r. d. mckeown jefferson lab college of william and mary the jlab 12 gev upgrade 1 r. mckeown - iupap...

30
R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Upload: ira-ford

Post on 25-Dec-2015

215 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

R. D. McKeownJefferson Lab

College of William and Mary

The Jlab 12 GeV Upgrade

1R. McKeown - IUPAP - July 2, 2010

Page 2: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

12 GeV Science Program

• The physical origins of quark confinement (GlueX, meson and baryon spectroscopy)

• The spin and flavor structure of the proton and neutron (PDF’s, GPD’s, TMD’s…)

• The quark structure of nuclei

• Probe potential new physics through high precision tests of the Standard Model

• Defining the Science Program:

– Four Reviews: Program Advisory Committees (PAC) 30, 32, 34, 35

– 2006 through 2010

– Results: 32 experiments approved ; 13 conditionally approved

– PAC36 scheduled August 2010: continue rankings

Exciting slate of experiments for 4 Halls planned for initial five years of operation!

2R. McKeown - IUPAP - July 2, 2010

Page 3: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

12 GeV Upgrade Project

Upgrade is designed to build on existing facility: vast majority of accelerator and experimental equipment have continued use New Hall

Add arc

Enhanced capabilitiesin existing Halls

Add 5 cryomodules

Add 5 cryomodules

20 cryomodules

20 cryomodules

Scope of the project includes: •Doubling the accelerator beam energy•New experimental Hall and beamline•Upgrades to existing Experimental Halls

Maintain capability to deliver lower pass beam energies:

2.2, 4.4, 6.6….

Upgrade arc magnets and supplies

CHL upgrade

3R. McKeown - IUPAP - July 2, 2010

Page 4: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Hall D – exploring origin of confinement by studying exotic mesons

Hall B – understanding nucleon structure via generalized parton distributions

Hall C – precision determination of valence quark properties in nucleons and nuclei

Hall A – short range correlations, form factors, hyper-nuclear physics, future new experiments (e.g. PV and

Moller)

12 GeV Scientific Capabilities

4R. McKeown - IUPAP - July 2,2010

Page 5: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Hall A

GEMs

Super Bigbite project:

➙ large dipole magnet ➙ GEM trackers (~100,000

channels)➙ hadron and EM calorimeter➙ Trigger and DAQ

operating in open geometry at a luminosity of 1038 cm-2s-1

5R. McKeown - IUPAP - July 2, 2010

Page 6: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Hall A (Additional Equipment Required)

meters

met

ers

first toroid hybrid

toroid

PV Moller Scattering:• Precision test of SM• Custom Toroidal Spectrometer• 5kw LH Target

SOLID:• High Luminosity on LD2 and LH2 • Better than 1% errors for small bins• Large Q2 coverage• x-range 0.25-0.75• W2> 4 GeV2

6R. McKeown - IUPAP - July 2, 2010

Page 7: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Hall B

HTCC

CTOF

Silicon Tracker

PCAL

FTOF

Drift ChambersR1, R2, R3

CLAS12

Solenoid &Toroid

7R. McKeown - IUPAP - July 2, 2010

Page 8: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

CLAS12 International Collaboration

8R. McKeown - IUPAP - July 2, 2010

UK Edinburgh Univ Software

UK Glasgow Univ Central Detector, DAQ, Tagger….

France Grenoble Univ Central Detector

France Orsay – IN2P3 Central neutron Detector

France CEA Saclay Central Tracker, Reconstruction Software

Italy Bari Tbd, interest in RICH

Italy Catania Tbd

Italy Frascati & Fermi Ctr Central neutron Detector, interest in RICH

Italy Genoa Central neutron Detector, interest in Tagger

Italy ISS/Rome Tbd, interest in RICH

Italy Rome Tor Vergata Central neutron Detector, HD target

Russia ITEP Magnets, Simulations

Russia Moscow State HEP & SINP Silicon Tracker, Software

Korea Kyungpook Nat’l Univ CD TOF

Armenia Yerevan Physics Institute Calorimetry

COUNTRY INSTITUTION FOCUS

Page 9: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Hall C• New Super High Momentum Spectrometer (SHMS)

Horiz. Bender, 3 Quads + DipoleP →11 GeV/cdP/P 0.5 –1.0x10-3

Acceptance: 5msr, 30%5.5°< θ< 40°

• High Momentum Spectrometer (HMS)

P →7.5 GeV/cDP/P = 0.5 –1.0x10-3

Acceptance: 6.5msr, 18%10.5°< θ< 90°

• Minimum opening angle: 17°

9R. McKeown - IUPAP - July 2, 2010

Page 10: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Hall D

10R. McKeown - IUPAP - July 2, 2010

Page 11: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Quantum Numbers of Hybrid MesonsQuarks

Excited Flux Tube Hybrid Meson

S 0

L 0

J PC 0

J PC 1

1

J PC

1

1

, Klike

J PC 0 1 2

0 1 2

S 1

L 0

J PC 1

J PC 1

1

like ,

Exotic

Flux tube excitation (and parallel quark spins) lead to exotic JPC

11R. McKeown - IUPAP - July 2, 2010

Page 12: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Mass Predictions

Lowest mass expected to be p1(1−+) at 1.9±0.2 GeV

Lattice1-+ 1.9 GeV2+- 2.1 GeV0+- 2.3 GeV

12R. McKeown - IUPAP - July 2, 2010

Page 13: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Wpu(x,k

T,r ) Wigner distributions

d2kT

PDFs f1

u(x), .. h1u(x)

GPDs/IPDs

d2kT drzd3r

TMD PDFs f1

u(x,kT), .. h1u(x,kT)

3D imaging

6D Dist.

d2rT

Form FactorsGE(Q2), GM(Q2)

dx &Fourier Transformation

1D

Unified View of Nucleon Structure

13R. McKeown - IUPAP - July 2, 2010

Page 14: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

H1, ZEUS

JLab Upgrade

11 GeV

H1, ZEUS

JLab @ 12 G

eV11 G

eV27 G

eV

200

GeV

W =

2 GeV

Study of high xB domain requires high luminosity

0.7

HERMES

COMPASS

The 12 GeV Upgrade is well matched to studies in the valence quark regime.

Kinematics Coverage of the 12 GeV Upgrade

14R. McKeown - IUPAP - July 2, 2010

Page 15: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Extraction of GPD’s

t

hard vertices

A =Ds2s

s+-s-

s++s- =

Unpolarized beam, transverse target:

DsUT~ sinf{k(F2H – F1E)}dfE( ,x t)

DsLU~ sinf{F1H+ ξ(F1+F2)H+kF2E}df~

Polarized beam, unpolarized target:

H(x,t)

ξ=xB/(2-xB)

Unpolarized beam, longitudinal target:

DsUL~ sinf{F1H+ξ(F1+F2)(H+ξ/(1+ξ)E)}df~ H(x,t)

~

Cleanest process: Deeply Virtual Compton Scattering

15R. McKeown - IUPAP - July 2, 2010

Page 16: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Quark Angular Momentum

16R. McKeown - IUPAP - July 2, 2010

→ Access to quark orbital angularmomentum

Page 17: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

DVCS beam asymmetry at 12 GeV CLAS12

ep epg

High luminosity and large acceptance allows wide coverage in Q2 < 8 GeV2, xB< 0.65, andt< 1.5GeV2

Experimental DVCS program E12-06-119 was approved for the 12 GeV upgrade using polarized beam and polarized targets.

sinφ moment of ALU

17R. McKeown - IUPAP - July 2 ,2010

Page 18: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

DVCS at 12 GeV CLAS12

u quarks

18R. McKeown - IUPAP - July 2, 2010

Page 19: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

SIDIS Electroproduction of Pions

• Separate Sivers and Collins effects

• Sivers angle, effect in distribution function:– (fh-fs) = angle of hadron relative to initial quark spin

• Collins angle, effect in fragmentation function: – (fh+fs) = p+(fh-fs’) = angle of hadron relative to final quark spin

e-e’ planeq

Scattering Plane

target angle

hadron angle

19R. McKeown - IUPAP - July 2, 2010

Page 20: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

A Solenoid Spectrometer for SIDIS

SIDIS SSAs depend on 4 variables (x, Q2, z and PT ) Large angular coverage and precision measurement of asymmetries in 4-D phase space are essential.

20R. McKeown - IUPAP - July 2, 2010

Page 21: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Hall A Transversity Projected Data• Total 1400 bins in x, Q2, PT and z for 11/8.8 GeV beam.

• z ranges from 0.3 ~ 0.7, only one z and Q2 bin of 11/8.8 GeV is shown here. π+ projections are shown, similar to the π- .

21R. McKeown - IUPAP - July 2, 2010

Page 22: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

High x spin dependent DIS

REQUIRES:• High beam polarization• High electron current• High target polarization• Large solid angle

spectrometers22

R. McKeown - IUPAP - July 2, 2010

Page 23: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

GEn – Hall C @ 12 GeV

23R. McKeown - IUPAP - July 2, 2010

Page 24: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Future PV Program

24R. McKeown - IUPAP - July 2, 2010

Page 25: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

12 GeV Upgrade Schedule

• Two short parasitic installation periods in FY10• 6-month installation May-Oct 2011• 12-month installation May 2012-May 2013• Hall A commissioning start October 2013• Hall D commissioning start April 2014• Halls B and C commissioning start October 2014• Project Completion June 2015

25R. McKeown - IUPAP - July 2, 2010

Page 26: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

12 GeV Construction

26R. McKeown - IUPAP - July 2, 2010

Page 27: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Physics Equipment Construction

27R. McKeown - IUPAP - July 2, 2010

Page 28: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Physics Equipment Construction

28R. McKeown - IUPAP - July 2, 2010

Page 29: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

29R. McKeown - IUPAP - July 2, 2010

Walls - June 2010

Page 30: R. D. McKeown Jefferson Lab College of William and Mary The Jlab 12 GeV Upgrade 1 R. McKeown - IUPAP - July 2, 2010

Jlab 12 GeV UpgradeAn exciting scientific opportunity Explore the physical origins of quark confinement (GlueX) New access to the spin and flavor structure of the proton and neutron Reveal the quark/gluon structure of nuclei Probe potential new physics through high precision tests of the Standard Model

Strong User community involvement NSF MRI and NSERC funding to universities for detector elements Strong international collaborations 32 PAC-approved experiments

Accel-Civil-Physics scope leverages the existing facility

Construction is well underway ! Accelerator nearing completion on major procurements; hardware arriving Detector assembly ramping up Civil construction on track

New Proposals and collaborations are welcome

30R. McKeown - IUPAP - July 2, 2010