Effective: 31.01.2016 Release: 09 TABLE OF CONTENTS 13.1 Power Plants, FGD Plants, Waste Incineration Plants 13.2 Power Plants ‒ Cooling Water Pipes 13.3 Spraying Pipes 13.4 General Plant Construction, Chemistry and Refineries 13.5 Shipbuilding 13.6 Fire-Extinguishing Systems 13.7 Constructional Steelwork 13.8 Customized GRP Components, Sewage Treatment Plant Covers 13.0 Reference List R E F E R E N C E S

Upload: others

Post on 24-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

TABLE OF CONTENTS

13.1 Power Plants, FGD Plants, Waste Incineration Plants

13.2 Power Plants ‒ Cooling Water Pipes

13.3 Spraying Pipes

13.4 General Plant Construction, Chemistry and Refineries

13.5 Shipbuilding

13.6 Fire-Extinguishing Systems

13.7 Constructional Steelwork

13.8 Customized GRP Components, Sewage Treatment Plant Covers

13.0

Reference ListR E F E R E N C E S

Page 2: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

2015 € 301,000.00 GRP 50 - 150 Vattenfall Europe Generation AG

Mrs. Veronika Hadlich

Tel. 0049 355 / 2887 3814

2014 € 730,000.00 GRP, 25 - 900 Babcock Noell GmbH

2015 PP Mr. Thalmann / Mr. Pietschmann

Tel.: 0049 931 / 903 0

2012 € 4,060,000.00 GRP 800 - 1,200 Vattenfall Europe Generation AG

to Mrs. Veronika Hadlich

2015 Tel. 0049 355 / 2887 3814

2001 € 250,000.00 PVDF, 25 - 150 MVA Hamburg

to GRP Mr. Koop

2015 Tel.: 0049 40 / 731 89 161

2014 € 400,000.00 GRP, 150 - 800 STEAG Power Saar GmbH

Steel Mr. Urban

Tel.: 0049 681 / 9494 7550

2014 € 1,200,000.00 S235, 25 - 800 Integral GmbH Österreich

1.4571 Mr. Andreas Wagner

Tel.: 0043 2236 / 770150

2013 € 181,000.00 GRP 200 - 300 Vattenfall Europe Generation AG

2014 Mrs. Veronika Hadlich

Tel. 0049 355 / 2887 3814

2013 € 255,000.00 Stainless St. 15 - 150 VWS Deutschland GmbH

1.4571, Mr. Gergs / Mrs. Krummendorf

Rubberised Tel. 0049 341 / 65068 140

Steel,

GRP,

PE

Renovation of blowdown

pipes and gypsum

suspension lines.

Engineering, delivery and

assembly of pipelines for the

FGD plant.

Power Plant Jänschwalde Vattenfall / Germany

Replacement of absorber

circulation pipes in several

blocks.

Power Plant Govora / Romania

Assembly of steel pipes,

above and underground,

engineering and delivery of

constructional steelwork as

well as engineering, delivery

and assembly of stainless

steel trays.

Gas and Steam Power Plant Köln-Niehl / Germany

Power Plant Fenne / Germany

Renovation of FGD plants

including pipelines, spray

levels and collectors.

Power Plant Jänschwalde Vattenfall / Germany

Delivery and assembly of

pipelines.

Waste Incineration Plant Hamburg / Germany

Engineering, delivery and

assembly of pipelines for

water treatment.

Turbinenprüfstand Ludwigsfelde / Germany

Engineering, delivery and

assembly of residual

discharge piping.

POWER PLANTS, FGD PLANTS,

WASTE INCINERATION PLANTS

13.1

Reference List

Power Plant Jänschwalde Vattenfall / Germany

Seite 2

Page 3: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

POWER PLANTS, FGD PLANTS,

WASTE INCINERATION PLANTS

13.1

Reference List

2013 € 1,010,000.00 GRP, 15 - 2,000 Steag Power Saar GmbH

Steel, Mr. Helmut Arenz

PP Tel.: 0049 681 / 9494 8212

2013 € 1,125,000.00 GRP, 15 - 2,000 Fisia Babcock Environment

Steel, Mrs. Leyens

Stainless St. Tel.: 0049 2261 / 85 2242

1.4571,

PP,

PE

2012 € 1,520,000.00 GRP, 25 - 1,200 Babcock Noell GmbH

2013 PP Mr. Thalmann / Mr. Kluger

Tel.: 0049 931 / 903 0

2012 € 290,000.00 GRP, Hamnon Enviroserv GmbH

2013 Steel, Mr. Ralf Biniek

Stainless St. Tel.: 0049 201 / 24673 151

Alloy 59

2011 € 2,800,000.00 P235GH, 25 - 1,200 Alstom Boiler Deutschland GmbH

to 1.4571, Mr. Schmidt-Taube

2013 16 Mo 3 Tel.: 0049 711 / 917 11631

2012 € 1,830,000.00 Stainless St. 25 - 200 VWS Deutschland GmbH

1.4571, Mr. Gergs

GRP, Tel. 0049 341 / 65068 140

PE

2012 € 440,000.00 40 - 200 Köster Bau

Mr. Lemper

Tel.: 0049 541 / 9981420

2012 € 1,110,000.00 Stainless St., 25 - 200 VWS Deutschland GmbH

1.4571, Mr. Gergs

GRP, Tel. 0049 341 / 65068 140

PE

Assembly of pipelines for

water treatment.

Assembly of pipelines for

water treatment.

Power Plant RDK 8 Karlsruhe / Germany

Power Plant Isalnita / Romania

MAN Power Plant / Martinique

Engineering, delivery and

assembly of pipelines in the

FGD plant.

Power Plant Paco / Panama

Engineering, delivery and

assembly of pipelines in the

FGD plant.

Power Plant Fenne / Germany

Complete building alteration

of two FGD plants including

pipelines, spray levels and

constructional steelwork.

Delivery and assembly of low-

and medium-pressure lines in

the boiler house.

Engineering, delivery and

assembly of pipelines in the

FGD plant.

Power Plant Lippendorf / Germany

Power Plant Hamm RWE / Germany

Delivery and assembly of

insulated GRP pipelines for

district heating.

GRP with PE-

Insulation

MAN Power Plant / La Réunion

Seite 3

Page 4: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

POWER PLANTS, FGD PLANTS,

WASTE INCINERATION PLANTS

13.1

Reference List

Assembly of pickling pipes. 2012 € 255,000.00 Steel, 25 - 300 Beiztechnik für Kraftwerke GmbH

S235 Mr. Bernd Kanetzki

Tel: 0049 7365 / 5300

2011 € 250,000.00 GRP 1,400

2012 ENBW

2011 € 138,000.00 GRP 25 - 800 STEAG Power Saar GmbH

Mr. Urban

Tel.: 0049 681 / 9494 7550

2010 € 64,000.00 GRP 1,400 Hugo Peterson GmbH

2011 Mr. Jürgen Stauss

Tel.: 0049 611 / 962 7822

2001 € 500,000.00 GRP 125 - 900 Saarenergie

to Mr. Jochum

2010 Tel.: 0049 6581 / 40 50

2009 € 250,000.00 GRP 25 - 300 Fisia Babcock Environment

Mrs. Leyens

Tel.: 0049 2261 / 85 2242

2008 € 2,800,000.00 GRP, 25 - 800 Fisia Babcock Environment

2009 Steel Mrs. Leyens

Tel.: 0049 2261 / 85 2242

2007 € 3,300,000.00 GRP, 25 - 1,200 Babcock Noell

to Steel Mr. Thalmann / Mr. Krack

2009 Tel.: 0049 931 / 903 3170

2008 € 2,500,000.00 GRP, 25 - 800 AE & E

Steel Mrs. Stengel

Tel.: 0043 316 / 501 497

Delivery and prefabrication of

pipelines in the FGD plant.

Power Plant Boxberg / Germany

Power Plant RDK 8 / Germany

Engineering, delivery and

assembly of pipelines in the

FGD plant and restoration of

the washer.

Power Plant Puerto Coronel / Chile

Power Plant Shuaibah / Saudi Arabia

Power Plant Bergkamen FGD / Germany

Engineering, delivery and

assembly of pipelines in the

FGD plant.

Power Plant Lonza / Switzerland

Power Plant Weiher / Germany

Engineering, delivery and

assembly of risers and

emergency spraying lines.

Delivery and assembly of

pipelines in the FGD plant.

Delivery and assembly of

pipelines in the FGD plant.

Engineering, delivery and

assembly of pipelines in the

FGD plant.

Power Plant Knapsack Köln / Germany

Engineering, delivery and

assembly of a fish

recirculation line.

Power Plant Bexbach / Germany

Seite 4

Page 5: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

POWER PLANTS, FGD PLANTS,

WASTE INCINERATION PLANTS

13.1

Reference List

2008 € 3,000,000.00 GRP, 25 - 900 AE & E

Steel, Mrs. Stengel

PP Tel.: 0043 316 / 501 497

2007 € 400,000.00 GRP 25 - 800 AE & E

Mrs. Stengel

Tel.: 0043 316 / 501 497

2007 € 200,000.00 GRP 25 - 300 AE & E

Mrs. Stengel

Tel.: 0043 316 / 501 497

2006 € 3,000,000.00 GRP, 25 - 800 Fisia Babcock Environment

Stainless St., Mr. Schadow

Steel Tel.: 0049 61 / 85 20 51

2006 € 400,000.00 GRP, 800 - 1,000 ISB

Stainless St. Mr. Lehnert

0049 931 / 903 0

2005 € 1,200,000.00 GRP, 25 - 800 Steag

Steel Mr. Bastuck

Tel.: 0049 681 / 40 57 501

2005 € 1,000,000.00 GRP, 25 - 800 Fisia Babcock Environment

Steel Mr. Schadow

Tel.: 0049 61 / 85 20 51

2005 € 1,500,000.00 GRP, 25 - 800 AE & E

Stainless St., Mrs. Stengel

Steel Tel.: 0043 316 / 501 497

Delivery and supervision of

pipelines in the FGD plant.

Engineering, delivery and

assembly of pipelines in the

FGD plant, restoration of the

washer and ducts.

GKM Mannheim / Germany

Power Plant Ruien / Belgium

Engineering, delivery and

assembly of pipelines in the

FGD plant.

Delivery and assembly of

pipelines in the FGD plant.

Pfaffenau / Austria

Power Plant Rybnik / Poland

Delivery, prefabrication and

assembly of pipelines in the

FGD plant.

Power Plant Mehrum / Germany

Engineering, delivery and

assembly of pipelines in the

FGD plant and restoration of

the washer.

Power Plant Megalopolis / Greece

Delivery and assembly of

pipelines for renovations of

the FGD plant.

Power Plant Bexbach / Germany

Power Plant Alcudia, Mallorca / Spain

Engineering, delivery and

assembly of pipelines in the

FGD plant.

Seite 5

Page 6: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

POWER PLANTS, FGD PLANTS,

WASTE INCINERATION PLANTS

13.1

Reference List

2003 € 750,000.00 GRP 25 - 500 Fiberdur

Mr. Steuler / Mr. Nieke

Tel.: 0049 2464 / 972 0

2002 € 3,000,000.00 GRP, 25 - 1,500 Alba Bahrain

2003 St 1.4571 Mr. de Vries

Tel.: 00973 960 / 83 69

2002 € 460,000.00 GRP 700 - 800 Mibrag

2003 Mr. Eichler / Mr. Landgraf

Tel.: 0049 3448 / 815 3 88

Lurgi Lentjes Bischoff

Mr. Kannenberg

Tel.: 0049 201 / 81 12 00

2002 € 450,000.00 St 35.8 III, 25 - 150 Babcock Borsig Power Environment

PP Mrs. Patzner

Tel.: 0049 2261 / 85 22 42

2002 € 500,000.00 GRP, 25 - 500 Babcock Borsig Power Environment

1.4571, Mrs. Patzner

PP Tel.: 0049 2261 / 85 22 42

2002 € 450,000.00 GRP, 2,0 x 2,0 m Thyssen Krupp Encoke

St 37, Mr. Frefert

1.4571, Tel: 0049 234 / 317367

15 Mo 3,

1.4828

2001 € 185,000.00 Galv. Steel 25 - 200 Babcock Borsig Power Environment

Mr. Scholz

Tel.: 0049 2261 / 85 0

Delivery and assembly of

pipelines.

Great Man River / Libya

Delivery and assembly of

pipelines in the FGD plant.

Delivery and assembly of fire-

fighting pipelines, dust

extraction system,

compressed-air lines and

ceiling drains.

Power Plant Halmstad / Sweden

Delivery and assembly of

pipelines.

Power Plant Elverlingsen / Germany

Power Plant Glostrup / Denmark

Brobbek Oslo / Norway

Prefabrication of filtration

piping.

Alba / Bahrain

Power Plants Deuben and Mumsdorf / Germany

Delivery and assembly of

risers.

Delivery and assembly of

pipelines and ducts.

Seite 6

Page 7: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

POWER PLANTS, FGD PLANTS,

WASTE INCINERATION PLANTS

13.1

Reference List

2001 € 160,000.00 GRP Lurgi Lentjes Bischoff

Mr. Kannenberg

Tel.: 0049 201 / 81 12 00

2001 € 165,000.00 St 35.8 III, 25 - 150 Babcock Borsig Power Environment

Galv. Steel Mr. Scholz

Tel.: 0049 2261 / 85 0

2001 € 175,000.00 Stainless St. 25 - 250 Babcock Borsig Power Energie

1.4462 Mr. Nicolai / Mr. Gewähr

Tel.: 0049 208 / 83 3 0

Revision of the boiler. 2001 € 55,000.00 GRP, HKS Kraftwerk Service GmbH

Steel Mr. Heb

15 Mo 3 Tel.: 0049 6733 / 96 11 64

2001 € 165,000.00 GRP, 25 - 400 Thyssen Krupp EnCoke

Steel, Mr. Frevert / Mr. Diesterbeck

PP Tel.: 0049 234 / 317 0

2001 € 60,000.00 Steel Alstom Power Boiler GmbH

Mr. Pohl

Tel.: 0049 221 / 96 82 315

2000 € 155,000.00 Stainless St. 25 - 400 Steinmüller Rompf Wassertechnik

2001 1.4571, Mr. Schulz

PP, Tel.: 0049 2261 / 85 0

GRP

2000 € 185,000.00 GRP 25 - 1,000

2001

Mr. Bürgel

Tel.: 0049 201 / 36 45 01

Delivery and assembly of

carrier levels for spraying

pipes.

Waste Incineration Plant Vestforbraending / Denmark

Power Plants Deuben und Mumsdorf / Germany

Power Plant Lippendorf / Germany

Renovations of water

treatment pipelines.

Power Plant Lippendorf / Germany

Caffaro / Italy

SVI-Verband Brabant / Netherlands

Delivery and assembly of

pipelines.

Delivery and assembly of

steel pipelines.

Power Plant Lippendorf / Germany

Delivery and assembly of the

waterlance system and water

tanks.

Power Plant Buschhaus Braunschweig / Germany

Assembly and disassembly of

ducts.

Renovations of the flue gas

cleaning.

Essener Hochdruck-

Rohrleitungsbau GmbH

Seite 7

Page 8: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

POWER PLANTS, FGD PLANTS,

WASTE INCINERATION PLANTS

13.1

Reference List

2000 € 85,000.00 GRP Lurgi Lentjes Bishoff

2001 Mr. Kannenberg

Tel.: 0049 201 / 81 12 00

1999 € 250,000.00 GRP 25 - 500 Wupperverband

to Mr. Zimmermann

2001 Tel.: 0049 202 / 27 46 108

2000 € 112,500.00 GRP 125 - 150 EnBW KW AG

Mr. Gamm

Tel.: 0049 7131 / 18 7 0

2000 € 185,000.00 GRP, RHE Energie- u. Wasserwerke

Steel Mr. Emig / Mr. Fechner

Tel.: 0049 621 / 290 0

2000 € 60,000.00 GRP, 25 - 800 Fiberdur-Vanck GmbH

Stainless St. Mr. Müller

Tel.: 0049 2464 / 97 2 0

2000 € 90,000.00 GRP with 25 - 80 Babcock Borsig Power Environment

PP-Inliner Mrs. Patzner / Mr. Ladjanski

Tel.: 0049 2261 / 85 0

1999 € 1,500,000.00 GRP, 25 - 600 L & C Steinmüller GmbH

2000 Steel, Mrs. Patzner

PP Tel.: 0049 2261 / 85 2242

L & C Steimüller GmbH

Mr. Lelanz

Tel.: 0045 65 / 90 42 84

1999 € 75,000.00 GRP 50 - 1,000 RWE Energie AG

Mr. Esser

Tel.: 0049 2271 / 70 28 50

Fiberdur-Vanck GmbH

Mr. Borges

Tel.: 0049 2464 / 972 310

Waste Incineration Plant Fünen / Denmark

Power Plant Niederaußem / Germany

Assembly of the circulation

line in the FGD plant.

Delivery and assembly of the

FGD plant and boiler house

piping and dust extraction

system.

Delivery and assembly of

filtration-system piping.

Renovation of absorber R1

and R2 of the FGD plant.

Delivery and assembly of

pipelines in the FGD plant.

Delivery and assembly of flow

grilles and spray lines.

Delivery and assembly of

pipelines in the FGD plant.

Waste Incineration Plant Weisweiler / Germany

MVV Mannheim / Germany

Power Plant Niederaußem / Germany

Delivery and assembly of

winter pipelines in the

cooling tower.

Power Plant Lippendorf / Germany

Neckarwerke Heilbronn / Germany

Restschlammverbrennung Wuppertal / Germany

Seite 8

Page 9: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

POWER PLANTS, FGD PLANTS,

WASTE INCINERATION PLANTS

13.1

Reference List

1998 € 2,250,000.00 GRP, 25 -1,000 L & C Steinmüller GmbH

1999 Steel, Mr. Engelking

PP Tel.: 0049 2261 / 85 3430

1997 € 1,500,000.00 GRP, 25 - 600 L & C Steinmüller GmbH

to Steel Mrs. Patzner

1999 Tel.: 0049 2261 / 85 2242

1997 € 2,500,000.00 GRP 25 - 1,000 Fiberdur-Vanck GmbH

to Mr. Borges

1999 Tel.: 0049 2642 / 972-310

Walter Bau AG

Mr. Müller

Tel.: 0049 34342 / 51135

Mr. Bürgel

Tel.: 0049 201 / 3645 131

Assembly of pipelines. 1997 € 750,000.00 GRP 25 - 600 L & C Steinmüller GmbH

to Mr. Engelking

1999 Tel.: 0049 2261 / 85 3430

1998 € 150,000.00 GRP, 25 - 200 L & C Steinmüller GmbH

Steel Mrs. Patzner

Tel.: 0049 2261 / 85 2242

HEW AG

Mr. Jerasch

Tel.: 0049 40 / 63 96 75 73

1997 € 175,000.00 PP, 50 - 200 L&C Steinmüller GmbH

St 37, Mr. Dr. Shamekhi

St 35.8 I Tel.: 0049 2261 / 85 3729

Hugo Petersen

Mr. Pichhardt

Mr. Küpferling

Tel.: 0049 3493 / 60 99 0

Sewage-Sludge-Incineration Plant Sande / Germany

Recycling Plant Böhlen / Germany

Waste-to-Energy Plant Kassel / Germany

Delivery and assembly of ash

humidification pipelines.

Delivery and assembly of

pipelines in the FGD plant,

the hydrochloric acid plant

and the boiler house piping.

Essener Hochdruck-

Rohrleitungsbau GmbH

MVB Hamburg-Tiefstack / Germany

Delivery and assembly of

pipelines.

Delivery and assembly of

pipelines.

Power Plant Lippendorf / Germany

Waste-to-Engergy Plant Böblingen / Germany

Delivery and assembly of

pipelines for the FGD plant,

raw water pipes,

underground, and fire-

fighting pipelines.

Seite 9

Page 10: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

POWER PLANTS, FGD PLANTS,

WASTE INCINERATION PLANTS

13.1

Reference List

1996 € 150,000.00 GRP, 25 - 400 Müllverwertung Borsig GmbH

1997 Steel, Mr. Koop

PP Tel.: 0049 40 / 73 18 91 61

L & C Steinmüller GmbH

Mrs. Patzner

Tel.: 0049 2261 / 85 2242

1996 € 200,000.00 GRP 25 - 200 L & C Steinmüller GmbH

1997 Mr. Engelking

Tel.: 0049 2261 / 85 3430

Delivery and assembly of ash

humidification pipelines.

MVB Borsigstraße Hamburg / Germany

Delivery and assembly of

pipelines.

Power Plant Schwarze Pumpe / Germany

Seite 10

Page 11: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

2015 € 3,200,000.00 GRP 25 - 3,400 General Electric (vormals Alstom)

2016 Mr. Tomasz Turek

0048 42 / 6131630

2014 € 200,000.00 GRP 1,200 Iberdrola

2015 Mr. Triebel

Tel.: 0049 30 / 30308 50000

2014 € 600,000.00 GRP 25 - 1,000 Siemens Sp. z.o.o Poland

2015 Mr. Tamas Vargas

(SIT SE)

Tel.: 0046 122 / 84613

2014 € 700,000.00 GRP 25 - 700 Integral GmbH Österreich

Mr. Andreas Wagner

Tel.: 0043 2236 / 770 150

2014 € 855,000.00 GRP 25 - 2,000 Siemens AG Erlangen

Mr. Wolfgang Arlt

Tel.: 0049 9131 / 18 3286

2013 € 1,200,000.00 GRP 25 - 2,000 Alstom Baden Schweiz

2014 Mr. Sylivan Hug

0041 56 / 5563879

2013 € 2,300,000.00 GRP, 25 - 2,000 Siemens AG Erlangen

2014 PE, Mr. Wolfgang Arlt

1.4571 Tel.: 0049 9131 / 18 3286

2013 € 650,000.00 GRP 25 - 2,000 Siemens AG Erlangen

2014 Mr. Wolfgang Arlt

Tel.: 0049 9131 / 18 3286

Engineering and delivery of

main and secondary cooling

water pipes, aboveground.

Gas and Steam Power Plant Lausward Düsseldorf / Germany

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Gas and Steam Power Plant Tuaspring / Singapore

Engineering, delivery and

supervision of the cooling

water pipes, aboveground.

Gas and Steam Power Plant Köln-Niehl / Germany

Engineering, delivery and

supervision of main and

secondary cooling water

pipes, above and

underground.

13.2

Reference List

Engineering, delivery and

assembly of cooling water

pipes, underground.

Gas and Steam Power Plant San Gabriel / Philippines

Gas and Steam Power Plant Lichterfelde / Germany

Gas and Steam Power Plant Gorzow / Poland

Turbinenprüfstand Ludwigsfelde / Germany

Engineering, delivery and

assembly of the cooling

water pipes, above and

underground.

Engineering, delivery and

assembly of the cooling

water pipes, above and

underground.

Power Plant Opole / Poland

Engineering and delivery of

main and secondary cooling

water pipes for the con-

struction of two new blocks.

POWER PLANTS

COOLING WATER PIPES

Seite 11

Page 12: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.2

Reference ListPOWER PLANTS

COOLING WATER PIPES

2013 € 690,000.00 GRP 600 - 1,000 UPM GmbH

2014 Mr. Hunger

Tel.: 0049 8861 / 213 551

2012 € 750,000.00 PE 200 - 300 Cobra Instalationes y Servicios S.A.

2013 Mr. Christian Matthies

Tel.: 0049 421 / 69 67 30

2012 € 88,000.00 GRP 500 - 1,000 VA Tech WABAG GmbH

Mr. Gerald Reiniger

Tel.: 0043 1 / 25105 0

2012 € 1,000,000.00 GRP 25 - 1,800 Siemens AG Erlangen

Mr. Wolfgang Arlt

Tel.: 0049 9131 / 18 3286

2010 € 920,000.00 GRP, 25 - 2,000 Seonghwa Industrial Co.,Ltd.

to PP, Mr. Duock Jeong

2012 PE Tel.: 0082 10 / 4126 3503

Bilfinger VAM GmbH

Mr. Ernst Jäger

Tel.: 0043 7242 / 406 437

2008 € 5,500,000.00 GRP 25 - 2,000 E.ON

to Mr. Dipl. Ing. Meyer

2012 Tel.: 0049 209 / 601 3030

2011 € 1,850,000.00 GRP 25 - 2,000 Siemens AG Erlangen

Mr. Wolfgang Arlt

Tel.: 0049 9131 / 18 3286

2010 € 680,000.00 GRP 25 - 2,100 Kremsmüller Östereich

2011 Mr. Norbert Flohrer

Tel.: 0043 7242 / 630 1432

Gas and Steam Power Plant Enecogen / Netherlands

Power Plant Maasvlakte / Netherlands

Gas and Steam Power Plant UPM Schongau / Germany

Engineering, delivery and

assembly of the cooling

water pipes, underground.

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Gas and Steam Power Plant Knapsack 2 / Germany

Power Plant Hemweg / Netherlands

Power Plant Mittelsbüren / Germany

Engineering, delivery and

assembly of the cooling

water pipes, underground.

Power Plant Wabag Shiraz / Iran

Engineering and delivery of

the cooling water pipes,

underground.

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Gas and Steam Power Plant Diemen / Netherlands

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Assembly of the cooling

water pipes, aboveground.

Seite 12

Page 13: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.2

Reference ListPOWER PLANTS

COOLING WATER PIPES

2010 € 810,000.00 GRP 3,400 Josef Möbius Bau AG

2011 Mr. Medebach

Tel: 0049 40 / 800 903 0

2009 € 2,600,000.00 GRP 25 - 2,000 Alpine Bau Deutschland AG

2010 Mr. Diefenbach

Tel.: 0049 231 / 54 13 395

Alstom Mannheim / Schweiz

Mr. Urs Naef

Tel.: 0041 58 / 505 83 77

2009 € 3,300,000.00 GRP 25 - 2,000 Siemens AG

2010 Mr. Dipl. Ing. Rührseits

Tel.: 0049 9131 / 18 43 99

2007 € 5,600,000.00 GRP 50 - 2,600 E.ON

to Mr. Meyer

2010 Tel.: 0049 209 / 601 30 30

2008 € 2,000,000.00 GRP 25 - 2,400 Alstom

2009 Mr. Stéphane Barranca

Tel.: 0031 / 32 075 21 03

2008 € 3,000,000.00 GRP, 25 - 2,300 Fabricom

2009 PE, Mr. Dick Siersema

PVC Tel.: 0031 / 22 45 71 73

2008 € 2,700,000.00 GRP, 25 - 1,650 Boccard

2009 PE Mrs. Brelivet

Tel.: 0033 / 478 94 51 79

2008 € 3,000,000.00 GRP 2,200 Integral Austria

2009 Mr. Stocker

Tel.: 0043 2236 / 770 543

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Gas and Steam Power Plant Lelystad / Netherlands

Assembly of the cooling

water pipes, above and

underground.

Engineering, delivery and

assembly of the cooling

water pipes, above and

underground.

Gas and Steam Power Plant Frankfurt-Höchst / Germany

Gas and Steam Power Plant Sloe Vlissingen / Netherlands

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Gas and Steam Power Plant Emile Huchet / France

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Power Plant Datteln / Germany

Engineering, delivery and

assembly of the cooling

water pipes, above and

underground.

Power Plant Wilhelmshaven / Germany

Engineering, delivery and

assembly of the cooling

water pipes, underground.

Power Plant RDK8 Karlsruhe / Germany

Engineering, delivery and

assembly of the cooling

water pipes, above and

underground.

Power Plant Lünen / Germany

Seite 13

Page 14: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.2

Reference ListPOWER PLANTS

COOLING WATER PIPES

2008 € 1,800,000.00 GRP, 25 - 2,000 VAM / Siemens

PE Mr. Tscherne

Tel.: 0043 7242 / 406 260

2007 € 1,300,000.00 GRP, 25 - 1,650 Boccard

2008 PE Mrs. Brelivet

Tel.: 0033 4 / 78 94 51 79

2007 € 3,000,000.00 PVC, 25 - 1,000 Siemens

PE, Mr. Norbert Becker

13 CrMo Tel.: 0049 9131 / 18 51 66

2006 € 2,400,000.00 GRP 50 - 2,000 VAM Austria

2007 Mr. Jäger

Tel.: 0043 72 42 / 406 437

Siemens Austria

Mr. Geromin

Tel.: 0043 51 / 707 31 909

2006 € 1,700,000.00 GRP 25 - 1,600 VAM

Mr. Tscherne

Tel.: 0043 7242 / 406 260

2006 € 1,500,000.00 GRP 25 - 1,600 VAM

Mr. Tscherne

Tel.: 0043 7242 / 406 260

2006 € 2,300,000.00 GRP, 25 - 1,600 BHR

PE, Mr. Ingo Wurzel

PP, Tel.: 0049 201 / 3645 133

PVC

2004 € 1,500,000.00 GRP 25 - 1,500 VAM-Wels

Mr. Freimuth

Tel.: 0043 7242 / 406 287

Moerdijk / Netherlands

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Gas and Steam Power Plant Irsching IV / Germany

Gas and Steam Power Plant Pont sur Sambre / France

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Engineering, delivery and

assembly of main and

secondary cooling water

pipes and the turbine piping,

above and underground.

Gas and Steam Power Plant Timelkam / Austria

Engineering, delivery and

assembly of the cooling

water pipes, above and

underground.

Gas and Steam Power Plant Sumgait / Azerbaijan

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Gas and Steam Power Plant Knapsack / Germany

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Gas and Steam Power Plant Hamm-Uentrop / Germany

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Gas and Steam Power Plant Antwerpen / Belgium

Engineering, delivery and

assembly of the cooling

water pipes, aboveground.

Seite 14

Page 15: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.2

Reference ListPOWER PLANTS

COOLING WATER PIPES

2004 € 400,000.00 GRP 50 - 400 Brochier

Mr. Eichenmüller

Tel.: 0049 911 / 95 43 368

2003 € 2,000,000.00 GRP, 25 - 1,600 Brochier

2004 PVC Mr. Eichenmüller

Tel.: 0049 911 / 95 43 368

2003 € 500,000.00 GRP, 15 - 450 Brochier

2004 PP, Mr. Eichenmüller

PVC Tel.: 0049 911 / 95 43 368

2002 € 3,000,000.00 GRP, 25 - 1,500 Alba Bahrain

2003 St 1.4571 Mr. de Vries

Tel.: 00973 960 / 83 69

Iskenderun / Turkey

2002 € 400,000.00 GRP 25 - 500 Fiberdur

Mr. Steuler / Mr. Nieke

Tel.: 02464 / 972 0

2001 € 450,000.00 GRP 1,200 - 1,800 Fiberdur-Vanck GmbH

Mr. Müller

Tel.: 0049 2464 / 972 0

1999 € 250,000.00 GRP 25 - 800 ABB Nürnberg

Mr. Kleinekampmann

Tel.: 0049 911 / 4130 783

1999 € 500,000.00 GRP 150 - 1,800 ABB Kraftwerke AG

Mr. Robens

Tel.: 0041 56 / 205 5435

Fiberdur-Vanck GmbH

Mr. Bauer

Tel.: 0049 2464 / 972 210

Arrubal / Spain

Palos de la Frontera / Spain

Delivery, prefabrication and

assembly of the secondary

cooling water system.

Assembly of the cooling

water pipes, underground.

Power Plant Leuna / Germany

Assembly of the cooling

water pipes, underground.

Power Plant Tocopilla / Chile

Assembly of the cooling

water pipes, above and

underground.

Alba / Bahrain

Delivery and assembly of the

cooling water pipes,

aboveground.

Assembly of the cooling

water pipes, aboveground.

Power Plant Rosarito / Mexico

Delivery, prefabrication and

assembly of the secondary

cooling water system and

repair of the main cooling

water system.

Tahaddart / Morocco

Delivery, prefabrication and

assembly of the secondary

cooling water system.

Seite 15

Page 16: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.2

Reference ListPOWER PLANTS

COOLING WATER PIPES

1999 € 250,000.00 GRP 25 - 1,400 Babcock GmbH

Mr. Klaudt

Tel.: 0049 2133 / 51 87 0

Fiberdur-Vanck GmbH

Mr. Bauer

Tel.: 0049 2464 / 972 210

Assembly of the cooling

water pipes, above and

underground.

Gas and Steam Power Plant Dormagen / Germany

Seite 16

Page 17: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

2015 € 350,000.00 GRP 125 - 1,000 Hamon Enviroserv GmbH

Mr. Ralf Bienick

Tel.: 0049 201 / 246731 51

2003 € 200,000.00 GRP 200 - 800 Steag Power Saar GmbH

to Mr. Helmut Arenz

2015 Tel. 0049 681 / 9494 8212

2003 € 300,000.00 GRP 100 - 300 Saarenergie

to Mr. Bastuck

2015 Tel.: 0049 681 / 405 75 28

2014 € 174,000.00 GRP 100 - 700 Hamon Enviroserv GmbH

Mr. Ralf Bienick

Tel.: 0049 201 / 246731 51

2014 € 190,000.00 GRP 125 - 900 Hamon Enviroserv GmbH

Mr. Ralf Bienick

Tel.: 0049 201 / 246731 51

2013 € 179,000.00 GRP 200 - 800 Steinmüller Engineering GmbH

Mr. Uwe Schadow

Tel.: 0049 2261 / 78950 498

2013 € 132,000.00 GRP 200 - 500 Fisia Babcock Environment GmbH

Mrs. Carla Leyens

Tel.: 0049 2261 / 85 2242

2006 € 200,000.00 GRP 100 - 350 Evonik Industries AG

to Mr. Königs

2010 Tel.: 0049 2306 / 109 1264

2008 € 460,000.00 GRP 100 - 500 Babcock Noell GmbH

2009 Mr. Melles

Tel.: 0049 931 / 903 0

Power Plant Fenne / Germany

Engineering and delivery of

spray levels.

Power Plant Bexbach / Germany

Engineering, delivery and

assembly of spray levels.

13.3

Reference List

FGD Opatovice / Czech Republik

Engineering and delivery of

spray levels.

SPRAYING PIPES

Engineering and delivery of

spray levels.

Power Plant Paroseni / Romania

Engineering and delivery of

spray levels.

AKSA Bolu Göynük / Turkey

Engineering and delivery of

spray levels.

Power Plant O Mon / Vietnam

Power Plant Paco / Panama

Engineering and delivery of

spray levels.

Power Plant Lünen / Germany

Engineering, delivery and

assembly of spray levels.

Power Plant Vattenfall Boxberg / Germany

Engineering, delivery and

assembly of spray levels.

Seite 17

Page 18: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.3

Reference ListSPRAYING PIPES

2005 € 700,000.00 GRP 100 - 1,000 AE & E

Mrs. Stengel

Tel.: 0043 316 / 501 497

2004 € 400,000.00 GRP 100 - 1,000 AE & E

Mrs. Stengel

Tel.: 0043 316 / 501 497

Assembly of spray levels. 2000 € 125,000.00 GRP 100 - 800 KTD-Plasticon

Mr. Rademacher

Tel.: 0049 2064 / 499 0

2000 € 115,000.00 GRP 125 - 150 EnBW KW AG

Mr. Gramm

Tel.: 0049 7131 / 187 0

1998 € 200,000.00 GRP 50 - 800 Lurgi Lentjes Bischoff

Mr. Kollenberg

Tel.: 0049 201 / 8112 261

Power Plant Zhangqiu / China

Engineering, delivery and

supervising of the assembly

of spray levels.

Power Plant Hejin / China

Engineering, delivery and

supervising of the assembly

of spray levels.

Power Plant Mumsdorf / Germany

Neckarwerke Heilbronn / Germany

Power Plant Cayirhan / Turkey

Prefabrication and assembly

of spray levels.

Engineering, delivery and

assembly of flow grilles.

Seite 18

Page 19: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

2013 € 707,000.00 GRP 150 - 600 Inge GmbH

to Mr. Christian Waschek

2015 Tel.: 0049 8192 / 997 700

2012 € 1,190,000.00 GRP 150 - 2,800 Statiflo International Ltd.

to Mr. Allan Taylor

2015 Tel.: 0044 1625 / 433 100

2014 € 180,000.00 GRP 25 - 80 Bilfinger Piping Technologies

GmbH

Mr. Winfried Bürgel

Tel.: 0049 208 / 4575 5131

2009 € 1,517,000.00 GRP 150 - 300 Berghof Membrane Technologie

to Mrs. Hablizel

2014 Tel.: 0049 7121 / 894 243

2013 € 137,000.00 GRP 1,600 Sachtleben Chemie GmbH

Mrs. Claudia Schwarz

Tel.: 0049 2066 / 22 2254

2012 € 255,000.00 GRP-HAT, 1,400 Rocal Boxberg GmbH & Co.

2013 PFA Mr. Andy Kowal

2007 € 510,000.00 GRP, 25 - 600 Sodawerke Staßfurt

to PP, Mrs. Eisenträger

2009 PVC Tel.: 0049 3925 / 263 300

2000 € 530,000.00 GRP Ø 2,800 K + S Kali GmbH

to Mr. Möller

2008 Tel.: 0049 6620 / 79 24 35

Cladding pipes for membrane

filters.

Refinery Shell - Godorf / Germany

Engineering and delivery of

GRP modules for water

treatment.

Delivery of GRP pipeline

modules.

Berghof / Germany

Engineering and delivery of

static mixers in different

versions

13.4

Reference List

inge GmbH / Germany

Statiflo / Great Britain

GENERAL PLANT CONSTRUCTION,

CHEMISTRY AND REFINERIES

Sachtleben Chemie / Germany

Power Plant Boxberg / Germany

Sodawerke Staßfurt / Germany

Engineering, delivery and

assembly of flue gas ducts.

Engineering, delivery and

assembly of high temperature

resin pipes with PFA liner.

K + S Kali GmbH - Hattorf / Germany

Engineering, delivery and

assembly of pipelines.

Engineering, delivery and

assembly of flotation cells.

Seite 19

Page 20: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.4

Reference ListGENERAL PLANT CONSTRUCTION,

CHEMISTRY AND REFINERIES

2001 € 27,500.00 PP, 15 - 40 Steinmüller Rompf

PE Mrs. Patzner / Mr. Hotz

Tel.: 0049 2261 / 85 0

2001 € 60,000.00 PP, 15 - 150 Rauschert Verfahrenstechnik

GRP GmbH

Mr. Spindler

Tel.: 0049 9262 / 77 0

2000 € 575,000.00 Rubberised 25 - 300 K + S Kali GmbH

2001 Steel Mr. Meister

Tel.: 0049 561 / 301 15 51

2000 € 380,000.00 Steel, Steinmüller Rompf

2001 GRP, Wassertechnik GmbH & Co.

PE, Mrs. Patzner

PP Tel.: 0049 2261 / 85 0

2000 € 155,000.00 GRP, 600 K + S Kali GmbH

2001 Galv. Steel Mr. Gockeln / Mr. Tobisch

14.571 Tel.: 0049 561 / 3011 0

Pipework of a storage tank. 2000 € 80,000.00 GRP 250 - 400 Eternit AG

Mr. Ebernau / Mr. Eggers

Tel.: 0049 30 / 34 85 0

2000 € 60,000.00 GRP 600 - 700 Fiberdur-Vanck GmbH

Mr. Müller

Tel.: 0049 2464 / 972 0

2000 € 50,000.00 Galv. Steel Cognis Henkel

14.571 Mr. Triestram

Tel.: 0049 211 / 79 40 56 89

Leachate Plant Leppe / Germany

Delivery and assembly of

pipelines.

Renovations of the complete

plant.

K + S Kali GmbH - Wintershall / Germany

Delivery and assembly of the

brine line.

Geel / Belgium

Delivery and assembly of

tank piping.

K + S Kali GmbH - Sigmundshall / Germany

Fermentation Plant Freiburg / Germany

Delivery and assembly of

rubberised steel pipelines.

InfraLeuna GmbH / Germany

InfraLeuna GmbH / Germany

Henkel Düsseldorf / Germany

Assembly of sewage pipes of

the emergency tank.

Delivery and assembly of the

basin lining.

Seite 20

Page 21: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.4

Reference ListGENERAL PLANT CONSTRUCTION,

CHEMISTRY AND REFINERIES

2000 € 95,000.00 Steel 35.81, 15 - 1,000 Lockwood Petersen

Galv. Steel Mr. Dr. Lindner

14.571 Tel.: 0049 611 / 16 06 0

2000 € 125,000.00 GRP 1,400 Selip Italien

Mr. Pini / Mrs. Onken

Tel.: 0039 521 / 824 244

Assembly of pipelines. 2000 € 115,000.00 GRP 25 - 800 Fiberdur-Vanck GmbH

Mr. Müller

Tel.: 0049 2464 / 972 0

Assembly of pipelines. 1999 € 250,000.00 GRP 25 - 1,100 Mannesmann Seifert GmbH

Mr. Lichtenstein

Tel.: 0049 3461 / 43 94 07

Fiberdur-Vanck GmbH

Mr. Meyer

Tel.: 0049 2464 / 972 332

1999 € 200,000.00 GRP 25 - 600 Deutsche Babcock GmbH

Mr. Küpferling

Tel.: 0049 3493 / 60 99 0

1999 € 150,000.00 GRP 25 - 200 Fiberdur-Vanck GmbH

Mr. Niecke

Tel.: 0049 2464 / 972 0

1999 € 30,000.00 GRP 25 - 300 Waterlink Axel Johnson

Engineering GmbH

Mr. Niedhart

Tel.: 0049 2131 / 3106 18

Norddeutsche Affinerie Hamburg / Germany

Trimmis / Switzerland

Manufacture of laminates for

ducts.

Repair of GRP lines and plant

sections.

Fresh Water Plant Leuna-Daspig / Germany

Fresh Water Plant Leuna-Daspig / Germany

BCA Bitterfeld / Germany

Delivery and assembly of the

chlorine-alkali membrane

electrolysis.

Recycling Plant Peres / Germany

Assembly of pipelines in the

silo building.

AKZO Nobel Stade / Germany

Delivery and assembly of

pipelines.

Seite 21

Page 22: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.4

Reference ListGENERAL PLANT CONSTRUCTION,

CHEMISTRY AND REFINERIES

1999 € 150,000.00 GRP 25 - 600 Sodawerke Staßfurt GmbH

Mr. Börstler

Tel.: 0049 3925 / 62 30 39

KSMM GmbH

Mrs. Eisenträger

Tel.: 0049 3925 / 263 355

1999 € 100,000.00 GRP 25 - 500 Fiberdur-Vanck GmbH

Mr. Faust

Tel.: 0049 2464 / 972 0

K + S KALI GmbH

Mr. Tobisch

Tel.: 0049 6620 / 79 2482

1999 € 50,000.00 GRP 200 Fiberdur-Vanck GmbH

Mr. Borges

Tel.: 0049 2464 / 972 0

Assembly of pipelines. 1998 € 400,000.00 GRP 50 - 400 Fiberdur-Vanck GmbH

1999 Mr. Borges

Tel.: 0049 2464 / 972 0

1998 € 350,000.00 GRP 50 - 400 L&C Steinmüller GmbH

1999 Mrs. Patzner

Tel.: 0049 2261 / 85 0

Assembly of pipelines. 1998 € 25,000.00 GRP 150 Fiberdur-Vanck GmbH

1999 Mr. Lutter

Tel.: 0049 2464 / 972 0

Assembly of pipelines. 1997 € 25,000.00 GRP 80 - 300 Fiberdur-Vanck GmbH

to Mr. Taube

1999 Tel.: 0049 2464 / 972 0

Sodawerke Staßfurt / Germany

Engineering, delivery and

assembly of pipelines and

tanks.

K + S KALI GmbH - Hattorf / Germany

Delivery and assembly of

vacuum lines.

Wintershall Emlichheim - Mineral Oil Plant / Germany

Assembly of the oil collector

pipe.

Stockyard Schleenhain / Germany

PCK Raffinerie GmbH - FGD Schwedt New Building IKW / Germany

Delivery and assembly of

pipelines.

Solvay Fluor und Derivate Werk Wimpfen / Germany

PCK Raffinerie GmbH Schwedt, Oder / Germany

Seite 22

Page 23: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.4

Reference ListGENERAL PLANT CONSTRUCTION,

CHEMISTRY AND REFINERIES

1998 € 125,000.00 GRP 25 - 500 Gas- und Industrie-Rohrbau

Langenhagen GmbH

Mr. Lumpe

Tel.: 0049 511 / 771 84 0

Assembly of pipelines. 1998 € 25,000.00 GRP 25 - 200 Fiberdur-Vanck GmbH

Mr. Oberlies

Tel.: 0049 2464 / 972 0

1998 € 25,000.00 GRP 25 - 300 L&C Steinmüller GmbH

Mrs. Patzner

Tel.: 0049 2261 / 85 0

Assembly of pipelines. 1998 € 25,000.00 GRP 25 - 100 Fiberdur-Vanck GmbH

Mr. Oberlies

Tel.: 0049 2464 / 972 0

1997 € 75,000.00 GRP, 25 - 65 L&C Steinmüller GmbH

1998 Rubberised Mrs. Patzner

Steel Tel.: 0049 2261 / 85 0

Assembly of pipelines. 1997 € 50,000.00 GRP 80 - 500 Fiberdur-Vanck GmbH

Mr. Müller

Tel.: 0049 2464 / 972 0

K + S Kali GmbH - Unterbreizbach / Germany

MVB Böblingen / Germany

STEAG Refinery Leuna / Germany

Delivery and assembly of

pipelines.

Montell Chemie Wesseling / Germany

WKC Swentibold Geleen / Netherlands

Delivery and assembly of

pipelines.

DOW Rheinmünster / Germany

Delivery and assembly of

pipelines for the hydrochloric

acid plant.

Seite 23

Page 24: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

Assembly of pipelines. 2015 € 2,100,000.00 St 37, 50 - 500 Meyer Werft GmbH & Co. KG

15 Mo 3, Mr. Evering

GRP, Tel.: 0049 4961 / 81 4522

PVC

Delivery of pipelines. 2015 € 150,000.00 GRP, 25 - 700 Lloyd Werft Bremerhaven AG

CSVE Mr. Mahler

0049 471 / 478 207

2015 € 300,000.00 St 37 50 - 500 Neptun Werft GmbH & Co. KG

Mr. von der Weth

Tel.: 0049 381 / 384 1922

Assembly of pipelines. 2014 € 3,300,000.00 St 37, 50 - 500 Meyer Werft GmbH & Co. KG

15 Mo 3, Mr. Evering

GRP, Tel.: 0049 4961 / 81 4522

PVC

Assembly of pipelines. 2013 € 1,421,000.00 St 37, 50 - 500 Meyer Werft GmbH & Co. KG

15 Mo 3, Mr. Evering

GRP, Tel.: 0049 4961 / 81 4522

PVC

Assembly of pipelines. 2012 € 1,834,000.00 St 37, 50 - 500 Meyer Werft GmbH & Co. KG

15 Mo 3, Mr. Evering

GRP, Tel.: 0049 4961 / 81 4522

PVC

Assembly of pipelines. 2011 € 446,000.00 St 37, 50 - 500 Meyer Werft GmbH & Co. KG

15 Mo 3, Mr. Evering

GRP, Tel.: 0049 4961 / 81 4522

PVC

Assembly of pipelines. 2010 € 270,000.00 St 37, 50 - 500 Meyer Werft GmbH & Co. KG

15 Mo 3, Mr. Cordes / Mr. Evering

GRP, Tel.: 0049 4961 / 81 4647

PVC

13.5

Reference List

Lloyd Werft / Germany

Neptun Werft / Germany

Assembly of pipelines and

ducts.

Meyer Werft Papenburg / Germany

Meyer Werft Papenburg / Germany

Meyer Werft Papenburg / Germany

Meyer Werft Papenburg / Germany

Meyer Werft Papenburg / Germany

SHIPBUILDING

Meyer Werft Papenburg / Germany

Seite 24

Page 25: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.5

Reference ListSHIPBUILDING

Assembly of pipelines. 2009 € 350,000.00 St 37, 50 - 250 Meyer Werft GmbH & Co. KG

15 Mo 3, Mr. Cordes / Mr. Evering

GRP, Tel.: 0049 4961 / 81 4647

PVC

Assembly of pipelines. 2008 € 260,000.00 St 37, 50 - 250 Meyer Werft GmbH & Co. KG

15 Mo 3, Mr. Cordes / Mr. Evering

GRP, Tel.: 0049 4961 / 81 4647

PVC

Assembly of pipelines. 2007 € 325,000.00 St 37, 50 - 250 Meyer Werft GmbH & Co. KG

15 Mo 3, Mr. Cordes / Mr. Evering

GRP, Tel.: 0049 4961 / 81 4647

PVC

Assembly of pipelines. 2006 € 593,000.00 St 37, 50 - 250 Meyer Werft GmbH & Co. KG

15 Mo 3, Mr. Cordes / Mr. Evering

GRP, Tel.: 0049 4961 / 81 4647

PVC

2005 € 23,000.00 GRP 50 - 200 TPR Fiberdur GmbH

Mr. Müller

Tel.: 0049 2464 / 9720

Assembly of pipelines. 2005 € 931,000.00 St 37, 50 - 250 Meyer Werft GmbH & Co. KG

15 Mo 3, Mr. Cordes / Mr. Evering

GRP, Tel.: 0049 4961 / 81 4647

PVC

2004 € 247,000.00 GRP 50 - 200 Peene-Werft GmbH

2005 Mrs. Scheel

Tel.: 0049 3836 / 250 232

2003 € 20,000.00 GRP 50 - 200 Fiberdur-Vanck GmbH

Mr. Nieke

Tel.: 0049 2464 / 972 0

Meyer Werft Papenburg / Germany

Meyer Werft Papenburg / Germany

Meyer Werft Papenburg / Germany

Meyer Werft Papenburg / Germany

Peene-Werft / Germany

Prefabricaton of ballast water

lines.

Meyer Werft Papenburg / Germany

Peene-Werft / Germany

Engineering and

prefabrication of ballast water

lines for several ships.

Peene-Werft Berne / Germany

Prefabricaton of ballast water

lines.

Seite 25

Page 26: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.5

Reference ListSHIPBUILDING

Assembly of pipelines. 2001 € 1,050,000.00 St 37, 25 - 700 Meyer Werft GmbH & Co. KG

to 15 Mo 3, Mr. Cordes / Mr. Evering

2003 13 Cr Mo 44 Tel.: 0049 4961 / 81 4647

1999 € 25,000.00 GRP 150 Fiberdur-Vanck GmbH

Mr. Nieke

Tel.: 0049 2464 / 972 0

Rendsburg / Germany

Assembly of GRP exhaust air

pipes, Megayacht HDW-

Nobiskrug GmbH.

Meyer Werft Papenburg / Germany

Seite 26

Page 27: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

2013 € 380,000.00 PE 125 - 250 Cobra Instalationes y Servicios S.A.

2014 Mr. Christian Matthies

Tel.: 0049 421 / 69 67 30

Assembly of pipelines. 1999 € 100,000.00 GRP 25 - 250 Kopf GmbH

to Mr. Thinius

2001 Tel.: 0049 3525 / 897 0

2000 € 150,000.00 Galvanised 25 - 100 L & C Steinmüller GmbH

Steel Mrs. Patzner

Tel.: 0049 2261 / 85 0

Assembly of pipelines. 1999 € 25,000.00 GRP 50 - 250 Fiberdur-Vanck GmbH

Mrs. Frauenkron

Tel.: 0049 2464 / 972 0

Assembly of pipelines. 1999 € 100,000.00 GRP 50 - 200 E. Heitkamp GmbH

Mr. Polei

Tel.: 0049 30 / 70 20 02 0

1996 € 500,000.00 GRP 25 - 600 Fiberdur GmbH

to Mr. Taube

1998 Tel.: 0049 2464 / 972 0

Walter Bau AG

Mr. Weinert

Tel.: 0049 34342 / 51135

Power Plant Lippendorf / Germany

VEAG Combined Heat and Power Station Lippendorf / Germany

Assembly of underground

pipelines.

Waste Incineration Plant Fünen / Denmark

Delivery and assembly of

pipelines.

Pomosin Expansions-Projekt Großenbrode / Germany

Carpet-Recycling Plant Premnitz / Germany

13.6

Reference List

Power Plant Mittelsbüren / Germany

Engineering, delivery and

installation of underground

fire-fighting pipelines.

FIRE-EXTINGUISHING SYSTEMS

Seite 27

Page 28: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

2001 € 90,000.00 Stainless St. Beton und Rohrbau

14.301, Mr. Weber

GRP Tel.: 0049 341 / 91 98 131

2001 € 10,000.00 Stainless St. Firma Lenz

14.571 Mr. Lenz

Tel.: 0049 6154 / 695 254

2000 € 40,000.00 Coated Phillipp Müller M+E

Steel Mr. von der Mark

Tel.: 0049 711 / 25 61 0

2000 € 10,000.00 PP, Mitras Automotive GmbH

Steel Mr. Lenz

Tel.: 0049 7222 / 599140

2000 € 180,000.00 Steel Mitras Automotive GmbH

Mr. Lenz

Tel.: 0049 7222 / 599140

1999 € 50,000.00 St 37

2000

Mr. Bürgel

Tel.: 0049 201 / 3645 131

1999 € 12,500.00 St 37 ABB Turbinen Nürnberg GmbH

Mr. Kleinekampmann

Tel.: 0049 911 / 4130 783

1999 € 50,000.00 St 37 L & C Steinmüller GmbH

2000 Mrs. Patzner

Tel.: 0049 2261 / 85 0

Delivery and assembly of

gauges and car body girders

of the car painting facility.

Power Plant Lippendorf / Germany

Delivery and assembly of

primary and secondary pipe

support.

Essener Hochdruck-

Rohrleitungsbau GmbH

Infra Leuna / Germany

Delivery and assembly of

primary and secondary pipe

support.

Power Plant Fünen / Denmark

Delivery and assembly of

primary and secondary pipe

support.

Mitras Presswerk Rastatt / Germany

13.7

Reference List

Sewage Treatment Plant Rosenthal Leipzig / Germany

Roßdorf / Germany

Engineering, delivery and

assembly of cabins for robot

installation.

Power Plant Lippendorf / Germany

Mitras Presswerk Rastatt / Germany

Engineering, delivery and

assembly of cabins for robot

installation.

CONSTRUCTIONAL STEELWORK

Engineering, delivery and

assembly of platforms.

Delivery and assembly of

scaffolding.

Seite 28

Page 29: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.7

Reference ListCONSTRUCTIONAL STEELWORK

1999 € 45,000.00 St 37 L & C Steinmüller GmbH

Mrs. Patzner

Tel.: 0049 2261 / 85 0

2002 € 130,000.00 S235

2003 € 520,000.00 S235

2004 € 870,000.00 S235

2005 € 1,310,000.00 S235

2006 € 1,840,000.00 S235

2007 € 2,180,000.00 S235

2008 € 2,500,000.00 S235

2009 € 2,500,000.00 S235

2010 € 2,500,000.00 S235

2011 € 2,500,000.00 S235

2012 € 2,500,000.00 S235

2013 € 2,500,000.00 S235

2014 € 2,500,000.00 S235

2015 € 2,500,000.00 S235

Several Clients

Power Plant Lippendorf / Germany

In Addition to General Plant Construction and Power Plant Projects

Pipe support, primary /

secondary.

Delivery and assembly of

operating platforms.

Seite 29

Page 30: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

2001 € 130,000.00 GRP, Villeroy & Boch AG

PP Mr. Geier

Tel.: 0049 6864 / 81 0

Coating of basins. 2001 € 5,000.00 GRP Manfred Burdinski GmbH

Mr. Burdinski

Tel.: 0049 3473 / 9263 27

1996 € 55,000.00 Saarstahl AG

to Mr. Mennige

2001 Tel.: 0049 6898 / 10 4638

1990 € 225,000.00 Ringler GmbH

to Mr. Österle

2001 Tel.: 0049 7171 / 94888 0

2000 € 33,000.00 GRP Stadt Bergisch Gladbach

Abwasserwerk

Mr. Grune

Tel.: 0049 2202 / 14 1340

2000 € 30,000.00 GRP, Stadt Bergisch Gladbach

Stainless St. Abwasserwerk

14.571 Mr. Grune

Tel.: 0049 2202 / 14 1340

2000 € 20,000.00 GRP SCA Hygiene Products GmbH

Mr. Held

Tel.: 0049 621 / 778 2042

2000 € 3,250.00 GRP Howatherm Klimatechnik GmbH

Mr. Backes

Tel.: 0049 6782 / 9999 0

Sewage Treatment Plant Bergisch Gladbach / Germany

SCA Hygiene Products - Mannheim / Germany

Howatherm Klimatechnik Birkenfeld / Germany

Delivery of moulds and

nozzles.

Engineering, delivery and

assembly of basin covers.

Engineering, delivery and

assembly of GRP covers.

Engineering, delivery and

assembly of GRP covers.

13.8

Reference List

Villeroy & Boch - Merzig / Germany

Manufacture of enamelling

line cabins.

CUSTOMIZED GRP COMPONENTS,

SEWAGE TREATMENT PLANT

COVERS

Burdinski Aschersleben / Germany

Saarstahl - Völklingen / Germany

Repair of the cooling tower

and air ducts.

Ringler - Waldstetten / Germany

Delivery of vacuum cleaner

covers.

Sewage Treatment Plant Beningsfeld - Bergisch Gladbach / Germany

Seite 30

Page 31: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.8

Reference ListCUSTOMIZED GRP COMPONENTS,

SEWAGE TREATMENT PLANT

COVERS

1996 € 22,500.00 Klaus Mathieu GmbH

to Mr. Karrenbauer

2000 Tel.: 0049 6831 / 9899 6

1994 € 55,000.00 ThyssenKrupp Schulte GmbH

to Mr. Krämer

2000 Tel.: 0049 681 / 9803394

Delivery of chemical tanks. 1990 € 105,000.00 Wieland Anlagen- und Apparatebau

to Mr. Mann

2000 Tel.: 0049 7263 / 9130 0

1990 € 130,000.00 Villeroy & Boch AG

to Mr. Wagner

2000 Tel.: 0049 6868 / 81 1621

1990 € 13,000.00 Veba Kraftwerke Ruhr AG

to Mr. Storz

2000 Tel.: 0049 209 / 601 5184

1990 € 17,000.00 Steag und VEW

to Gemeinschaftskraftwerk

2000 Mr. Sornig

1990 € 65,000.00 KHD Deutz

to Mrs. Niedarskowski

2000 Tel.: 0049 221 / 822 6222

1990 € 19,500.00 Kali & Salz GmbH

to Mr. Schulz

2000 Tel.: 0049 39208 / 42693

Delivery of band conveyor

covers.

K + S KALI GmbH / Germany

Delivery of band conveyor

covers.

Veba KW Ruhr AG / Germany

Delivery of band conveyor

covers.

Steag - Bergkamen / Germany

Delivery of band conveyor

covers.

KHD Deutz / Germany

ThyssenKrupp Schulte - Völklingen / Germany

Delivery of GRP cable

troughs.

Wieland / Germany

Villeroy & Boch / Germany

Engineering, delivery and

installation of tanks,

amphoras and pilaster strips.

Mathieu Saarlouis / Germany

Several thermoplastic

operations.

Seite 31

Page 32: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.8

Reference ListCUSTOMIZED GRP COMPONENTS,

SEWAGE TREATMENT PLANT

COVERS

1990 € 42,500.00 Thyssen Krupp Fördertechnik

to GmbH

2000 Mr. Göddel

Tel.: 0049 6894 / 599 1

1990 € 20,000.00 Ruhrkohle AG

to Mr. Bachmann

2000 Tel.: 0049 2323 / 153653

1990 € 45,000.00 Firma Precismeca

to Mr. Rhim

2000 Tel.: 0033 8871 / 8010

Assembly of a filtration plant. 1999 € 2,500.00 Stadtverwaltung Zwenkau

Mr. Schewitzer

Tel.: 0049 34203 / 509 0

1999 € 25,000.00 Stainless St. Ingenieurbüro Baumgärtner

Mr. Baumgärtner

Tel.: 0049 89 / 74 88 86 0

1996 € 110,000.00 Marquardt GmbH

to Mr. Marquardt

1998 Tel.: 0049 6834 / 1839

1990 € 900,000.00 MTD Products AG

to Mr. Gerlinger

1998 Tel.: 0049 6805 / 790 327

1996 € 45,000.00 Firma Bard

Mr. Bard

Tel.: 0049 6853 / 20

Delivery of lawn mower

covers.

Swimming Bath Tholey / Germany

Delivery of a water tank -

110 m3.

Sewage Treatment Plant Gut Marienhof München II / Germany

Assembly of an activation

basin.

Marquardt - Bous / Germany

Delivery of the canopy

storage box of the Ford

Escort Van.

Gutbrod, MTD Products / Germany

Ruhrkohle AG - Niederrhein / Germany

Delivery of band conveyor

covers.

Precismeca / France

Delivery of band conveyor

covers.

Waldbad Zwenkau / Germany

Thyssen Krupp Fördertechnik / Germany

Delivery of band conveyor

covers.

Seite 32

Page 33: R E F E R E N C E S - FKT Faßbender GmbHfkt-gmbh.de/wp-content/uploads/2016/03/Chapter_13-References.pdf · R E F E R E N C E S Reference List. Effective: 31.01.2016 Release: 09

Effective: 31.01.2016

Release: 09

Project Year Contract value Material DN Client / Contact person

13.8

Reference ListCUSTOMIZED GRP COMPONENTS,

SEWAGE TREATMENT PLANT

COVERS

Delivery of air washers. 1993 € 150,000.00 Firma Chinacompany

to Mr. Hagemann

1996 Tel.: 0049 611 / 42020

1995 € 100,000.00 Hochtief GmbH

Mr. Rauch

Tel.: 0049 228 / 67548

1990 € 175,000.00 EWK-Zschocke Umwelttechnik

to Mr. Diehl

1995 Tel.: 0049 631 / 857 230

1994 € 65,000.00 Township Boostedt

Tel.: 0049 4393 / 9976 0

Delivery of caravan fairings. 1990 € 80,000.00 Knaus AG

to Mr. Nusser

1992 Tel.: 0049 8583 / 21 201

Delivery of chemical tanks. 1990 € 25,000.00 Apparatebau Biersdorf Walter

to Krämer GmbH

1992 Mr. Dr. Forkmann

Tel.: 0049 9002 / 7009 0

Knaus Wohnwagen / Germany

Apparatebau Krämer - Rain / Germany

Engineering, delivery and

assembly of GRP sewage

treatment covers.

EWK-Zschocke Umwelttechnik / Germany

Delivery and assembly of

cooling towers.

Boostedt / Germany

Engineering, delivery and

assembly of GRP sewage

treatment covers.

Chinacompany / Germany

Hochtief GmbH - Bonn / Germany