railroad commission of texas monthly production report (pr) deborah davis

34
Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Upload: hilda-james

Post on 31-Dec-2015

234 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Railroad Commission of Texas

Monthly Production Report (PR)Deborah Davis

Page 2: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis
Page 3: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Why file production reports (PR’s) ?• Statewide Rules (SWR)

• SWR 27

• SWR 54

• SWR 58 (b)

• Required to be filed On or Before the last working day of the month, following the month covered by the report

Page 4: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

PR Information• Oil/Condensate Production is reported in

Barrels (BBLS) (Including any test oil and condensate)

• Casinghead Gas (CSGHD) and

• Gas Well Gas (GWG) Production is reported in thousand cubic feet

(MCF)(Including test gas)

• Disposition

• Stock on hand

• All volumes need to be in whole numbers

Page 5: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

When to file PR reports

• Transfer Stock Only

• Reclassifications

• Gas Wells

• Oil Wells

Page 6: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

PR Filing Options

1. Hard Copy

2. Electronic Data Interchange (EDI)

3. On-Line

Page 7: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

HARD COPY

RRC Drilling1701 D. Road

Good TX 78766

0 0 0 0 0 0 0 1

0 1 2 0 1 0

REMARKS Hard WorkMike Bike Mike Bike

002-356-9912 2-14-12

Page 8: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Hard Copy Processing Issues Not on approved format

NO SIGNATURE – signatures are required on ALL pages

Only Blue or Black Ink accepted

Column 2 – Lease Type

Font too small – with the exception of column 1

Incorrect District/RRC Identifier and Operator Number

Month/Year

Field Name not on each page

Breaking of RRC identifier from one page to another

Page 9: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

CODESOil / Condensate (Column 8) :

• Code 3 & 6

• Code 4

• Code 5 – Form H-8

• Code 8

• Code 71

• Code 72

• Code 73

• Code 74

• Code 75

Page 10: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

CODES continued…

Casinghead/Gas Well Gas (Column 12) :

Code 4 – Vented or Flared

Questions: Terry Edwards (512) 463-6785

Page 11: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Pending Drilling or American Petroleum Institue (API) Number

Identifying Information needs to be correct

Be Consistent with Drilling Permit Number or API Number

Oil Wells

Page 12: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

RRC On-Line System Methods available to submit vs. paper:

1. EDI – Electronic Data Interchange

2. CD

3. PR On-Line System

Page 13: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

PR On-Line System What Can Be Viewed On-line:

Current

Lates and Corrected 1993 – Current Month

Pending (when lease number has not been assigned)

Using Drilling Permit or API Number

Page 14: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

PR On-Line System continued…

Filing: Read Website Requirements for Filing Electronically

www.rrc.state.tx.us/electronicfiling/edifilingrequirements.pdf

Submit your Security Administrator Designation (SAD) form

Receive your email from P-5 with User ID and instructions

Administrator User ID cannot file on the PR system

Administrator gives employees filing rights

Page 15: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

EDI – Electronic Data Interchange Upload File

File Upload Location: https://webapps.rrc.state.tx.us/security/login PR User ID

RRC On-Line System

PR EDI Upload

Browse and then verify

Check verified files

SUBMIT

Update Successful

EMAIL: [email protected]

Page 16: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

EDI – Electronic Data Interchange Upload File

PR EDI Upload Email Message: File Name

Upload Time 2005-05-11 11:27:43.351

Agent ID

Submitter ID

Agent Phone #

Number of records received

Number of records processed successfully

Number of records dropped

Page 17: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

EDI – Electronic Data Interchange Upload File

Reminders:

Cannot combine Current and Lates and Corrected in same file

Receive an Update Successful Message

E-Mail Confirmation

Page 18: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

On Line System Reminders Logging On: Use PR User ID, NOT Administrator ID

ONLY click on Multiple Commingling if your lease is on more than ONE permit

DO NOT use same RRC identifier on different lines for addition codes

Review the MONTH/YEAR and verify lease information

Confirm and Submit

View printable format

Page 19: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

PR QueryReminders:

Logged into RRC On-Line system

NOT Logged into RRC On-Line system

Page 20: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Log on to the RRC website www.rrc.state.tx.us

On the home page

click on Data

Online Research (Queries)

From the Online Research Queries page scroll down to the Statewide Production Data Query System (PDQ) and click on

Launch Application

Page 21: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis
Page 22: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis
Page 23: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis
Page 24: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis
Page 25: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Log on to the RRC website www.rrc.state.tx.us

Page 26: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Log on to the RRC website www.rrc.state.tx.us

Page 27: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Log on to the RRC website www.rrc.state.tx.us

Page 28: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Log on to the RRC website www.rrc.state.tx.us

Page 29: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Log on to the RRC website www.rrc.state.tx.us

Page 30: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Log on to the RRC website www.rrc.state.tx.us

Page 31: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Outstanding DiscrepanciesFix Discrepancy

Use this queue to view delinquent reports.

Correct discrepancies

Page 32: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

QUICK P-17 Form TIPSP-17 PERMIT FEE TOTAL IS $375

P-17 Permit Fee $150

As of 05/01/12, Surcharge Fee $225

Turbine and Coriolis Exception Meters Fee is $375 Per meter

FEE EXCEPTION

CANCELLATION

Page 33: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

QUESTIONS ??

Page 34: Railroad Commission of Texas Monthly Production Report (PR) Deborah Davis

Contact Information

P-17

Darlene Williams (512) 463-6873

[email protected]

Production

General Phone Line (512) [email protected]