quota arrangement in production _ scn

Upload: venkat-chakri

Post on 17-Oct-2015

101 views

Category:

Documents


7 download

DESCRIPTION

How to maintain Quota arrangement

TRANSCRIPT

  • Getting Started Newsletters Store

    Products Services & Support About SCN Downloads

    Industries Training & Education Partnership Developer Center

    Lines of Business University Alliances Events & Webinars Innovation

    1 pointsWelcome, Venkateswarlu. V Search the Community

    Activity Communications

    5

    Actions

    Brow se Create

    Your

    0 Tweet

    created by Ramagiri Srinivas Rao on Feb 11, 2014 8:45 PM, last modif ied by Ramagiri Srinivas Rao on Mar 21, 2014 7:01 PM

    In addition to the Blog posted by Mr. Anupam Sharma Production version-Alternate BOM selection-Quota

    arrangement and Mr Rajen http://scn.sap.com/community/erp/manufacturing-pp/blog/2013/08/15/alternative-bom-

    selection-a-workaround like to share some more inputs on Quota Functionality in Production.

    Quota Arrangement:

    If a material can be obtained from various sources of supply, each individual source of supply can be

    allocated a quota arrangement. The quota arrangement is valid for a certain period of time and specifies

    exactly how the receipts are to be distributed amongst each source of supply.

    We can set quota arrangement for in-house production as well as for external procurement.

    Scenario 1:

    Demand of Finished Product for calender year is 1100 qty. Out of this 60% to be procured and 40 % to be in-house

    manufactured. Accordingly the requirement of BOM components of finished product to be procured.

    Test data:

    Quota Material(FERT) - M-800, BOM Component (ROH1) -T-T029, BOM Component (ROH2) -100-210

    Process Steps:

    1. Create Material Master and Maintain Quota settings (Tcode : MM01/MM02)

    2. Maintain Purchase Info Record ( Tcode: ME11)

    3. Maintain Quota percentage for the calendar year (Tcode : MEQ1)

    4. Maintain Planned independent requirements(PIR) (Tcode: MD61)

    5. Run MRP( Tcode : MD02)

    6. Stock Requirements list (MD04)

    Process Steps with screen shots:

    Create Material Master and Maintain Quota settings (Tcode : MM01/MM02):

    For FERT material for which Quota needs to be planned. Below are the material master settings:

    Lot Size - ES ( Lot for lot order quantity with splitting. (This setting is mandatory for triggering the procurement and in-

    house production)

    Procurement Type -X

    Quota arr usage - 4

    Purchasing view to be selected

    Functionality of Quota Arrangement inProduction

    Share

    Version 5

  • Lot Size ES -Config:

  • Maintain Info Record for the material (Tcode : MEQ1)

    Info record as given below maintained for the FERT material M-800.

  • Maintain Quota percentage for the calendar year (Tcode : MEQ1)

    Quota maintained for the FERT material M-800 as given below:

    Procurement - 60%

    In-house - 40%

    Maintain Planned independent requirements(PIR) (Tcode: MD61)

    PIR maintained for the FERT material M-800 for 1100 qty.

  • Run MRP( Tcode : MD02)

    MRP executed for FERT M-800 through MD02 tcode.

    Stock Requirements list (MD04)

    As per quota settings system should calculate as given below:

    Procurement Qty - 1100 * 60/100 = 660

    In house Qty - 1100 * 40/100 = 440.

  • If we click on the Quota arrangement button it will display the allocated quota as given below:

    As 60 % is procured and 40% only is manufactured, requirement of raw material to be planned for only 40% of in-

    house manufacturing.

    Requirement of Raw Material T-T029 is as follows:

    FERT In-house PIR Qty (440) * BOM Ratio (2) = 880 Qty. So PR triggered for 880 Qty as given below:

    Requirement of Raw Material 100-210 is as follows:

    FERT In-house PIR Qty (440) * BOM Ratio (2) = 880 Qty. Stock available is 500. Net requirement = 880 -500 = 380.

  • So PR triggered for 880 Qty as given below:

    Conclusion:

    By defining Quota % , accordingly system will calculate the procurement proposals and in-house production qty.

    Subsequently system will plan the lower level raw materials qty only for in-house qty requirement.

    Scenario 2:

    Demand of Finished Product for calender year is 1100 qty. Out of this 60% to be procured and 40 % to be in-house

    manufactured. Also Quota is defined for one of the raw material which is BOM item of the FERT quota material.

    Raw material Quota is maintained as 70 % for Vendor 1 and 30% for Vendor 2.

    Process Steps:

    1. Create Material Master and Maintain Quota settings (Tcode : MM01/MM02)

    2. Create Info Record for the Raw Material (ME11)

    3. Maintain Quota percentage for the calendar year (Tcode : MEQ1) for FERT and ROH material.

    4. Maintain Planned independent requirements(PIR) (Tcode: MD61) for FERT

    5. Run MRP( Tcode : MD02)

    6. Stock Requirements list (MD04)

    Process Steps with screen shots:

    Create Material Master and Maintain Quota settings (Tcode : MM01/MM02): ( For Raw Material T-T029)

    Lot Size -EX

    Quota arrg usage - 3

  • Lot Size EX Config:

    Maintain Quota percentage for the calendar year (Tcode : MEQ1)

    Quota % maintained for the raw material as 70% for Vendor 130 and 30% for Vendor 137.

  • Average User Rating

    (10 ratings)

    My Rating:

    Tweet0

    PIR maintained in MD61 for FERT material as per scenario 1 and MRP executed in MD02

    Stock Requirements list (MD04)

    As 60 % is procured and 40% only is manufactured, requirement of raw material to be planned for only 40% of in-

    house manufacturing

    Also Raw material T-T029 quota maintained as 70% for Vendor 130 and 30 % for Vendor 137

    Requirement of Raw Material T-T029 is as follows:

    PR for Vendor 130 = FERT In-house PIR Qty (440) * BOM Ratio (2) = 880 Qty * 70 % = 616 Qty system generated PR

    for vendor 130

    PR for Vendor 137 = FERT In-house PIR Qty (440) * BOM Ratio (2) = 880 Qty * 30 % = 264 Qty system generated PR

    for vendor 137

    Accordingly Quota is allocated as given below:

    Conclusion:

    Purchase Requisition triggered for various source of supply based on Quota defined for the material. Generated

    PR qty consists of quota % maintained at raw material level for the in-house demand.

    Also, read the SAP Note 1508647 - MRP does not consider the quota arrangement and 1947519 - Rounding with

    the split quota always allocates the rest to the first vendor

    649 View s

    Products: sap_erp_logistics_materials_management, sap_erp_manufacturing_production_planning Tags: pp,

    quotaarrangement, production_planning, material_planning, quota_arrangement, quota_

    Share

  • 36 Comments

    Like

    (1)

    Srini Ravindra Kumar Feb 26, 2014 5:13 PM

    Ramagiri, Know that you work with DIMP/IS-systems. Is the ES lot size a standard one provided withthe IS features/options with Splitting quota indicator ON by default? Think you are referring to thesame indicator as the mandatory setting here again. In the 2nd part you are using EX for your raw material and you definitely have manually checked ONthe indicator yourself. Better to highlight the same information with a small screen shot of theindicator as past SCN queries are like quota arrangement is not working etc etc.,

    Like

    (0)

    Ramagiri Srinivas Rao Feb 27, 2014 12:12 PM (in response to Srini Ravindra Kumar)

    Hi Srini, Thanks for your analysis. Yes you are right. Splitting quota indicator is set ON in both ES and EX lot size. This process was mapped for one of the client where i created new lot size 'ZS' which iscopy of EX with splitting quota indicator ON. Currently i created this scenerio in IDESPractice where ES is default available with splitting quota indicator ON, hence used thesame. In 2nd part i used standard EX lot size for raw material. For using quota only in procurementwe need to use EX only. I will add lot size screens. Thanks & Regards,Ramagiri

    Like

    (1)

    Caetano Almeida Feb 26, 2014 5:28 PM

    HelloNice document, very detailed.Could please add a link to the following note? 1508647 MRP does not consider the quota arrangement BR Caetano

    Like

    (1)

    Srini Ravindra Kumar Feb 27, 2014 5:11 PM (in response to Caetano Almeida)

    Caetano Almeida, I do not agree to the KBA screenshot showing EX lot size with'Splitting quota' indicator checked ON.For MRP the priority is1. Quota file/meq1 data ..if not2. Source list..if not then3.Outline agreements and Inforecord (Contracts/ SA's/Inforecords in that order) and so onwith other steps as applicable. If we set the split quota indicator in EX,(and assuming all materials in the company are withEX) even if a material is not quota managed system tries to see MEQ1 data and then goesto next priority which is non-value adding.Chances of performance related issues can also be put forward in instances like ElectronicOEM scenarios. That is probably the reason why SAP has left the indicator not checked ONby default. It is always better to have a customised lot size for Quota managed items exclusively (withthe splitting quota indicator ON) and that should be the message in a KBA.Just a suggestion.---------------------------------------Version2: After the N/R calculation, system does lot size calculation. So system should startthat for the lotsize EX, as the splitting quota is set, check quota arrangement usage field aseither 3 or 4 and if not set ignore quota arrangement and go to next option namely sourcelist. Either way there seems to be a delay because of the splitting quota indicator.

    Ramagiri Srinivas Rao Feb 26, 2014 9:19 PM (in response to Caetano Almeida)

    Hi Caetano,

  • Like

    (0)

    Thanks. I will include the note. Thanks & Regards,Ramagiri

    Like

    (0)

    Ramagiri Srinivas Rao Feb 27, 2014 12:13 PM (in response to Ramagiri Srinivas Rao)

    Hi Srini /Caetano, Included lot size screens and note included. Thanks for your analysis and suggestions. Thank & Regards,Ramagiri

    Like

    (0)

    Srini Ravindra Kumar Feb 27, 2014 5:02 PM

    Thanks a lot for all the clarifications Ramagiri.At a later date you can plan for coming out with a document on advanced options/functionalitiesavailable in quota arrangement like Max Rel qty and basically all the data that we find towards theright in the quota/MEQ1 file.

    Like

    (0)

    Ramagiri Srinivas Rao Feb 27, 2014 5:25 PM (in response to Srini Ravindra Kumar)

    Sure Srini.

    Like

    (1)

    Prabhu Sundararaman Mar 1, 2014 5:46 PM

    Hello Ramgiri,Excellent document. Scenarios are well explained & your screenshots are illustrative.You could probably add a quota scenario where one of the materials is procured from externalsubcontract vendor and has a BOM. RegardsPrabhu

    Like

    (0)

    Ramagiri Srinivas Rao Mar 3, 2014 8:59 AM (in response to Prabhu Sundararaman)

    Hi Prabhu, Thanks for your comments. Will surely add at the earliest. Thanks & Regards,Ramagiri

    Like

    (1)

    Rijil Raj Mar 4, 2014 10:26 PM

    Thanks Ramagiri. Nice document.

    Like

    (0)

    Ramagiri Srinivas Rao Mar 5, 2014 7:48 AM (in response to Rijil Raj)

    Thanks Raj for your comments.

    SANKET DESHMUKH Mar 5, 2014 9:49 AM

    Hi Ramgiri,Scenarios are well explained & your screenshots are illustrative.informative document.keep posting with different topics.

  • Like

    (1)

    Like

    (0)

    Ramagiri Srinivas Rao Mar 5, 2014 9:59 AM (in response to SANKET DESHMUKH)

    Thanks Sanket for your comments. Will work towards posting on different topics.

    Like

    (1)

    GYAN R Mar 5, 2014 9:58 AM

    Nice Document Ramagiri Srinivas Rao.Thanks for sharing this document. It is very useful one.

    Like

    (0)

    Ramagiri Srinivas Rao Mar 5, 2014 10:05 AM (in response to GYAN R)

    Thanks Gyan.

    Like

    (1)

    Naresh Patil Mar 5, 2014 10:01 AM

    Hi, Good and well explained with screen snaps. Thanks for sharing. Regards,Narresh

    Like

    (0)

    Ramagiri Srinivas Rao Mar 5, 2014 10:06 AM (in response to Naresh Patil)

    Thanks Naresh for your comments.

    Like

    (1)

    Muhammad Umar Mar 5, 2014 10:07 AM

    Nice document.

    Like

    (0)

    Ramagiri Srinivas Rao Mar 5, 2014 11:59 AM (in response to Muhammad Umar)

    Thanks Umar for your comments

    Like

    (1)

    Bala B Mar 7, 2014 4:18 AM

    Nice document for basic understanding.. Bala.

    Like

    (0)

    Ramagiri Srinivas Rao Mar 7, 2014 5:40 AM (in response to Bala B)

    Thanks Bala for your comments.

    Like

    (1)

    Arun Kumar Mar 7, 2014 2:58 PM

    Wow,, this is just the way i wanted.. thanks a lot keep up the good work!!

  • Like

    (1)

    Ramagiri Srinivas Rao Mar 7, 2014 4:06 PM (in response to Arun Kumar)

    Thanks Arun for your feedback.Glad to know that this document helped you to resolve yourissue. Ramagiri

    Like

    (1)

    Santosh Sharma Mar 7, 2014 3:54 PM

    Hi Ramagiri, Very nice documents

    Like

    (0)

    Ramagiri Srinivas Rao Mar 7, 2014 4:06 PM (in response to Santosh Sharma)

    Thanks Sharma for your feedback. Ramagiri

    Like

    (1)

    Ibrahim Syed Mar 8, 2014 6:20 PM

    Hi Ramagiri, Very well explained document,Thanks for sharing, Kind Regards, Ibrahim

    Like

    (0)

    Ramagiri Srinivas Rao Mar 8, 2014 6:29 PM (in response to Ibrahim Syed)

    Thanks Ibrahim for your feedback.

    Like

    (1)

    Ray Zhou Mar 10, 2014 10:29 AM

    Hi Ramagiri,

    cool. Very detailed documentation. Like that.

    Cheers.Ray

    Like

    (0)

    Ramagiri Srinivas Rao Mar 15, 2014 8:40 AM (in response to Ray Zhou)

    Thanks Ray for your feedback.

    Like

    (1)

    Shripad Renapurkar Mar 24, 2014 10:29 AM

    Hi ramagiri,nice and detailed document.

    Like

    (0)

    Ramagiri Srinivas Rao Mar 24, 2014 11:42 AM (in response to Shripad Renapurkar)

    Hi Shripad, Thanks for your feedback. Ramagiri

  • Like

    (1)

    Prashant Deshpande Mar 24, 2014 11:45 AM

    Hello, Excellent Document sir. I would like to know, what is BOM ratio?How did you calculate it? Thanks Prashant

    Like

    (0)

    Ramagiri Srinivas Rao Mar 24, 2014 12:36 PM (in response to Prashant Deshpande)

    Hi Prashant, Thanks for your feedback. As 60 % is procured and 40% only is manufactured, requirement of raw material to beplanned for only 40% of in-house manufacturing.

    Requirement of Raw Material T-T029 is as follows:

    FERT In-house PIR Qty (440) * BOM Ratio (2 number) = 880 Qty. So PR triggered for 880Qty as given below:

    Requirement of Raw Material 100-210 is as follows:

    FERT In-house PIR Qty (440) * BOM Ratio (2 number) = 880 Qty. Stock available is 500. Netrequirement = 880 -500 = 380. So PR triggered for 380 Qty as given below:

    Thanks & Regards,Ramagiri

    Like

    (0)

    Prashant Deshpande Mar 26, 2014 10:20 AM

    Hi ramagiri, Thanks for quick reply. BOM ratio means the quantity of RAW material in BOM ofFinished product....Right??? Thanks Prahsant

    Ramagiri Srinivas Rao Mar 26, 2014 11:13 AM (in response to Prashant Deshpande)

    Yes Prashant. Your understanding is right.

  • Follow SCNSite Index Contact Us SAP Help Portal

    Privacy Terms of Use Legal Disclosure Copyright

    Like

    (1)