rack factory jan 2010 28 mb

114
Rack Factory (I) Pvt. Ltd. Rack Factory (I) Pvt. Ltd.

Upload: deepakshukla122

Post on 10-May-2015

662 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Rack Factory Jan 2010 28 Mb

Rack Factory (I) Pvt. Ltd.Rack Factory (I) Pvt. Ltd.

Page 2: Rack Factory Jan 2010 28 Mb

• AD’s World Group Company (ISO Certified )• Inception Year - 2006• A unit started as a backward integration for

for its Retail Domain• Team of 180 people

– Sr. Management – Business Development & Servicing– Execution & Operation– Creative– Technical Team– Production Team– Work Force ( Carpenters, Painter, Welders, Machine Operators & Helpers)

Page 3: Rack Factory Jan 2010 28 Mb

@ Rack Factory

• State of Art production facility at Delhi • Pan-India services• Trained workforce• Quality & Consistency• Competitive • Pan India deliveries and installation

Page 4: Rack Factory Jan 2010 28 Mb

South - Bangalore, Chennai, Hyderabad, Cochin, West - Mumbai, Pune

North - Delhi, Chandigarh &East - Kolkata

Pan India foot print Integrated with all offices for

Servicing, Operation and Execution

Page 5: Rack Factory Jan 2010 28 Mb

The Last Meter – Retail Solution

for better brand connect and to become a part of the consideration list

VisualElements

Merchandising

Furniture & Fixture

Create Advocacy

Page 6: Rack Factory Jan 2010 28 Mb
Page 7: Rack Factory Jan 2010 28 Mb

Specializations

Custom Designed Custom Designed FurnitureFurniture

Modular Modular FurnitureFurniture

Exclusive Exclusive ShowroomsShowrooms

Shop-in-ShopShop-in-Shop

In-Shop & Out In-Shop & Out Shop BrandingShop Branding

Page 8: Rack Factory Jan 2010 28 Mb

Material Specialization

Mild Steel

Stainless Steel

Wood

Ply Board

MDF

Solid Wood

Metal

Aluminum/ACP

Acrylic

Page 9: Rack Factory Jan 2010 28 Mb

Machines @ work

• Flat bed CNC Router• Vacuum Membrane press• Hot Press• Auto Edge bander & trimmer• Manual Edge bander for edging• Sliding Panel saw for high precision cutting• Glue spreader• Combimax – handles 8 functions of woodwork – Surfacing, thicknessing, rebating,

sawing, grooving, drilling, grinding & moulding• Multi-boring machine• Post forming Automatic machine• Spindle Moulder etc.• High precision wielding machines

Page 10: Rack Factory Jan 2010 28 Mb

Opportunity to Service

Page 11: Rack Factory Jan 2010 28 Mb

Work Showcase

Page 12: Rack Factory Jan 2010 28 Mb

IT Industry IT Industry

Page 13: Rack Factory Jan 2010 28 Mb

Over 450 outlets

• Lollipop, backlit glow sign, shutter painting• Wall & beam branding, routed logos• Round tables, laptop & desktop stands, stand alone banners

Page 14: Rack Factory Jan 2010 28 Mb
Page 15: Rack Factory Jan 2010 28 Mb
Page 16: Rack Factory Jan 2010 28 Mb
Page 17: Rack Factory Jan 2010 28 Mb
Page 18: Rack Factory Jan 2010 28 Mb
Page 19: Rack Factory Jan 2010 28 Mb
Page 20: Rack Factory Jan 2010 28 Mb
Page 21: Rack Factory Jan 2010 28 Mb
Page 22: Rack Factory Jan 2010 28 Mb

IT Junction

Page 23: Rack Factory Jan 2010 28 Mb
Page 24: Rack Factory Jan 2010 28 Mb
Page 25: Rack Factory Jan 2010 28 Mb
Page 26: Rack Factory Jan 2010 28 Mb
Page 27: Rack Factory Jan 2010 28 Mb

Mobile Industry / ServicesMobile Industry / Services

Page 28: Rack Factory Jan 2010 28 Mb

Shop-in-shop

Page 29: Rack Factory Jan 2010 28 Mb
Page 30: Rack Factory Jan 2010 28 Mb
Page 31: Rack Factory Jan 2010 28 Mb
Page 32: Rack Factory Jan 2010 28 Mb
Page 33: Rack Factory Jan 2010 28 Mb
Page 34: Rack Factory Jan 2010 28 Mb
Page 35: Rack Factory Jan 2010 28 Mb
Page 36: Rack Factory Jan 2010 28 Mb

Concept to Execution

Page 37: Rack Factory Jan 2010 28 Mb
Page 38: Rack Factory Jan 2010 28 Mb

MTS

Page 39: Rack Factory Jan 2010 28 Mb

MTS

Page 40: Rack Factory Jan 2010 28 Mb

MTS

Page 41: Rack Factory Jan 2010 28 Mb

MTS

Page 42: Rack Factory Jan 2010 28 Mb

Liquor Industry

Page 43: Rack Factory Jan 2010 28 Mb

Destination Outlets

Page 44: Rack Factory Jan 2010 28 Mb
Page 45: Rack Factory Jan 2010 28 Mb
Page 46: Rack Factory Jan 2010 28 Mb
Page 47: Rack Factory Jan 2010 28 Mb

Consumer Durable

Page 48: Rack Factory Jan 2010 28 Mb

Racks

Page 49: Rack Factory Jan 2010 28 Mb
Page 50: Rack Factory Jan 2010 28 Mb
Page 51: Rack Factory Jan 2010 28 Mb

Apparel

Page 52: Rack Factory Jan 2010 28 Mb
Page 53: Rack Factory Jan 2010 28 Mb
Page 54: Rack Factory Jan 2010 28 Mb
Page 55: Rack Factory Jan 2010 28 Mb
Page 56: Rack Factory Jan 2010 28 Mb
Page 57: Rack Factory Jan 2010 28 Mb
Page 58: Rack Factory Jan 2010 28 Mb

Service Industry

Page 59: Rack Factory Jan 2010 28 Mb
Page 60: Rack Factory Jan 2010 28 Mb
Page 61: Rack Factory Jan 2010 28 Mb
Page 62: Rack Factory Jan 2010 28 Mb
Page 63: Rack Factory Jan 2010 28 Mb

Lifestyle

Page 64: Rack Factory Jan 2010 28 Mb

Gitanjali – Front Desk

Page 65: Rack Factory Jan 2010 28 Mb

Shuddhi – Pedestal Unit

Page 66: Rack Factory Jan 2010 28 Mb

Shuddhi Wall Unit

Page 67: Rack Factory Jan 2010 28 Mb
Page 68: Rack Factory Jan 2010 28 Mb

Other Work…..

Page 69: Rack Factory Jan 2010 28 Mb

Play-n-Pets

Page 70: Rack Factory Jan 2010 28 Mb

Play-n-Pets

Page 71: Rack Factory Jan 2010 28 Mb

Play-n-Pets

Page 72: Rack Factory Jan 2010 28 Mb

Pedigree /Snickers Chocolates

Page 73: Rack Factory Jan 2010 28 Mb

J L Morrison

Page 74: Rack Factory Jan 2010 28 Mb
Page 75: Rack Factory Jan 2010 28 Mb

Emmar MGF

Page 76: Rack Factory Jan 2010 28 Mb
Page 77: Rack Factory Jan 2010 28 Mb

•Project :- Government Schools and Colleges Computer Lab Furniture's

•No of Schools:- 775 Schools and Colleges of Jhansi, Gorakhpur and Rajasthan.

• Fabrication Specification:- Modular tables with Particle Board & MS powder coated pipe’s with blue colour laminate,

TFT fixture & necessary hardware.•Quantity

• Computer Tables: 8406• Printer Tables: 650• Instructor Tables: 818

• Fabrication Time• Between 45 to 60 Days from the date of PO

Page 78: Rack Factory Jan 2010 28 Mb
Page 79: Rack Factory Jan 2010 28 Mb
Page 80: Rack Factory Jan 2010 28 Mb
Page 81: Rack Factory Jan 2010 28 Mb
Page 82: Rack Factory Jan 2010 28 Mb

Modular Furniture & Concepts

Page 83: Rack Factory Jan 2010 28 Mb
Page 84: Rack Factory Jan 2010 28 Mb
Page 85: Rack Factory Jan 2010 28 Mb
Page 86: Rack Factory Jan 2010 28 Mb
Page 87: Rack Factory Jan 2010 28 Mb
Page 88: Rack Factory Jan 2010 28 Mb
Page 89: Rack Factory Jan 2010 28 Mb

Signage for differentiation

Page 90: Rack Factory Jan 2010 28 Mb
Page 91: Rack Factory Jan 2010 28 Mb
Page 92: Rack Factory Jan 2010 28 Mb
Page 93: Rack Factory Jan 2010 28 Mb
Page 94: Rack Factory Jan 2010 28 Mb

Concepts and Designs

Page 95: Rack Factory Jan 2010 28 Mb
Page 96: Rack Factory Jan 2010 28 Mb

Header

Page 97: Rack Factory Jan 2010 28 Mb

2 display stand Wall unit

Counter table

Computer standWall unit

Page 98: Rack Factory Jan 2010 28 Mb

Option - 2

Page 99: Rack Factory Jan 2010 28 Mb

Front_View

Standee

Branding area

Unit forData Cards

Unit forMobiles

Acrylic stands

Page 100: Rack Factory Jan 2010 28 Mb

Front View

Page 101: Rack Factory Jan 2010 28 Mb

LH View RH View

Page 102: Rack Factory Jan 2010 28 Mb

Top View Top View

Page 103: Rack Factory Jan 2010 28 Mb
Page 104: Rack Factory Jan 2010 28 Mb
Page 105: Rack Factory Jan 2010 28 Mb

Front View

GSB

LED Display

Awnings

Wall Runners

Granite Steps

Step Branding

Flooring

Paan Counter

Side wall

SAV Branding with Acrylic sheet

One Way Vision Side runners

Page 106: Rack Factory Jan 2010 28 Mb

Approved Design by Aircel

Page 107: Rack Factory Jan 2010 28 Mb
Page 108: Rack Factory Jan 2010 28 Mb

Left View

Slat Walls with storage space

Sales Counter

Translite Box Almirah with racks & storage space

Almirah with translite box

Page 109: Rack Factory Jan 2010 28 Mb

Left View Branding on Sunboard

Page 110: Rack Factory Jan 2010 28 Mb
Page 111: Rack Factory Jan 2010 28 Mb

Show Window cum Almirah, Top Portion – Translite box

Page 112: Rack Factory Jan 2010 28 Mb

SAV on ceiling

Wind Chimes

Page 113: Rack Factory Jan 2010 28 Mb

………………& lot more to offer

Page 114: Rack Factory Jan 2010 28 Mb

Thank You