IRSE Seminar on 8th Jan’2010
New Delhi
ERTMS Level 1 and Level 2: Products & Applications
A. CasazzaV. Kumar
Goal of Presentation
• Overview of Ansaldo STS• Ansaldo ERTMS Applications• Ansaldo ERTMS Level 2 Applications• Ansaldo ERTMS Level 1 Applications• Ansaldo ERTMS Products
2
3
Ansaldo STS Worldwide Presence
Brisbane
Headquarters Regional leader company Offices Factory
AmericasAmericasEmployees: 1061Revenues: 145 M€
Central & Eastern EuropeCentral & Eastern EuropeEmployees: 1430Revenues: 576 M€
Western &Western & Northern EuropeNorthern EuropeEmployees: 802Revenues: 154 M€
Asia PacificAsia PacificEmployees: 965Revenues: 94 M€
Pittsburgh
ParisGenoa
4 200 Employees Present in 28 countries
4
GreeceOnboard - lev. 1
ScandinaviaSTM Nordic
UKCambrian Coast - lev. 2
RomaniaCampina – Predeal lev. 1
IndiaChennai - Gummudipundi - lev. 1Delhi - Agra - lev. 1
ChinaZhengzhou-Xi’an - lev. 2Shijiazhuang - Taiyuan – lev. 1Onboard - lev. 1-2
Czech RepublicPoříčany - Kolín – lev. 2
Belgium - NetherlandsOnboard lev. 1/2
Spain - FranceFigueres - Perpignan - lev. 1/2
SpainMadrid - Llerida - lev. 1/2Onboard – lev. 1/2
FranceLGV Est - lev. 2Tournan - Marles en Brie - lev. 1/2 Onboard - lev. 1/2Onboard - lev. 2
Austria – HungaryVienna - Budapest – lev. 1
ItalyTurin - Milan HSL, lev. 2Milano - Bologna HSL, lev. 2SCMT (STM) projects Onboard - lev. 1Onboard - lev. 2
GermanySaarbrücken - MannheimLev. 2
Ansaldo STS: ERTMS applications
5
Italian High-Speed Network – Case Study
Design phaseBuilding phaseIn revenue operation
Km CBI(Stations)
RBC Control Centre
Links
Roma- Napoli 211 18 3 1 4
Torino-Novara125
102 1 3
Novara-Milano 4
Milano-Bologna 185 19 3 1 7
Bologna-Firenze 81 8 1 1 1
ERTMS Level 2
6
The HSL and its equipment
KMC
TCP /IP Network
Maintenance
SICAM
ERTMSControl Centre
Telecom
GSM-R
RBCSILAM(Maintenance
System)
RBC RBC RBC RBC RBC RBC
PARIS
LONDON
AMSTERDAM
KÖLN
STRASBOURGLE MANS
TOURS
LYON
VALENCE
MONTPELLIER
BARCELONAZARAGOZA
MADRID
TORINOFIRENZE
NAPOLI
CALAISFOLKESTONE
LILLEBRUSSEL
LEGENDTVM 300TVM 430TVM ISEIERTMSOthers HSL in project
ROMA
BREST
NANTES
BORDEAUX
PERPIGNAN
MARSEILLE
ToBrussels
ToLondon
To Rennesand Nantes
ToBordeaux
Paris
Strasbourg
To Lyonand Marseille
To LilleCA
I 4
P. R
ac. In
terc
onne
xion
Chau
conin
CAI 2
8
P. R
ac. O
cque
rreCou
lombs
CAI 5
5CA
I 61
Beuv
arde
sCA
I 80
Villie
rs-A
gron
Aigu
izyCA
I 101
Gare C
hampa
gne
Arde
nne
CAI 1
23CA
I 133
Rac.
de C
hâlon
sCA
I 155
Tilloy
et B
ellay
CAI 1
78
CAI 1
97CA
I 204
Gare M
euse
CAI 2
24La
mor
ville
CAI 2
44CA
I 254
Prén
y
CAI 2
90
Livry
-Lou
verc
y
Ville
rs en
Arg
onne
P. R
ac. P
agny
-Van
dière
s
P. R
ac. d
e Bau
drec
ourt
Gare L
orra
ine-L
ouvig
ny
SEI
SEI andTracksideEquipment
(*)On-Board Bi-StandardERTMS / TVM 430 Vital Computer
Wayside:SEI-TVM : 37RBC : 7Eurobalise : 2 000
On-board: POS High Speed Trains: on-board bi-standard (ERTMS + TVM 430)
TVM & ERTMS Level 2TVM & ERTMS Level 2
7
ERTMS level 2 pilot line Passengers/Freight line : 215 km
Main characteristics of the line
ERTMS Architecture
Wayside
• Interlocking (SEI)• RBC• MTOR • Balises (380)
On Board
ERTMS level 2 on board equipment for 28 freight locomotives (class 158 & class 37)
8
MAIN BUILDING
CENTRALIZED TRAFFIC CONTROL
Interlocking System Equipment Overview
ToField Objects
CTCMMI
Detector PC M/T MMI
RoutersExternal TrainPositionning
ExternalERTMS CTC
ExternalMaint. Syst. External
KMC
Routers
WAN
CTC MMIKMC
Maint.Syst.JRU
CTCMain
2
CTCMain 1(Server)
RBC
IXL(PAI)
GSM-R
MTOR
Switches
ToField Objects
MTOR inShelter
Switches
ExternalRBC/IL
ToField Objects
Switches
BUILDING
ElectronicLX System
LAN
LAN A (VLAN)
LAN B (VLAN)
LAN
ERTMS level 2 pilot line Passengers/Freight line : 150 km single-track line, Eight (8) stations and nine (9) level crossings in all on the part being equipped with the ERTMS ESTER system.
Main characteristics of the lineWayside
28 MTOR Object controllers in 11 locations 211 fixed balises 142 Track circuits1 RBC1 SEI
GÖTEBORG
HELSINGBORG
LUND
MALMÖ
JÖNKÖPING
LINKÖPING
NORSKÖPING
STOCKHOLM
VÅSTERÅS
KARLSTAD
FILIPSTADUPPSALA
GÅVLE
SUNDSVALL
HÅRNÖSANDSVEDJE
ULMEÅ
TIMRÅSTAVREVIKEN
HUSSJÖBYHÄGGSJÖN
HÄLLENYLAND
BIRSTA
MÖRTSAL
SPRÄNDSVIKENFRANÖ
DYNÄSKRAMSFORS
VÄSTERASPBY
LULEÅ
PITEÅ
BODEN
HAPARANDAVUONOSKÖGEN
BREDVIKENKALIX
KOSJÄRV
MORJÄRV
SÅGBÄCKENAVAFORS
NIEMISEL
BUDDBYN
LULEÅ
PITEÅ
BODEN
HAPARANDA
VUONOSKÖGENBREDVIKENKALIX
KOSJÄRVMORJÄRV
SÅGBÄCKENAVAFORS
NIEMISELBUDDBYN
SUNDSVALL
HÅRNÖSANDSVEDJE
TIMRÅSTAVREVIKEN
HUSSJÖBYHÄGGSJÖN
HÄLLENYLAND
BIRSTA
MÖRTSAL
SPRÄNDSVIKENFRANÖ
DYNÄSKRAMSFORS
VÄSTERASPBY
HAPARANDABANAN
PROJEKT
ÅDALSBANANPROJEKT
9
“POS Nord” Line
“POS Nord”: Paris-Ostfrankreich-Südwestdeutschland
Scope of the Work : to equip with ERTMS Level 1 e Level 2 the Saarbrücken–Ludwigshafen/Mannheim Line (about 125 km), located in the western-center part of Germany
Customer : Deutsche Bahn Aktiengesellschaft
9
10
Czech Republic Pilot Project
• General:– Poříčany - Kolìn pilot section 22 km long– ERTMS/ETCS Level 2 system, according to the UNISIG SRS
version 2.3.0 (Subset-108 version 1.0.0)– Use of Velim Ring for preliminary tests
11
Sirt-Ras Ajdir & Al Hisha-Sabha Lybia: Main Features
• Type of System: ERTMS/ETCS Level 1 & 2• ERTMS/ETCS Baseline: UNISIG 2.3.0• Customer: Libyan Railroads• Infrastructures: Newly built• Length: 1500 km • Backup signalling systems: No• Max speed: 250 km/h• Mixed traffic: tbd• Light signals: No - Only fixed signals in the stations• Headway: Few trains/hour
12
ZhengXi Line China: Main Features
• Type of System: ERTMS/ETCS Level 2• ERTMS/ETCS Baseline: UNISIG 2.3.0• Customer: MOR (Chinese Railways)• Infrastructures: Newly built• Length: 500 km• Backup signalling systems: CTCS2• Max speed: 350 km/h • Mixed traffic: Yes• Light signals: No - Only fixed signals (Marker Boards) along the line and in the
stations• Headway: not provided
13
Management of mixed traffic on the same lineTrains equipped ETCS Level 2 Trains equipped CTCS-2
Onboard integration ETCS and CTCS-2The CTCS-2 system is integrated as a national STM
Centralized management of the TSR for both systems ETCS and CTCS-2RBC manages the speed restrictions (TSR)
ZhengXi Line China: Main functional requirements
14
Work schedulePHASE 1Commencement of Works 01/07/2008
Delivery in China January 2009Test
Laboratory April-October 2009Line October-December 2009
Trial run January 2010Commercial run 1 February 2010
PHASE 2 (Additional functionalities)
ZhengXi Line China: Schedule
Bogazkopru-Yenice & Mersin-Toprakkale Line Turkey: Main Features
Key
• Type of System: ERTMS/ETCS Level 1• ERTMS/ETCS Baseline: UNISIG 2.3.0• Customer: TCDD• Infrastructures: existing• Length: 440 km • Backup signalling systems: No• Max speed: 160 km/h• Mixed traffic: Yes• Light signals: Yes• Headway: 30:100 trains/day
16
Campina–Predeal Line Romania: Main features• Type of System: ERTMS/ETCS Level 1• ERTMS/ETCS Baseline: UNISIG 2.3.0• Customer: CFR• Infrastructures: existing• Length: 48 km • Backup signalling systems: INDUSI I60• Max speed: 120 km/h• Mixed traffic: Yes• Light signals: Yes• Headway: tbd
17
Wayside : more than 3.600 km equipped lines with 300 stations (33.000 Eurobalise and 3.400 LEU)
node of Firenze: 120 stations
node of Napoli: 72 stations
node of Torino: 50 stations
node of Verona: 14 stations
SCMT: Sistema Controllo Marcia Treno Italy
SCMT : ERTMS-1 technology with use of Packet 44
18
440 km - 4 stations -
3000 balises (amongst them 1100 switchables)
365 LEU modules
1000 CDV / 5 RBC
In commercial service with SEI & ERTMS Level 1 since May 2006
ETCS-1 – Spain Madrid/Lerida
19
ETCS – Lev.1 Some references
BDŽ (Bulgaria) Sofia – BurgasSupply of :
»BTM and Antennas (184)»Eurobalises (1.078)
MÁV (Hungary) Budapest-Kelenföld-KimleSupply of :
»BTM and Antennas (20)»Eurobalises (1.800)
20
ETCS – Lev.1 References
Northern Indian Railways
Supplier (for the Lev.1 system) of:»BTM and Antennas (35)»Compact LEU (290)»Eurobalises (520)»EVC (35)
ETCS-1
21
ETCS – Lev.1 References
Southern Indian Railways
Supplier (for the Lev.1 system) of:»BTM and Antennas (84)»Compact LEU (108)»Eurobalises (520)»EVC (84)
ETCS-1
22
TPWS -IndiaNew Delhi to Agra (North)– one of the busiest trunk routes in India• Chennai Beach to Gummidipundi (South)– one of the busiest suburban routes in IndiaBenefits:• Gradual implementation as an overlay to existinginfrastructure.• Qualitative and quantitative safety improvement• Flexible to adopt to specific customer requirements• Increase train speed & shorter train headways• Reduction of unit and direct operating costs• Eliminating human error leading to signals passed at“Danger” and over speeding.• Stimulate the implementation of Modern, proactive andsystematic safety.• Common system concepts with high safety standards(CENELEC)
23
On-board architecture (TPWS)
ERTMS DMI
EUROBALISEAntenna
Train Interface
PSTI RACK
Speed
sensors
BTM
24
Eurobalises
– ERTMS EUROSIG EUROBALISE Compliance
– FSK transmission, 565.4 KHz– 1023 and 341 - bit telegrams– Fixed or variable data balises– Programmable through C Interface – Suitable for SIL 4 systems– Class A Balise
– Length 523 mm– Width 403 mm– Height 40 mm– Weight < 10kg– Temperature Range - 40 °C / +70
°C
25
Reduced Size Eurobalise
Length 440 mm Width 262 mm Height 42 mm Weight < 5 kg Temperature Range- 40 / +70°C Designed for railway and metro
lines Compatible with the majority
supports used in ERTMS and KER applications
Available with different type of connector (screw or bayonet)
26
Signal Encoder
ON-BOARD SYSTEM
INTERFACE "A"
ETCS SIGNAL
ENCODER
EUROBALISEs
TRACK SIDE SYSTEM
EEddSS INPUT INTERFACE AND ACQUISITION
CENTRAL PROCESS UNIT
INPUT Pre-Elaboration
TELEGRAM MANAGEMENT LOGIC
OUTPUT INTERFACE
(EUROBALISE or EUROLOOP Modem )
SUPPLY
Diagnostic Interface and Programming
UI
MODEM EUROLOOP
27
Signal Encoder
Basic Version insideresin cabinet
Width ~ 300 mmHeight ~ 520 mmDepth ~ 330 mmWeight ~ 12 kg (*)
(*) fully equipped device plus external case
28
Signal Encoder
Basic Version insidemetallic cabinet
Width ~ 460 mmHeight ~ 700 mmDepth ~ 450 mmWeight ~ 45 kg (*)
(*) fully equipped device plus showed external case
(double layer, IP65)
29
Signal Encoder
I/O capability depending on configuration (cont’d)
Basic version – High number of input
- Up to 23 inputs
- Up to 4 outputs (all EUROBALISE or max 3 LOOMO)
30
Signal Encoder
I/O capability depending on configurationExtended version (maximum configuration)- Up to 30 inputs- Up to 8 outputs (all EUROBALISE or max 3 LOOMO)
31
Signal Encoder
I/O capability depending on configuration (cont’d)
Basic version – High number of output
- Up to 16 inputs
- Up to 8 outputs (all EUROBALISE or max 3 LOOMO)
32
1 Operator Interface Cabinet
3 Cabinets (TMR+CC) 1 Cabinet ART
RBC Product – (Example of 3 RBC Milano-Bologna)
D&M MI Interface
HMI Interface
1 FunctionalKeyboard
33
References over the past 2 years
Country / Customer Equipment Quantity
Spain (GIF/ADIF) ERTMS levels 1 & 2 12(CAF) ERTMS levels 1 & 2 12 (CAF) ERTMS levels 1 & 2 29(Alstom) ERTMS levels 1 & 2 16
Czech RepublicERTMS level 2 + STM LS90 4
India ERTMS level 1 130(Northern / Southern Railways)
Netherlands (Ansaldo Breda) Eurocab ETCS 2 38 (V2.3.0)
Korea (Rotem) Eurocab ETCS 1 (Loco 8200) 28
UK (Cambrian line) ERTMS Level 2 24
On-board ERTMS ATP deliveries
34
References over the past 2 years
Country / Customer Equipment Quantity
France (SNCF) Bi standard for HSL 800ERTMS level 2 + TVM
Bi standard for POS trains 32ERTMS level 2 + TVM
Bi standard for Thalys 60
China (MOR) ATP for EMU Trains 120 based on China CTCS standard(linked with ERTMS standard)
Korea (Rotem) Bi standard for KTX 20ETCS / TVM 430
Siemens (Velaro) ERTMS-2 30STMs: KVB,TVM, ZUB, LZB, TBL
35
WheelSensors
DopplerRadar
Maintenance
JRUDownloading
GSM-RRadio
Modem
STM
Eurobalises Radio Infill
EVC
BTM
R FO
ON OF
ON OF
MovementDirection Switch
Power SupplyCab Main Switch
Isolation
010
203040
50607080
90100110
Km/h
120130
140
120011001000900800700600500400300200100
00
10203040
50607080
90100110
Km/h
120130
140
120011001000900800700600500400300200100
0
MMI 1 MMI 2
EUROCAB
EUROCAB product description Components (System integration)