56: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/56.jpg)
Acute Angle Crossing
![Page 57: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/57.jpg)
Diamond Crossing
![Page 58: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/58.jpg)
Square Crossing
![Page 59: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/59.jpg)
Track Junctions• Turnouts• Symmetrical split• Three throw switch• Double turnout or Tandem• Diamond crossing• Cross overs• Single slip and double slip• Gauntlet track and ladder tracks• Temporary diversion• Triangle• Double junctions
![Page 60: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/60.jpg)
Turnout
![Page 61: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/61.jpg)
Symmetrical split
![Page 62: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/62.jpg)
https://www.youtube.com/watch?v=L_wOPY5Pu-A
How Railway Track Changes
![Page 63: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/63.jpg)
Signalling It consists of the systems, devices and means by which trains are operated efficiently and tracks are used to maximum extent, maintaining the safety of the passengers, the staff and the rolling stock.
![Page 64: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/64.jpg)
On the basis of Operating Characteristics:
• Detonating Signals (Fog or audible signals)
• Hand signals (Visual Indication signals)
• Fixed signals (Visual Indication signals)
![Page 65: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/65.jpg)
Detonating Signal
![Page 66: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/66.jpg)
Hand Signals
![Page 67: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/67.jpg)
Fixed Signals
![Page 68: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/68.jpg)
• Stop or Semaphore type Signals
• Warner Signals
• Shunting Signals (Disc or Ground Signals)
• Coloured-light Signals
On the basis of Functional Characteristics:
![Page 69: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/69.jpg)
Semaphore type signals
![Page 70: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/70.jpg)
Warner Signals
![Page 71: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/71.jpg)
Shunting Signals
![Page 72: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/72.jpg)
Coloured-light Signals
![Page 73: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/73.jpg)
• Reception Signals
– Outer signals
– Home signals
• Departure Signals
– Starter
– Advance Starter
On the basis of Locational Characteristics:
![Page 74: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/74.jpg)
Departure Signals
![Page 75: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/75.jpg)
• Repeater or Co-acting signals
• Routing Signals
• Calling on signals
• Point indicator
• Modified lower quadrant semaphore signal
• Miscellaneous signals
On the basis of Special Characteristics:
![Page 76: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/76.jpg)
High Speed Bullet Train
https://www.youtube.com/watch?v=2-_yS60NhyM
![Page 77: Railway engineering](https://reader033.vdocuments.us/reader033/viewer/2022052311/55a6be871a28ab4d688b4624/html5/thumbnails/77.jpg)
THANK YOU