Page 1: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

RAILROAD BRIDGE AND TRACK DESIGN AND

COORDINATION ISSUESLloyd M. Wolf, P.E.

Page 2: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E
Page 3: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Coordination with Railroad

• Meet with Railroad Early in Project Development to Discuss

• Railroad Track Operations are Very Important

• Minimize Impact on RR Operations• LOA and RR Agreement

Page 4: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Structure Type Selection

andBridge Design

Page 5: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Superstructure Considerations

• Safety

–Highway Users

–Railroad

• Required Span for Horizontal Clearance

–Column Protection

• Adequate Vertical Clearance

Page 6: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Preferred Railroad Grade Separations

1. Overpass2. UPRR Steel Deck Girder Standards3. Deck Plate Girder w/ Steel Deck4. Steel Girder w/ Conc Deck5. Prestressed Beam w/ Conc Deck6. Thru-Girder w/ Steel Deck

Page 7: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

UPRR Deck Girder Standard• Depth-Top / Rail to Low Chord = 5’-5”

• Steel Deck

• 69 ft Max

Span Length

Page 8: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Thru Girder• Depth-Top / Rail to Low Chord = 4’-6”

• Steel Deck

• 155 ft Max

Span Length

Page 9: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Superstructure Considerations

• TxDOT Design Requirements

• UPRR-BNSF Design Guidelines

• KCS Design Guidelines

• Composite and Non-Composite Design

• No Sacrificial Beams

• Design for 30” Ballast

• Ballast Depth for Concrete Tie

Page 10: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Vertical Clearance

• Steel Deck Girder 16.5 ft

• Steel Thru Girder-Bolt Bot Fl 17.5 ft

• Prestressed Conc 17.5 ft

• Hwy Over RR 23.33 ft

Page 11: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Design Development and Review

Processwith Railroads

Page 12: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Railroad Underpass

• 30% Submittal - Exhibit “A”

• 60% Submittal

• 90% Submittal

• 100% PS&E Plans

RR Agreement with Exhibit “B”

Page 13: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

30% Submittal - Exhibit “A”• Preliminary:

– Bridge Layout

– Track Plan and Profile

– Track Typical Sections

• Structure Type Selection Report

– Thru Girder

• LOA Facilitate RR Review

Page 14: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Structure Type Selection Report

• Required for Thru-Girder• Design Factors Considered

–Underpassing Roadway Width–Clear Zone–Vertical Clearance

• Consider All Options for Railroad

Page 15: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

RR Requirements Sheets

Page 16: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

60% Submittal

• Complete Bridge Plans

• Complete Mainline and ShooFly Track Plans and Profiles

• Railroad Track Standards

• Mainline and ShooFly Typical Sections

Page 17: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

60% Submittal, ctd• Track Sections every 50 ft

• Division of Labor

• Sequence

of Work

Page 18: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

90% Submittal

• Revised Complete Bridge Plans

• Revised Complete Mainline and ShooFly

• Track Plans and Profiles

• Mainline & ShooFly Typ Sections

Page 19: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

90% Submittal, ctd

• Track Sections every 50 ft

• All Parts of PS&E that Affect the Railroad

• All Specifications

Page 20: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

100% Submittal• Complete PS&E That Affects RR• Complete Bridge Plans• Complete Mainline and ShooFly• Track Plans and Profiles• Mainline & ShooFly Typ Sections• Sequence and Division of Work• RR Agreement w/ Exhibit “B”

Attachment

Page 21: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Mainline Bridge Replacement

Shoo-Fly Construction

Page 22: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Track Plans & Sequence of Work

• Bridge Replacement on Mainline• Longer Span and Increased

Clearance• Track Raise• Shoo-Fly Construction Best

Maintains RR Operations

Page 23: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Track Design Speed

• Railroad Operating Dept

Determines Speed

• Mainline & ShooFly Same Speed ?

–Existing Conditions

–Future Upgrades

–Design Speed Agreement

Page 24: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Railroad Track Grade Raise

• No Grade Raise is Desirable

• 6” Max Raise with Ballast Only

• Use Subballast for Greater Raises

• ShooFly Profile Grade

• Ballast Delivery May Be an Issue

Page 25: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E
Page 26: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Bridge Designand

Track DesignResources

Page 27: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Bridge and Track Design Resources

• TxDOT and Individual Railroad• Use TxDOT Annotated Guidelines

–TxDOT Website• BRG Project Development Web Page

–BRG FTP Site• AREMA and AASHTO

Page 28: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Bridge and Track Design Resources

• UPRR, BNSF, KCS Guidelines and Standards

• Updated Requirements and Standards

TxDOT Bridge FTP Site:

–ftp://bridge:[email protected]

–Railroad Bridge and Track Design

Page 29: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E
Page 30: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Ballasted Track Construction Specification

• Bridge Division has a Reference Spec Available for Project Use

• Bridge Division is Workingto Develop StatewideSpecial Spec

Page 31: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

ThankYou

Page 32: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Lloyd M. Wolf, P.E.512-416-2279

[email protected]

Page 33: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Estimated Costs 2008

Bridgeand

Track

Page 34: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Estimated Railroad Costs 2008

Steel Deck Girder = $350 / SFwith Steel Deck

Steel Thru Girder = $450 / SFwith Steel Deck

Prestressed Beam = $225 / SFwith Concrete Deck

Page 35: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Estimated Railroad Costs 2008

ShooFly Bridge

with Open Deck =

$350,000 / EA

Temp SpecialShoring = $60 / SF

Page 36: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Estimated Railroad Costs 2008

Ballasted Track = $240 / LFwith 1 ft Raise

Ballasted Track = $170 / LFNo Raise

Ballasted Track = $45 / LFRemoval

Page 37: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Estimated Railroad Costs 2008

Turnout / Switch = $85,000 / EA

Signal for Switch = $50,000 / EA

Including Circuit

Page 38: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Estimated Railroad Costs 2008

Engineering Design Review = $100-175,000

And Construction Inspection

Railroad Flagging = $900 / Day

Page 39: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Mainline Track Raise at Turnout

Page 40: RAILROAD BRIDGE AND TRACK DESIGN AND COORDINATION ISSUES Lloyd M. Wolf, P.E

Mainline Track Raise with Ballast Retainer