r net training

31

Upload: karthikeyan-mkr

Post on 17-Dec-2014

17.864 views

Category:

Self Improvement


0 download

DESCRIPTION

R Net Training for Postal Employees

TRANSCRIPT

Page 1: R net training
Page 2: R net training

Today’s Overview

Page 3: R net training

Register Net (RNet)

• R Net is an Application Software (Similar to Speed net for Speed post) which will be put in to use at the Mail offices.

• This also facilitates the end to end tracking• The R Net was developed in house at the

Centre for Excellence in Postal Technology, Mysore.

Page 4: R net training

R Net New modules

Page 5: R net training

RNet Integration

Page 6: R net training
Page 7: R net training

Point Of Sale

Page 8: R net training

Despatch

Page 9: R net training

Postman

• My Office -> Environment

Page 10: R net training

POINT OF SALE

Page 11: R net training
Page 12: R net training

DESPATCH

Page 13: R net training

Despatch (POS - Despatch Module) • Receipt >Receipt from counters/special journal/BOs • Click on “Receive” Button to accept the articles

Page 14: R net training

Auto Sorting

1. What is Auto Sorting? The articles received will be allotted to Due Bags depending upon the Pincode given at the time of Article Booking and Pin range allotted to that Due Bag as below steps.2. To benefit auto sorting the following configuration is mandatory. (One time only) 3. Configure the Pin code Range for the Due Bags from supervisor menu by going to “Master --> Allot Pin range” as shown in below screen

Page 15: R net training

Due Bag Master – Pin range

Page 16: R net training

Perform Auto Sorting (To be done by Operator)Operator => Prepare => Auto Sorting. This auto sorting option can be used for article sorting for Bundle / Bag / HVMO list for each Despatch.

Page 17: R net training

Save to Bundle / Close Bundle • Prepare => Bag / Bundle option• You can add\modify the articles in a bundle by clicking

the “Save to Bundle” option till final closure. • Prior to close the bundle, application will prompt

following message for final closer of bundle. • Till final closure of bundle articles can be added to

bundle using “Save to Bundle” option.

Page 18: R net training

Save to Bag / Close Bag

Page 19: R net training
Page 20: R net training
Page 21: R net training

POSTMAN - DELIVERY

Page 22: R net training

DELIVERY (Postman)• At the beginning of the day, the R Net communication has to be run to

fetch data from sorting office. • Thereafter the function of the day can start. However, while receiving

the bag, we can receive the bags using virtual scanning option• But this virtual bag has to be selected only when the bag concerned is

physically received. Further action on bag receipt is done in the usual course.

Page 23: R net training

Invoicing articles for the beats Once the bags received are opened through virtual scanning, data of articles inside will be available in the invoicing screen for automatic selection as seen in figure below

Page 24: R net training

R Net Communication • The R Net communication will communicate to

Central server periodically to upload the Booking / Despatch / Delivery data for further processing.

• Keep RNet Communication Always open• Update Office Master Data when you receive

alerts

• User Call server option to transmit frequently

Page 25: R net training

MIS Options @ Web

• Booked Data The number of article booked in your office can

be cross-checked by visiting the URL URL: https://services.ptcmysore.gov.in/RNet User : dop Password: india

Page 26: R net training
Page 27: R net training

Tracking

Page 28: R net training

Types of Articles

Page 29: R net training

Summary

• Use barcode to book RLs• Using Despatch Module is compulsory for

Despatch of Articles• Keep Rnet Communication Module running

Page 30: R net training

QUESTIONS?

Page 31: R net training