ra for n2he leak test_comment shahram
TRANSCRIPT
Generic Risk Assessment
Team Leader 25/1/2012
RA Member 4/5/2012
RA Member 3/5/2015
RA Member
Approved by
On-Site Review
1a 1b 1c 2a 2c 2d 2e 3c 3d 3e 3b 3f
No Activity Safety Hazard Possible Accident/ Ill-Health/Personal Risk
Severity
Likelih
oo
d
Risk L
evel
Severity
Likelih
oo
d
Risk L
evel
Person Responsible
Remarks
1 General Trips, Slips and falls Personal Injury 3 2 6 3 1 3 Supervisor
Step over barriers to be used where practicable. Good housekeeping standards to always be
Attention drawn to potential hazard. Carry
RA-006
Signature
1.Hazard Identification 2. Risk Evaluation
Existing Risk Control
2b 3a
3.Risk Controls
Task:
Risk Assessment Team
Name
RA NumberNitrogen OperationsRISK LEVEL ACCEPTABILITY MATRIX
Additional Risk Control
Date Assessed
Last Review Date
Next Review Date
Approval Date
On-Site Review Date
Activity may proceed with existing risk controls.1-3 ACCEPTABLE
Activity may only proceed with additional risk controls that reduce the risk level.
4-12 TOLERABLE
Activity cannot proceed. Hazards must be eliminated by other means and a New Risk Assessment carried
out.Approval & Review 12-25 ALARM
1 General Trips, Slips and falls Personal Injury 3 2 6 3 1 3 Supervisor
Untrained Crane Operator, rigger or signalman
Personal Injury Equipment Damage
5 2 10 5 1 5Crane Operator,
Rigger & signalman
Crane Equipment FailurePersonal Injury
Equipment Damage5 2 10 5 1 5 Client
Lifting Equipment FailurePersonal Injury
Equipment Damage5 2 10 5 1 5
Crane Operator, Rigger &
signalman
Equipment not properly secured.
Personal Injury Equipment Damage
5 2 10 5 1 5Crane Operator,
Rigger & signalman
Equipment swinging Personal Injury
Equipment Damage5 2 10 5 1 5
Crane Operator, Rigger &
signalman
Untrained Driver. Personal Injury
Equipment Damage5 1 5 5 1 5 Forklift Operator
Any complex lifting operations require a written lifting plan. The plan will be
discussed with all personnel involved in the lift. Lifting operations to be highlighted
at VSCC/PSCC meeting
2 Crane Lifting
Good housekeeping standards to always be maintained. Route cables, hoses & wires correctly
out regular Inspections
Comply with Client Lifting Procedure
Ensure Load Properly Secured.
Trained personnel only to operate crane. Rigger/signalman must also be trained
Ensure proper communicatios are established eg Walkie talkies
Comply with Client Lifting Procedure Client to conduct equipment maintenance checks
Only certified lifting equipment to be used. (this equipment should be checked for general condition, suitability before use). Barricade affected lifting area when required
Assign watchman to patrol area
Tag Line fitted to equipment
Trained forklift drivers to operate equipment.
Comply with Client Lifting Procedure. Barrier area under load path
1 of 4
Generic Risk Assessment
1a 1b 1c 2a 2c 2d 2e 3c 3d 3e 3b 3f
No Activity Safety Hazard Possible Accident/ Ill-Health/Personal Risk
Severity
Likelih
oo
d
Risk L
evel
Severity
Likelih
oo
d
Risk L
evel
Person Responsible
Remarks
1.Hazard Identification 2. Risk Evaluation
Existing Risk Control
2b 3a
3.Risk Controls
Additional Risk Control
Overloading the forks. Personal Injury
Equipment Damage5 2 10 5 1 5 Forklift Operator
Enviromental Conditions eg Wet or Uneven road surfaces
Equipment Damage 3 2 6 3 1 3 Forklift Operator
Fall from height Personal Injury 4 2 8 3 1 3 Supervisor
Dropped Objects Personal Injury 4 2 8 3 1 3 Supervisor
Rig up to wrong systemPersonal Injury Equipment Damage
3 2 6 3 1 3 Supervisor
3 Forklift Operations Keep loads within forklift rated capacity
Check forklift rated capacity & load weight prior to operation
Ensure all scaffolding has a valid Scaffolding Inspection Tag (Scaftag) Safety harnesses to be used as directed by Client Procedures. Ensure 3 point contact during climbing up/down the ladder and make sure the ladder place in a even surface.
Check condition of body harness before use
4
Adherence to safe Operating Procedures. Not using forklift during bad weather
Hard barriers c/w ‘kick boards’ to be erected around open hatches. Signs and barriers to be erected to prevent access to all relevant immediate and adjacent work areas.
Keep tools and equipment well away from open hatches.Persons must not work above others below & persons must not work with others working above.Good housekeeping standards to be maintained on work-site at all times.
Working at height
Test Pack Workbook to be signed by Client
Line walk system prior to rig up. Ensure it matches the test pack/line number
Incorrect Use Of Hand tools Personal injury 2 2 4 2 1 2 Supervisor
Manual Handling Personal Injury 3 2 6 2 2 4 Supervisor
Blocking escape routes with cables, hoses or wires
Personal Injury 2 1 2 2 1 2
Hose connections coming undone
Personal Injury 3 2 6 3 1 3 Supervisor
Incompatible/ faulty fittings Leaking hoses 3 2 6 3 1 3 Supervisor
5
Use correct and compatible connections at all times. Check that the correct ratings of fittings are being used. Carry out visual inspection on fittings.
Always use whip checks on all hose connections. Carry out visual inspection on fittings and hoses. Use certified hoses only
Check condition of hand tools before use
Rig up
Trained Personnel.All equipment checked for suitability.
Carry out air test
Use certified & tagged whipchecks
Ensure proper routing using arches, S hooks etc
Personnel made aware of Manual Handling Hazards
Supervisor and worker jointly review the work method and plan activites
2 of 4
Generic Risk Assessment
1a 1b 1c 2a 2c 2d 2e 3c 3d 3e 3b 3f
No Activity Safety Hazard Possible Accident/ Ill-Health/Personal Risk
Severity
Likelih
oo
d
Risk L
evel
Severity
Likelih
oo
d
Risk L
evel
Person Responsible
Remarks
1.Hazard Identification 2. Risk Evaluation
Existing Risk Control
2b 3a
3.Risk Controls
Additional Risk Control
6 Air Test Hose,Fitting, Pipework FailureUncontrolled Pressure Release. Personal Injury
3 2 6 2 1 2 Supervisor Testing operations to be highlighted at VSCC/PSCC meeting
Explosion. 5 2 10 5 1 5 Supervisor
Uncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
Fire 4 2 8 4 1 4 Supervisor
LN2 Spillage 3 2 6 3 1 3 SupervisorEffective Emergency Response in place
Barricade affected area where required. Assign watchman to patrol area
Preventative Maintenance Schedule in operation, Access to area restricted
Pump/Tank Catastrophic Failure
Effective Emergency Response in place
Effective Spillage controls in place e.g. bunding.
Always use whip checks and on all air connections. Carry out visual inspection on fittings and hoses. Use certified hoses only. Use correct and compatible connections at all times. Check that the correct ratings of fittings are being used.
Preventative Maintenance Schedule in operation, Access to area restricted Patrol area to check for leaks
Effective Emergency Response in place
Access to area restricted. Fire extinguisher on standby.
Effective Emergency Response in place
LN2 Spillage 3 2 6 3 1 3 Supervisor
Noise PollutionInconvenience to adjacent workers/ Hearing loss
3 2 6 3 1 3 Supervisor
Pipe work FailureUncontrolled Pressure Release. Personal Injury Equipment Damage
3 2 6 3 1 3 Supervisor
Hose RuptureUncontrolled Pressure Release. Personal Injury Equipment Damage
3 2 6 3 1 3 Supervisor
Fitting FailureUncontrolled Pressure Release. Personal Injury Equipment Damage
3 2 6 3 1 3 Supervisor
Noise Pollution During VentingInconvenience to adjacent workers/ Hearing loss
3 2 6 3 1 3 Supervisor
Do not run engine unless requiredMaintain engine according to schedules. Use correct PPE. Access to area restricted
Assign watchman to patrol area
Assign watchman to patrol area
7ANitrogen Operations
using N2 Pump
Effective Emergency Response in place
Assign watchman to patrol area.
All equipment checked for suitability.Only in date certified equipment to be used Effective Spillage controls in place e.g. bunding. Access to area restricted Use whipchecks as required
Assign watchman to patrol area.
bunding. Access to area restricted Wear correct PPE
All equipment checked for suitability.Access to area restrictedOnly in date certified equipment to be used. Use of Correct PPE.
Testing operations to be highlighted at VSCC/PSCC meeting. MSDS Sheet for LN2 should be available so that correct PPE can be supplied
Use correct PPE. Access to area restricted Assign watchman to patrol area
Effective Spillage controls in place e.g. bunding. Access to area restricted Wear correct PPE
3 of 4
Generic Risk Assessment
1a 1b 1c 2a 2c 2d 2e 3c 3d 3e 3b 3f
No Activity Safety Hazard Possible Accident/ Ill-Health/Personal Risk
Severity
Likelih
oo
d
Risk L
evel
Severity
Likelih
oo
d
Risk L
evel
Person Responsible
Remarks
1.Hazard Identification 2. Risk Evaluation
Existing Risk Control
2b 3a
3.Risk Controls
Additional Risk Control
Pipe work Failure
Uncontrolled Pressure Release. Personal Injury Equipment Damage Oil Spillage
3 2 6 3 1 3 SupervisorTesting operations to be highlighted at VSCC/PSCC meeting.
Hose Rupture
Uncontrolled Pressure Release. Personal Injury Equipment Damage Oil Spillage
3 2 6 3 1 3 Supervisor
Fitting FailureUncontrolled Pressure Release. Personal Injury Equipment Damage
3 2 6 3 1 3 Supervisor
Noise Pollution During Pressuisation/Venting
Inconvenience to adjacent workers/ Hearing loss
3 2 6 3 1 3 Supervisor
Incorrect Use Of Hand tools Personal injury 2 2 4 2 1 2 Supervisor
7B
Use correct PPE. Access to area restricted
Testing operations to be highlighted at VSCC/PSCC meeting.
Effective Spillage controls in place e.g. bunding. Access to area restricted Wear correct PPE
Assign watchman to patrol area
All equipment checked for suitability.Only in date certified equipment to be used Effective Spillage controls in place e.g. bunding. Access to area restricted Use whipchecks as required
Assign watchman to patrol area.
Check condition of hand tools before use
Assign watchman to patrol area.
Nitrogen Operations using Gas Bottles
Assign watchman to patrol area
Trained Personnel.All equipment checked for suitability.
All equipment checked for suitability.Access to area restrictedOnly in date certified equipment to be used. Use of Correct PPE.
8 Rig down
Manual Handling Personal Injury 3 2 6 2 2 4 SupervisorSupervisor and worker jointly review the
work method and plan activitesPersonnel made aware of Manual Handling Hazards
8 Rig down
4 of 4
Risk Assessment
PRESSURE TESTING
Team Leader 25/1/2012
RA Member 4/5/2012
RA Member 3/5/2015
RA Member
Approved by
On-Site Review
1a 1b 1c 2a 2c 2d 2e 3b 3c 3d 3e 3f
No Activity Safety Hazard Possible Accident/ Ill-Health/Personal Risk
Severity
Likelih
oo
d
Risk L
evel
Severity
Likelih
oo
d
Risk L
evel
Person Responsible
Remarks
1 General Trips, Slips and falls Personal Injury 3 2 6 3 1 3 Supervisor
On-Site Review Date
Addiional Risk Control
Approval Date
3a
3.Risk Controls
Step over barriers to be used where practicable. Good housekeeping standards to always be
Attention drawn to potential hazard. Carry out regular Inspections
Date Assessed
Last Review Date
Next Review Date
2b
Signature
Approval & Review
RA Number
Risk Assessment Team
NameRISK LEVEL ACCEPTABILITY MATRIX
RA-009
1.Hazard Identification 2. Risk Evaluation
Existing Risk Control
Task:
1-3 ACCEPTABLEActivity may proceed with existing
risk controls.
Activity may only proceed with additional risk controls that reduce
the risk level.4-12 TOLERABLE
Activity cannot proceed. Hazards must be eliminated by other means and a New Risk Assessment carried
out.
12-25 ALARM
1 General Trips, Slips and falls Personal Injury 3 2 6 3 1 3 Supervisor
Untrained Crane Operator, rigger or signalman
Personal Injury Equipment Damage
5 2 10 5 1 5Crane Operator,
Rigger & signalman
Crane Equipment FailurePersonal Injury
Equipment Damage5 2 10 5 1 5 Client
Lifting Equipment FailurePersonal Injury
Equipment Damage5 2 10 5 1 5
Crane Operator, Rigger & signalman
Equipment not properly secured.
Personal Injury Equipment Damage
5 2 10 5 1 5Crane Operator,
Rigger & signalman
Equipment swinging Personal Injury
Equipment Damage5 2 10 5 1 5
Crane Operator, Rigger & signalman
Any complex lifting operations require a written lifting plan. The plan will be
discussed with all personnel involved in the lift. Lifting operations to be highlighted
at VSCC/PSCC meeting
2 Crane Lifting
Comply with Client Lifting Procedure Tag Line fitted to equipment
Comply with Client Lifting Procedure Client to conduct equipment maintenance checks
Only certified lifting equipment to be used. (this equipment should be checked for general condition, suitability before use).
Barricade affected lifting area when required. Assign watchman to patrol area
Trained personnel only to operate crane. Rigger/signalman must also be trained
Ensure proper communicatios are established eg Walkie talkies
Comply with Client Lifting Procedure. Barrier area under load path
Ensure Load Properly Secured.
Good housekeeping standards to always be maintained. Route cables, hoses & wires correctly
out regular Inspections
1 of 4
Risk Assessment
1a 1b 1c 2a 2c 2d 2e 3b 3c 3d 3e 3f
No Activity Safety Hazard Possible Accident/ Ill-Health/Personal Risk
Severity
Likelih
oo
d
Risk L
evel
Severity
Likelih
oo
d
Risk L
evel
Person Responsible
RemarksAddiional Risk Control
3a
3.Risk Controls
2b
1.Hazard Identification 2. Risk Evaluation
Existing Risk Control
Untrained Driver. Personal Injury
Equipment Damage5 1 5 5 1 5 Forklift Operator
Overloading the forks. Personal Injury
Equipment Damage5 2 10 5 1 5 Forklift Operator
Enviromental Conditions eg Wet or Uneven road surfaces
Equipment Damage 3 2 6 3 1 3 Forklift Operator
Fall from height Personal Injury 4 2 8 3 1 3 Supervisor
Dropped Objects Personal Injury 4 2 8 3 1 3 Supervisor
3 Forklift Operations
Hard barriers c/w ‘kick boards’ to be erected around open hatches. Signs and barriers to be erected to prevent access to all relevant immediate and adjacent work areas.
Keep tools and equipment well away from open hatches.Persons must not work above others below & persons must not work with others working above.Good housekeeping standards to be maintained on work-site at all times.
Adherence to safe Operating Procedures. Not using forklift during bad weather
Ensure all scaffolding has a valid Scaffolding Inspection Tag (Scaftag) Safety harnesses to be used as directed by Client Procedures. Ensure 3 point contact during climbing up/down the ladder and make sure the ladder place in a even surface.
Check condition of body harness before use
Trained forklift drivers to operate equipment.
Keep loads within forklift rated capacityCheck forklift rated capacity & load weight prior to operation
4 Working at height
Rig up to wrong systemPersonal Injury Equipment Damage
3 2 6 3 1 3 Supervisor
Incorrect Use Of Hand tools Personal injury 2 2 4 2 1 2 Supervisor
Manual Handling Personal Injury 3 2 6 2 2 4 Supervisor
Blocking escape routes with cables, hoses or wires
Personal Injury 2 1 2 2 1 2
Hose connections coming undone
Personal Injury 3 2 6 3 1 3 Supervisor
Incompatible/ faulty fittings Leakage 3 2 6 3 1 3 Supervisor
5
Ensure proper routing using arches, S hooks etc
Always use whip checks on all connections. Carry out visual inspection on fittings and hoses. Use tested & certified hoses only
Rig up
Personnel made aware of Manual Handling Hazards
Test Pack Workbook to be signed by Client
Use certified & tagged whipchecks
Use correct and compatible connections at all times. Check that the correct ratings of fittings are being used. Carry out visual inspection on fittings.
Carry out low pressure test
Supervisor and worker jointly review the work method and plan activites
Trained Personnel.All equipment checked for suitability.
Check condition of hand tools before use
Line walk system prior to rig up. Ensure it matches the test pack/line number
2 of 4
Risk Assessment
1a 1b 1c 2a 2c 2d 2e 3b 3c 3d 3e 3f
No Activity Safety Hazard Possible Accident/ Ill-Health/Personal Risk
Severity
Likelih
oo
d
Risk L
evel
Severity
Likelih
oo
d
Risk L
evel
Person Responsible
RemarksAddiional Risk Control
3a
3.Risk Controls
2b
1.Hazard Identification 2. Risk Evaluation
Existing Risk Control
Explosion. 5 2 10 5 1 5 Supervisor
Uncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
Fire 4 2 8 4 1 4 Supervisor
Water Spillage 3 2 6 3 1 3 Supervisor
Pipe work FailureUncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
High Pressure Hose RuptureUncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
Hydrotesting Pressure Testing using Water
6A
Effective Spillage controls in place e.g. bunding. Access to area restricted
All equipment checked for suitability.Access to area restrictedOnly in date certified equipment to be used
Effective Emergency Response in place Standby diaphragm pump to remove spill
Access to area restricted. Fire extinguisher on standby.
Effective Emergency Response in place
Preventative Maintenance Schedule in operation, Access to area restricted
Pump/Tank Catastrophic Failure
Pump/Tank Catastrophic Failure
Access to area restricted.Signs & barriers in place Operations to be highlighted at
VSCC/PSCC meeting. PTW may be required
Operations to be highlighted at VSCC/PSCC meeting.
PTW required
Effective Emergency Response in place Stand by tray/ container to collect any leak water Stand by diaphragm pump to pump out leak water
Preventative Maintenance Schedule in operation, Access to area restricted
Effective Emergency Response in place
Effective Emergency Response in place Stand by tray/ container to collect any leak water Stand by diaphragm pump to pump out leak water
Effective Emergency Response in place Stand by tray/ container to collect any leak water Stand by diaphragm pump to pump out leak water
High Pressure Fitting FailureUncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
Explosion. 5 2 10 5 1 5 Supervisor
Uncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
Fire 4 2 8 4 1 4 Supervisor
Oil Spillage 3 2 6 3 1 3 Supervisor
Pipe work FailureUncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
6BPressure Testing
using Oil
Access to area restricted. Fire extinguisher on standby.
Pump/Tank Catastrophic Failure
Preventative Maintenance Schedule in operation, Access to area restricted
Effective Emergency Response in place
Effective Emergency Response in place
Effective Spillage controls in place e.g. bunding. Access to area restricted
Access to area restricted.Signs & barriers in place
Effective Emergency Response in place Stand by tray/ container to collect any leak oil Stand by diaphragm pump to pump out leak oil
Effective Emergency Response in place Standby diaphragm pump to remove spill
All equipment checked for suitability.Access to area restrictedOnly in date certified equipment to be used
Effective Emergency Response in place Stand by tray/ container to collect any leak water Stand by diaphragm pump to pump out leak water
Preventative Maintenance Schedule in operation, Access to area restricted
Effective Emergency Response in place Stand by tray/ container to collect any leak oil Stand by diaphragm pump to pump out leak oil
water
Operations to be highlighted at VSCC/PSCC meeting.
PTW required
3 of 4
Risk Assessment
1a 1b 1c 2a 2c 2d 2e 3b 3c 3d 3e 3f
No Activity Safety Hazard Possible Accident/ Ill-Health/Personal Risk
Severity
Likelih
oo
d
Risk L
evel
Severity
Likelih
oo
d
Risk L
evel
Person Responsible
RemarksAddiional Risk Control
3a
3.Risk Controls
2b
1.Hazard Identification 2. Risk Evaluation
Existing Risk Control
High Pressure Hose RuptureUncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
High Pressure Fitting FailureUncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 SupervisorOperations to be highlighted at VSCC/PSCC meeting. PTW required
Noise Pollution Possible NID Risk 3 2 6 3 1 3 Supervisor
Explosion. 5 2 10 5 1 5 Supervisor
Uncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
Fire 4 2 8 4 1 4 Supervisor
All equipment checked for suitability.Access to area restrictedOnly in date certified equipment to be used
Effective Emergency Response in place Stand by tray/ container to collect any leak oil Stand by diaphragm pump to pump out leak oil
Pump/Tank Catastrophic Failure
Effective Emergency Response in place Access to area restricted. Fire extinguisher on standby. Effective Emergency Response in place
Preventative Maintenance Schedule in operation, Access to area restricted
Effective Emergency Response in place
Do not run engine unless requiredUse correct PPE. Access to area restricted
Effective Emergency Response in place
Maintain engine according to schedules.
Preventative Maintenance Schedule in operation, Access to area restricted
Effective Emergency Response in place Stand by tray/ container to collect any leak oil Stand by diaphragm pump to pump out leak oil
All equipment checked for suitability.Access to area restrictedOnly in date certified equipment to be used
Liquid Nitrogen Spillage 4 2 8 3 2 6 Supervisor
Pipe work FailureUncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
High Pressure Hose RuptureUncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
High Pressure Fitting FailureUncontrolled Pressure Release. Personal Injury Equipment Damage
5 2 10 5 1 5 Supervisor
Gas Venting Possible NID Risk 3 1 3 3 1 3
Incorrect Use Of Hand tools Personal injury 2 2 4 2 1 2 Supervisor
Manual Handling Personal Injury 3 2 6 2 2 4 Supervisor
6CPressure Testing
using Air(Pneumatic) or Nitrogen
All equipment checked for suitability.Signs & barriers in placeOnly in date certified equipment to be used
Assign watchman to patrol area. Preventative Maintenance Schedule in operation
Use of Correct PPE.Access to area restricted near vent point
Trained Personnel.All equipment checked for suitability.
7 Rig down
Assign watchman to patrol area. Preventative Maintenance Schedule in operation
Effective Spillage controls in place Access to area restricted
Charged Water Hose on standby
Effective Emergency Response in place
Personnel made aware of Manual Handling Hazards
Supervisor and worker jointly review the work method and plan activites
Assign watchman to patrol areaAccess to area restricted.Signs & barriers in place
All equipment checked for suitability.Signs & barriers in placeOnly in date certified equipment to be used
Check condition of hand tools before use
Extra Care when pressure testing with Air or Gas due to higher stored energy Operations to be highlighted at VSCC/PSCC meeting. PTW required
4 of 4