QCPCI Reference: AN /2120741 Commission of Inquiry QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF INQUIRY Name of Witness Marcus SALOUK Date of Birth 2 April1967 Address and contact details Occupation Director Officer taking statement Amanda Hickey Date taken 5 March2013 I, MARCUS SALOUK of state as follows: Background 1 I am the owner and director of Scancorp which comprises two companies, Scan and Scan Capital. Scan Capital is a corporate advisory business and Scan is a business brokerage. I have been in my cunent role since September 2010. 2 Prior to my work with Scancorp, I perfmmed some contracting to IDA Intemational in Singapore for about nine months through to the end of 2010. 3 I was employed by Accenture between September 1994 and September 2009 for a period of 15 years. Employment at Accenture 4 When I commenced work at Accenture m 1994, I joined the Brisbane office, which was Andersen Consulting at the time. I statted work at Andersen Consulting at the level of Manager. I was atl experienced hire. 5 I was initially employed as a management consultant so I was focussed on business process engineering, then I worked as a project manager and program director. Witness signature:

Upload: others

Post on 16-Oct-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN /2120741

Commission of Inquiry

QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF INQUIRY

Name of Witness Marcus SALOUK

Date of Birth 2 April1967

Address and contact details

Occupation Director

Officer taking statement Amanda Hickey

Date taken 5 March2013

I, MARCUS SALOUK of state as follows:

Background

1 I am the owner and director of Scancorp which comprises two companies, Scan and Scan

Capital. Scan Capital is a corporate advisory business and Scan is a business brokerage. I have

been in my cunent role since September 2010.

2 Prior to my work with Scancorp, I perfmmed some contracting to IDA Intemational in

Singapore for about nine months through to the end of 2010.

3 I was employed by Accenture between September 1994 and September 2009 for a period of 15

years.

Employment at Accenture

4 When I commenced work at Accenture m 1994, I joined the Brisbane office, which was

Andersen Consulting at the time. I statted work at Andersen Consulting at the level of

Manager. I was atl experienced hire.

5 I was initially employed as a management consultant so I was focussed on business process

engineering, then I worked as a project manager and program director.

Witness signature:

Page 2: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741 t!eatth Commission of Inquiry

6 In the last 8 years of my career at Accenture (2001-2009), I focussed on acquiring new business

for the company and worked on the largest transactions that Accenture had within Asia Pacific.

7 At the end of my time with Accenture 2004-2009, I was employed as a Managing Director, and

was a Senior Partner. At the time, I was what is referred to as a Level 2 Partner. I was the

Managing Director responsible for new business across the Asia-Pacific region, with a focus on

public sector work.

Accenture and the Queensland Government

8 During my time at Accenture, I had significant involvement with the public sector. Government

was one of my areas of expertise.

9 Throughout my career at Accenture, I very much had an Asia-Pacific focus, but I knew the

Queensland government sector very well.

10 In 1995 I was engaged to do some work on a Queensland Rail project as a project manager for

several years.

11 I subsequently worked with Queensland Treasury in 2002. I led the business case process, by

which I mean Queensland Treasury went through a series of consultations before embarking on

the whole of government Shared Services Program.

12 As part of this process, I recall that the Queensland Treasury used the services of a number of

different IT organisations. They tried out Accenture as well as IDM.

13 Accenture was responsible for a piece of work that focussed on the business case. I led that

piece of work. I subsequently did some work for QBuild.

14 In 2001 I was based in Singapore. This coincided with the time I was doing work for

Queensland Treasury.

Queensland Government's Implementation of SAP

15 Around 2005 a decision was made by the State that the whole of Queensland government would

implement a software application known as SAP. This decision was made as part of a Shared

Services Initiative (SSI).

Witness signature:

Page 3: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741

16 Commission of Inquiry

Leading up to that decision, I recall that Accenture conducted a few pieces of consulting work

for the government. Accenture was engaged to draft the business case, to structure the program,

identify the potential cost savings for government and to help structure how Shared Services

would work in terms of roles which should be retained in the various depmiments. I played a

key role in that process and led the business case referred to in paragraph 11 of this statement.

17 I do not believe that it was Accenture who identified SAP as the software that should be used to

replace the Lattice payroll system. I believe there was a subsequent piece of work and it is

possible that SAP was selected as part of that process.

18 I recall at the time our advice to the govemment was "to keep the softvmre vendors hungry -

you want to create a competitive environment". At the time there was a view held within the

govenunent that SAP was probably the only system that could cany a whole of government

implementation of that size.

19 After the whole of government decision m·ound 2005 to implement SAP, Queensland Treasury

effectively decided that they were going to be the systems implementation lead, by which I

mean they were going to implement SAP themselves. They ran the program from 2005.

Accenture was involved on what is known as a "time and materials" basis whereby they were

contracted to provide people for fixed daily rates (as opposed to a fixed-price contract to

achieve an outcome). For that reason, I considered that it was a low risk job and we were

basically operating under the management ofTreasmy. Accenture was focussed on process and

application. At the time I recall that IBM was more focussed on systems and infrastructure.

Appointment of a Prime Contractor

20 In 2007 Accenture advised Queensland Treasury that they should engage a professional Prime

Systems Integrator as Queensland Treasmy were not experienced systems implementers and

that they were buming through their budget without getting commensurate outcomes. We

believed they needed to go to market and appoint a Prime Systems Integrator.

21 Most critically, Queensland Treasury were, in my observation, not professional project

managers. That was not their core skill.

22 Tlu·ough the course of that advice in mid 2007, Treasury decided they were going to go to

market and appoint a Prime Services Partner.

Witness signature:

Page 4: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741

Commission of Inquiry 23 Once Accenture was in a position where we were being asked to consider a tender under certain

conditions, that is when we started to look at holistic problems and possible solutions.

24 I saw Queensland Treasury as being the driving force who was issuing the orders at that stage.

25 I led Accenture's bid for the Prime Contractor role in 2007.

26 Barbara Penott was a main point of contact for Accenture at Queensland Treasury, and she was

ultimately reporting to the Under Treasurer, Gerard Bradley.

CorpTech Consultants

27 I recall that in 2007 there were a lot of external contractors and consultants engaged by

CorpTech. Some of those consultants were from Accenture. Accenture as an organisation had

a "time and materials" contract and our focus was on processes and applications. ffiM also had

contractors within CorpTech, as did Logica. CorpTech also had its own independent

contractors.

28 A consultant named Teny Burns was working within CorpTech around the time the Prime

Contractor decision was being made. I believe Teny Bums became involved in the project in

early2007.

29 I had significant personal dealings with Terry Bums, but none of these were ever one-on-one.

30 Accenture played a major role in the govemment's decision to appoint a Prime Contractor. I

personally played a major role in that decision. It was my belief that the govemment needed a

Prime Contractor to be appointed. I knew the business case and I was ve1y passionate about it.

I knew how much the govemment had to spend to get an outcome and how quickly those

outcomes had to be achieved. I knew that the Queensland Treasury was burning its budget, but

I was concerned that going through that process, they would end up with insufficient budget to

actually get where they needed to get to with implementing the new system.

Request for Proposal

31 An RFI is a Request For Infmmation. Through an RFI, you tend to spoil your client in tenns of

giving them a broad range of information. The commercial reality is that you know the RFI is

going to be used to educate a client and your IP is not protected through an RFI process. You

do expect some of the information in an RFI to come back to market and be presented to your

Wituess signature:

Page 5: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN /2120741

Commission of Inquiry competitors, so you deal with that accordingly. If you have some competitive advantage, you

would be naive to give that information to your competitors in an RFI.

32 An RFP is a Request For Proposal. A government generally awards a contract on the basis of

an RFP. You can have an RFP that is in multiple stages, but in the case of Queensland

Treasury, I always wanted to understand how many stages there were going to be for the RFP.

An RFP means the govemment is formally committed to the process of protecting a tenderer's

confidential information and it is a competitive environment. A tenderer would generally put its

best foot forward in an RFP. Even if you stage an RFP over a period of time, you do not expect

for there to be a leakage of information.

33 From my own recollection and fi·om having refi·eshed my memory from recent file notes

constructed by me from Accenture documents dated 3 August 2007 and 27 August 2007 the

RFP process leading to the ITO was as follows:

(a) on or about 25 July 2007 Accenture received a request from CorpTech by email asking

Accenture to put forward a proposal for the SSI. There was no Request for Tender or terms

provided at this time. Contract terms were not included in the RFP. Contract terms were to

be negotiated but it was expected that a contract with a Prime Contractor would be

negotiated broadly based on the Queensland Government GOTC5 contracts with work

orders under that contract.

(b) This email which Accenture treated as a RFP was sent to four existing suppliers already

under contract with CorpTech, namely SAP, IBM, Logica and Accenture.

(c) To the best of my recollection there had been a more general request for information in July

2007 from CorpTech which had been addressed to several existing extemal service

providers of Corp Tech but only 4 had responded.

(d) The 25 July 2007 RFP sought finn price offers and the proposed approach of the relevant

supplier in respect of taking delivery responsibility for the remaining build, deploy and

support work for the Shared Services Solution SAP program across all of Queensland

Govemment.

(e) Any proposals in response were to be submitted by 7 August 2007. SAP did not provide any

proposal in response to the request.

Witness signature:

Page 5 of22

Page 6: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN /2120741

34 Commission of Inquiry

A major concem which Accenture had in responding to the RFP was that sensitive pricing and

structuring information contained in its response to the RFP may be leaked to the market.

Meeting with Gerard Bradley, Terry Burns and Barbara Perrott

35 In July 2007 I had concerns about the RFP process which I expressed to Gerard Bradley, Terry

Burns and Barbara Perrott and I requested a meeting with them.

36 I recall that on 2 August 2007 I met with Gerard Bradley, Terry Bums and Barbara Perrott and

asked them the question "Is this RFP the first stage of two, because if it is, we have concerns

around commercial information being leaked qfter this stage if we have to go through another

process". I recall that they advised that they had legal advice and that the RFP for the PSP was

going to be the binding RFP. I understood that to mean that the RFP was a one-stage process,

after which the contract would be awarded to a Prime Contractor.

3 7 I have reconstructed a file note of the meeting on 2 August 2007 from an email that I sent to Mr

Sneddon at around the end of July. This email contained the full proposed agenda for the

meeting that was to take place with Mr Bradley on 2 Augsut 2007. From my own recollection of

the meeting, I recall thaty Mr Sneddon followed the agenda and discussed each of the items

listed in the file note dated 2 August 2007.

3 8 I asked for confirmation in that meeting that the RFP process would be in accordance with

Queensland govemment tendering guidelines, and that it would generate a legally binding

contract process because it would cost Accenture a lot of money to go through the business

development required to submit a bid. I was concemed that Accenture's information would be

leaked to the market if we had to go through the RFP process twice.

39 In my observation, the RFP process was loosely defined- it did not have the usual stringent

govemment, very structured RFP process around it. My concem was that the govemment was

going to get advice that they were not going to be able to appoint a contractor as a result of that

RFP process. I had concerns about whole the RFP process.

40 Despite my expressed concerns, I never felt that I totally received the necessary assurances I

was seeking about the tender process. However, Accenture had directly asked the question

about the Government's ability and intention to contract from the RFP many times. I recall that

I asked the question to each of Terry Bums, Barbara Pen-ott and Gerard Bradley in the two

weeks preceding 7 August 2007 and Accenture had been assured that the Government could

contract directly from the RFP.

Witness signature:

Page 6 of22

Page 7: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741 Health Commission of Inquiry

41 I recall being told in a meeting with Gerard Bradley that Treasury had taken legal advice and

was confident in the tender process. To the best recollection, Gerard Bradley confirmed this fact

in the meeting.

42 At that point I believed Accenture had to stop asking the question about due process and either

not bid, or bid and give it eve1ything. Accenture chose the latter option.

43 I do not know who the govemment obtained legal advice from in relation to the tender process.

I believe it was a Tier 1 law firm.

7 August 2007 Presentation

44 Accenture decided to give a full and complete proposal in response to the request. An Executive

Summary presentation consisting of 55 pages and a proposal of approximately 111 pages was

provided to CorpTech. I recall the contact officer at CorpTech at the time was Teny Bums for

the purposes of the RFP. The Accenture proposal was provided under a cover letter dated 6

August 2007 from Mr Sneddon, the Managing Director of Accenture, addressed to the Under

Treasurer, Mr Bradley. This letter outlined Accenture's proposal. I have been shown a copy of

the letter of 6 August 2007 by the Commission.

45 Accenture's response to the RFP included a 111 page proposal and a slide presentation which

occurred on 7 August 2007. My file note of this presentation and the questions asked by

Corp Tech personnel is dated 7 August 2007 and forms part of the documents I supplied to the

Commission.

46 Mr Bradley, the Under Treasurer, could not attend the 7 August 2007 presentation. I therefore

met with Mr Bradley and Teny Bums on 8 August 2007. Mr Burns had invited Accenture to

present to the Executive Summary to Mr Bradley.

4 7 On 9 August 2007, I and other Accenture team members including Simon Porter met with Terry

Bums, Barbara Perrott and approximately 30 other Queensland Treasury representatives. At this

meeting Accenture presented the highlights of its original proposal.

Other Tenderers

48 The RFP process was open to Accenture, IBM, Logica and SAP. The RFP was effectively

issued as a brief email requesting submission of proposals.

Witness signature:

Page 7 of22

Page 8: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN /2120741

Commission of Inquiry 49 Had the government issued to the whole of the market at the time, I would not have had any

concerns because Accenture thought we were very well placed to help the government solve its

problem and no one, other than Accenture, IBM or Logica had been inside the organisation and

really could have put forward a credible bid.

50 In terms of the whole of the market as at 2007, I believe only Accenture, IBM and Logica

would have been able to deliver the program as Prime Service Provider (PSP).

51 I recall that my point of contact at Corp Tech was Terry Bums. I would direct all of my queries

to Terry Burns. In Accenture's view, and the way Terry presented it, Teny was reporting to

Barbara Perrott, and Terry was managing the process on Barbara's behalf.

52 The RFP was ultimately conducted in two stages as the Government decided not to award from

the first process. The Government followed the initial RFP with what they referred to as an

Invitation to Offer (ITO).

53 From our conversation with Gerard Bradley, Accenture believed that the government was in a

position to appoint a Prime Contractor at the end of the RFP process.

54 At the end of the RFP process, the market rumour was cettainly that Accenture had won the

RFP for the PSP. Accenture was confident that we had won. Unfortunately, what happened

over the next couple of weeks was that Treasury came back and advised that it had new legal

advice that said that it could appoint as a result of the RFP, however, it would be unwise to do

so.

55 The government did not expand on why it would be unwise for them to do so. I believe that

they ran too loose a process the first time around with the RFP. There was mention that one of

the bidders had made a complaint. If that was the case, I do not know which.

56 I recall that the RFP was then conducted again. The second time it was a far more structured

process and it was referred to as an Invitation to Offer (ITO).

57 The ITO for the Prime Contractor role was issued on 13 September 2007. This was a closed

tender process. Only Logica, Accenture and IBM participated in this process.

Witness signature:

Page 8 of22

Page 9: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741

Accenture's Response to the ITO

Health

Commission of Inquiry

58 I reviewed the ITO when it came in and I led Accenture's bid. I recall that the ITO was a very

long, very detailed ITO. It was an arduous ITO but Accenture had no real concems about the

structure of it. We had seen good and bad ITOs in our experience.

59 At the time, Accenture was concemed the ITO may have contained some of Accenture's

Intellectual Property.

60 Accenture fell victim to providing a fulsome response to the RFP tender process. During the

time Accenture responded to the RFP, Accenture was engaged on a "time and materials basis".

Accenture was in a position where we had a much broader understanding of the whole SSP than

IBM did, because IBM was really operating at a systems and infrastructure level. Accenture

was engaged for a job and by virtue of that job, we had far more visibility of the government's

requirements. As such, I believe we had far more insight that we were able to articulate within

our proposal than IBM did.

61 In our initial RFP we told the govemment what order they should do things in, we gave them a

schedule. We told them how they would mitigate risk and we gave them a revised budget. We

advised them on how they could take a team of what was, in our opinion, a very big team of

various contractors and unmotivated staff and create a high performing team around that.

Unfmiunately, by the time the ITO came out, there was a lot of Accenture's themes reflected

throughout that document.

Discussions with Terry Burns

62 We expressed those concems to Teny Burns and Barbara Penott at the time in a meeting on 20

August 2007. At that meeting I commented that it appeared as though Treasmy was

commoditising Accenture's approach, giving IBM time, levelling the playing field and setting

up for a price shoot-out. I said that it appeared as though Treasury wanted to buy IBM and were

giving them a better chance. I recall that Teny and Barbara advised that this was not the case

and it was simply a process issue that prevented them from awarding from the first RFP. As we

were in a competitive tender environment we could elect to continue to bid or protest which

would have disrupted the process. We elected to commit to the ITO process.

63 I recall that Terry Burns was copied in on a lot of Accenture's emails. A lot of our interaction

with Teny, certainly at the RFP stage, was face-to-face. Accenture would meet with Terry and

Barbara, and that was largely becaus vemment, having tried to run the proj

Witness signature:

Page 9 of22

Page 10: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741 Health Commission of Inquiry

years by themselves, suddenly found themselves in an urgent bid to appoint a prime services

lead. They were in a big hurry to make that appointment so we were meeting Terry face-to-face

for much of the first stage. Through the ITO stage there was a lot more structure in place.

64 We were aware that Terry Burns had conducted a review for the government in April 2007,

reporting in May 2007, suggesting the appointment of a Prime Contractor. I recall that Terry

was quite proud of it. He saw himself as the architect of that recommendation and, in my

opinion, that was reasonable advice.

65 I recall that Accenture never knew where we stood with Teny. During the tender process, there

were still some contractors working at Queensland Treasury. We urged Treasury and CorpTech

to roll off all of the contractors. A couple of those contractors were from Accenture. I was of

the opinion that it did not matter where those contractors came from - the government should

not have had people on the inside effectively working directly for the bidders and for the client

as there was an increased risk ofloss of confidentiality. I believe that some of those contractors

were from each of Accenture, IBM and Logica.

Use of Confidential Information

66 I recall that in October 2007 Accenture sent an email to Treasury asking them to confirm that

the ITO submissions were secure. Treasury advised that they were.

67 However, Accenture had concems about how confidential pricing information in the tenders

was being used. For example, Queensland Treasmy's budget remaining for the project was

around $80m. Accenture's estimate of the effort required to complete the task was around

$180m. During the ITO stage, Accenture's price remained the same as the RFP stage as nothing

had changed in the few weeks between the two tenders. However, I believe IBM reduced its

price to $70 million or $80 million consistent with Treasury's budget. From my own

recollection and from having refreshed my memory from recent file notes constructed by me

from Accenture documents dated 27 August 2007, Accenture identified this risk in the

following terms:

(a) "given the procurement process followed to date, content, including approach/ price etc. of

Accenture's bid is out in the market. The implementation plan that Treasury published on

17'11 August has similarities to that which Accenture proposed. With another step now to

occur in the procurement process there is concem that Accenture's differentiators (Based on

our knowledge/ insight of the program) is being undermined"; and

Witness signature: ~Officer signature: --~,_::___~ " C/7"---- Page 10 of22

Page 11: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741 Health Commission of Inquiry

(b) "Accenture's previous offers to client are believed to be known to the market. So we risk

that IBM will adopt our approach (that is preferred by the client) and focus on undercutting

on price".

68 I am not sure if this information was leaked. However, I observed that Terry Bums ran far too

loose a tender process and did not apply enough discipline about what different tender

proponents were told. I recall having discussions with Terry Bums and I remember thinking

that he was being ve1y generous in his information and I hoped that Accenture's information

was not being treated in the same way.

69 At no point during the RFP process did Terry Bums meet with me on an "off the record" basis.

70 I have never met with Mr Bums on a one-on-one basis. I have never had coffee with Mr Bums

on a one-on-one basis.

71 Whenever I met with Mr Bums, I believe other representatives of CorpTech such as Barbara

Perrott, Philip Hood or Darrin Bond were present.

72 Mr Bums, at no stage, provided any coaching to Accenture as to how we should structure our

response to the RFP.

73 Mr Bums never strongly recommended the position that Accenture should adopt in its approach

to the RFP response.

74 Mr Bums never indicated to me that he was a "long time IBMer". Mr Bums never told me that

IBM was grossly under-represented on the Shared Services engagement or that the CorpTech

program needed a significant increase of involvement by IBM.

75 Mr Burns never indicated to me that there were no "sacred cows" within CorpTech, meaning

that Accenture shouldn't discount those components of the Shared Services program that had

the involvement of other IT consultant companies prior to the RFP.

76 Mr Burns never provided encouragement to Accenture to be competitive in its pricing. I recall

telling Mr Bums that the budget required for the RFP was not related to the budget that

Treasmy had remaining and Mr Bums appeared supportive of this position.

77 Mr Bums never offered Accenture a dry-run for any presentation that Accenture gave to

CorpTech as part of the RFP process.

Witness signature: Officer signature:

Page 11 of22

Page 12: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN /2120741

Response to the ITO Commission of Inquiry

78 I believe that Terry Burns was brought in as an expert consultant and Barbara Perrott had

basically delegated her role to him and he was going to manage the project on her behalf.

Accenture witnessed him running the process, taking recommendations to Barbara Perrott and

Barbara signed off on those recommendations. Ultimately, however, Terry was doing all of the

work to run the bidding process.

79 I recall that the response time for the ITO was extended. I believe one of either IBM or Logica

requested the extension. It was a very onerous ITO, but a company like Accenture or IBM

should have been able to respond in that time. Accenture assembled a very comprehensive

proposal in that time frame and I would have expected IBM to have been able to do the same,

certainly having been through the process for a second time. It was a tight time frame but I

think the govemment should have defended that by saying that the tenderers had already been

through the process once and that those answers would not need to change the second time

around.

80 My point of contact in Corp Tech during the time I was in charge ofleading Accenture's bid was

Terry Burns. I also had contact with Barham Penott, but primarily my contact was with Terry

Burns. My contact was a little more structured during the ITO process than it had previously

been. We ce11ainly sent out most of our clarification questions through email to Marce

Blakeney, who was the designated officer to contact at Corp Tech.

81 I recall that Accenture in the course of the ITO process responded to a number of clarification

requests in respect to its response to the ITO. Accenture also attended meetings at which the

ITO process was explained. I have seen an Accenture file note of one of these meetings dated

17 September 2007. The file note records a meeting from lpm to 5 pm. My best recollection

from the file note is that Barbara Penott, Terry Burns and Keith Goddard were present and

outlined the ITO process. The evaluation process was explained to us, including the criteria that

would be used by 8 separate teams in evaluating each response. The file note in respect to the

evaluation criteria "Value for Money" which contained 5 matters states: "these are our criteria

from RFT". By this notation I understand that these were the criteria for "Value for Money"

identified by Accenture in our response to the RFP. I provided a copy of this file note to the

Commission.

82 This was not the first time that I had cause to be concerned in relation to Accenture's

information in its response to the RFP being leaked to the marke:t.

Witness signature: Officer signature:

Page 13: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741 Health Commission of Inquiry

already expressed similar concerns at the beginning of the RFP process. When it came to the

ITO process Accenture received a letter on or about 17 August 2007 from Barbara Perrott. I

have supplied to the Commission a string of internal Accenture emails which outlines the

concerns held by Accenture and me that our response to the RFP was being used to structure the

ITO so that IBM would have the benefit of such a structure for the roll-out of the Shared

Services Solution.

83 Another internal contemporaneous email I have supplied to the Commission is from me to other

Accenture executives dated 20 August 2007 at 2:10pm. This email stated:

"We asked QT many times whether they could buy from the prior process, we highlighted that

once they had our proposal it would be on the "market" and hence that that needed to be end of

the process -so we'll ask them where they got it wrong and also where we fell short such that

they couldn't buy us now".

IBM is awarded the Contract

84 The ITO closed on 8 October 2007.

85 In the course of the assessment I recall that Accenture was requested to attend a meeting for the

pmpose of doing a presentation to clarify questions that had been raised concerning price. In

this respect I have provided to the Commission 3 documents, the first is entitled "Accenture

responds to questions raised by email from Marie Blakeney- Wednesday, 17 October 2007".

The second is entitled "Questions raised during presentation Wednesday, 17 October 2007 -

presentation session 3: Pricing Overview". The third is entitled "Accenture responds to question

on pricing impact on change to program schedule to accommodate early retirement of

LATTICE payroll". Accenture also provided clarification to 17 questions, excluding pricing

questions. In this respect I have supplied to the Commission a document entitled "Accenture

response to clarification request- clarification question 1-17 (excludes pricing questions)".

86 In recall that Accenture have two pricing presentations. The first was high level and I did not

attend this presentation. I attended the second pricing presentation which was held at CorpTech.

I believe Accenture was given a couple of days notice for the purpose of doing a detailed price

presentation in the course of the ITO assessment.

87 On or about 26 October 2007 Accenture received a letter from Barbara Perrott advising that

CorpTech was going to enter into exclusive negotiations with IBM. I have provided a copy of

this letter to the Commission. The letter informed Accenture that the Evaluation

Witness signature: /~2 (fj/~ ·~

Page 14: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741

Commission of Inquiry concluded that Accenture's offer was the second-ranked offer. Accenture was extremely

disappointed. We were gutted. From our perspective, we had been through the whole process,

and I believed we had won the bid the first time.

88 I had made the point many times with Treasury that $80m was not going to fix their problem.

89 After we completed our first bid, Accenture thought it was critical to maintain our integrity. We

did not want to win the second-time bid just for the sake of winning. We wanted to help the

government fix the problem. Our second bid contained a budget of around $180m. I recall that

we spent another $1m worth of business development in completing our second bid.

90 The structure of the ITO contract enabled bidders to provide a fixed-price, a firm price and then

a not-to-exceed (NTE) budget. Accenture believed it could execute the program for $180

million and so all of the fixed, finn and NTE added to $180m. We treated the NTE as a budget

that would not be exceeded and would ideally be reduced as scope became more certain and as

contingency reduced.

91 I recall that IBM was rumoured to have submitted a revised price that was within the budget of

around $80m and of this their fixed-price commitment was likely to be around $1Om or less. I

believe IBM bid such that their total was within Treasury's remaining budget and then intended

to contract manage their way to increase their price to commercial levels.

92 Accenture did not work like that. In my view, the IBM budget and schedule was just not

achievable.

Meeting with Mr Grierson

93 I recall that Accenture was so disappointed that I went and met with Mal Grierson in the first

week of December 2007. I was aware that Mal Grierson was going to inherit the problem and I

expressed my disappointment to him. I recall him saying that there were tens of millions of

dollars between IBM and Accenture's bid and that left the Govenunent with no option. I asked

him to "hold IBM's feet to the fire". I recall saying words to the effect of "if you get IBM to

deliver on the schedule they promised, for the budget they have committed to, I will personally

write you a letter congratulating you on this decision".

94 I also recall turning my own mind to the procurement policy of the State government at this

time to see whether due process had been complied with. I spoke with Accenture Legal to

understand whether the fitm had appetite and grounds for legal action. I was confident that

leakage of information had Witness signature:

and was surprised that the Governme t w u tl award a Officer signature: • 1

·

Page 14 of22

Page 15: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741

Commission of Inquiry contract to an organisation that drastically reduced their price on the second submission. I

believed this created an exceptionally high risk for the Government. I believed the Government

was exposed under the "not-to-exceed" methodology with a contractor who was in a position to

and had intention to ratchet up their price.

95 I observed that price and scheduling were key drivers in the decision to award the tender to

IBM. The schedule around the Queensland Health payroll was of pmticular concem.

96 In my observation, the Shm·ed Services Project was very large and could have been done on a

work order-by-work order basis. Accenture offered that as an option. You would need a very

disciplined and experienced government to be able to keep a service provider accountable, and

for them not to add in additional fees out of future work orders because they become

entrenched. Accenture had experience with a not-to-exceed framework with Government and

our interpretation of it was that the total fixed-price work orders would be within the not-to­

exceed umbrella. I had concern that IBM would use the not-to-exceed framework to simply bid

low, get contracted then increase their price to ensure they made commercial returns.

Implementation of the Contract

97 Once IBM commenced the project, the first mmour Accenture heard, which I considered to be

an extremely reliable rumour, was that IBM soon after submitted a revised "not-to-exceed"

figure which was around $180m. I considered that to be extraordinary given that $180m was

what Accenture bid in the first place. Soon after that, the rumour in the industry was that IBM's

bid had then gone from $180m to $300m plus.

98 What the market was basically saying was that IBM got in the door, won the work, could not

cany out the job and so it priced itself out of the Prime Contractor role. I believe Mal Grierson

terminated IBM's whole of govemment appointment and held them accountable for Queensland

Health payrolL

Further Meetings with Mr Schwa1·ten and Mr Grierson

99 I recall that on 9 December 2008 I flew up to Rockhampton to have dinner with Mr and Mrs

Schwarten. Mr Schwatten was the Minister for Public Works at the time.

Witness signature:

Page 16: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741 Health

Commission of Inquiry 100 I recall that the contract was awarded to IDM in December 2007 by Treasury. It was a whole of

government contract. I recall that at some point after that, the delive1y of that contract or the

execution of that contract would have been given to Public Works.

1 01 I recall that when I met with Mr and Mrs Schwarten, also present were two members of

Accenture. One was an Accenture partner called Brad Cable and the other was a gentleman

called Josh Kennedy-White. Mr Kennedy-White arranged the meeting. The purpose of the

meeting was to meet the minister.

102 Although I cannot recall exactly what was said at the meeting, I made the point that I believed

that IDM's schedule was high risk. From my own recollection, at the 9 December 2008 meeting

we discussed the risk associated with SSS Program with regard to IDM's schedule and budget.

103 I recall that Mr Schwarten's response at that meeting was that he had left the project in the

hands ofMr Grierson, but that he would touch base with him subsequent to our meeting. I recall

telling Mr Schwmten that we were also going to see Mr Grierson.

104 At a meeting on 15 December 2008 at Augustine's restaurant I met with Mr Grierson. In the

course of that meeting we advised that we had met with his Minister. From my own recollection

and from having refreshed my memory from recent file notes constructed by me from

Accenture documents, Mr Grierson said words to the effect of:

" 'there are some tough decisions to make after Xmas with his 'blue' colleagues'. He also said

'what was being put fonl'ard now was close to what Accenture had originally proposed'.

Assume last comment was about price- not timeline ".

105 I had a fmther meeting with Mr Grierson on 12 February 2009 at CBD restaurant. Also present

were Paul Chapman and Janine Griffiths from Accenture as well as the Deputy Director General

of Public Works Robyn Turbit.

106 Accenture's motivation for setting up the meeting and attending on the Director-General was

because we had a genuine concern about the project. We felt confident that the project was

going to fail and we thought it was diligent to express that.

107 We felt that DPW was desperately looking for a "quick win" and was using Queensland Health

Payroll to achieve that purpose. Accenture's view was that fixing the Queensland Health payroll

problem was going to take at least 2 'li years to fix and that the government was going to have to

spend a lot of money keeping LATTICE alive with continued vendor suppmt in that process.

Witness signature: p-£7. . //' . .. Officer signature: ""'""'===-------1'------"'._,::::_____j_---b-~~ ~ Page 16of22

Page 17: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCl Reference: AN /2120741

108 Commission of Inquiry

I advised Mr Grierson that I believed the decision to contract IBM for Queensland Health

Payroll was extremely risky. I said that I didn't believe it was appropriate as a quick win as it

was too high risk. I recall that Mr Greirson advised that he had IBM on a "water-tight contract".

I replied that relying on a contract may not be where the Government wants to be if they have

Doctors and Nurses that weren't paid or rostered correctly. I recall that Mr Grierson stated that

he didn't expect that Accenture would have wanted to undertake the Queensland Health Payroll.

I advised that we could not deliver it as a standalone project to the schedule IBM had planned

nor within the budget allocated and that Accenture saw it as the highest risk component of the

whole of government program.

109 Accenture looked at taking LATTICE and negotiating continued vendor support to keep the

system alive. We then had a parallel run strategy, which meant that the Queensland government

would never lose LATTICE until the other system was tested and proven. The two systems

would be run in parallel under Accenture's proposal but that solution takes time and costs

money.

110 I recall explaining to Mr Grierson at this meeting that I considered the Queensland Health

payroll project to be a loss leader. Accenture had structured its bid in a way that calculated

pricing for the whole program. By that, I mean that a company would only take on the

Queensland Health payroll project because you had to as a whole of government solution. An

IT company needed the whole of government project to compensate for the Queensland Health

component, because you would not make a dollar out of the Queensland Health element.

Ill I am awaTe that the governance structure that Queensland Treasury and CorpTech had in place

disintegrated soon after IBM commenced work. I recall that soon after IBM started on the

project, people within the depattment who had key skills were lost.

Consultants

112 A consulting company called Arena played a key role in restructuring the ITO. I do not know

what relationship they have with IBM. I believe Terry Burns came from a finn called

Cavendish. I believe that Cavendish was Terry Bums' consulting company. Prior to his work

with Queensland Treasury, I thought Terry Bums was engaged on an SAP project possibly

overseas or interstate.

Witness signature:

Page 18: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN /2120741

Concerns

Health Commission of Inquiry

113 My primary concern with the tender process was, given how Accenture was positioned after the

RFP process, Accenture was naturally so far ahead because we had so much more insight into

the government's businesses requirements. The way that IBM caught up between the two

tender processes was outstanding.

114 I do not have any personal knowledge of who caused the legal advice to be sought and given

about the tender process. I recall that Terry Bums' explanation to us was that one of the

proponents had made complaints about the tender process. As a result of those complaints,

CorpTech had received legal advice and that advice was to the effect that they could award the

tender, but they should not. I do not know who complained.

115 I recall that Accenture spent a lot of time thinking through some ve1y unique concepts for the

first RFP response. I recall that Accenture's first response was approximately 100 pages. The

second response was several volumes.

116 Accenture' s IP in the first I 00 page document was commercially sensitive. It is my opinion that

if somebody had given another tenderer Accenture's proposal, that tenderer would have known

exactly how Accenture was going to bid. I believe that if IBM had access to our pricing from

our first response, the commercial advantage to them would be enonnous. It would also be an

enonnous commercial advantage to have access to another tenderer's structure and staging of

the project. Unlike many private sector tenders, Govemment tenders rely heavily on the

documented proposal. The ITO evaluation would have been weighted almost entirely against

the written responses, as opposed to other methods such as relying on interviews with the

proposed team members or conducting workshops. So any tenderer that had another bidder's

proposal would have had enonnous competitive advantage.

117 I do not have any personal knowledge that the IP in our first proposal was passed on to IBM.

However, Accenture fmnly believed there was leakage of confidential information. So much

so, I recall that the partners of Accenture came together at the time to work out if there was a

leak within our team.

118 I believe that Terry Bums had his own interest and he was looking to bring some contractors

onto the project. Accenture was never asked by Teny Bums to help him realise that ambition.

Accenture is not a great employer of contractors. For example, with the Shared Services tender,

Accenture was ultimately willing to bring in most of the man power itself and do the job with

Witness signature:

Page 18 of22

Page 19: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741 Health

Commission of Inquiry very little subcontracting. As a form of risk mitigation, Accenture had formal policies limitmg

the percentage of contractors to be used on a project. I believe the market would be well aware

of Accenture's stance.

119 IBM, by contrast, came in and to the best of my know ledge subcontracted up to 60% of some of

its projects.

120 I cannot recall the exact date, but I believe Terry Burns had carried out a very recent project for

IBM before the ITO. I believe it was in around 2006 and the project took place in New Zealand

or interstate and was an SAP project.

121 Any relationship between Terry Bums and IBM was never declared by him to Accenture in the

tender process. He cetiainly never raised any conflict of interest issue with us. We found out

about the previous work that Terry Burns had conducted for IBM through our SAP practice.

Further observations

122 It does not surprise me that there were at least 47 change requests to the contract that IBM

entered into with the State. In my observation IBM's strategy throughout the Asia-Pacific

region was to bid low and contract manage. IBM were better contract managers than Accenture

were.

123 I recall that Accenture gave a lot of thought to governance of the project. We believed that a

high perfmming team needed to be put in place. Accenture bid for the whole of govemment

project and a high perfmming team board was, in our opinion, necessary. We advocated an

Advisory Board. I recall the Board Accenture proposed had Mr Bradley and myself on it.

There was a methodology around identifying initiatives for process improvements and there was

a vety robust govemance team around that, not dissimilar to what you would expect to see in

the private sector with a Board and the appropriate committees.

124 In my observation, Teny Burns was not sufficiently experienced to run a project like this. To

be a good consultant, one needs to be able to call out what they do not know. Terry always

presented himself as a very knowledgeable person that was across a lot of detail, and he simply

was not, in my experience. That, in my observation, was one of Teny's shmifalls. He just did

not have the sufficient level of experience.

125 If I was in the position of assessing a tender such as this, price should never have driven the

result.

Witness signature:

Page 19 of22

Page 20: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN I 2120741

126 Commission of Inquiry

I recall an Accenture staff member receiving a call from Lachlan Bloomfield of IBM a day or

two prior to the final due date for the ITO submission. I believe Mr Bloomfield boasted to the

Accenture staff member about IBM's position, that they had already submitted their response,

were off to play golf and were confident.

Security of SSS Program Documentation

127 fu the course of the ITO process certain information was sent to Accenture entirely without a

solicitation or request. This information came from an Accenture contractor who sent an email

attaching Excel spreadsheet information relating to the SSS Program that I appeared to contain

IBM financial infonnation.

128 This breach was brought to the attention of Barbara Perrott by Accenture. I have provided to the

Commission a letter dated 22 October 2007 from Simon Potter of Accenture to Barbara Perrott.

To my knowledge the contractor involved had his contract tetminated by Accenture and he

retumed to Italy soon after. I have also supplied to the Commission a letter from Barbara Penott

to Accenture dated 8 February 2008. None of the information leaked by this contractor was ever

used Accenture's response to the ITO. Accenture's response to the ITO was submitted on 8

October 2007.

Verification of IP Concerns

129 At the request of the Commission I considered the responses to the RFP of both Accenture and

IBM. I also considered the ITO itself as well as IBM's response to the ITO. I was asked to

undettake a review of these documents by the Commission for the purpose of identifying any

examples of information contained in Accenture's response to the RFP being used in populating

either the ITO or IBM's response to the ITO. I found this task difficult in the sense that it

required a comparison of what is an extensive amount of information. I spent approximately two

hours examining this material. I was highly familiar with Accenture's response to the RFP. I

was also generally familiar with the contents of the ITO. The only documents I was not familiar

with was IBM's response to the RFP and ITO. Having undertaken this task I cannot specifically

identify a misuse of either the futellectual Property of Accenture or more generally misuse or

reuse of the infonnation contained in Accenture's response to the RFP.

130 I have, however, identified some similarities in approach between Accenture's response to the

RFP and the ITO. These similarities include the organisational structure. By this I mean how the

Program Team would be structured (see for example page 18 of Accenture's response to the

RFP and Attachment 8 of the

Witness signature:

Page 20 of22

Page 21: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN /2120741

131

132

Commission of Inquiry There were also some similarities in the Schedule of the Program of Works in terms of

scheduling (see for example page 45 of Accenture's response to the RFP and Attachment 6 of

the ITO).

Whilst in the time available to me I have been unable to identifY any misuse of Accenture's

Intellectual Property it is still my belief that Accenture's extensive response to the RFP

generally informed the structure and approach contained in the ITO. It is still my belief that the

two stage process resulted in IBM being advantaged.

133 My concern is not that IBM as a tenderer should not have been given information to make it an

equal playing field. Rather, Accenture would have been far more cautious in the information it

provided in response to the RFP if we had known it was to be a two stage process.

134 Accenture spent approximately $1 million dollars in its response to the RFP. This was spent in

anticipation of a contract being awarded at the end of this process. The fact that a contract was

not awarded at the end of the RFP process meant that by its fulsome response Accenture had

shown its hand both in terms of price and structure.

Price Comparison

135 Accenture's response to the RFP identified a price (excluding CorpTech's staff expense) of

approximately $176 million (page 13 of Accenture's response to the RFP). The $176 million

was a not-to-exceed price.

136 From my examination of page 60 of the IBM response to the RFP, IBM's indicative pricing for

the cost of implementation was $156- 190 million dollars. This price was also exclusive of

Agency implementation teams (that is, CorpTech's staft).

137 Accenture's not-to-exceed price in response to the ITO was approximately $175 million. Page

19 of Schedule 4 of Accenture's response to the ITO reconciled our initial figure for the RFP

(refen·ed to in this document as the RFI) of $176 million to our figure for the ITO (in this

document called the RFO) of $175,097,369.

138 I have attempted to identifY from IBM's response to the ITO IBM's price. I have been unable to

do so. I have been shown a document entitled 'Summaty of Financial Issues- Appendix D'

which I have been instructed to assume constitutes the final evaluation regarding price with

respect to the ITO by Corp Tech. Having read this document it is clear to me that IBM did not

price at all a number of integral components of the program.

Witness signature:

Page 21 of22

Page 22: QUEENSLAND HEALTH PAYROLL SYSTEM COMMISSION OF …

QCPCI Reference: AN /2120741 Hi'!alth

Commission of Inquiry 139 Having read the 'Summary of Financial Issues' and IDM's response to the ITO in respect to

price I cannot detennine what price IDM was suggesting in terms of the fixed price or the total

expected price.

140 Unlike Accenture's response to the ITO, I can not find in the IBM response to the ITO a

reconciliation of the prices quoted by IDM for the RFP and the ITO. I note in this respect that I

have not been provided by the Commission with IDM's full response to the ITO and the details

of any IDM pricing presentations.

This written statement by me dated ;:) fV'k::vth WI}. and contained in the pages numbered

1 to ;)..)__ is true a.11d-G JTect to the best of my knowledge and belief.

20~

Witnessed:

~~~~~~--------Signature

~::L.'~~~.Y._s-...1~~:..----- Rank _J,~~~,___J,;t: eg. No.

Witness signature: