    NO URAIAN PEKERJAAN Volume Satuan HARGA SATUAN Total

    A PEKERJAAN PERSIAPAN & PEMBERSIHAN1 Site Visit 1,00 ls -2 Site Marking (Lantai satu 15x5 meter dan lantai dua 15x5 meter) 150,00 m2 -2 Operasional 1,00 ls -

    RENCANA ANGGARAN BIAYA

    Office

    ro ect ean ng - mo sas pem uangan sampa proye , s -4 General Cleaning - Clean Ditail 1,00 ls 1.500.000 1.500.000

    5 Mobilisasi peralatan 1,00 ls 1.200.000 1.200.0006 Fee Design (Free)

    Sub Tota l 2.700.000

    B PEKERJAAN BONGKARAN

    C PEKERJAAN DINDING PARTISI DAN PLAFOND1 Wall Treatment (plywood fin hpl) Backdrop receptionist 6,00 m2 -2 Wall Treatment (plywood fin hpl glossy) meeting room 12,00 m2 -3 Partisi Gypsum ex. Jaya Board 9mm with rangka holo galvanil 20x40, 40x40 30,00 m2 300.000 9.000.000

    Sub Total 9.000.000

    D PEKERJAAN FURNITURE - CHAIRS - SOFA

    1 Meja Direktur 1,00 unit 5.000.000 5.000.000Bahan Pla wood 18mm Fin. HPL Ukuran 1800x800x720 . ,

    2 Sofa 3 seater (Area Lobby Receptionist) 1,00 unit 6.300.000 6.300.000

  • 8/16/2019 RAB-Office Alt 3.Xls

    2/3

    3 sofa 1 seater (Area Lobby Receptionist) unit -4 coffee table (Area Lobby Receptionist) 1,00 unit 1.500.000 1.500.0005 Receptionist desk (Area Lobby Receptionist) 1,00 unit 4.600.000 4.600.0006 Meeting table 10 pax 1,00 unit 6.600.000 6.600.0007 Meeting chair 10,00 unit 2.000.000 20.000.0008 Direktur chair 1,00 unit 4.500.000 4.500.0009 Staff chair 6,00 unit 2.000.000 12.000.000

    10 Staff Table (workstation) ukuran 1400x700x720 6,00 unit 2.500.000 15.000.00011 Kitchen Set (hanging cabinet+floor cabinet+sink) ukuran panjang 3 meter tinggi 2,8 meter 1,00 unit 12.000.000 12.000.00012 Display Cabinet besar dan kecil 1,00 unit 6.000.000 6.000.000

    -

    Sub Tota l 93.500.000

    E FLOORING

    - -

    Sub Total -

    F ME & Plumbing

    1 Paket ME dan Plumbing 1,00 ls -

    -

    GRAND TOTAL 105.200.000Pembayaran DP 50% 52.600.000

    Pembayaran 30 % 31.560.000Pembayaran 15% 15.780.000

    Retensi 5% 5.260.000

    Jakarta, 7 Januari 2016Disusun Oleh :

    M SampurnoDirektur

  • 8/16/2019 RAB-Office Alt 3.Xls