Page 1: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

RR

The Hoistinator The Hoistinator

Sophomore Clinic Design Project

Rowan University

Page 2: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 22

RR Design ProblemDesign Problem

Design, analyze, fabricate, and test an overhead crane to lift heavy weights.

Page 3: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 33

RR Primary SpecificationsPrimary SpecificationsTo lift a weight, quickly: >400 lbs, >24 inches in elevation < 4 seconds

Weight = 70lb Diameter = 24”,

Thickness = 0.5”

# of plates = 20

Up to 1400lb!Up to 1400lb!

Page 4: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 44

RR Main Crane ColumnMain Crane Column

Main Crane Column 6” construction-

grade I beam Structural steel 0.5” pin-holes 2”

apart along edge

Base Structural steel C-channel

Page 5: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 55

RR Crane Pivot & StopperCrane Pivot & Stopper

Pivot axis Column Stopper

Page 6: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 66

RR Pick-up ReelPick-up Reel

Diameter = 3”

Page 7: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 77

RR PulleyPulley

Diameter = 6”

Page 8: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 88

RR Timer CircuitTimer Circuit

Your design must include a timer circuit capable of measuring and displaying weight lift time during the 24-inch travel from the initial elevation to the final elevation.

An official time circuit will be used simultaneously

Page 9: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 99

RR Structural MaterialsStructural Materials Aluminum

75 in3 of 2024-T3 in various sizes No dimension exceeding 48”

Plastic 50 in3 of TIVAR UHMW in bar stock

Volume constraint is measured before any drilling or other material removal operation, i.e., pre-machined

Page 10: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 1010

RR Miscellaneous Supplies Miscellaneous Supplies Miscellaneous supplies such as pulleys, pins

(with pulley spacer blocks and shims), nuts, bolts, and other minor parts will be available.

Tools will be supplied, but it will be more convenient if you carry your own.

You will be able to use project lab. You will use various machines to fabricate

the parts.

Page 11: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 1111

RR Performance FormulaPerformance Formula

P: Performance Index W: Weight being lifted h: Height reached t: Official time tm: Time measured with your timer circuit

LCA: Life Cycle Assessment Eco-indicator points PW: Present worth

PWLCAt

tthWP

dp

m 435*

5.31

24400

Page 12: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 1212

RR Important DatesImportant Dates

Sept. 30: Preliminary Design Proposal Oct. 14: Machining Starts Dec. 2: Preliminary Testing Dec. 9: Final Testing!

Page 13: R The Hoistinator The Hoistinator Sophomore Clinic Design Project Rowan University

ME • ROWANME • ROWAN 1313

RR A Background SurveyA Background Survey

??