Page 1: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

R. Brown, EE&T, Inc.

D. Cornwell, EE&T, Inc.

M. Schmelling, DC Water

11

Page 2: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Funding

– WRF 4584 TC = DC Water & WRF

• Participating Utilities

– Four water systems

• PI

– David Cornwell

• WRF PM

– Jonathan Cuppett

• PAC

– A. Putz, M. Freidman, N. Charlton, M. Corson

22

Page 3: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement

• Can in-home, high velocity flushing eliminate or mitigate these impacts?

– Flush by opening all taps inside the house for several minutes to dislodge and remove particulate lead from premise plumbing and from the service line after replacement

• Can this same type of flushing help other high lead households (e.g., with or without LSLR)

33

Page 4: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Traditional “flushing” - displacement

– Performed to displace old stagnant water

– Not necessarily for particulate removal

• High velocity “flushing” - dislodgement

– Analogous to “unidirectional” flushing of dist. sys.

– Objective is to dislodge, and then remove particulate material from pipes, fittings, and other parts of plumbing

– In this case to remove all loose particulate material between household taps and water main

44

Page 5: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Dislodge particulate lead

– that may otherwise be subsequently released to customer

• Mobilize and remove

– Remove aerators and screen

– Run long enough duration and high enough rate to dislodge particles and move them to tap

– Water from tap goes to drain (i.e., lead is not in pipes any more)

55

Page 6: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Many unidirectional flushing programs used in the distribution system target 6 to 8 ft/s.

– We often find success is possible at velocities near

2.5 ft/s; however, it requires longer flush duration.

• Examples

– ¾-in pipe at 3.5 gpm (9.5 L/min)

• velocity of about 2.5 ft/s (0.78 m/s)

– 1-in pipe at 10 gpm (~38 L/min) - typical this study

• ~4 ft/s (1.2 m/s)

• 30 min duration for this study

66

Page 7: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Flush - use one of three types after PLSLR

Flush hose bibs - outside the house (SL only) – group “A”

Same as “A” but longer duration = group “B”

Whole-house flush (by customer) = group “C”

• Findings

Little improvement with 2 methods of flush for LSL only (outside the house)

Improvement by 1st mo after whole-house flush (customer)

7

Page 8: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

88

Page 9: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

99

0.0-0.5 L4.3-4.8 L

8.6-9.1 L0.0010

0.0100

0.1000

A01 A02 A03 A04 B01 B02 C01 C02 C03 C04

Pb

Co

ncen

tra

tio

n (

mg

/L) 0.0-0.5 L

4.3-4.8 L

8.6-9.1 L

Page 10: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

1010

0.0-0.5 L4.3-4.8 L

8.6-9.1 L0.001

0.01

0.1

A01 A02 A03 A04 B01 B02 C01 C02 C03 C04

Pb

Co

ncen

trati

on

(m

g/L

)

0.0-0.5 L

4.3-4.8 L

8.6-9.1 L

Page 11: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

1111

0.0-0.5 L4.3-4.8 L

8.6-9.1 L0.001

0.01

0.1

A01 A02 A03 A04 B01 B02 C01 C02 C03 C04

Pb

Co

ncen

trati

on

(m

g/L

)

0.0-0.5 L

4.3-4.8 L

8.6-9.1 L

Page 12: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• One-time Flush 30 min, at least one tap per floor, aerator off, highest rate (esp. bathtubs)

• Collect 12 or more consecutive 1L samples

– Aerator off

– After 6 hr stagnation

– “normal” flow rate (see next slide)

• Analyze total & dissolved Pb, Mn, and Cu

– Some utilities analyzed other metals too (e.g., Fe)

• Sequence

– Most locations = Sample, flush, collect 1 day later, then monthly intervals thereafter

– Eight locations = sample, PLSLR, flush, collect 1 day later, monthly intervals thereafter

1212

This presentation will focus on total Pb

Page 13: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Rates at all locations were consistent with normal water use

– Worked out to be about 25s to fill a 1L bottle, or 2.4 L/min

• Locations at PWS 2 followed the normal velocity samples with “high rate” samples

– These were about 4 to 6s per L, or 15 to 10 L/min

1313

Page 14: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

1414

Table 2.1

Participating utilities

PWS 2 PWS 6 PWS 4 PWS 3

Lead control strategy

pH and alkalinity adjustment yes

Pb(IV) yes

Orthophosphate yes yes yes

Residual disinfectant

Free Chlorine yes yes

Chloramines yes yes

Water chemistry

Entry point pH 7.2 8.5 7.2 7.6

Alkalinity (mg/L as CaCO3) 66 75 13 100

Free chlorine residual (mg/L as Cl2) >1 0.6

Combined residual (mg/L as Cl2) 2.7 1.7

PO4 residual (mg/L as P) 0.8 0.7 0.6

Sample collection

Sample collection by B A A B

A = customers in their own homes (mostly were staff homes or homes of relatives)

B = trained PWS staff at customer homes

Page 15: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

15

Page 16: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Impact of flush w/ vs w/o aerator removed

16

Page 17: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

0

10

20

30

40

50

60

1 2 3 4 5 6 7 8 9 10 11 12

To

tal L

ea

d (

µg

/L)

Profile Volume (L)

Location XM - PLSLR and household flush w/ aerator on 07/08/2015, 2nd whole house flush aerator off 07/13/2015

pre-LSLR (06/23) post-LSLR & flush w/ aerator on (07/09)

post-flush w/ aerator off (07/14) later post-flush (07/30)

below DL

one 07/09/2015 value not shown7th L, 199 µg/L

17

Page 18: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• normal flow = no improvement high rate = improvement

18

Page 19: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

0.1

1

10

100

10001 2 3 4 5 6 7 8 9

10

11

12

13

14

15

16

17

18

19

20

H1

H2

H3

H4

H5

H6

H7

H8

H9

H10

H11

H12

H13

H14

H15

H16

H17

H18

H19

H20

To

tal L

ea

d (

µg

/L)

Profile Volume (L)

Location MT (Flush and PLSR 04/2015)

initial 1 day 1 mo 2 mo 3 mo 4 mo

Household plumbing: no leadSL: 4.0 - 13.6 L (before PLSLR)

4.0 - 16.7 L (after PLSLR)LSL: 4.0 - 13.6 L (before PLSLR)

4.0 - 10.5 L (after PLSLR)

19

Normal sampling velocity High sampling velocity

Page 20: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• improvement between 1st and 2nd month

– Especially in first 11 L (inside house till end of SL)

20

Page 21: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

0.1

1

10

100

10001 2 3 4 5 6 7 8 9

10

11

12

13

14

15

16

17

18

19

20

H1

H2

H3

H4

H5

H6

H7

H8

H9

H1

0

H1

1

H1

2

H1

3

H1

4

H1

5

H1

6

H1

7

H1

8

H1

9

H2

0

To

tal L

ea

d (

µg

/L)

Profile Volume (L)

Location TN (Flush and PLSR 05/2015)

initial 1 day 1 mo 2 mo 3 mo 4 mo

Household plumbing: unknown materialSL: 5 - 9.9 L (before PLSLR)

5 - 11 L (after PLSLR)LSL: 5 - 9.9 L (before PLSLR)

5 - 6.5 L (after PLSLR)

21

Page 22: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

22

Page 23: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Little improvement in “normal” velocity samples, much greater improvement in high velocity samples

– Household through SL

23

Page 24: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

0

5

10

15

20

25

30

35

40

45

50

1 2 3 4 5 6 7 8 9 10 11 12 H1 H2 H3 H4 H5 H6 H7 H8 H9 H10 H11 H12

To

tal L

ea

d (

µg

/L)

Profile Volume (L)

Location HX (Flush no PLSR 10/2014)

initial 1 mo 2 mo

Household plumbing: no leadSL: 2.7 - 8.3 L All SL is unknown material

24

Page 25: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

0

5

10

15

20

25

30

35

40

45

50

To

tal L

ea

d (

µg

/L)

Profile Volume (L)

Location TH (Flush no PLSR 02/2015)

initial 1 mo 2 mo

Household plumbing: some leadSL: 4.3 - 8.8 LLSL: 4.3 - 8.8 L

25

Page 26: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• improvement in 1st mo return to pre-flush by 2nd mo.

26

Page 27: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

0

5

10

15

20

25

30

1 2 3 4 5 6 7 8 9 10 11 12 H1 H2 H3 H4 H5 H6 H7 H8 H9 H10 H11 H12

To

tal L

ea

d (µ

g/L

)

Profile Volume (L)

Location KQ (Flush no PLSR 08/2014)

initial 1 mo 2 mo

Household plumbing: some leadSL: 4.1 - 9.0 L

4.1 - 7.35 L is unknown materialLSL: none

27

Page 28: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Lead levels increase after flushing

– but no samples after 2nd month

28

Page 29: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

0

5

10

15

20

25

30

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20

To

tal L

ea

d (µ

g/L

)

Profile Volume (L)

Location KS (Flush no PLSR 05/2014)

initial 1 mo 2 mo service line LSL

Household plumbing: no lead

29

Page 30: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Slightly worse during first 2 mo, improvement thereafter

– Improvement continues up to 16 mo after single flush event

30

Page 31: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

0

5

10

15

20

0 1 2 3 4 5 6 7 8 9 10 11 12

To

tal L

ea

d (µ

g/L

)

Profile Volume (L)

Location HA (Flush 07/2014)

initial 1 day 1 mo 2 mo 3 mo 4 mo 7th mo 16th mo service line LSL

31

Page 32: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• Lead levels decrease after flushing

– Lower levels maintained up to at least 10 mo

– Some higher Pb on 1st day

32

Page 33: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

0

10

20

30

40

50

60

70

80

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21

To

tal L

ea

d (

µg

/L)

Profile Volume (L)

Location AW (Flush July 27, 2014)

initial 1 day 1 mo 2 mo 10 mo service line LSL

3333

Page 34: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

34

Page 35: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

3535

• Peak Total Lead

• Difference relative to pre-flush

–Positive = increase

–Negative = decrease

Page 36: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

-40

-20

0

20

40

60

80

HM MT TN TT XM XF XO XA HX KQ KS KX OG QJ TH AW QA AE AK HA HJ

Diffe

ren

ce

in

Pe

ak L

ea

d V

ers

us P

re-f

lush

g/L

)

Location

Difference after in-home flush = 1 day ("+" means pre-flush higher, "-" means post-flush higher)

flush - no PLSLR

+228 µg/L

-191 µg/L

PLSLR w/ flush

Page 37: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

-40

-20

0

20

40

60

80

HM MT TN TT XM XF XO XA HX KQ KS KX OG QJ TH AW QA AE AK HA HJ

Diffe

ren

ce

in

Pe

ak L

ea

d V

ers

us P

re-f

lush

g/L

)

Location

Difference after in-home flush = 1 month("+" means pre-flush higher, "-" means post-flush higher)

+170 µg/L

-277 µg/L

flush - no PLSLRPLSLR w/ flush

Page 38: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

-40

-20

0

20

40

60

80

HM MT TN TT XM XF XO XA HX KQ KS KX OG QJ TH AW QA AE AK HA HJ

Diffe

ren

ce

in

Pe

ak L

ea

d V

ers

us P

re-f

lush

g/L

)

Location

Difference after in-home flush = 2 months("+" means pre-flush higher, "-" means post-flush higher)

+1,964 µg/L

-320 µg/L

- 41 µg/L

flush - no PLSLRPLSLR w/ flush

Page 39: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

-40

-20

0

20

40

60

80

HM MT TN TT XM XF XO XA HX KQ KS KX OG QJ TH AW QA AE AK HA HJ

Diffe

ren

ce

in

Pe

ak L

ea

d V

ers

us P

re-f

lush

g/L

)

Location

Difference after in-home flush = 3 months("+" means pre-flush higher, "-" means post-flush higher)

-316 µg/L

- 61 µg/L

flush - no PLSLRPLSLR w/ flush

Page 40: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

-40

-20

0

20

40

60

80

HM MT TN TT XM XF XO XA HX KQ KS KX OG QJ TH AW QA AE AK HA HJ

Diffe

ren

ce

in

Pe

ak L

ea

d V

ers

us P

re-f

lush

g/L

)

Location

Difference after in-home flush = 4 months("+" means pre-flush higher, "-" means post-flush higher)

-320 µg/L

- 68 µg/L

flush - no PLSLRPLSLR w/ flush

Page 41: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

-40

-20

0

20

40

60

80

HM MT TN TT XM XF XO XA HX KQ KS KX OG QJ TH AW QA AE AK HA HJ

Diffe

ren

ce

in

Pe

ak L

ea

d V

ers

us P

re-f

lush

g/L

)

Location

Difference after in-home flush = >6 months ("+" means pre-flush higher, "-" means post-flush higher)

flush - no PLSLRPLSLR w/ flush

Page 42: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

42

Page 43: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

4343

• Add total lead in all 12 samples for 1st L + 2nd L + 3rd L + etc. (normal rate)

Each date

Each location

<DL = 0

• With and without PLSLR

Page 44: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

0.1

1

10

100

1000

10000

0.1 1 10 100 1000 10000

Po

st-

Flu

sh

Cu

mu

lati

ve T

ota

l L

ead

g)

Pre-Flush Cumulative Total Lead (µg)

PLSLR, then flush

1 day 1 mo 2 mo 3 mo 4 mo

Page 45: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

0.1

1

10

100

1000

10000

0.1 1 10 100 1000 10000

Po

st-

Flu

sh

Cu

mu

lati

ve T

ota

l L

ead

g)

Pre-Flush Cumulative Total Lead (µg)

Flush, no PLSLR

1 day 1 mo 2 mo 3 mo 4 mo 6 mo or more

Page 46: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

• High velocity flushing after PLSLR

– PLSLR already known to disturb lead for a few months• PWS provides instructions for water use in the 1st few months after PLSLR

– Flushing appears to make it better during this period (i.e., ~2 mo instead of longer w/o flushing)

– Some data shows immediate improvement after whole house flush but other times it takes longer (~2 months)

• High velocity flushing without PLSLR

– increased disturbance may cause higher lead in 1st couple of months

– Lead levels come down in subsequent months

• Both

– Data suggest higher velocity, longer flush, and/or repeat flush events may be needed

4646

Page 47: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

4747

• Lead scale analysis

• Lead isotopes (source/fate tracking)

Page 48: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

48

• EE&T Further Pioneering Analysis:

– XRD-crystalline Structures

– XRF and Raman-amorphous structures

– SEM/EDS-elemental analysis

– Pb Isotope Analysis for source and fate tracking

Page 49: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •
Page 50: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

37

Shows Turbicule Cross-section

Page 51: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

5151

Page 52: R. Brown, EE&T, Inc. D. Cornwell, EE&T, Inc. M. …...• Disturbances during LSLR have been shown to increase particulate and total lead in weeks/months following replacement •

Richard Brown

[email protected]

712 Gum Rock CourtNewport News, Virginia 23606(757) 873-1534 (757) 873-2392 – Faxwww.eetinc.com

52