[R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008). The Large Hadron Collider Contents: 1. The machine II. The beam III. The interaction regions IV. First LHC beam. III. First LHC beam. Contents: Injection test 1 Injection test II Injection test III - PowerPoint PPT PresentationTRANSCRIPT
![Page 1: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/1.jpg)
The Large Hadron ColliderContents:
1. The machineII. The beam
III. The interaction regionsIV. First LHC beam
[R. Alemany][CERN AB/OP]
[Engineer In Charge of LHC]Lectures at NIKHEF (12.12.2008)
![Page 2: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/2.jpg)
III. First LHC beamContents:I. Injection test 1II. Injection test IIIII.Injection test IIIIV.10th September
![Page 3: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/3.jpg)
IV.1. Injection Test 1
8 to 10.08.2008
![Page 4: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/4.jpg)
IV.I. Injection Test 1 Achieved
Synchronization SPS – LHC Beam 1 injected IP2 Through to collimators in IP3 first shot Trajectory correction Kick-response measurements Off-energy measurements (dispersion) Explored the aperture First beam induced quench
Discovered Aperture restriction in the injection line
Traced to misaligned vacuum pump Optics problem IP3
Polarity convention QTL
![Page 5: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/5.jpg)
IV.II. Injection Test 2
22-24.08.2008
![Page 6: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/6.jpg)
IV.II. Injection Test 2 Achieved
Beam 2 injected IP8 Through to collimators in IP7 first shot Trajectory correction Kick-response measurements Off-energy measurements (dispersion) Explored the aperture Beam 1 injected IP2 Through to collimators in IP3 Aperture in injection region OK Polarity correction confirmed Interleaved injection
Discovered Optics problem at the end of the TI8 line
![Page 7: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/7.jpg)
I.I. Basic layout of the machine: quadrupole corrector magnets
LHC TDR
Fo
Do
MSCB
MCBM (dipole):Nominal main field strength = 2.93 TInominal = 55 A, 1.9 K, L=78.5 cm, ~143 kg
MSM (sextupole):Nominal main field strength = 4430 T/m2
Inominal = 550 A, 1.9 K, L=45.5 cm, ~83 kg
ChromaticityOrbit
Explore a range of particle angles (=kick strength) with one corrector dipole, then go to the next one
![Page 8: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/8.jpg)
IV.II. Injection Test 2Beam 1 injected IP2Through to collimators in IP3Aperture in injection region OKPolarity correction confirmedInterleaved injection
DiscoveredOptics problem at the end of the
TI8 line
![Page 9: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/9.jpg)
IV.III. Injection Test 3
5 – 7.09.2008
![Page 10: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/10.jpg)
IV.III. Injection Test 3 Achieved
Beam 2 injected IP8 Threaded to dump in IP6 Steered then inject and dump Beam 1 injected IP2 Threaded through to coll in IP5
Discovered Optics problem in IP7
Polarity convention on Q6 Optics problem in IP4
Polarity convention
![Page 11: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/11.jpg)
IV.IV. 10th of September
10.09.2008
![Page 12: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/12.jpg)
IV.IV. 10th of SeptemberAchieved
Beam 1 injected IP2Threaded around the machine in 1hTrajectory steering gave 2 or 3 turns
Beam 2 injected IP8Threaded around the machine in 1h30Trajectory steering gave 2 or 3 turnsQ and Q’ trims gave a few hundred turns
![Page 13: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/13.jpg)
IV.IV. 10th of SeptemberBeam 1 – First turn
trajectory
Each point is a BPM (Beam Position Measurement)
49 mm apertureARC BPMs
Betatron oscillation
![Page 14: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/14.jpg)
IV.IV. 10th of September Beam 1 on TDI screen – 1st and 2nd
turns
ALIC
E
![Page 15: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/15.jpg)
IV.IV. 10th of September Beam 2 – First turn
trajectory
Horizontal position (mm)
Vertical position (mm)
![Page 16: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/16.jpg)
IV.IV. 10th of September Beam 2 – first turn dispersion
measurement
ppsDx x
)(
RF
![Page 17: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/17.jpg)
IV.IV. 10th of September Beam 2: Longitudinal Bunch Profile
~ 200 turns
![Page 18: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/18.jpg)
IV.IV. 10th of September Beam 2 closed orbit
![Page 19: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/19.jpg)
IV.IV. 10th of September Beam 2 beta measurement
QF
QD
![Page 20: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/20.jpg)
IV.IV. 10th of September Beam 2 beta measurement
Reminder from BH lectures
![Page 21: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/21.jpg)
IV.IV. 10th of September Beam 2 integer tunes
Qx = 64
Qy = 59
![Page 22: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/22.jpg)
IV.IV. 10th of September Beam 2 tunes
Qx = .279Qy = .310
BPM pos FFT tune
![Page 23: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/23.jpg)
IV.IV. 10th of September Beam 2 fast BCT (Beam Current Transformer)
FBCT
Inte
nsity
~ 3 109
![Page 24: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/24.jpg)
IV.IV. 10th of September Beam dilution on dump block
~ 8 m
concrete shielding
Beam Dump Block (graphite)
![Page 25: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/25.jpg)
IV.IV. 10th of September Beam 2 captured – mountain range
display
Now RF ON
Bunch length
Turn
num
ber
![Page 26: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/26.jpg)
IV.IV. 10th of September Fast start 10, 11 and 12
All done in 3 days Made possible by
Meticulous preparation Magnetic model data Sophisticated settings generation Dry runs Injection tests
Powerful control system (LSA) Powerful instrumentation working very quickly Logging a multitude of parameters
Allowed early look at several machine parameters systematic check of orbit system
![Page 27: [R. Alemany] [CERN AB/OP] [Engineer In Charge of LHC ] Lectures at NIKHEF (12.12.2008)](https://reader036.vdocuments.us/reader036/viewer/2022081604/568156ce550346895dc46630/html5/thumbnails/27.jpg)
IV.IV. 10th of September