queanbev'an manaoement area s-.. for.i: comparlment … · operation also complies with clause...

37
LOCALITY MAP Jt j. ..., ) Forestry Corporation Comparlment 2311 S-.. For.I: Tlllq1nd9 No:677 80unt CMST IFQI\ QUEANBEV'AN MANAOEMENTAREA 9"11< 1:100,000 i ?oi e1 o-- - f'llm.. _ D + e..... .... ,.._"°" o-a- ....... -MajO<F-- - - lllnorFnllRood 011on- --- ... o-- - llrjor- o,,_... D-·

Upload: others

Post on 05-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

LOCALITY MAP Jtj) Forestry

CorporationComparlment 2311 S- ForI Tlllq1nd9 No677

80unt CMST IFQI QUEANBEVAN MANAOEMENT AREA 911lt 1100000 i ~ oie 1

o-shy - fllm_ o~-shymiddot -amp~ D Plill~1111Uilaquo + e _deg ~-shy o-a--MajOltF-shy- - lllnorFnllRood 011onshy ---o-shy- llrjor- o_ D-middot

Pl lly Kn Halon MclClnnon) Harvest Plan Operational Map bull ) Forestry Miona J~ Corporation Compartment 2399

State Forest TALLAGANDANo 577 = (l jQJ GOASouthem IFOA- South Coal Mep Sheet BOMMY(8827-38) amp BENDOURA (8826-4N) ~

t=~L1 =------Ntt~~~

---_middot

bull

Lot ~

f Lot 1$

LEOEND 1EllllE Nllll IWIVHTAREABaUNDARIEB DNSOnllPbulllklim sntEAll

u~

EXCWllDll ZGIEll IElL IHL112 amp RL)IOUlUIE CPT _ONLYbull bull bull S11m FonlllBoUndllfY CJPIMePrapelly Feft119 Zone1edlofl ZIMebull bull bull 0-ntlGlnl8iy IZ2l OM --C1119~IWlVEITAREA NIA NIANIAROADamp 1- 1FNbllllbullWllland ampEllcblonlmM~middotamp Hellllwmr HalllWI bull 111on1erROlldll (Pllf) 1shy- - Non Fortllle IFMZT-nee) - llpeclll 11bull 191Mt111(FllZ2) -Im 1Sm 1DM- HdlgeRoa(new) EEC-Talltllndbull SB D Sdt DAd Plantalion IFMZamp) 112ndonlllr

--middot OllMRoeda eaeaamp vnGrUIY tlaclancl bull 3rdnw 5m 25m 111mMUNA FEA1VREIDIWllAG 4111 DRler 10Mbull llllblllle Rock a Emutlon ZAM (211111) pound[ ongaana CGdWo 11111 usm

----UDAR Comlcl8d LIC Dnln111e FMZ4-RU1IEduded FOIHI + vlbIMlelled Blr(Feed1lwl)- - - - ftllciltNe UnmlPllld Dnlnaae F- bull iHA dbullioiZoftl DUMPS amp CROlllNOI + PwelfillOMfimiddotl lDAR SIDrraquo30 (lttl26 hi)reg Tampeimy Illywtber A OIMIvtittllM

fETT PCINTII FiRobilI gt-lt ~alCaaing ElnelllflCIY ~ flllnl liFRAITRUCIUREOTllRFlA RD

Rode Ill be Wlfltllld t SdltyH8Dnl bullreg =Urdllground CableHARllEampTAREA Q lal a B llO 1000 Scale 11ampGOO_~-FMZ4-RU11STS Ht9vy - CGmlurllllllMl 111m -

PNpnd llf --jNdQnoot Harvest Plan Forest Type Map ~l ForestryJl CorporationIVinion I I Compartment 2399 State Forest TALLAGANDANo 577 Ni- xl I GDASouthem IFOA-Soutll C089I rtp Shlld BOMBAY (11827-38) amp BBfDOURA(M28-4N) -- I

bull

J I I

f IJ

r I I I I I

II

LmllD IKIUllDAllEI bullbullbull 111111 _BaundlfYbull bull bull can--Baundiily llDoDll -~-c-~- HUlft-(nlwl

ClllllRshyllllAllUOE

- --ltLIMWIYltIR 00-UCDllhlCIG middot-middot bull i nd-lkmyenped_F_

FORESTTYPE(RN11)

D 1)pe 111 h11

CJ 1)pe 131 Pappel-MountlnlMbullubull Gum

CJ 1)pe 1311 SrmwGum

CJ 1)pe 140S-Oum-Mwntln1MmOln

D 1)pe 1s111rawn eerre1-~

D 1)pe 15111rawn 1111mi1

CJ 1)pe 156 llnMn Blrrtl-OUm

CJ TrPe 1119Mounln IMlnnB Gun

Tp Mbull(hbull) 111 408 131 295

138 257

14D 218

151 124

154 351S

155 78

159 4113

bull - S111 115000ilmiii5iii5iii~ CCftUllllMlll1Dm

HARDWOOD FORESTS- SOUTHERN IFOA SOUTH COAST HARVESTING PLAN

Tallaganda State Forest - Compartment 2399

Certification This plan has been prepared in accordance with the Integrated Forestry Operations Approval issued under the Forestry and National Park Estate Act 1998 The Harvest Plan Standard Conditions for Hardwood Forest Operations in South Coast apply to this operation Prepared By Harvest Planner

Kate Halton Approved By Operations Planning Mgr

Lee Blessington

Signature Kate Halton Signature Lee Blessington

Date 07092016 Date 1392016

Note Approval includes the Harvest Plan Operational Map (HPOM) with the corresponding approval date displayed on the map verifying final approved version Other maps included with this plan are Locality Forest Type Roading and Cultural Heritage (limited distribution)

Description of Proposal

Harvesting of Hardwood forest Harvesting of Hardwood forest using Single Tree Selection Silviculture subject to the Southern IFOA requirements will be undertaken within this planning unit Timber harvesting and road construction will not be licensed under the EPL The primary product of the harvesting is high quality large sawlogs (quota logs) small high quality sawlogs veneer logs girders poles amp piles where timber markets are available Parts of felled logs that do not meet high quality log specifications are segregated and graded into other classifications such as salvage sawlogs pulp logs amp miscellaneous timbers eg split amp round posts firewood mining timbers amp craftwood The availability of miscellaneous timbers depends mainly on forest types log defectiveness amp market conditions at the time of harvesting

Clause 22 ndash Integrated Forestry Operations Approval (IFOA) Consideration All relevant factors have been reviewed taking into account the volume and monetary value of each forest product to supply Term Agreement Holders The harvesting operation also complies with Clause 22 of the IFOA

Attachment 1 Site Safety Plan prescribes safety requirements and Medical Emergency Evacuation Plan for this harvesting operation

Attachment 2 Roading plan prescribes roading requirements for this harvesting operation

HP_BB_2399_14_v4 12-07-17 1

Abbreviations used in this plan

FT = Forest Technician HC= Harvesting Coordinator PtS= Protection Supervisor HS = Harvesting Supervisor RC = Roading Coordinator IFOA = Integrated Forestry Operations Approval

Area Identification and Yield Estimates

State Forest Compartments IFOA Region

Management Area

Certification

Tallaganda 2399 Southern Queanbeyan AFS 604224 AS47082013

Cpt 2399 Plan Compartment ID 22297 Gross Area (ha) 538 Net Harvestable Area (ha) 480 Harvest Area (ha) 259 Poles Piles Veneer amp Girders 0msup3 Quota Logs (HQL) 2300msup3 High Quality Small 200m3

Salvage 3300msup3 Pulp E1 2300t FirewoodMisc 2300t

Note The yield estimates in the table above are derived from the Plan of Operations

Slope Classes (percent of harvest area)

Slope Class Cpt 2399

of harvest area 0-15ordm 485

15-20 ordm 26 20-25 ordm 19 25-30 ordm 62 30 ordm + 03

HP_BB_2399_14_v4 12-07-17 2

- -

-

ATTACHMENT 1 SITE SAFETY PLAN

Worksite Information Is this Declared Hunting Area Yes Is hunting excluded Yes Comments

Have Exclusion Zone signs been erected or checked prior to starting work daily NA

Comments Description of Work to be undertaken on site

- Refer to description of proposal above

Site Supervisor

Name Contact number

Communication

Radio channel number VHF UHF Other (eg hand signals)

Traffic management (describe) eg Signage Road closure Traffic control Within compartment 2399 only roads that are shown on the HPOM as haulage roads may be used for haulage All haulage roads within compartment 2399 must comply with EPL The haulage route endorsed by this harvest plan (and rates calculated for) from the Compartment is

1 North on Main Range Forest Road or Lowden Road (both FCNSW roads) and west onto Rossi Road (FCNSW Road within the State Forest becoming a Palerang Shire Council where the State Forest ends)

2 South on Main Range Fire Road (FCNSW Road) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

3 South of Lowden Road and Coxes Creek Road (both FCNSW Roads) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

For all three haulage routes sight distances from the forest onto a major council roads has been assessed as suitable No traffic control is required Road intersections outside the control of FCNSW are not covered by this plan or any FCNSW Traffic Control Plan Haulage contractors must abide by NSW road laws and standard operating procedures in relation to haulage routes outside the control of FCNSW Dust noise and school bus routes Dust and noise ndash Where log haulage routes pass close to rural housing along natural surfacegravel roads dust and noise must be minimised to the greatest extent practicable Trucks should reduce speed restrict use to daylight hours and minimise the use of engine brakes through these areas Local traffic - Lowden road is used by local commuters between the hours of 730am to 830 am and 330pm to 430pm On weekdays to the greatest extent practicable log haulage should avoid commute time on the above road School bus route - Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads Name of on site safety first aiders

Location of first aid kit

HP_BB_2399_14_v4 12-07-17 3

SITE HAZARD amp RISK ASSESSMENT NO CONTROL WHO IMPLEM

ENTED

1 Vehicle collision at adjoining roads of various traffic levels

Warning signs at FCNSW intersections road closure on FCNSW roads Implement Traffic Control plans (where specified in this harvest plan) 60kmhr speed limit on all State Forest gravel roads unless otherwise signposted Compliance with FCNSW lights on policy

2 Overhead powerlines or cables

Assess every individual tree for directional felling and degree of risk Do not fall trees towards overhead hazard if within two tree lengths

3 Underground cables pipelines

Minimise ground disturbance across or along cables amp pipelines Increase depth of earth cover if required

4 Cliff lines amp rocky very steep terrain

Operators to assess work site within two tree lengths to identify immediate hazards Communicate to other operators and mark sites

5 Hazardous or dead trees

Refer to FCNSW WHS procedure 426 Assess area within two tree lengths of work site Assess risk mark any Distinctly Dangerous Trees with the symbol Oslash amp if necessary remove hazard or move work site Use machinery to assist with hazard removal if possible Contractor is responsible for implementing control strategies during harvesting NOTE A hung up tree occurs at C6 ensure this tree is removed during roading operations

6 Overhead hazards associated with dumps

Refer to FCNSW WHS procedure 426 Assess overhead hazard within two tree lengths of the dump Assess risk amp if necessary remove hazard or relocate dump site Contractor is responsible for implementing control strategies during harvesting

7 Dust from passing vehicles along dirt haulage routes

Restrict speed to minimise dust generation slow down when passing vehicles Turn on driving and hazard lights to increase visibility

8 Trucks colliding with oncoming school buses on Rossi Rd

Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads

9 Asbestos in Old Forestry DepotShed

The Shed is not in the immediate vicinity of the harvesting area Avoid this area by not using it as a lunch spot or meeting area Note that MEEP 11 at this site has not been used for this harvest plan instead the intersection of Coxes Creek Road and Lowden Road is the MEEP for this harvest plan

bull All visitors contractors and employees must be fully inducted onto the worksite by the workplace supervisor eg the Principal Contractor or the Forestry Corporation supervisor This must be recorded on the attached induction sheet

bull Relevant Safe Work Procedures are available and understood for the type of work to be undertaken bull A Risk and Hazard Assessment Worksheet must be completed if site specific hazards are identified

that are not covered by a Safe Work Procedure The top (pink sheet) is to be attached to this site safety plan

bull Operators in training must be supervised by the site supervisor bull All appropriate Personal Protective Equipment (PPE) must be worn on the worksite at all times

HP_BB_2399_14_v4 12-07-17 4

MEDICAL EMERGENCY EVACUATION PLAN

Nearest reliable mobile phone reception (describe location)

Next G Network Poor GSM NA Satellite NA

GPS LatLong 35deg 29 54 S 149deg 31 19 E

MGA 728764E 6068765N Datum GDA 94 Zone 55

Location description Lowden Road northern end of Cpt 2399

Emergency meeting point for ambulance police (refer to attached locality map) GPS LatLong 35deg 31 08 S 149deg 32 29 E

MGA 730473E 6066661N Datum GDA 94 Zone 55

Location description Intersection of Lowden Road and Coxes Creek Road

Helicopter landing place (refer to attached locality map)

GPS LatLong 35deg 27 27 S 149deg 30 18 E

Location description Rossi Village

Procedures to obtain ambulance assistance 1 Dial 000 2 If there is no mobile coverage dial 112 (which

will work on any mobile phone system) 3 If no response on 112

bull use a radio link (TARA be discrete with personal information)

bull move to an area with mobile coverage bull find a landline bull use another network (eg a contractorrsquos VHF

radio)

Contact nearest Forestry Corporation office on

Channel 236

Telephone 1300 880 548

Give details of the situation and ask for a 000 call to be placed

000 operator question Response

1 Police Fire Ambulance NSW Ambulance

2 Suburb State Forest name Tallaganda Nearest town or locality Rossi Nearest ambulance station Braidwood

3 Address Lowden Road

4 Nearest road junctioncross street Lowden Road and Coxes Creek Road

5 Local government area Palerang

6 Nature of the problem Describe the accident number and condition of casualties

7 Where is the accident Refer to safety meeting point above Directions to navigate from nearest ambulance station to the emergency meeting point From Braidwood travel south-west along Araluen Road for approx 17km and turn right onto Cooma road Travel 22km to intersection with Captains Flat road Turn right onto Captains Flat road and travel 27km and turn right into Parlour Creek Road Travel 45km to the beginning of Harolds Cross Road then travel another 5km turning right into Coxes Creek Road Travel a further 65km and turn left onto Lowden Road 8 4WD ambulance required N CB radio channel to use

9 Injuries Give detailed information about the condition of the casualty (do not mention names over radio system)

10 Your name and call back number

HP_BB_2399_14_v4 12-07-17 5

Silviculture and Harvesting Prescriptions

Year 2004 2005 2007

TSI radic X X

HR Burning X X radic

Wildfires X X X

Logging m3 0 3100 0

radic - applies X ndash not applicable

Compartment Resource Unit

No of Sweeps

BA Average (m2ha)

BA Range (m2ha)

2399 1 amp2 16 33 20-44

Silvicultural Planning Single Tree Selection The STS tract (481ha) is a predominantly mixed aged mature forest and will be harvested under a heavy single tree selection (STS) regime The objective within the 246 ha harvest area for this operation (resource unit 1) is to remove 70 of the basal area to create canopy openings for regeneration whilst retaining and minimising damage to young regenerating stems seed trees habitat and recruitment trees

It is envisaged that the next harvesting operation in this compartment would be on average 30 years time

The STS tract for IFOA purposes includes resource units 1 amp 2 of 2399 as indicated on the HPOM

Single Tree Selection (STS) must remove no more than 70 of the basal area (BA) while retaining a minimum BA of 10m2 per hectare within the tract

Resource Unit (Refer

to HPOM for detail)

Species Composition Stand Structure and Condition

1 Overstorey dominated by brown barrel (E fastigata) manna gum (E viminalis) mountain gum (E dalrympleana) and narrow-leaved peppermint (E radiata)

Resource unit is a mixed age forest with a predominantly matureover mature overstorey Stand has reached endpoint with limited further growth potential

2 Overstorey dominated by snow gum (E pauciflora) narrow-leaved peppermint (E radiata) manna gum (E Viminalis) and mountain gum (E dalrympleana)

Poor site quality matureover mature even aged forest Limited commercial value due to low sawlog yields and species mix

HP_BB_2399_14_v4 12-07-17 6

Harvesting Prescription

Resource Unit (Refer to HPOM

for detail)

of Harvest

Area

Silvicultural Treatment

1 100 STS heavy bull Retain and protect from harvestingfire damage

-polesadvanced growth (lt40cm DBHOB) with good form and vigour -habitat and recruitment trees as per TSL

bull Retained trees should be evenly spaced throughout the resource unit

bull Ensure no more than 70 of the BA within the resource unit is removed while retaining a minimum BA of 10m2 per hectare within the tract

bull All other products should be removed markets permitting If this objective cannot be achieved the following options should be considered -reject tree felling (HC must first obtain approval from HS) -defer harvesting until ideal market conditions prevail -consider harvesting under a light or medium STS regime

Note The area of each silvicultural treatment must be mapped and recorded in the Post logging information section of this plan

Special Requirements

Permanent Growth and Research Plots Any inventory plots located during the harvesting operation are to be treated the same as the surrounding area Private Property Private property occurs adjacent to the north western boundary of the compartment as indicated on the HPOM Private property owners have been notified of the scheduled harvesting and post-harvest burning The table below lists neighbours who adjoin Compartment 2399

bull No harvest disturbance is permitted on private property

bull Harvesting debris must not be left within five metres of the boundary fence lines

bull Any damage to fences must be repaired by the contractor

bull Access roads must be maintained free of debris and in a trafficable state

Occupation Permits

HP_BB_2399_14_v4 12-07-17 7

Apiary 4 apiary sites provided in the table below are located within the planning unit Contact details are available from the Batemans Bay office

Name Site Number Contact number

bull The HC must provide the apiary permittees with at least two weeks advance notice when bee boxes need to be removed or relocated

Forestry Corporation Planted Forest State Forest Plantation Occurs to the south of compartment 2399 Roads and drainage features form the majority of the boundary between compartment 2399 State Forest Planation Where the boundary between compartment 2399 and State Forest Planation is not a road or drainage feature the FT must mark the boundary as mapped

bull No harvest disturbance is permitted on State Forest Plantation

bull Access roads must be maintained free of debris and in a trafficable state

bull A permanent apiary set down sites is located on dump 13 (see HPOM) It must be levelled and free of debris at the completion of logging

Rocky Terrain Rocky terrain occurs within the net planned area All rocky terrain shown on the HPOM as ldquoRock to be verifiedrdquo needs to be assessed by FT during mark up to determine if it meets the definition of a rocky outcrop or cliff (and apply 20m exclusion if required) Additionally FTHC will continue to conduct on the ground mark-up and searches and report back to PlannerField Ecologist any feature requiring further investigation

Tower Road Due to excessive riling and saturation of the entire length of Tower Road snigging along Tower Road is not permitted Snigging across this road is permitted On completion of harvesting in the vicinity of Tower Road the Contractor must be close off with Baulks (spaced to EPL specification)

Underground Cables A dial before you dig request query of the compartment indicates that underground Telstra cables are present on the eastern side of the compartment Dial before you dig and field markers (where located) have been used to indicate the approximate location of the cable on the HPOM Prior to any harvesting or roading activity taking place in the vicinity of the cables the HC should inspect the area for markers or other evidence of the cables and flag with marking tape When carrying out harvesting or road maintenance activities near cables minimise ground disturbance across or along and increase depth of earth cover if required

From time to time above ground infrastructure associated with the cables occurs Where this infrastructure is detected the FT should pass the location and details on to the burning supervisor who should consider if extra protection measures (eg rake hoe line) are required

Any damages to cables must be immediately reported to Telstra on 13 22 03

Forest Management Zoning

HP_BB_2399_14_v4 12-07-17 8

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 2: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

Pl lly Kn Halon MclClnnon) Harvest Plan Operational Map bull ) Forestry Miona J~ Corporation Compartment 2399

State Forest TALLAGANDANo 577 = (l jQJ GOASouthem IFOA- South Coal Mep Sheet BOMMY(8827-38) amp BENDOURA (8826-4N) ~

t=~L1 =------Ntt~~~

---_middot

bull

Lot ~

f Lot 1$

LEOEND 1EllllE Nllll IWIVHTAREABaUNDARIEB DNSOnllPbulllklim sntEAll

u~

EXCWllDll ZGIEll IElL IHL112 amp RL)IOUlUIE CPT _ONLYbull bull bull S11m FonlllBoUndllfY CJPIMePrapelly Feft119 Zone1edlofl ZIMebull bull bull 0-ntlGlnl8iy IZ2l OM --C1119~IWlVEITAREA NIA NIANIAROADamp 1- 1FNbllllbullWllland ampEllcblonlmM~middotamp Hellllwmr HalllWI bull 111on1erROlldll (Pllf) 1shy- - Non Fortllle IFMZT-nee) - llpeclll 11bull 191Mt111(FllZ2) -Im 1Sm 1DM- HdlgeRoa(new) EEC-Talltllndbull SB D Sdt DAd Plantalion IFMZamp) 112ndonlllr

--middot OllMRoeda eaeaamp vnGrUIY tlaclancl bull 3rdnw 5m 25m 111mMUNA FEA1VREIDIWllAG 4111 DRler 10Mbull llllblllle Rock a Emutlon ZAM (211111) pound[ ongaana CGdWo 11111 usm

----UDAR Comlcl8d LIC Dnln111e FMZ4-RU1IEduded FOIHI + vlbIMlelled Blr(Feed1lwl)- - - - ftllciltNe UnmlPllld Dnlnaae F- bull iHA dbullioiZoftl DUMPS amp CROlllNOI + PwelfillOMfimiddotl lDAR SIDrraquo30 (lttl26 hi)reg Tampeimy Illywtber A OIMIvtittllM

fETT PCINTII FiRobilI gt-lt ~alCaaing ElnelllflCIY ~ flllnl liFRAITRUCIUREOTllRFlA RD

Rode Ill be Wlfltllld t SdltyH8Dnl bullreg =Urdllground CableHARllEampTAREA Q lal a B llO 1000 Scale 11ampGOO_~-FMZ4-RU11STS Ht9vy - CGmlurllllllMl 111m -

PNpnd llf --jNdQnoot Harvest Plan Forest Type Map ~l ForestryJl CorporationIVinion I I Compartment 2399 State Forest TALLAGANDANo 577 Ni- xl I GDASouthem IFOA-Soutll C089I rtp Shlld BOMBAY (11827-38) amp BBfDOURA(M28-4N) -- I

bull

J I I

f IJ

r I I I I I

II

LmllD IKIUllDAllEI bullbullbull 111111 _BaundlfYbull bull bull can--Baundiily llDoDll -~-c-~- HUlft-(nlwl

ClllllRshyllllAllUOE

- --ltLIMWIYltIR 00-UCDllhlCIG middot-middot bull i nd-lkmyenped_F_

FORESTTYPE(RN11)

D 1)pe 111 h11

CJ 1)pe 131 Pappel-MountlnlMbullubull Gum

CJ 1)pe 1311 SrmwGum

CJ 1)pe 140S-Oum-Mwntln1MmOln

D 1)pe 1s111rawn eerre1-~

D 1)pe 15111rawn 1111mi1

CJ 1)pe 156 llnMn Blrrtl-OUm

CJ TrPe 1119Mounln IMlnnB Gun

Tp Mbull(hbull) 111 408 131 295

138 257

14D 218

151 124

154 351S

155 78

159 4113

bull - S111 115000ilmiii5iii5iii~ CCftUllllMlll1Dm

HARDWOOD FORESTS- SOUTHERN IFOA SOUTH COAST HARVESTING PLAN

Tallaganda State Forest - Compartment 2399

Certification This plan has been prepared in accordance with the Integrated Forestry Operations Approval issued under the Forestry and National Park Estate Act 1998 The Harvest Plan Standard Conditions for Hardwood Forest Operations in South Coast apply to this operation Prepared By Harvest Planner

Kate Halton Approved By Operations Planning Mgr

Lee Blessington

Signature Kate Halton Signature Lee Blessington

Date 07092016 Date 1392016

Note Approval includes the Harvest Plan Operational Map (HPOM) with the corresponding approval date displayed on the map verifying final approved version Other maps included with this plan are Locality Forest Type Roading and Cultural Heritage (limited distribution)

Description of Proposal

Harvesting of Hardwood forest Harvesting of Hardwood forest using Single Tree Selection Silviculture subject to the Southern IFOA requirements will be undertaken within this planning unit Timber harvesting and road construction will not be licensed under the EPL The primary product of the harvesting is high quality large sawlogs (quota logs) small high quality sawlogs veneer logs girders poles amp piles where timber markets are available Parts of felled logs that do not meet high quality log specifications are segregated and graded into other classifications such as salvage sawlogs pulp logs amp miscellaneous timbers eg split amp round posts firewood mining timbers amp craftwood The availability of miscellaneous timbers depends mainly on forest types log defectiveness amp market conditions at the time of harvesting

Clause 22 ndash Integrated Forestry Operations Approval (IFOA) Consideration All relevant factors have been reviewed taking into account the volume and monetary value of each forest product to supply Term Agreement Holders The harvesting operation also complies with Clause 22 of the IFOA

Attachment 1 Site Safety Plan prescribes safety requirements and Medical Emergency Evacuation Plan for this harvesting operation

Attachment 2 Roading plan prescribes roading requirements for this harvesting operation

HP_BB_2399_14_v4 12-07-17 1

Abbreviations used in this plan

FT = Forest Technician HC= Harvesting Coordinator PtS= Protection Supervisor HS = Harvesting Supervisor RC = Roading Coordinator IFOA = Integrated Forestry Operations Approval

Area Identification and Yield Estimates

State Forest Compartments IFOA Region

Management Area

Certification

Tallaganda 2399 Southern Queanbeyan AFS 604224 AS47082013

Cpt 2399 Plan Compartment ID 22297 Gross Area (ha) 538 Net Harvestable Area (ha) 480 Harvest Area (ha) 259 Poles Piles Veneer amp Girders 0msup3 Quota Logs (HQL) 2300msup3 High Quality Small 200m3

Salvage 3300msup3 Pulp E1 2300t FirewoodMisc 2300t

Note The yield estimates in the table above are derived from the Plan of Operations

Slope Classes (percent of harvest area)

Slope Class Cpt 2399

of harvest area 0-15ordm 485

15-20 ordm 26 20-25 ordm 19 25-30 ordm 62 30 ordm + 03

HP_BB_2399_14_v4 12-07-17 2

- -

-

ATTACHMENT 1 SITE SAFETY PLAN

Worksite Information Is this Declared Hunting Area Yes Is hunting excluded Yes Comments

Have Exclusion Zone signs been erected or checked prior to starting work daily NA

Comments Description of Work to be undertaken on site

- Refer to description of proposal above

Site Supervisor

Name Contact number

Communication

Radio channel number VHF UHF Other (eg hand signals)

Traffic management (describe) eg Signage Road closure Traffic control Within compartment 2399 only roads that are shown on the HPOM as haulage roads may be used for haulage All haulage roads within compartment 2399 must comply with EPL The haulage route endorsed by this harvest plan (and rates calculated for) from the Compartment is

1 North on Main Range Forest Road or Lowden Road (both FCNSW roads) and west onto Rossi Road (FCNSW Road within the State Forest becoming a Palerang Shire Council where the State Forest ends)

2 South on Main Range Fire Road (FCNSW Road) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

3 South of Lowden Road and Coxes Creek Road (both FCNSW Roads) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

For all three haulage routes sight distances from the forest onto a major council roads has been assessed as suitable No traffic control is required Road intersections outside the control of FCNSW are not covered by this plan or any FCNSW Traffic Control Plan Haulage contractors must abide by NSW road laws and standard operating procedures in relation to haulage routes outside the control of FCNSW Dust noise and school bus routes Dust and noise ndash Where log haulage routes pass close to rural housing along natural surfacegravel roads dust and noise must be minimised to the greatest extent practicable Trucks should reduce speed restrict use to daylight hours and minimise the use of engine brakes through these areas Local traffic - Lowden road is used by local commuters between the hours of 730am to 830 am and 330pm to 430pm On weekdays to the greatest extent practicable log haulage should avoid commute time on the above road School bus route - Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads Name of on site safety first aiders

Location of first aid kit

HP_BB_2399_14_v4 12-07-17 3

SITE HAZARD amp RISK ASSESSMENT NO CONTROL WHO IMPLEM

ENTED

1 Vehicle collision at adjoining roads of various traffic levels

Warning signs at FCNSW intersections road closure on FCNSW roads Implement Traffic Control plans (where specified in this harvest plan) 60kmhr speed limit on all State Forest gravel roads unless otherwise signposted Compliance with FCNSW lights on policy

2 Overhead powerlines or cables

Assess every individual tree for directional felling and degree of risk Do not fall trees towards overhead hazard if within two tree lengths

3 Underground cables pipelines

Minimise ground disturbance across or along cables amp pipelines Increase depth of earth cover if required

4 Cliff lines amp rocky very steep terrain

Operators to assess work site within two tree lengths to identify immediate hazards Communicate to other operators and mark sites

5 Hazardous or dead trees

Refer to FCNSW WHS procedure 426 Assess area within two tree lengths of work site Assess risk mark any Distinctly Dangerous Trees with the symbol Oslash amp if necessary remove hazard or move work site Use machinery to assist with hazard removal if possible Contractor is responsible for implementing control strategies during harvesting NOTE A hung up tree occurs at C6 ensure this tree is removed during roading operations

6 Overhead hazards associated with dumps

Refer to FCNSW WHS procedure 426 Assess overhead hazard within two tree lengths of the dump Assess risk amp if necessary remove hazard or relocate dump site Contractor is responsible for implementing control strategies during harvesting

7 Dust from passing vehicles along dirt haulage routes

Restrict speed to minimise dust generation slow down when passing vehicles Turn on driving and hazard lights to increase visibility

8 Trucks colliding with oncoming school buses on Rossi Rd

Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads

9 Asbestos in Old Forestry DepotShed

The Shed is not in the immediate vicinity of the harvesting area Avoid this area by not using it as a lunch spot or meeting area Note that MEEP 11 at this site has not been used for this harvest plan instead the intersection of Coxes Creek Road and Lowden Road is the MEEP for this harvest plan

bull All visitors contractors and employees must be fully inducted onto the worksite by the workplace supervisor eg the Principal Contractor or the Forestry Corporation supervisor This must be recorded on the attached induction sheet

bull Relevant Safe Work Procedures are available and understood for the type of work to be undertaken bull A Risk and Hazard Assessment Worksheet must be completed if site specific hazards are identified

that are not covered by a Safe Work Procedure The top (pink sheet) is to be attached to this site safety plan

bull Operators in training must be supervised by the site supervisor bull All appropriate Personal Protective Equipment (PPE) must be worn on the worksite at all times

HP_BB_2399_14_v4 12-07-17 4

MEDICAL EMERGENCY EVACUATION PLAN

Nearest reliable mobile phone reception (describe location)

Next G Network Poor GSM NA Satellite NA

GPS LatLong 35deg 29 54 S 149deg 31 19 E

MGA 728764E 6068765N Datum GDA 94 Zone 55

Location description Lowden Road northern end of Cpt 2399

Emergency meeting point for ambulance police (refer to attached locality map) GPS LatLong 35deg 31 08 S 149deg 32 29 E

MGA 730473E 6066661N Datum GDA 94 Zone 55

Location description Intersection of Lowden Road and Coxes Creek Road

Helicopter landing place (refer to attached locality map)

GPS LatLong 35deg 27 27 S 149deg 30 18 E

Location description Rossi Village

Procedures to obtain ambulance assistance 1 Dial 000 2 If there is no mobile coverage dial 112 (which

will work on any mobile phone system) 3 If no response on 112

bull use a radio link (TARA be discrete with personal information)

bull move to an area with mobile coverage bull find a landline bull use another network (eg a contractorrsquos VHF

radio)

Contact nearest Forestry Corporation office on

Channel 236

Telephone 1300 880 548

Give details of the situation and ask for a 000 call to be placed

000 operator question Response

1 Police Fire Ambulance NSW Ambulance

2 Suburb State Forest name Tallaganda Nearest town or locality Rossi Nearest ambulance station Braidwood

3 Address Lowden Road

4 Nearest road junctioncross street Lowden Road and Coxes Creek Road

5 Local government area Palerang

6 Nature of the problem Describe the accident number and condition of casualties

7 Where is the accident Refer to safety meeting point above Directions to navigate from nearest ambulance station to the emergency meeting point From Braidwood travel south-west along Araluen Road for approx 17km and turn right onto Cooma road Travel 22km to intersection with Captains Flat road Turn right onto Captains Flat road and travel 27km and turn right into Parlour Creek Road Travel 45km to the beginning of Harolds Cross Road then travel another 5km turning right into Coxes Creek Road Travel a further 65km and turn left onto Lowden Road 8 4WD ambulance required N CB radio channel to use

9 Injuries Give detailed information about the condition of the casualty (do not mention names over radio system)

10 Your name and call back number

HP_BB_2399_14_v4 12-07-17 5

Silviculture and Harvesting Prescriptions

Year 2004 2005 2007

TSI radic X X

HR Burning X X radic

Wildfires X X X

Logging m3 0 3100 0

radic - applies X ndash not applicable

Compartment Resource Unit

No of Sweeps

BA Average (m2ha)

BA Range (m2ha)

2399 1 amp2 16 33 20-44

Silvicultural Planning Single Tree Selection The STS tract (481ha) is a predominantly mixed aged mature forest and will be harvested under a heavy single tree selection (STS) regime The objective within the 246 ha harvest area for this operation (resource unit 1) is to remove 70 of the basal area to create canopy openings for regeneration whilst retaining and minimising damage to young regenerating stems seed trees habitat and recruitment trees

It is envisaged that the next harvesting operation in this compartment would be on average 30 years time

The STS tract for IFOA purposes includes resource units 1 amp 2 of 2399 as indicated on the HPOM

Single Tree Selection (STS) must remove no more than 70 of the basal area (BA) while retaining a minimum BA of 10m2 per hectare within the tract

Resource Unit (Refer

to HPOM for detail)

Species Composition Stand Structure and Condition

1 Overstorey dominated by brown barrel (E fastigata) manna gum (E viminalis) mountain gum (E dalrympleana) and narrow-leaved peppermint (E radiata)

Resource unit is a mixed age forest with a predominantly matureover mature overstorey Stand has reached endpoint with limited further growth potential

2 Overstorey dominated by snow gum (E pauciflora) narrow-leaved peppermint (E radiata) manna gum (E Viminalis) and mountain gum (E dalrympleana)

Poor site quality matureover mature even aged forest Limited commercial value due to low sawlog yields and species mix

HP_BB_2399_14_v4 12-07-17 6

Harvesting Prescription

Resource Unit (Refer to HPOM

for detail)

of Harvest

Area

Silvicultural Treatment

1 100 STS heavy bull Retain and protect from harvestingfire damage

-polesadvanced growth (lt40cm DBHOB) with good form and vigour -habitat and recruitment trees as per TSL

bull Retained trees should be evenly spaced throughout the resource unit

bull Ensure no more than 70 of the BA within the resource unit is removed while retaining a minimum BA of 10m2 per hectare within the tract

bull All other products should be removed markets permitting If this objective cannot be achieved the following options should be considered -reject tree felling (HC must first obtain approval from HS) -defer harvesting until ideal market conditions prevail -consider harvesting under a light or medium STS regime

Note The area of each silvicultural treatment must be mapped and recorded in the Post logging information section of this plan

Special Requirements

Permanent Growth and Research Plots Any inventory plots located during the harvesting operation are to be treated the same as the surrounding area Private Property Private property occurs adjacent to the north western boundary of the compartment as indicated on the HPOM Private property owners have been notified of the scheduled harvesting and post-harvest burning The table below lists neighbours who adjoin Compartment 2399

bull No harvest disturbance is permitted on private property

bull Harvesting debris must not be left within five metres of the boundary fence lines

bull Any damage to fences must be repaired by the contractor

bull Access roads must be maintained free of debris and in a trafficable state

Occupation Permits

HP_BB_2399_14_v4 12-07-17 7

Apiary 4 apiary sites provided in the table below are located within the planning unit Contact details are available from the Batemans Bay office

Name Site Number Contact number

bull The HC must provide the apiary permittees with at least two weeks advance notice when bee boxes need to be removed or relocated

Forestry Corporation Planted Forest State Forest Plantation Occurs to the south of compartment 2399 Roads and drainage features form the majority of the boundary between compartment 2399 State Forest Planation Where the boundary between compartment 2399 and State Forest Planation is not a road or drainage feature the FT must mark the boundary as mapped

bull No harvest disturbance is permitted on State Forest Plantation

bull Access roads must be maintained free of debris and in a trafficable state

bull A permanent apiary set down sites is located on dump 13 (see HPOM) It must be levelled and free of debris at the completion of logging

Rocky Terrain Rocky terrain occurs within the net planned area All rocky terrain shown on the HPOM as ldquoRock to be verifiedrdquo needs to be assessed by FT during mark up to determine if it meets the definition of a rocky outcrop or cliff (and apply 20m exclusion if required) Additionally FTHC will continue to conduct on the ground mark-up and searches and report back to PlannerField Ecologist any feature requiring further investigation

Tower Road Due to excessive riling and saturation of the entire length of Tower Road snigging along Tower Road is not permitted Snigging across this road is permitted On completion of harvesting in the vicinity of Tower Road the Contractor must be close off with Baulks (spaced to EPL specification)

Underground Cables A dial before you dig request query of the compartment indicates that underground Telstra cables are present on the eastern side of the compartment Dial before you dig and field markers (where located) have been used to indicate the approximate location of the cable on the HPOM Prior to any harvesting or roading activity taking place in the vicinity of the cables the HC should inspect the area for markers or other evidence of the cables and flag with marking tape When carrying out harvesting or road maintenance activities near cables minimise ground disturbance across or along and increase depth of earth cover if required

From time to time above ground infrastructure associated with the cables occurs Where this infrastructure is detected the FT should pass the location and details on to the burning supervisor who should consider if extra protection measures (eg rake hoe line) are required

Any damages to cables must be immediately reported to Telstra on 13 22 03

Forest Management Zoning

HP_BB_2399_14_v4 12-07-17 8

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 3: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

PNpnd llf --jNdQnoot Harvest Plan Forest Type Map ~l ForestryJl CorporationIVinion I I Compartment 2399 State Forest TALLAGANDANo 577 Ni- xl I GDASouthem IFOA-Soutll C089I rtp Shlld BOMBAY (11827-38) amp BBfDOURA(M28-4N) -- I

bull

J I I

f IJ

r I I I I I

II

LmllD IKIUllDAllEI bullbullbull 111111 _BaundlfYbull bull bull can--Baundiily llDoDll -~-c-~- HUlft-(nlwl

ClllllRshyllllAllUOE

- --ltLIMWIYltIR 00-UCDllhlCIG middot-middot bull i nd-lkmyenped_F_

FORESTTYPE(RN11)

D 1)pe 111 h11

CJ 1)pe 131 Pappel-MountlnlMbullubull Gum

CJ 1)pe 1311 SrmwGum

CJ 1)pe 140S-Oum-Mwntln1MmOln

D 1)pe 1s111rawn eerre1-~

D 1)pe 15111rawn 1111mi1

CJ 1)pe 156 llnMn Blrrtl-OUm

CJ TrPe 1119Mounln IMlnnB Gun

Tp Mbull(hbull) 111 408 131 295

138 257

14D 218

151 124

154 351S

155 78

159 4113

bull - S111 115000ilmiii5iii5iii~ CCftUllllMlll1Dm

HARDWOOD FORESTS- SOUTHERN IFOA SOUTH COAST HARVESTING PLAN

Tallaganda State Forest - Compartment 2399

Certification This plan has been prepared in accordance with the Integrated Forestry Operations Approval issued under the Forestry and National Park Estate Act 1998 The Harvest Plan Standard Conditions for Hardwood Forest Operations in South Coast apply to this operation Prepared By Harvest Planner

Kate Halton Approved By Operations Planning Mgr

Lee Blessington

Signature Kate Halton Signature Lee Blessington

Date 07092016 Date 1392016

Note Approval includes the Harvest Plan Operational Map (HPOM) with the corresponding approval date displayed on the map verifying final approved version Other maps included with this plan are Locality Forest Type Roading and Cultural Heritage (limited distribution)

Description of Proposal

Harvesting of Hardwood forest Harvesting of Hardwood forest using Single Tree Selection Silviculture subject to the Southern IFOA requirements will be undertaken within this planning unit Timber harvesting and road construction will not be licensed under the EPL The primary product of the harvesting is high quality large sawlogs (quota logs) small high quality sawlogs veneer logs girders poles amp piles where timber markets are available Parts of felled logs that do not meet high quality log specifications are segregated and graded into other classifications such as salvage sawlogs pulp logs amp miscellaneous timbers eg split amp round posts firewood mining timbers amp craftwood The availability of miscellaneous timbers depends mainly on forest types log defectiveness amp market conditions at the time of harvesting

Clause 22 ndash Integrated Forestry Operations Approval (IFOA) Consideration All relevant factors have been reviewed taking into account the volume and monetary value of each forest product to supply Term Agreement Holders The harvesting operation also complies with Clause 22 of the IFOA

Attachment 1 Site Safety Plan prescribes safety requirements and Medical Emergency Evacuation Plan for this harvesting operation

Attachment 2 Roading plan prescribes roading requirements for this harvesting operation

HP_BB_2399_14_v4 12-07-17 1

Abbreviations used in this plan

FT = Forest Technician HC= Harvesting Coordinator PtS= Protection Supervisor HS = Harvesting Supervisor RC = Roading Coordinator IFOA = Integrated Forestry Operations Approval

Area Identification and Yield Estimates

State Forest Compartments IFOA Region

Management Area

Certification

Tallaganda 2399 Southern Queanbeyan AFS 604224 AS47082013

Cpt 2399 Plan Compartment ID 22297 Gross Area (ha) 538 Net Harvestable Area (ha) 480 Harvest Area (ha) 259 Poles Piles Veneer amp Girders 0msup3 Quota Logs (HQL) 2300msup3 High Quality Small 200m3

Salvage 3300msup3 Pulp E1 2300t FirewoodMisc 2300t

Note The yield estimates in the table above are derived from the Plan of Operations

Slope Classes (percent of harvest area)

Slope Class Cpt 2399

of harvest area 0-15ordm 485

15-20 ordm 26 20-25 ordm 19 25-30 ordm 62 30 ordm + 03

HP_BB_2399_14_v4 12-07-17 2

- -

-

ATTACHMENT 1 SITE SAFETY PLAN

Worksite Information Is this Declared Hunting Area Yes Is hunting excluded Yes Comments

Have Exclusion Zone signs been erected or checked prior to starting work daily NA

Comments Description of Work to be undertaken on site

- Refer to description of proposal above

Site Supervisor

Name Contact number

Communication

Radio channel number VHF UHF Other (eg hand signals)

Traffic management (describe) eg Signage Road closure Traffic control Within compartment 2399 only roads that are shown on the HPOM as haulage roads may be used for haulage All haulage roads within compartment 2399 must comply with EPL The haulage route endorsed by this harvest plan (and rates calculated for) from the Compartment is

1 North on Main Range Forest Road or Lowden Road (both FCNSW roads) and west onto Rossi Road (FCNSW Road within the State Forest becoming a Palerang Shire Council where the State Forest ends)

2 South on Main Range Fire Road (FCNSW Road) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

3 South of Lowden Road and Coxes Creek Road (both FCNSW Roads) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

For all three haulage routes sight distances from the forest onto a major council roads has been assessed as suitable No traffic control is required Road intersections outside the control of FCNSW are not covered by this plan or any FCNSW Traffic Control Plan Haulage contractors must abide by NSW road laws and standard operating procedures in relation to haulage routes outside the control of FCNSW Dust noise and school bus routes Dust and noise ndash Where log haulage routes pass close to rural housing along natural surfacegravel roads dust and noise must be minimised to the greatest extent practicable Trucks should reduce speed restrict use to daylight hours and minimise the use of engine brakes through these areas Local traffic - Lowden road is used by local commuters between the hours of 730am to 830 am and 330pm to 430pm On weekdays to the greatest extent practicable log haulage should avoid commute time on the above road School bus route - Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads Name of on site safety first aiders

Location of first aid kit

HP_BB_2399_14_v4 12-07-17 3

SITE HAZARD amp RISK ASSESSMENT NO CONTROL WHO IMPLEM

ENTED

1 Vehicle collision at adjoining roads of various traffic levels

Warning signs at FCNSW intersections road closure on FCNSW roads Implement Traffic Control plans (where specified in this harvest plan) 60kmhr speed limit on all State Forest gravel roads unless otherwise signposted Compliance with FCNSW lights on policy

2 Overhead powerlines or cables

Assess every individual tree for directional felling and degree of risk Do not fall trees towards overhead hazard if within two tree lengths

3 Underground cables pipelines

Minimise ground disturbance across or along cables amp pipelines Increase depth of earth cover if required

4 Cliff lines amp rocky very steep terrain

Operators to assess work site within two tree lengths to identify immediate hazards Communicate to other operators and mark sites

5 Hazardous or dead trees

Refer to FCNSW WHS procedure 426 Assess area within two tree lengths of work site Assess risk mark any Distinctly Dangerous Trees with the symbol Oslash amp if necessary remove hazard or move work site Use machinery to assist with hazard removal if possible Contractor is responsible for implementing control strategies during harvesting NOTE A hung up tree occurs at C6 ensure this tree is removed during roading operations

6 Overhead hazards associated with dumps

Refer to FCNSW WHS procedure 426 Assess overhead hazard within two tree lengths of the dump Assess risk amp if necessary remove hazard or relocate dump site Contractor is responsible for implementing control strategies during harvesting

7 Dust from passing vehicles along dirt haulage routes

Restrict speed to minimise dust generation slow down when passing vehicles Turn on driving and hazard lights to increase visibility

8 Trucks colliding with oncoming school buses on Rossi Rd

Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads

9 Asbestos in Old Forestry DepotShed

The Shed is not in the immediate vicinity of the harvesting area Avoid this area by not using it as a lunch spot or meeting area Note that MEEP 11 at this site has not been used for this harvest plan instead the intersection of Coxes Creek Road and Lowden Road is the MEEP for this harvest plan

bull All visitors contractors and employees must be fully inducted onto the worksite by the workplace supervisor eg the Principal Contractor or the Forestry Corporation supervisor This must be recorded on the attached induction sheet

bull Relevant Safe Work Procedures are available and understood for the type of work to be undertaken bull A Risk and Hazard Assessment Worksheet must be completed if site specific hazards are identified

that are not covered by a Safe Work Procedure The top (pink sheet) is to be attached to this site safety plan

bull Operators in training must be supervised by the site supervisor bull All appropriate Personal Protective Equipment (PPE) must be worn on the worksite at all times

HP_BB_2399_14_v4 12-07-17 4

MEDICAL EMERGENCY EVACUATION PLAN

Nearest reliable mobile phone reception (describe location)

Next G Network Poor GSM NA Satellite NA

GPS LatLong 35deg 29 54 S 149deg 31 19 E

MGA 728764E 6068765N Datum GDA 94 Zone 55

Location description Lowden Road northern end of Cpt 2399

Emergency meeting point for ambulance police (refer to attached locality map) GPS LatLong 35deg 31 08 S 149deg 32 29 E

MGA 730473E 6066661N Datum GDA 94 Zone 55

Location description Intersection of Lowden Road and Coxes Creek Road

Helicopter landing place (refer to attached locality map)

GPS LatLong 35deg 27 27 S 149deg 30 18 E

Location description Rossi Village

Procedures to obtain ambulance assistance 1 Dial 000 2 If there is no mobile coverage dial 112 (which

will work on any mobile phone system) 3 If no response on 112

bull use a radio link (TARA be discrete with personal information)

bull move to an area with mobile coverage bull find a landline bull use another network (eg a contractorrsquos VHF

radio)

Contact nearest Forestry Corporation office on

Channel 236

Telephone 1300 880 548

Give details of the situation and ask for a 000 call to be placed

000 operator question Response

1 Police Fire Ambulance NSW Ambulance

2 Suburb State Forest name Tallaganda Nearest town or locality Rossi Nearest ambulance station Braidwood

3 Address Lowden Road

4 Nearest road junctioncross street Lowden Road and Coxes Creek Road

5 Local government area Palerang

6 Nature of the problem Describe the accident number and condition of casualties

7 Where is the accident Refer to safety meeting point above Directions to navigate from nearest ambulance station to the emergency meeting point From Braidwood travel south-west along Araluen Road for approx 17km and turn right onto Cooma road Travel 22km to intersection with Captains Flat road Turn right onto Captains Flat road and travel 27km and turn right into Parlour Creek Road Travel 45km to the beginning of Harolds Cross Road then travel another 5km turning right into Coxes Creek Road Travel a further 65km and turn left onto Lowden Road 8 4WD ambulance required N CB radio channel to use

9 Injuries Give detailed information about the condition of the casualty (do not mention names over radio system)

10 Your name and call back number

HP_BB_2399_14_v4 12-07-17 5

Silviculture and Harvesting Prescriptions

Year 2004 2005 2007

TSI radic X X

HR Burning X X radic

Wildfires X X X

Logging m3 0 3100 0

radic - applies X ndash not applicable

Compartment Resource Unit

No of Sweeps

BA Average (m2ha)

BA Range (m2ha)

2399 1 amp2 16 33 20-44

Silvicultural Planning Single Tree Selection The STS tract (481ha) is a predominantly mixed aged mature forest and will be harvested under a heavy single tree selection (STS) regime The objective within the 246 ha harvest area for this operation (resource unit 1) is to remove 70 of the basal area to create canopy openings for regeneration whilst retaining and minimising damage to young regenerating stems seed trees habitat and recruitment trees

It is envisaged that the next harvesting operation in this compartment would be on average 30 years time

The STS tract for IFOA purposes includes resource units 1 amp 2 of 2399 as indicated on the HPOM

Single Tree Selection (STS) must remove no more than 70 of the basal area (BA) while retaining a minimum BA of 10m2 per hectare within the tract

Resource Unit (Refer

to HPOM for detail)

Species Composition Stand Structure and Condition

1 Overstorey dominated by brown barrel (E fastigata) manna gum (E viminalis) mountain gum (E dalrympleana) and narrow-leaved peppermint (E radiata)

Resource unit is a mixed age forest with a predominantly matureover mature overstorey Stand has reached endpoint with limited further growth potential

2 Overstorey dominated by snow gum (E pauciflora) narrow-leaved peppermint (E radiata) manna gum (E Viminalis) and mountain gum (E dalrympleana)

Poor site quality matureover mature even aged forest Limited commercial value due to low sawlog yields and species mix

HP_BB_2399_14_v4 12-07-17 6

Harvesting Prescription

Resource Unit (Refer to HPOM

for detail)

of Harvest

Area

Silvicultural Treatment

1 100 STS heavy bull Retain and protect from harvestingfire damage

-polesadvanced growth (lt40cm DBHOB) with good form and vigour -habitat and recruitment trees as per TSL

bull Retained trees should be evenly spaced throughout the resource unit

bull Ensure no more than 70 of the BA within the resource unit is removed while retaining a minimum BA of 10m2 per hectare within the tract

bull All other products should be removed markets permitting If this objective cannot be achieved the following options should be considered -reject tree felling (HC must first obtain approval from HS) -defer harvesting until ideal market conditions prevail -consider harvesting under a light or medium STS regime

Note The area of each silvicultural treatment must be mapped and recorded in the Post logging information section of this plan

Special Requirements

Permanent Growth and Research Plots Any inventory plots located during the harvesting operation are to be treated the same as the surrounding area Private Property Private property occurs adjacent to the north western boundary of the compartment as indicated on the HPOM Private property owners have been notified of the scheduled harvesting and post-harvest burning The table below lists neighbours who adjoin Compartment 2399

bull No harvest disturbance is permitted on private property

bull Harvesting debris must not be left within five metres of the boundary fence lines

bull Any damage to fences must be repaired by the contractor

bull Access roads must be maintained free of debris and in a trafficable state

Occupation Permits

HP_BB_2399_14_v4 12-07-17 7

Apiary 4 apiary sites provided in the table below are located within the planning unit Contact details are available from the Batemans Bay office

Name Site Number Contact number

bull The HC must provide the apiary permittees with at least two weeks advance notice when bee boxes need to be removed or relocated

Forestry Corporation Planted Forest State Forest Plantation Occurs to the south of compartment 2399 Roads and drainage features form the majority of the boundary between compartment 2399 State Forest Planation Where the boundary between compartment 2399 and State Forest Planation is not a road or drainage feature the FT must mark the boundary as mapped

bull No harvest disturbance is permitted on State Forest Plantation

bull Access roads must be maintained free of debris and in a trafficable state

bull A permanent apiary set down sites is located on dump 13 (see HPOM) It must be levelled and free of debris at the completion of logging

Rocky Terrain Rocky terrain occurs within the net planned area All rocky terrain shown on the HPOM as ldquoRock to be verifiedrdquo needs to be assessed by FT during mark up to determine if it meets the definition of a rocky outcrop or cliff (and apply 20m exclusion if required) Additionally FTHC will continue to conduct on the ground mark-up and searches and report back to PlannerField Ecologist any feature requiring further investigation

Tower Road Due to excessive riling and saturation of the entire length of Tower Road snigging along Tower Road is not permitted Snigging across this road is permitted On completion of harvesting in the vicinity of Tower Road the Contractor must be close off with Baulks (spaced to EPL specification)

Underground Cables A dial before you dig request query of the compartment indicates that underground Telstra cables are present on the eastern side of the compartment Dial before you dig and field markers (where located) have been used to indicate the approximate location of the cable on the HPOM Prior to any harvesting or roading activity taking place in the vicinity of the cables the HC should inspect the area for markers or other evidence of the cables and flag with marking tape When carrying out harvesting or road maintenance activities near cables minimise ground disturbance across or along and increase depth of earth cover if required

From time to time above ground infrastructure associated with the cables occurs Where this infrastructure is detected the FT should pass the location and details on to the burning supervisor who should consider if extra protection measures (eg rake hoe line) are required

Any damages to cables must be immediately reported to Telstra on 13 22 03

Forest Management Zoning

HP_BB_2399_14_v4 12-07-17 8

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 4: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

HARDWOOD FORESTS- SOUTHERN IFOA SOUTH COAST HARVESTING PLAN

Tallaganda State Forest - Compartment 2399

Certification This plan has been prepared in accordance with the Integrated Forestry Operations Approval issued under the Forestry and National Park Estate Act 1998 The Harvest Plan Standard Conditions for Hardwood Forest Operations in South Coast apply to this operation Prepared By Harvest Planner

Kate Halton Approved By Operations Planning Mgr

Lee Blessington

Signature Kate Halton Signature Lee Blessington

Date 07092016 Date 1392016

Note Approval includes the Harvest Plan Operational Map (HPOM) with the corresponding approval date displayed on the map verifying final approved version Other maps included with this plan are Locality Forest Type Roading and Cultural Heritage (limited distribution)

Description of Proposal

Harvesting of Hardwood forest Harvesting of Hardwood forest using Single Tree Selection Silviculture subject to the Southern IFOA requirements will be undertaken within this planning unit Timber harvesting and road construction will not be licensed under the EPL The primary product of the harvesting is high quality large sawlogs (quota logs) small high quality sawlogs veneer logs girders poles amp piles where timber markets are available Parts of felled logs that do not meet high quality log specifications are segregated and graded into other classifications such as salvage sawlogs pulp logs amp miscellaneous timbers eg split amp round posts firewood mining timbers amp craftwood The availability of miscellaneous timbers depends mainly on forest types log defectiveness amp market conditions at the time of harvesting

Clause 22 ndash Integrated Forestry Operations Approval (IFOA) Consideration All relevant factors have been reviewed taking into account the volume and monetary value of each forest product to supply Term Agreement Holders The harvesting operation also complies with Clause 22 of the IFOA

Attachment 1 Site Safety Plan prescribes safety requirements and Medical Emergency Evacuation Plan for this harvesting operation

Attachment 2 Roading plan prescribes roading requirements for this harvesting operation

HP_BB_2399_14_v4 12-07-17 1

Abbreviations used in this plan

FT = Forest Technician HC= Harvesting Coordinator PtS= Protection Supervisor HS = Harvesting Supervisor RC = Roading Coordinator IFOA = Integrated Forestry Operations Approval

Area Identification and Yield Estimates

State Forest Compartments IFOA Region

Management Area

Certification

Tallaganda 2399 Southern Queanbeyan AFS 604224 AS47082013

Cpt 2399 Plan Compartment ID 22297 Gross Area (ha) 538 Net Harvestable Area (ha) 480 Harvest Area (ha) 259 Poles Piles Veneer amp Girders 0msup3 Quota Logs (HQL) 2300msup3 High Quality Small 200m3

Salvage 3300msup3 Pulp E1 2300t FirewoodMisc 2300t

Note The yield estimates in the table above are derived from the Plan of Operations

Slope Classes (percent of harvest area)

Slope Class Cpt 2399

of harvest area 0-15ordm 485

15-20 ordm 26 20-25 ordm 19 25-30 ordm 62 30 ordm + 03

HP_BB_2399_14_v4 12-07-17 2

- -

-

ATTACHMENT 1 SITE SAFETY PLAN

Worksite Information Is this Declared Hunting Area Yes Is hunting excluded Yes Comments

Have Exclusion Zone signs been erected or checked prior to starting work daily NA

Comments Description of Work to be undertaken on site

- Refer to description of proposal above

Site Supervisor

Name Contact number

Communication

Radio channel number VHF UHF Other (eg hand signals)

Traffic management (describe) eg Signage Road closure Traffic control Within compartment 2399 only roads that are shown on the HPOM as haulage roads may be used for haulage All haulage roads within compartment 2399 must comply with EPL The haulage route endorsed by this harvest plan (and rates calculated for) from the Compartment is

1 North on Main Range Forest Road or Lowden Road (both FCNSW roads) and west onto Rossi Road (FCNSW Road within the State Forest becoming a Palerang Shire Council where the State Forest ends)

2 South on Main Range Fire Road (FCNSW Road) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

3 South of Lowden Road and Coxes Creek Road (both FCNSW Roads) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

For all three haulage routes sight distances from the forest onto a major council roads has been assessed as suitable No traffic control is required Road intersections outside the control of FCNSW are not covered by this plan or any FCNSW Traffic Control Plan Haulage contractors must abide by NSW road laws and standard operating procedures in relation to haulage routes outside the control of FCNSW Dust noise and school bus routes Dust and noise ndash Where log haulage routes pass close to rural housing along natural surfacegravel roads dust and noise must be minimised to the greatest extent practicable Trucks should reduce speed restrict use to daylight hours and minimise the use of engine brakes through these areas Local traffic - Lowden road is used by local commuters between the hours of 730am to 830 am and 330pm to 430pm On weekdays to the greatest extent practicable log haulage should avoid commute time on the above road School bus route - Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads Name of on site safety first aiders

Location of first aid kit

HP_BB_2399_14_v4 12-07-17 3

SITE HAZARD amp RISK ASSESSMENT NO CONTROL WHO IMPLEM

ENTED

1 Vehicle collision at adjoining roads of various traffic levels

Warning signs at FCNSW intersections road closure on FCNSW roads Implement Traffic Control plans (where specified in this harvest plan) 60kmhr speed limit on all State Forest gravel roads unless otherwise signposted Compliance with FCNSW lights on policy

2 Overhead powerlines or cables

Assess every individual tree for directional felling and degree of risk Do not fall trees towards overhead hazard if within two tree lengths

3 Underground cables pipelines

Minimise ground disturbance across or along cables amp pipelines Increase depth of earth cover if required

4 Cliff lines amp rocky very steep terrain

Operators to assess work site within two tree lengths to identify immediate hazards Communicate to other operators and mark sites

5 Hazardous or dead trees

Refer to FCNSW WHS procedure 426 Assess area within two tree lengths of work site Assess risk mark any Distinctly Dangerous Trees with the symbol Oslash amp if necessary remove hazard or move work site Use machinery to assist with hazard removal if possible Contractor is responsible for implementing control strategies during harvesting NOTE A hung up tree occurs at C6 ensure this tree is removed during roading operations

6 Overhead hazards associated with dumps

Refer to FCNSW WHS procedure 426 Assess overhead hazard within two tree lengths of the dump Assess risk amp if necessary remove hazard or relocate dump site Contractor is responsible for implementing control strategies during harvesting

7 Dust from passing vehicles along dirt haulage routes

Restrict speed to minimise dust generation slow down when passing vehicles Turn on driving and hazard lights to increase visibility

8 Trucks colliding with oncoming school buses on Rossi Rd

Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads

9 Asbestos in Old Forestry DepotShed

The Shed is not in the immediate vicinity of the harvesting area Avoid this area by not using it as a lunch spot or meeting area Note that MEEP 11 at this site has not been used for this harvest plan instead the intersection of Coxes Creek Road and Lowden Road is the MEEP for this harvest plan

bull All visitors contractors and employees must be fully inducted onto the worksite by the workplace supervisor eg the Principal Contractor or the Forestry Corporation supervisor This must be recorded on the attached induction sheet

bull Relevant Safe Work Procedures are available and understood for the type of work to be undertaken bull A Risk and Hazard Assessment Worksheet must be completed if site specific hazards are identified

that are not covered by a Safe Work Procedure The top (pink sheet) is to be attached to this site safety plan

bull Operators in training must be supervised by the site supervisor bull All appropriate Personal Protective Equipment (PPE) must be worn on the worksite at all times

HP_BB_2399_14_v4 12-07-17 4

MEDICAL EMERGENCY EVACUATION PLAN

Nearest reliable mobile phone reception (describe location)

Next G Network Poor GSM NA Satellite NA

GPS LatLong 35deg 29 54 S 149deg 31 19 E

MGA 728764E 6068765N Datum GDA 94 Zone 55

Location description Lowden Road northern end of Cpt 2399

Emergency meeting point for ambulance police (refer to attached locality map) GPS LatLong 35deg 31 08 S 149deg 32 29 E

MGA 730473E 6066661N Datum GDA 94 Zone 55

Location description Intersection of Lowden Road and Coxes Creek Road

Helicopter landing place (refer to attached locality map)

GPS LatLong 35deg 27 27 S 149deg 30 18 E

Location description Rossi Village

Procedures to obtain ambulance assistance 1 Dial 000 2 If there is no mobile coverage dial 112 (which

will work on any mobile phone system) 3 If no response on 112

bull use a radio link (TARA be discrete with personal information)

bull move to an area with mobile coverage bull find a landline bull use another network (eg a contractorrsquos VHF

radio)

Contact nearest Forestry Corporation office on

Channel 236

Telephone 1300 880 548

Give details of the situation and ask for a 000 call to be placed

000 operator question Response

1 Police Fire Ambulance NSW Ambulance

2 Suburb State Forest name Tallaganda Nearest town or locality Rossi Nearest ambulance station Braidwood

3 Address Lowden Road

4 Nearest road junctioncross street Lowden Road and Coxes Creek Road

5 Local government area Palerang

6 Nature of the problem Describe the accident number and condition of casualties

7 Where is the accident Refer to safety meeting point above Directions to navigate from nearest ambulance station to the emergency meeting point From Braidwood travel south-west along Araluen Road for approx 17km and turn right onto Cooma road Travel 22km to intersection with Captains Flat road Turn right onto Captains Flat road and travel 27km and turn right into Parlour Creek Road Travel 45km to the beginning of Harolds Cross Road then travel another 5km turning right into Coxes Creek Road Travel a further 65km and turn left onto Lowden Road 8 4WD ambulance required N CB radio channel to use

9 Injuries Give detailed information about the condition of the casualty (do not mention names over radio system)

10 Your name and call back number

HP_BB_2399_14_v4 12-07-17 5

Silviculture and Harvesting Prescriptions

Year 2004 2005 2007

TSI radic X X

HR Burning X X radic

Wildfires X X X

Logging m3 0 3100 0

radic - applies X ndash not applicable

Compartment Resource Unit

No of Sweeps

BA Average (m2ha)

BA Range (m2ha)

2399 1 amp2 16 33 20-44

Silvicultural Planning Single Tree Selection The STS tract (481ha) is a predominantly mixed aged mature forest and will be harvested under a heavy single tree selection (STS) regime The objective within the 246 ha harvest area for this operation (resource unit 1) is to remove 70 of the basal area to create canopy openings for regeneration whilst retaining and minimising damage to young regenerating stems seed trees habitat and recruitment trees

It is envisaged that the next harvesting operation in this compartment would be on average 30 years time

The STS tract for IFOA purposes includes resource units 1 amp 2 of 2399 as indicated on the HPOM

Single Tree Selection (STS) must remove no more than 70 of the basal area (BA) while retaining a minimum BA of 10m2 per hectare within the tract

Resource Unit (Refer

to HPOM for detail)

Species Composition Stand Structure and Condition

1 Overstorey dominated by brown barrel (E fastigata) manna gum (E viminalis) mountain gum (E dalrympleana) and narrow-leaved peppermint (E radiata)

Resource unit is a mixed age forest with a predominantly matureover mature overstorey Stand has reached endpoint with limited further growth potential

2 Overstorey dominated by snow gum (E pauciflora) narrow-leaved peppermint (E radiata) manna gum (E Viminalis) and mountain gum (E dalrympleana)

Poor site quality matureover mature even aged forest Limited commercial value due to low sawlog yields and species mix

HP_BB_2399_14_v4 12-07-17 6

Harvesting Prescription

Resource Unit (Refer to HPOM

for detail)

of Harvest

Area

Silvicultural Treatment

1 100 STS heavy bull Retain and protect from harvestingfire damage

-polesadvanced growth (lt40cm DBHOB) with good form and vigour -habitat and recruitment trees as per TSL

bull Retained trees should be evenly spaced throughout the resource unit

bull Ensure no more than 70 of the BA within the resource unit is removed while retaining a minimum BA of 10m2 per hectare within the tract

bull All other products should be removed markets permitting If this objective cannot be achieved the following options should be considered -reject tree felling (HC must first obtain approval from HS) -defer harvesting until ideal market conditions prevail -consider harvesting under a light or medium STS regime

Note The area of each silvicultural treatment must be mapped and recorded in the Post logging information section of this plan

Special Requirements

Permanent Growth and Research Plots Any inventory plots located during the harvesting operation are to be treated the same as the surrounding area Private Property Private property occurs adjacent to the north western boundary of the compartment as indicated on the HPOM Private property owners have been notified of the scheduled harvesting and post-harvest burning The table below lists neighbours who adjoin Compartment 2399

bull No harvest disturbance is permitted on private property

bull Harvesting debris must not be left within five metres of the boundary fence lines

bull Any damage to fences must be repaired by the contractor

bull Access roads must be maintained free of debris and in a trafficable state

Occupation Permits

HP_BB_2399_14_v4 12-07-17 7

Apiary 4 apiary sites provided in the table below are located within the planning unit Contact details are available from the Batemans Bay office

Name Site Number Contact number

bull The HC must provide the apiary permittees with at least two weeks advance notice when bee boxes need to be removed or relocated

Forestry Corporation Planted Forest State Forest Plantation Occurs to the south of compartment 2399 Roads and drainage features form the majority of the boundary between compartment 2399 State Forest Planation Where the boundary between compartment 2399 and State Forest Planation is not a road or drainage feature the FT must mark the boundary as mapped

bull No harvest disturbance is permitted on State Forest Plantation

bull Access roads must be maintained free of debris and in a trafficable state

bull A permanent apiary set down sites is located on dump 13 (see HPOM) It must be levelled and free of debris at the completion of logging

Rocky Terrain Rocky terrain occurs within the net planned area All rocky terrain shown on the HPOM as ldquoRock to be verifiedrdquo needs to be assessed by FT during mark up to determine if it meets the definition of a rocky outcrop or cliff (and apply 20m exclusion if required) Additionally FTHC will continue to conduct on the ground mark-up and searches and report back to PlannerField Ecologist any feature requiring further investigation

Tower Road Due to excessive riling and saturation of the entire length of Tower Road snigging along Tower Road is not permitted Snigging across this road is permitted On completion of harvesting in the vicinity of Tower Road the Contractor must be close off with Baulks (spaced to EPL specification)

Underground Cables A dial before you dig request query of the compartment indicates that underground Telstra cables are present on the eastern side of the compartment Dial before you dig and field markers (where located) have been used to indicate the approximate location of the cable on the HPOM Prior to any harvesting or roading activity taking place in the vicinity of the cables the HC should inspect the area for markers or other evidence of the cables and flag with marking tape When carrying out harvesting or road maintenance activities near cables minimise ground disturbance across or along and increase depth of earth cover if required

From time to time above ground infrastructure associated with the cables occurs Where this infrastructure is detected the FT should pass the location and details on to the burning supervisor who should consider if extra protection measures (eg rake hoe line) are required

Any damages to cables must be immediately reported to Telstra on 13 22 03

Forest Management Zoning

HP_BB_2399_14_v4 12-07-17 8

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 5: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

Abbreviations used in this plan

FT = Forest Technician HC= Harvesting Coordinator PtS= Protection Supervisor HS = Harvesting Supervisor RC = Roading Coordinator IFOA = Integrated Forestry Operations Approval

Area Identification and Yield Estimates

State Forest Compartments IFOA Region

Management Area

Certification

Tallaganda 2399 Southern Queanbeyan AFS 604224 AS47082013

Cpt 2399 Plan Compartment ID 22297 Gross Area (ha) 538 Net Harvestable Area (ha) 480 Harvest Area (ha) 259 Poles Piles Veneer amp Girders 0msup3 Quota Logs (HQL) 2300msup3 High Quality Small 200m3

Salvage 3300msup3 Pulp E1 2300t FirewoodMisc 2300t

Note The yield estimates in the table above are derived from the Plan of Operations

Slope Classes (percent of harvest area)

Slope Class Cpt 2399

of harvest area 0-15ordm 485

15-20 ordm 26 20-25 ordm 19 25-30 ordm 62 30 ordm + 03

HP_BB_2399_14_v4 12-07-17 2

- -

-

ATTACHMENT 1 SITE SAFETY PLAN

Worksite Information Is this Declared Hunting Area Yes Is hunting excluded Yes Comments

Have Exclusion Zone signs been erected or checked prior to starting work daily NA

Comments Description of Work to be undertaken on site

- Refer to description of proposal above

Site Supervisor

Name Contact number

Communication

Radio channel number VHF UHF Other (eg hand signals)

Traffic management (describe) eg Signage Road closure Traffic control Within compartment 2399 only roads that are shown on the HPOM as haulage roads may be used for haulage All haulage roads within compartment 2399 must comply with EPL The haulage route endorsed by this harvest plan (and rates calculated for) from the Compartment is

1 North on Main Range Forest Road or Lowden Road (both FCNSW roads) and west onto Rossi Road (FCNSW Road within the State Forest becoming a Palerang Shire Council where the State Forest ends)

2 South on Main Range Fire Road (FCNSW Road) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

3 South of Lowden Road and Coxes Creek Road (both FCNSW Roads) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

For all three haulage routes sight distances from the forest onto a major council roads has been assessed as suitable No traffic control is required Road intersections outside the control of FCNSW are not covered by this plan or any FCNSW Traffic Control Plan Haulage contractors must abide by NSW road laws and standard operating procedures in relation to haulage routes outside the control of FCNSW Dust noise and school bus routes Dust and noise ndash Where log haulage routes pass close to rural housing along natural surfacegravel roads dust and noise must be minimised to the greatest extent practicable Trucks should reduce speed restrict use to daylight hours and minimise the use of engine brakes through these areas Local traffic - Lowden road is used by local commuters between the hours of 730am to 830 am and 330pm to 430pm On weekdays to the greatest extent practicable log haulage should avoid commute time on the above road School bus route - Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads Name of on site safety first aiders

Location of first aid kit

HP_BB_2399_14_v4 12-07-17 3

SITE HAZARD amp RISK ASSESSMENT NO CONTROL WHO IMPLEM

ENTED

1 Vehicle collision at adjoining roads of various traffic levels

Warning signs at FCNSW intersections road closure on FCNSW roads Implement Traffic Control plans (where specified in this harvest plan) 60kmhr speed limit on all State Forest gravel roads unless otherwise signposted Compliance with FCNSW lights on policy

2 Overhead powerlines or cables

Assess every individual tree for directional felling and degree of risk Do not fall trees towards overhead hazard if within two tree lengths

3 Underground cables pipelines

Minimise ground disturbance across or along cables amp pipelines Increase depth of earth cover if required

4 Cliff lines amp rocky very steep terrain

Operators to assess work site within two tree lengths to identify immediate hazards Communicate to other operators and mark sites

5 Hazardous or dead trees

Refer to FCNSW WHS procedure 426 Assess area within two tree lengths of work site Assess risk mark any Distinctly Dangerous Trees with the symbol Oslash amp if necessary remove hazard or move work site Use machinery to assist with hazard removal if possible Contractor is responsible for implementing control strategies during harvesting NOTE A hung up tree occurs at C6 ensure this tree is removed during roading operations

6 Overhead hazards associated with dumps

Refer to FCNSW WHS procedure 426 Assess overhead hazard within two tree lengths of the dump Assess risk amp if necessary remove hazard or relocate dump site Contractor is responsible for implementing control strategies during harvesting

7 Dust from passing vehicles along dirt haulage routes

Restrict speed to minimise dust generation slow down when passing vehicles Turn on driving and hazard lights to increase visibility

8 Trucks colliding with oncoming school buses on Rossi Rd

Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads

9 Asbestos in Old Forestry DepotShed

The Shed is not in the immediate vicinity of the harvesting area Avoid this area by not using it as a lunch spot or meeting area Note that MEEP 11 at this site has not been used for this harvest plan instead the intersection of Coxes Creek Road and Lowden Road is the MEEP for this harvest plan

bull All visitors contractors and employees must be fully inducted onto the worksite by the workplace supervisor eg the Principal Contractor or the Forestry Corporation supervisor This must be recorded on the attached induction sheet

bull Relevant Safe Work Procedures are available and understood for the type of work to be undertaken bull A Risk and Hazard Assessment Worksheet must be completed if site specific hazards are identified

that are not covered by a Safe Work Procedure The top (pink sheet) is to be attached to this site safety plan

bull Operators in training must be supervised by the site supervisor bull All appropriate Personal Protective Equipment (PPE) must be worn on the worksite at all times

HP_BB_2399_14_v4 12-07-17 4

MEDICAL EMERGENCY EVACUATION PLAN

Nearest reliable mobile phone reception (describe location)

Next G Network Poor GSM NA Satellite NA

GPS LatLong 35deg 29 54 S 149deg 31 19 E

MGA 728764E 6068765N Datum GDA 94 Zone 55

Location description Lowden Road northern end of Cpt 2399

Emergency meeting point for ambulance police (refer to attached locality map) GPS LatLong 35deg 31 08 S 149deg 32 29 E

MGA 730473E 6066661N Datum GDA 94 Zone 55

Location description Intersection of Lowden Road and Coxes Creek Road

Helicopter landing place (refer to attached locality map)

GPS LatLong 35deg 27 27 S 149deg 30 18 E

Location description Rossi Village

Procedures to obtain ambulance assistance 1 Dial 000 2 If there is no mobile coverage dial 112 (which

will work on any mobile phone system) 3 If no response on 112

bull use a radio link (TARA be discrete with personal information)

bull move to an area with mobile coverage bull find a landline bull use another network (eg a contractorrsquos VHF

radio)

Contact nearest Forestry Corporation office on

Channel 236

Telephone 1300 880 548

Give details of the situation and ask for a 000 call to be placed

000 operator question Response

1 Police Fire Ambulance NSW Ambulance

2 Suburb State Forest name Tallaganda Nearest town or locality Rossi Nearest ambulance station Braidwood

3 Address Lowden Road

4 Nearest road junctioncross street Lowden Road and Coxes Creek Road

5 Local government area Palerang

6 Nature of the problem Describe the accident number and condition of casualties

7 Where is the accident Refer to safety meeting point above Directions to navigate from nearest ambulance station to the emergency meeting point From Braidwood travel south-west along Araluen Road for approx 17km and turn right onto Cooma road Travel 22km to intersection with Captains Flat road Turn right onto Captains Flat road and travel 27km and turn right into Parlour Creek Road Travel 45km to the beginning of Harolds Cross Road then travel another 5km turning right into Coxes Creek Road Travel a further 65km and turn left onto Lowden Road 8 4WD ambulance required N CB radio channel to use

9 Injuries Give detailed information about the condition of the casualty (do not mention names over radio system)

10 Your name and call back number

HP_BB_2399_14_v4 12-07-17 5

Silviculture and Harvesting Prescriptions

Year 2004 2005 2007

TSI radic X X

HR Burning X X radic

Wildfires X X X

Logging m3 0 3100 0

radic - applies X ndash not applicable

Compartment Resource Unit

No of Sweeps

BA Average (m2ha)

BA Range (m2ha)

2399 1 amp2 16 33 20-44

Silvicultural Planning Single Tree Selection The STS tract (481ha) is a predominantly mixed aged mature forest and will be harvested under a heavy single tree selection (STS) regime The objective within the 246 ha harvest area for this operation (resource unit 1) is to remove 70 of the basal area to create canopy openings for regeneration whilst retaining and minimising damage to young regenerating stems seed trees habitat and recruitment trees

It is envisaged that the next harvesting operation in this compartment would be on average 30 years time

The STS tract for IFOA purposes includes resource units 1 amp 2 of 2399 as indicated on the HPOM

Single Tree Selection (STS) must remove no more than 70 of the basal area (BA) while retaining a minimum BA of 10m2 per hectare within the tract

Resource Unit (Refer

to HPOM for detail)

Species Composition Stand Structure and Condition

1 Overstorey dominated by brown barrel (E fastigata) manna gum (E viminalis) mountain gum (E dalrympleana) and narrow-leaved peppermint (E radiata)

Resource unit is a mixed age forest with a predominantly matureover mature overstorey Stand has reached endpoint with limited further growth potential

2 Overstorey dominated by snow gum (E pauciflora) narrow-leaved peppermint (E radiata) manna gum (E Viminalis) and mountain gum (E dalrympleana)

Poor site quality matureover mature even aged forest Limited commercial value due to low sawlog yields and species mix

HP_BB_2399_14_v4 12-07-17 6

Harvesting Prescription

Resource Unit (Refer to HPOM

for detail)

of Harvest

Area

Silvicultural Treatment

1 100 STS heavy bull Retain and protect from harvestingfire damage

-polesadvanced growth (lt40cm DBHOB) with good form and vigour -habitat and recruitment trees as per TSL

bull Retained trees should be evenly spaced throughout the resource unit

bull Ensure no more than 70 of the BA within the resource unit is removed while retaining a minimum BA of 10m2 per hectare within the tract

bull All other products should be removed markets permitting If this objective cannot be achieved the following options should be considered -reject tree felling (HC must first obtain approval from HS) -defer harvesting until ideal market conditions prevail -consider harvesting under a light or medium STS regime

Note The area of each silvicultural treatment must be mapped and recorded in the Post logging information section of this plan

Special Requirements

Permanent Growth and Research Plots Any inventory plots located during the harvesting operation are to be treated the same as the surrounding area Private Property Private property occurs adjacent to the north western boundary of the compartment as indicated on the HPOM Private property owners have been notified of the scheduled harvesting and post-harvest burning The table below lists neighbours who adjoin Compartment 2399

bull No harvest disturbance is permitted on private property

bull Harvesting debris must not be left within five metres of the boundary fence lines

bull Any damage to fences must be repaired by the contractor

bull Access roads must be maintained free of debris and in a trafficable state

Occupation Permits

HP_BB_2399_14_v4 12-07-17 7

Apiary 4 apiary sites provided in the table below are located within the planning unit Contact details are available from the Batemans Bay office

Name Site Number Contact number

bull The HC must provide the apiary permittees with at least two weeks advance notice when bee boxes need to be removed or relocated

Forestry Corporation Planted Forest State Forest Plantation Occurs to the south of compartment 2399 Roads and drainage features form the majority of the boundary between compartment 2399 State Forest Planation Where the boundary between compartment 2399 and State Forest Planation is not a road or drainage feature the FT must mark the boundary as mapped

bull No harvest disturbance is permitted on State Forest Plantation

bull Access roads must be maintained free of debris and in a trafficable state

bull A permanent apiary set down sites is located on dump 13 (see HPOM) It must be levelled and free of debris at the completion of logging

Rocky Terrain Rocky terrain occurs within the net planned area All rocky terrain shown on the HPOM as ldquoRock to be verifiedrdquo needs to be assessed by FT during mark up to determine if it meets the definition of a rocky outcrop or cliff (and apply 20m exclusion if required) Additionally FTHC will continue to conduct on the ground mark-up and searches and report back to PlannerField Ecologist any feature requiring further investigation

Tower Road Due to excessive riling and saturation of the entire length of Tower Road snigging along Tower Road is not permitted Snigging across this road is permitted On completion of harvesting in the vicinity of Tower Road the Contractor must be close off with Baulks (spaced to EPL specification)

Underground Cables A dial before you dig request query of the compartment indicates that underground Telstra cables are present on the eastern side of the compartment Dial before you dig and field markers (where located) have been used to indicate the approximate location of the cable on the HPOM Prior to any harvesting or roading activity taking place in the vicinity of the cables the HC should inspect the area for markers or other evidence of the cables and flag with marking tape When carrying out harvesting or road maintenance activities near cables minimise ground disturbance across or along and increase depth of earth cover if required

From time to time above ground infrastructure associated with the cables occurs Where this infrastructure is detected the FT should pass the location and details on to the burning supervisor who should consider if extra protection measures (eg rake hoe line) are required

Any damages to cables must be immediately reported to Telstra on 13 22 03

Forest Management Zoning

HP_BB_2399_14_v4 12-07-17 8

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 6: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

- -

-

ATTACHMENT 1 SITE SAFETY PLAN

Worksite Information Is this Declared Hunting Area Yes Is hunting excluded Yes Comments

Have Exclusion Zone signs been erected or checked prior to starting work daily NA

Comments Description of Work to be undertaken on site

- Refer to description of proposal above

Site Supervisor

Name Contact number

Communication

Radio channel number VHF UHF Other (eg hand signals)

Traffic management (describe) eg Signage Road closure Traffic control Within compartment 2399 only roads that are shown on the HPOM as haulage roads may be used for haulage All haulage roads within compartment 2399 must comply with EPL The haulage route endorsed by this harvest plan (and rates calculated for) from the Compartment is

1 North on Main Range Forest Road or Lowden Road (both FCNSW roads) and west onto Rossi Road (FCNSW Road within the State Forest becoming a Palerang Shire Council where the State Forest ends)

2 South on Main Range Fire Road (FCNSW Road) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

3 South of Lowden Road and Coxes Creek Road (both FCNSW Roads) to Haroldrsquos Cross Road (Palerang Shire Council Road) then turning east only

For all three haulage routes sight distances from the forest onto a major council roads has been assessed as suitable No traffic control is required Road intersections outside the control of FCNSW are not covered by this plan or any FCNSW Traffic Control Plan Haulage contractors must abide by NSW road laws and standard operating procedures in relation to haulage routes outside the control of FCNSW Dust noise and school bus routes Dust and noise ndash Where log haulage routes pass close to rural housing along natural surfacegravel roads dust and noise must be minimised to the greatest extent practicable Trucks should reduce speed restrict use to daylight hours and minimise the use of engine brakes through these areas Local traffic - Lowden road is used by local commuters between the hours of 730am to 830 am and 330pm to 430pm On weekdays to the greatest extent practicable log haulage should avoid commute time on the above road School bus route - Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads Name of on site safety first aiders

Location of first aid kit

HP_BB_2399_14_v4 12-07-17 3

SITE HAZARD amp RISK ASSESSMENT NO CONTROL WHO IMPLEM

ENTED

1 Vehicle collision at adjoining roads of various traffic levels

Warning signs at FCNSW intersections road closure on FCNSW roads Implement Traffic Control plans (where specified in this harvest plan) 60kmhr speed limit on all State Forest gravel roads unless otherwise signposted Compliance with FCNSW lights on policy

2 Overhead powerlines or cables

Assess every individual tree for directional felling and degree of risk Do not fall trees towards overhead hazard if within two tree lengths

3 Underground cables pipelines

Minimise ground disturbance across or along cables amp pipelines Increase depth of earth cover if required

4 Cliff lines amp rocky very steep terrain

Operators to assess work site within two tree lengths to identify immediate hazards Communicate to other operators and mark sites

5 Hazardous or dead trees

Refer to FCNSW WHS procedure 426 Assess area within two tree lengths of work site Assess risk mark any Distinctly Dangerous Trees with the symbol Oslash amp if necessary remove hazard or move work site Use machinery to assist with hazard removal if possible Contractor is responsible for implementing control strategies during harvesting NOTE A hung up tree occurs at C6 ensure this tree is removed during roading operations

6 Overhead hazards associated with dumps

Refer to FCNSW WHS procedure 426 Assess overhead hazard within two tree lengths of the dump Assess risk amp if necessary remove hazard or relocate dump site Contractor is responsible for implementing control strategies during harvesting

7 Dust from passing vehicles along dirt haulage routes

Restrict speed to minimise dust generation slow down when passing vehicles Turn on driving and hazard lights to increase visibility

8 Trucks colliding with oncoming school buses on Rossi Rd

Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads

9 Asbestos in Old Forestry DepotShed

The Shed is not in the immediate vicinity of the harvesting area Avoid this area by not using it as a lunch spot or meeting area Note that MEEP 11 at this site has not been used for this harvest plan instead the intersection of Coxes Creek Road and Lowden Road is the MEEP for this harvest plan

bull All visitors contractors and employees must be fully inducted onto the worksite by the workplace supervisor eg the Principal Contractor or the Forestry Corporation supervisor This must be recorded on the attached induction sheet

bull Relevant Safe Work Procedures are available and understood for the type of work to be undertaken bull A Risk and Hazard Assessment Worksheet must be completed if site specific hazards are identified

that are not covered by a Safe Work Procedure The top (pink sheet) is to be attached to this site safety plan

bull Operators in training must be supervised by the site supervisor bull All appropriate Personal Protective Equipment (PPE) must be worn on the worksite at all times

HP_BB_2399_14_v4 12-07-17 4

MEDICAL EMERGENCY EVACUATION PLAN

Nearest reliable mobile phone reception (describe location)

Next G Network Poor GSM NA Satellite NA

GPS LatLong 35deg 29 54 S 149deg 31 19 E

MGA 728764E 6068765N Datum GDA 94 Zone 55

Location description Lowden Road northern end of Cpt 2399

Emergency meeting point for ambulance police (refer to attached locality map) GPS LatLong 35deg 31 08 S 149deg 32 29 E

MGA 730473E 6066661N Datum GDA 94 Zone 55

Location description Intersection of Lowden Road and Coxes Creek Road

Helicopter landing place (refer to attached locality map)

GPS LatLong 35deg 27 27 S 149deg 30 18 E

Location description Rossi Village

Procedures to obtain ambulance assistance 1 Dial 000 2 If there is no mobile coverage dial 112 (which

will work on any mobile phone system) 3 If no response on 112

bull use a radio link (TARA be discrete with personal information)

bull move to an area with mobile coverage bull find a landline bull use another network (eg a contractorrsquos VHF

radio)

Contact nearest Forestry Corporation office on

Channel 236

Telephone 1300 880 548

Give details of the situation and ask for a 000 call to be placed

000 operator question Response

1 Police Fire Ambulance NSW Ambulance

2 Suburb State Forest name Tallaganda Nearest town or locality Rossi Nearest ambulance station Braidwood

3 Address Lowden Road

4 Nearest road junctioncross street Lowden Road and Coxes Creek Road

5 Local government area Palerang

6 Nature of the problem Describe the accident number and condition of casualties

7 Where is the accident Refer to safety meeting point above Directions to navigate from nearest ambulance station to the emergency meeting point From Braidwood travel south-west along Araluen Road for approx 17km and turn right onto Cooma road Travel 22km to intersection with Captains Flat road Turn right onto Captains Flat road and travel 27km and turn right into Parlour Creek Road Travel 45km to the beginning of Harolds Cross Road then travel another 5km turning right into Coxes Creek Road Travel a further 65km and turn left onto Lowden Road 8 4WD ambulance required N CB radio channel to use

9 Injuries Give detailed information about the condition of the casualty (do not mention names over radio system)

10 Your name and call back number

HP_BB_2399_14_v4 12-07-17 5

Silviculture and Harvesting Prescriptions

Year 2004 2005 2007

TSI radic X X

HR Burning X X radic

Wildfires X X X

Logging m3 0 3100 0

radic - applies X ndash not applicable

Compartment Resource Unit

No of Sweeps

BA Average (m2ha)

BA Range (m2ha)

2399 1 amp2 16 33 20-44

Silvicultural Planning Single Tree Selection The STS tract (481ha) is a predominantly mixed aged mature forest and will be harvested under a heavy single tree selection (STS) regime The objective within the 246 ha harvest area for this operation (resource unit 1) is to remove 70 of the basal area to create canopy openings for regeneration whilst retaining and minimising damage to young regenerating stems seed trees habitat and recruitment trees

It is envisaged that the next harvesting operation in this compartment would be on average 30 years time

The STS tract for IFOA purposes includes resource units 1 amp 2 of 2399 as indicated on the HPOM

Single Tree Selection (STS) must remove no more than 70 of the basal area (BA) while retaining a minimum BA of 10m2 per hectare within the tract

Resource Unit (Refer

to HPOM for detail)

Species Composition Stand Structure and Condition

1 Overstorey dominated by brown barrel (E fastigata) manna gum (E viminalis) mountain gum (E dalrympleana) and narrow-leaved peppermint (E radiata)

Resource unit is a mixed age forest with a predominantly matureover mature overstorey Stand has reached endpoint with limited further growth potential

2 Overstorey dominated by snow gum (E pauciflora) narrow-leaved peppermint (E radiata) manna gum (E Viminalis) and mountain gum (E dalrympleana)

Poor site quality matureover mature even aged forest Limited commercial value due to low sawlog yields and species mix

HP_BB_2399_14_v4 12-07-17 6

Harvesting Prescription

Resource Unit (Refer to HPOM

for detail)

of Harvest

Area

Silvicultural Treatment

1 100 STS heavy bull Retain and protect from harvestingfire damage

-polesadvanced growth (lt40cm DBHOB) with good form and vigour -habitat and recruitment trees as per TSL

bull Retained trees should be evenly spaced throughout the resource unit

bull Ensure no more than 70 of the BA within the resource unit is removed while retaining a minimum BA of 10m2 per hectare within the tract

bull All other products should be removed markets permitting If this objective cannot be achieved the following options should be considered -reject tree felling (HC must first obtain approval from HS) -defer harvesting until ideal market conditions prevail -consider harvesting under a light or medium STS regime

Note The area of each silvicultural treatment must be mapped and recorded in the Post logging information section of this plan

Special Requirements

Permanent Growth and Research Plots Any inventory plots located during the harvesting operation are to be treated the same as the surrounding area Private Property Private property occurs adjacent to the north western boundary of the compartment as indicated on the HPOM Private property owners have been notified of the scheduled harvesting and post-harvest burning The table below lists neighbours who adjoin Compartment 2399

bull No harvest disturbance is permitted on private property

bull Harvesting debris must not be left within five metres of the boundary fence lines

bull Any damage to fences must be repaired by the contractor

bull Access roads must be maintained free of debris and in a trafficable state

Occupation Permits

HP_BB_2399_14_v4 12-07-17 7

Apiary 4 apiary sites provided in the table below are located within the planning unit Contact details are available from the Batemans Bay office

Name Site Number Contact number

bull The HC must provide the apiary permittees with at least two weeks advance notice when bee boxes need to be removed or relocated

Forestry Corporation Planted Forest State Forest Plantation Occurs to the south of compartment 2399 Roads and drainage features form the majority of the boundary between compartment 2399 State Forest Planation Where the boundary between compartment 2399 and State Forest Planation is not a road or drainage feature the FT must mark the boundary as mapped

bull No harvest disturbance is permitted on State Forest Plantation

bull Access roads must be maintained free of debris and in a trafficable state

bull A permanent apiary set down sites is located on dump 13 (see HPOM) It must be levelled and free of debris at the completion of logging

Rocky Terrain Rocky terrain occurs within the net planned area All rocky terrain shown on the HPOM as ldquoRock to be verifiedrdquo needs to be assessed by FT during mark up to determine if it meets the definition of a rocky outcrop or cliff (and apply 20m exclusion if required) Additionally FTHC will continue to conduct on the ground mark-up and searches and report back to PlannerField Ecologist any feature requiring further investigation

Tower Road Due to excessive riling and saturation of the entire length of Tower Road snigging along Tower Road is not permitted Snigging across this road is permitted On completion of harvesting in the vicinity of Tower Road the Contractor must be close off with Baulks (spaced to EPL specification)

Underground Cables A dial before you dig request query of the compartment indicates that underground Telstra cables are present on the eastern side of the compartment Dial before you dig and field markers (where located) have been used to indicate the approximate location of the cable on the HPOM Prior to any harvesting or roading activity taking place in the vicinity of the cables the HC should inspect the area for markers or other evidence of the cables and flag with marking tape When carrying out harvesting or road maintenance activities near cables minimise ground disturbance across or along and increase depth of earth cover if required

From time to time above ground infrastructure associated with the cables occurs Where this infrastructure is detected the FT should pass the location and details on to the burning supervisor who should consider if extra protection measures (eg rake hoe line) are required

Any damages to cables must be immediately reported to Telstra on 13 22 03

Forest Management Zoning

HP_BB_2399_14_v4 12-07-17 8

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 7: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

SITE HAZARD amp RISK ASSESSMENT NO CONTROL WHO IMPLEM

ENTED

1 Vehicle collision at adjoining roads of various traffic levels

Warning signs at FCNSW intersections road closure on FCNSW roads Implement Traffic Control plans (where specified in this harvest plan) 60kmhr speed limit on all State Forest gravel roads unless otherwise signposted Compliance with FCNSW lights on policy

2 Overhead powerlines or cables

Assess every individual tree for directional felling and degree of risk Do not fall trees towards overhead hazard if within two tree lengths

3 Underground cables pipelines

Minimise ground disturbance across or along cables amp pipelines Increase depth of earth cover if required

4 Cliff lines amp rocky very steep terrain

Operators to assess work site within two tree lengths to identify immediate hazards Communicate to other operators and mark sites

5 Hazardous or dead trees

Refer to FCNSW WHS procedure 426 Assess area within two tree lengths of work site Assess risk mark any Distinctly Dangerous Trees with the symbol Oslash amp if necessary remove hazard or move work site Use machinery to assist with hazard removal if possible Contractor is responsible for implementing control strategies during harvesting NOTE A hung up tree occurs at C6 ensure this tree is removed during roading operations

6 Overhead hazards associated with dumps

Refer to FCNSW WHS procedure 426 Assess overhead hazard within two tree lengths of the dump Assess risk amp if necessary remove hazard or relocate dump site Contractor is responsible for implementing control strategies during harvesting

7 Dust from passing vehicles along dirt haulage routes

Restrict speed to minimise dust generation slow down when passing vehicles Turn on driving and hazard lights to increase visibility

8 Trucks colliding with oncoming school buses on Rossi Rd

Rossi road is used by school buses between the hours of 700am to 900 am and 310pm to 445pm On weekdays to the greatest extent practicable log haulage should avoid school bus times on the above roads

9 Asbestos in Old Forestry DepotShed

The Shed is not in the immediate vicinity of the harvesting area Avoid this area by not using it as a lunch spot or meeting area Note that MEEP 11 at this site has not been used for this harvest plan instead the intersection of Coxes Creek Road and Lowden Road is the MEEP for this harvest plan

bull All visitors contractors and employees must be fully inducted onto the worksite by the workplace supervisor eg the Principal Contractor or the Forestry Corporation supervisor This must be recorded on the attached induction sheet

bull Relevant Safe Work Procedures are available and understood for the type of work to be undertaken bull A Risk and Hazard Assessment Worksheet must be completed if site specific hazards are identified

that are not covered by a Safe Work Procedure The top (pink sheet) is to be attached to this site safety plan

bull Operators in training must be supervised by the site supervisor bull All appropriate Personal Protective Equipment (PPE) must be worn on the worksite at all times

HP_BB_2399_14_v4 12-07-17 4

MEDICAL EMERGENCY EVACUATION PLAN

Nearest reliable mobile phone reception (describe location)

Next G Network Poor GSM NA Satellite NA

GPS LatLong 35deg 29 54 S 149deg 31 19 E

MGA 728764E 6068765N Datum GDA 94 Zone 55

Location description Lowden Road northern end of Cpt 2399

Emergency meeting point for ambulance police (refer to attached locality map) GPS LatLong 35deg 31 08 S 149deg 32 29 E

MGA 730473E 6066661N Datum GDA 94 Zone 55

Location description Intersection of Lowden Road and Coxes Creek Road

Helicopter landing place (refer to attached locality map)

GPS LatLong 35deg 27 27 S 149deg 30 18 E

Location description Rossi Village

Procedures to obtain ambulance assistance 1 Dial 000 2 If there is no mobile coverage dial 112 (which

will work on any mobile phone system) 3 If no response on 112

bull use a radio link (TARA be discrete with personal information)

bull move to an area with mobile coverage bull find a landline bull use another network (eg a contractorrsquos VHF

radio)

Contact nearest Forestry Corporation office on

Channel 236

Telephone 1300 880 548

Give details of the situation and ask for a 000 call to be placed

000 operator question Response

1 Police Fire Ambulance NSW Ambulance

2 Suburb State Forest name Tallaganda Nearest town or locality Rossi Nearest ambulance station Braidwood

3 Address Lowden Road

4 Nearest road junctioncross street Lowden Road and Coxes Creek Road

5 Local government area Palerang

6 Nature of the problem Describe the accident number and condition of casualties

7 Where is the accident Refer to safety meeting point above Directions to navigate from nearest ambulance station to the emergency meeting point From Braidwood travel south-west along Araluen Road for approx 17km and turn right onto Cooma road Travel 22km to intersection with Captains Flat road Turn right onto Captains Flat road and travel 27km and turn right into Parlour Creek Road Travel 45km to the beginning of Harolds Cross Road then travel another 5km turning right into Coxes Creek Road Travel a further 65km and turn left onto Lowden Road 8 4WD ambulance required N CB radio channel to use

9 Injuries Give detailed information about the condition of the casualty (do not mention names over radio system)

10 Your name and call back number

HP_BB_2399_14_v4 12-07-17 5

Silviculture and Harvesting Prescriptions

Year 2004 2005 2007

TSI radic X X

HR Burning X X radic

Wildfires X X X

Logging m3 0 3100 0

radic - applies X ndash not applicable

Compartment Resource Unit

No of Sweeps

BA Average (m2ha)

BA Range (m2ha)

2399 1 amp2 16 33 20-44

Silvicultural Planning Single Tree Selection The STS tract (481ha) is a predominantly mixed aged mature forest and will be harvested under a heavy single tree selection (STS) regime The objective within the 246 ha harvest area for this operation (resource unit 1) is to remove 70 of the basal area to create canopy openings for regeneration whilst retaining and minimising damage to young regenerating stems seed trees habitat and recruitment trees

It is envisaged that the next harvesting operation in this compartment would be on average 30 years time

The STS tract for IFOA purposes includes resource units 1 amp 2 of 2399 as indicated on the HPOM

Single Tree Selection (STS) must remove no more than 70 of the basal area (BA) while retaining a minimum BA of 10m2 per hectare within the tract

Resource Unit (Refer

to HPOM for detail)

Species Composition Stand Structure and Condition

1 Overstorey dominated by brown barrel (E fastigata) manna gum (E viminalis) mountain gum (E dalrympleana) and narrow-leaved peppermint (E radiata)

Resource unit is a mixed age forest with a predominantly matureover mature overstorey Stand has reached endpoint with limited further growth potential

2 Overstorey dominated by snow gum (E pauciflora) narrow-leaved peppermint (E radiata) manna gum (E Viminalis) and mountain gum (E dalrympleana)

Poor site quality matureover mature even aged forest Limited commercial value due to low sawlog yields and species mix

HP_BB_2399_14_v4 12-07-17 6

Harvesting Prescription

Resource Unit (Refer to HPOM

for detail)

of Harvest

Area

Silvicultural Treatment

1 100 STS heavy bull Retain and protect from harvestingfire damage

-polesadvanced growth (lt40cm DBHOB) with good form and vigour -habitat and recruitment trees as per TSL

bull Retained trees should be evenly spaced throughout the resource unit

bull Ensure no more than 70 of the BA within the resource unit is removed while retaining a minimum BA of 10m2 per hectare within the tract

bull All other products should be removed markets permitting If this objective cannot be achieved the following options should be considered -reject tree felling (HC must first obtain approval from HS) -defer harvesting until ideal market conditions prevail -consider harvesting under a light or medium STS regime

Note The area of each silvicultural treatment must be mapped and recorded in the Post logging information section of this plan

Special Requirements

Permanent Growth and Research Plots Any inventory plots located during the harvesting operation are to be treated the same as the surrounding area Private Property Private property occurs adjacent to the north western boundary of the compartment as indicated on the HPOM Private property owners have been notified of the scheduled harvesting and post-harvest burning The table below lists neighbours who adjoin Compartment 2399

bull No harvest disturbance is permitted on private property

bull Harvesting debris must not be left within five metres of the boundary fence lines

bull Any damage to fences must be repaired by the contractor

bull Access roads must be maintained free of debris and in a trafficable state

Occupation Permits

HP_BB_2399_14_v4 12-07-17 7

Apiary 4 apiary sites provided in the table below are located within the planning unit Contact details are available from the Batemans Bay office

Name Site Number Contact number

bull The HC must provide the apiary permittees with at least two weeks advance notice when bee boxes need to be removed or relocated

Forestry Corporation Planted Forest State Forest Plantation Occurs to the south of compartment 2399 Roads and drainage features form the majority of the boundary between compartment 2399 State Forest Planation Where the boundary between compartment 2399 and State Forest Planation is not a road or drainage feature the FT must mark the boundary as mapped

bull No harvest disturbance is permitted on State Forest Plantation

bull Access roads must be maintained free of debris and in a trafficable state

bull A permanent apiary set down sites is located on dump 13 (see HPOM) It must be levelled and free of debris at the completion of logging

Rocky Terrain Rocky terrain occurs within the net planned area All rocky terrain shown on the HPOM as ldquoRock to be verifiedrdquo needs to be assessed by FT during mark up to determine if it meets the definition of a rocky outcrop or cliff (and apply 20m exclusion if required) Additionally FTHC will continue to conduct on the ground mark-up and searches and report back to PlannerField Ecologist any feature requiring further investigation

Tower Road Due to excessive riling and saturation of the entire length of Tower Road snigging along Tower Road is not permitted Snigging across this road is permitted On completion of harvesting in the vicinity of Tower Road the Contractor must be close off with Baulks (spaced to EPL specification)

Underground Cables A dial before you dig request query of the compartment indicates that underground Telstra cables are present on the eastern side of the compartment Dial before you dig and field markers (where located) have been used to indicate the approximate location of the cable on the HPOM Prior to any harvesting or roading activity taking place in the vicinity of the cables the HC should inspect the area for markers or other evidence of the cables and flag with marking tape When carrying out harvesting or road maintenance activities near cables minimise ground disturbance across or along and increase depth of earth cover if required

From time to time above ground infrastructure associated with the cables occurs Where this infrastructure is detected the FT should pass the location and details on to the burning supervisor who should consider if extra protection measures (eg rake hoe line) are required

Any damages to cables must be immediately reported to Telstra on 13 22 03

Forest Management Zoning

HP_BB_2399_14_v4 12-07-17 8

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 8: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

MEDICAL EMERGENCY EVACUATION PLAN

Nearest reliable mobile phone reception (describe location)

Next G Network Poor GSM NA Satellite NA

GPS LatLong 35deg 29 54 S 149deg 31 19 E

MGA 728764E 6068765N Datum GDA 94 Zone 55

Location description Lowden Road northern end of Cpt 2399

Emergency meeting point for ambulance police (refer to attached locality map) GPS LatLong 35deg 31 08 S 149deg 32 29 E

MGA 730473E 6066661N Datum GDA 94 Zone 55

Location description Intersection of Lowden Road and Coxes Creek Road

Helicopter landing place (refer to attached locality map)

GPS LatLong 35deg 27 27 S 149deg 30 18 E

Location description Rossi Village

Procedures to obtain ambulance assistance 1 Dial 000 2 If there is no mobile coverage dial 112 (which

will work on any mobile phone system) 3 If no response on 112

bull use a radio link (TARA be discrete with personal information)

bull move to an area with mobile coverage bull find a landline bull use another network (eg a contractorrsquos VHF

radio)

Contact nearest Forestry Corporation office on

Channel 236

Telephone 1300 880 548

Give details of the situation and ask for a 000 call to be placed

000 operator question Response

1 Police Fire Ambulance NSW Ambulance

2 Suburb State Forest name Tallaganda Nearest town or locality Rossi Nearest ambulance station Braidwood

3 Address Lowden Road

4 Nearest road junctioncross street Lowden Road and Coxes Creek Road

5 Local government area Palerang

6 Nature of the problem Describe the accident number and condition of casualties

7 Where is the accident Refer to safety meeting point above Directions to navigate from nearest ambulance station to the emergency meeting point From Braidwood travel south-west along Araluen Road for approx 17km and turn right onto Cooma road Travel 22km to intersection with Captains Flat road Turn right onto Captains Flat road and travel 27km and turn right into Parlour Creek Road Travel 45km to the beginning of Harolds Cross Road then travel another 5km turning right into Coxes Creek Road Travel a further 65km and turn left onto Lowden Road 8 4WD ambulance required N CB radio channel to use

9 Injuries Give detailed information about the condition of the casualty (do not mention names over radio system)

10 Your name and call back number

HP_BB_2399_14_v4 12-07-17 5

Silviculture and Harvesting Prescriptions

Year 2004 2005 2007

TSI radic X X

HR Burning X X radic

Wildfires X X X

Logging m3 0 3100 0

radic - applies X ndash not applicable

Compartment Resource Unit

No of Sweeps

BA Average (m2ha)

BA Range (m2ha)

2399 1 amp2 16 33 20-44

Silvicultural Planning Single Tree Selection The STS tract (481ha) is a predominantly mixed aged mature forest and will be harvested under a heavy single tree selection (STS) regime The objective within the 246 ha harvest area for this operation (resource unit 1) is to remove 70 of the basal area to create canopy openings for regeneration whilst retaining and minimising damage to young regenerating stems seed trees habitat and recruitment trees

It is envisaged that the next harvesting operation in this compartment would be on average 30 years time

The STS tract for IFOA purposes includes resource units 1 amp 2 of 2399 as indicated on the HPOM

Single Tree Selection (STS) must remove no more than 70 of the basal area (BA) while retaining a minimum BA of 10m2 per hectare within the tract

Resource Unit (Refer

to HPOM for detail)

Species Composition Stand Structure and Condition

1 Overstorey dominated by brown barrel (E fastigata) manna gum (E viminalis) mountain gum (E dalrympleana) and narrow-leaved peppermint (E radiata)

Resource unit is a mixed age forest with a predominantly matureover mature overstorey Stand has reached endpoint with limited further growth potential

2 Overstorey dominated by snow gum (E pauciflora) narrow-leaved peppermint (E radiata) manna gum (E Viminalis) and mountain gum (E dalrympleana)

Poor site quality matureover mature even aged forest Limited commercial value due to low sawlog yields and species mix

HP_BB_2399_14_v4 12-07-17 6

Harvesting Prescription

Resource Unit (Refer to HPOM

for detail)

of Harvest

Area

Silvicultural Treatment

1 100 STS heavy bull Retain and protect from harvestingfire damage

-polesadvanced growth (lt40cm DBHOB) with good form and vigour -habitat and recruitment trees as per TSL

bull Retained trees should be evenly spaced throughout the resource unit

bull Ensure no more than 70 of the BA within the resource unit is removed while retaining a minimum BA of 10m2 per hectare within the tract

bull All other products should be removed markets permitting If this objective cannot be achieved the following options should be considered -reject tree felling (HC must first obtain approval from HS) -defer harvesting until ideal market conditions prevail -consider harvesting under a light or medium STS regime

Note The area of each silvicultural treatment must be mapped and recorded in the Post logging information section of this plan

Special Requirements

Permanent Growth and Research Plots Any inventory plots located during the harvesting operation are to be treated the same as the surrounding area Private Property Private property occurs adjacent to the north western boundary of the compartment as indicated on the HPOM Private property owners have been notified of the scheduled harvesting and post-harvest burning The table below lists neighbours who adjoin Compartment 2399

bull No harvest disturbance is permitted on private property

bull Harvesting debris must not be left within five metres of the boundary fence lines

bull Any damage to fences must be repaired by the contractor

bull Access roads must be maintained free of debris and in a trafficable state

Occupation Permits

HP_BB_2399_14_v4 12-07-17 7

Apiary 4 apiary sites provided in the table below are located within the planning unit Contact details are available from the Batemans Bay office

Name Site Number Contact number

bull The HC must provide the apiary permittees with at least two weeks advance notice when bee boxes need to be removed or relocated

Forestry Corporation Planted Forest State Forest Plantation Occurs to the south of compartment 2399 Roads and drainage features form the majority of the boundary between compartment 2399 State Forest Planation Where the boundary between compartment 2399 and State Forest Planation is not a road or drainage feature the FT must mark the boundary as mapped

bull No harvest disturbance is permitted on State Forest Plantation

bull Access roads must be maintained free of debris and in a trafficable state

bull A permanent apiary set down sites is located on dump 13 (see HPOM) It must be levelled and free of debris at the completion of logging

Rocky Terrain Rocky terrain occurs within the net planned area All rocky terrain shown on the HPOM as ldquoRock to be verifiedrdquo needs to be assessed by FT during mark up to determine if it meets the definition of a rocky outcrop or cliff (and apply 20m exclusion if required) Additionally FTHC will continue to conduct on the ground mark-up and searches and report back to PlannerField Ecologist any feature requiring further investigation

Tower Road Due to excessive riling and saturation of the entire length of Tower Road snigging along Tower Road is not permitted Snigging across this road is permitted On completion of harvesting in the vicinity of Tower Road the Contractor must be close off with Baulks (spaced to EPL specification)

Underground Cables A dial before you dig request query of the compartment indicates that underground Telstra cables are present on the eastern side of the compartment Dial before you dig and field markers (where located) have been used to indicate the approximate location of the cable on the HPOM Prior to any harvesting or roading activity taking place in the vicinity of the cables the HC should inspect the area for markers or other evidence of the cables and flag with marking tape When carrying out harvesting or road maintenance activities near cables minimise ground disturbance across or along and increase depth of earth cover if required

From time to time above ground infrastructure associated with the cables occurs Where this infrastructure is detected the FT should pass the location and details on to the burning supervisor who should consider if extra protection measures (eg rake hoe line) are required

Any damages to cables must be immediately reported to Telstra on 13 22 03

Forest Management Zoning

HP_BB_2399_14_v4 12-07-17 8

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 9: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

Silviculture and Harvesting Prescriptions

Year 2004 2005 2007

TSI radic X X

HR Burning X X radic

Wildfires X X X

Logging m3 0 3100 0

radic - applies X ndash not applicable

Compartment Resource Unit

No of Sweeps

BA Average (m2ha)

BA Range (m2ha)

2399 1 amp2 16 33 20-44

Silvicultural Planning Single Tree Selection The STS tract (481ha) is a predominantly mixed aged mature forest and will be harvested under a heavy single tree selection (STS) regime The objective within the 246 ha harvest area for this operation (resource unit 1) is to remove 70 of the basal area to create canopy openings for regeneration whilst retaining and minimising damage to young regenerating stems seed trees habitat and recruitment trees

It is envisaged that the next harvesting operation in this compartment would be on average 30 years time

The STS tract for IFOA purposes includes resource units 1 amp 2 of 2399 as indicated on the HPOM

Single Tree Selection (STS) must remove no more than 70 of the basal area (BA) while retaining a minimum BA of 10m2 per hectare within the tract

Resource Unit (Refer

to HPOM for detail)

Species Composition Stand Structure and Condition

1 Overstorey dominated by brown barrel (E fastigata) manna gum (E viminalis) mountain gum (E dalrympleana) and narrow-leaved peppermint (E radiata)

Resource unit is a mixed age forest with a predominantly matureover mature overstorey Stand has reached endpoint with limited further growth potential

2 Overstorey dominated by snow gum (E pauciflora) narrow-leaved peppermint (E radiata) manna gum (E Viminalis) and mountain gum (E dalrympleana)

Poor site quality matureover mature even aged forest Limited commercial value due to low sawlog yields and species mix

HP_BB_2399_14_v4 12-07-17 6

Harvesting Prescription

Resource Unit (Refer to HPOM

for detail)

of Harvest

Area

Silvicultural Treatment

1 100 STS heavy bull Retain and protect from harvestingfire damage

-polesadvanced growth (lt40cm DBHOB) with good form and vigour -habitat and recruitment trees as per TSL

bull Retained trees should be evenly spaced throughout the resource unit

bull Ensure no more than 70 of the BA within the resource unit is removed while retaining a minimum BA of 10m2 per hectare within the tract

bull All other products should be removed markets permitting If this objective cannot be achieved the following options should be considered -reject tree felling (HC must first obtain approval from HS) -defer harvesting until ideal market conditions prevail -consider harvesting under a light or medium STS regime

Note The area of each silvicultural treatment must be mapped and recorded in the Post logging information section of this plan

Special Requirements

Permanent Growth and Research Plots Any inventory plots located during the harvesting operation are to be treated the same as the surrounding area Private Property Private property occurs adjacent to the north western boundary of the compartment as indicated on the HPOM Private property owners have been notified of the scheduled harvesting and post-harvest burning The table below lists neighbours who adjoin Compartment 2399

bull No harvest disturbance is permitted on private property

bull Harvesting debris must not be left within five metres of the boundary fence lines

bull Any damage to fences must be repaired by the contractor

bull Access roads must be maintained free of debris and in a trafficable state

Occupation Permits

HP_BB_2399_14_v4 12-07-17 7

Apiary 4 apiary sites provided in the table below are located within the planning unit Contact details are available from the Batemans Bay office

Name Site Number Contact number

bull The HC must provide the apiary permittees with at least two weeks advance notice when bee boxes need to be removed or relocated

Forestry Corporation Planted Forest State Forest Plantation Occurs to the south of compartment 2399 Roads and drainage features form the majority of the boundary between compartment 2399 State Forest Planation Where the boundary between compartment 2399 and State Forest Planation is not a road or drainage feature the FT must mark the boundary as mapped

bull No harvest disturbance is permitted on State Forest Plantation

bull Access roads must be maintained free of debris and in a trafficable state

bull A permanent apiary set down sites is located on dump 13 (see HPOM) It must be levelled and free of debris at the completion of logging

Rocky Terrain Rocky terrain occurs within the net planned area All rocky terrain shown on the HPOM as ldquoRock to be verifiedrdquo needs to be assessed by FT during mark up to determine if it meets the definition of a rocky outcrop or cliff (and apply 20m exclusion if required) Additionally FTHC will continue to conduct on the ground mark-up and searches and report back to PlannerField Ecologist any feature requiring further investigation

Tower Road Due to excessive riling and saturation of the entire length of Tower Road snigging along Tower Road is not permitted Snigging across this road is permitted On completion of harvesting in the vicinity of Tower Road the Contractor must be close off with Baulks (spaced to EPL specification)

Underground Cables A dial before you dig request query of the compartment indicates that underground Telstra cables are present on the eastern side of the compartment Dial before you dig and field markers (where located) have been used to indicate the approximate location of the cable on the HPOM Prior to any harvesting or roading activity taking place in the vicinity of the cables the HC should inspect the area for markers or other evidence of the cables and flag with marking tape When carrying out harvesting or road maintenance activities near cables minimise ground disturbance across or along and increase depth of earth cover if required

From time to time above ground infrastructure associated with the cables occurs Where this infrastructure is detected the FT should pass the location and details on to the burning supervisor who should consider if extra protection measures (eg rake hoe line) are required

Any damages to cables must be immediately reported to Telstra on 13 22 03

Forest Management Zoning

HP_BB_2399_14_v4 12-07-17 8

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 10: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

Harvesting Prescription

Resource Unit (Refer to HPOM

for detail)

of Harvest

Area

Silvicultural Treatment

1 100 STS heavy bull Retain and protect from harvestingfire damage

-polesadvanced growth (lt40cm DBHOB) with good form and vigour -habitat and recruitment trees as per TSL

bull Retained trees should be evenly spaced throughout the resource unit

bull Ensure no more than 70 of the BA within the resource unit is removed while retaining a minimum BA of 10m2 per hectare within the tract

bull All other products should be removed markets permitting If this objective cannot be achieved the following options should be considered -reject tree felling (HC must first obtain approval from HS) -defer harvesting until ideal market conditions prevail -consider harvesting under a light or medium STS regime

Note The area of each silvicultural treatment must be mapped and recorded in the Post logging information section of this plan

Special Requirements

Permanent Growth and Research Plots Any inventory plots located during the harvesting operation are to be treated the same as the surrounding area Private Property Private property occurs adjacent to the north western boundary of the compartment as indicated on the HPOM Private property owners have been notified of the scheduled harvesting and post-harvest burning The table below lists neighbours who adjoin Compartment 2399

bull No harvest disturbance is permitted on private property

bull Harvesting debris must not be left within five metres of the boundary fence lines

bull Any damage to fences must be repaired by the contractor

bull Access roads must be maintained free of debris and in a trafficable state

Occupation Permits

HP_BB_2399_14_v4 12-07-17 7

Apiary 4 apiary sites provided in the table below are located within the planning unit Contact details are available from the Batemans Bay office

Name Site Number Contact number

bull The HC must provide the apiary permittees with at least two weeks advance notice when bee boxes need to be removed or relocated

Forestry Corporation Planted Forest State Forest Plantation Occurs to the south of compartment 2399 Roads and drainage features form the majority of the boundary between compartment 2399 State Forest Planation Where the boundary between compartment 2399 and State Forest Planation is not a road or drainage feature the FT must mark the boundary as mapped

bull No harvest disturbance is permitted on State Forest Plantation

bull Access roads must be maintained free of debris and in a trafficable state

bull A permanent apiary set down sites is located on dump 13 (see HPOM) It must be levelled and free of debris at the completion of logging

Rocky Terrain Rocky terrain occurs within the net planned area All rocky terrain shown on the HPOM as ldquoRock to be verifiedrdquo needs to be assessed by FT during mark up to determine if it meets the definition of a rocky outcrop or cliff (and apply 20m exclusion if required) Additionally FTHC will continue to conduct on the ground mark-up and searches and report back to PlannerField Ecologist any feature requiring further investigation

Tower Road Due to excessive riling and saturation of the entire length of Tower Road snigging along Tower Road is not permitted Snigging across this road is permitted On completion of harvesting in the vicinity of Tower Road the Contractor must be close off with Baulks (spaced to EPL specification)

Underground Cables A dial before you dig request query of the compartment indicates that underground Telstra cables are present on the eastern side of the compartment Dial before you dig and field markers (where located) have been used to indicate the approximate location of the cable on the HPOM Prior to any harvesting or roading activity taking place in the vicinity of the cables the HC should inspect the area for markers or other evidence of the cables and flag with marking tape When carrying out harvesting or road maintenance activities near cables minimise ground disturbance across or along and increase depth of earth cover if required

From time to time above ground infrastructure associated with the cables occurs Where this infrastructure is detected the FT should pass the location and details on to the burning supervisor who should consider if extra protection measures (eg rake hoe line) are required

Any damages to cables must be immediately reported to Telstra on 13 22 03

Forest Management Zoning

HP_BB_2399_14_v4 12-07-17 8

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 11: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

Apiary 4 apiary sites provided in the table below are located within the planning unit Contact details are available from the Batemans Bay office

Name Site Number Contact number

bull The HC must provide the apiary permittees with at least two weeks advance notice when bee boxes need to be removed or relocated

Forestry Corporation Planted Forest State Forest Plantation Occurs to the south of compartment 2399 Roads and drainage features form the majority of the boundary between compartment 2399 State Forest Planation Where the boundary between compartment 2399 and State Forest Planation is not a road or drainage feature the FT must mark the boundary as mapped

bull No harvest disturbance is permitted on State Forest Plantation

bull Access roads must be maintained free of debris and in a trafficable state

bull A permanent apiary set down sites is located on dump 13 (see HPOM) It must be levelled and free of debris at the completion of logging

Rocky Terrain Rocky terrain occurs within the net planned area All rocky terrain shown on the HPOM as ldquoRock to be verifiedrdquo needs to be assessed by FT during mark up to determine if it meets the definition of a rocky outcrop or cliff (and apply 20m exclusion if required) Additionally FTHC will continue to conduct on the ground mark-up and searches and report back to PlannerField Ecologist any feature requiring further investigation

Tower Road Due to excessive riling and saturation of the entire length of Tower Road snigging along Tower Road is not permitted Snigging across this road is permitted On completion of harvesting in the vicinity of Tower Road the Contractor must be close off with Baulks (spaced to EPL specification)

Underground Cables A dial before you dig request query of the compartment indicates that underground Telstra cables are present on the eastern side of the compartment Dial before you dig and field markers (where located) have been used to indicate the approximate location of the cable on the HPOM Prior to any harvesting or roading activity taking place in the vicinity of the cables the HC should inspect the area for markers or other evidence of the cables and flag with marking tape When carrying out harvesting or road maintenance activities near cables minimise ground disturbance across or along and increase depth of earth cover if required

From time to time above ground infrastructure associated with the cables occurs Where this infrastructure is detected the FT should pass the location and details on to the burning supervisor who should consider if extra protection measures (eg rake hoe line) are required

Any damages to cables must be immediately reported to Telstra on 13 22 03

Forest Management Zoning

HP_BB_2399_14_v4 12-07-17 8

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 12: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

FMZ 7 Non Forest and FMZ 4- General Management (normal harvesting prescriptions apply) occur within the compartment Refer to HPOM for more detail

FMZ 7 ndash Refer to site safety plan section of this harvest plan for the safety requirements when working in the vicinity of powerlines No other conditions apply

IFOA Required Approval of Forestry Activities

Construction or re-opening of roads or snig tracks may occur with prior approval in the following exclusion zones

- Operations Planning Mgr approval required for Stream Exclusion Zones During the harvesting operation the HC must identify any crossings required in these exclusion zones and contact the Planner to obtain required approvals Cultural Heritage

Flora and Fauna

Species adequately covered by general prescriptions The following species have been recorded in or around the compartments and are adequately covered by the general prescriptions No further protection measures are required for these species Olive Whistler (Pachycephala olivacea) Flame Robin (Petroica phoenicea) and Gang Gang Cockatoo (Callocephalon fimbriatum)

Tree Retention

Zone

Hollow

bearing T

reesha

Recruitm

ent Trees ha

GG

density gt1ha + H

abitatha

Protection of R

etained Trees

Dead Standing

Trees (only if safe)

Significant Food R

esource

Non Regrowth 5 5 +3 radic radic radic

TSL condition 56b 56c 64d 610 f

56h 56f 56 g

radic - Condition applies

HP_BB_2399_14_v4 12-07-17 9

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 13: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

General exclusion zones General exclusions as listed below are shown on the HPOM

FeatureCondition TSL condrsquon

Occurs within Planning Unit

Rainforest 54 Has been assessed amp is unlikely to occur in the field May require further

investigation Riparian Protection Zones 57 Yes

Based on spatially corrected LIC drainage Ridge amp Headwater Habitat 58 Yes Wetlands 59 Has been assessed amp is unlikely to occur

in the field May require further investigation

Heath and Scrub 510 Has been assessed amp is unlikely to occur in the field May require further

investigation Rocky Outcrops and Cliffs 511 Has been assessed as a risk that it may

occur in the field May require further investigation

The area shown on HPOM as ldquoprobable rock and exclusion zonerdquo has been

assessed at planning stage FT to mark 20m exclusion

Endangered Ecological Community NA Has been assessed as a risk that Montane Peatlands and Swamps EEC amp

Tablelands Snow Gum Black Sallee Candlebark and Ribbon Gum EEC may

occur in the field May require further investigation Harvesting harvesting machinery and post harvest burning must be excluded from all areas of EEC EEC shown on the HPOM has not been assessed in the field and

must be assessed by a field ecologist or excluded from harvesting and

burning as mapped FTHC will continue to conduct on the ground mark-up amp searches and report back to forestersecologists any features requiring further investigation

General Threatened Flora and Fauna Prescriptions Feature Records in 2399 Licence conditions

under the TSC Act Threatened Frog General

Protection Measures No 512

Bird Nest and Roost Site Protection

No 513

Tree Bat Roost Protection No 5141 Subterranean Roost

Protection No 5142

Protection of flying-fox No 5143

HP_BB_2399_14_v4 12-07-17 10

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 14: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

Feature Records in 2399 Licence conditions under the TSC Act

Camps Burning Net planned area 516

Ground Habitat Protection Net planned area 517

Species amp Site-Specific Threatened Flora and Fauna Prescriptions The following species have been recorded within or nearby the area and the associated prescriptions must be implemented

Threatened species and habitat features within trigger distance

Records in 2399 Licence conditions under the TSC Act or relevant Site-specific

prescription Powerful Owl Ninox strenua Yes 64 Spotted tailed Quoll Dasyurus maculatus

No 610

Yellow-bellied Glider Petaurus australis

No 613

Fisheries Licence Conditions

Compartment 2399 contains Class 2 Aquatic Habitat as defined by the Southern Region Fisheries Licence Therefore the conditions of the fisheries licence are triggered for this operation

Unmapped drainage lines must not be harvested within the compartment

Riparian Exclusion Zones Buffer Zones and Special Operational Zones must be established as per condition 7A1 ndash 7A3 of the Fisheries Licence Operations within these zones must comply with restrictions detailed in conditions 7A4 ndash 7A10

If a need for ldquoin-stream worksrdquo within Class 2 Aquatic Habitat is identified during the operation (additional to any works already described within the harvest plan) the Contract Coordinator must inform the Harvest Planner immediately ldquoIn-stream worksrdquo are defined as any activity being carried out within the incised channel or where there is no defined bank between the apparent edges of the watercourse

All ldquoin-stream worksrdquo within Class 2 Aquatic Habitat must comply within condition 8 of the Fisheries Licence

Soils and Water Protection

Refer to EPL Booklet amp Standard Plan Conditions Spatially Corrected LIC Drainage Spatially corrected LIC drainage has been built using LiDAR derived drainage in compartment 2399 Protection zones and filter strips have been rebuilt based on spatially correct LIC drainage and an additional mean stream bed width included for each stream order Stream based Ridge and Headwater exclusions have been rebuilt based on spatially

HP_BB_2399_14_v4 12-07-17 11

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 15: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

corrected LIC drainage (mean stream width is not built in to these exclusions)The FT or Harvest Contractor may use the HPOM and GPS mapping to locate exclusion boundaries or traditional measure and mark up methods If GPS mapping is being used to locate boundaries as a minimum the FT must mark with flagging tape all unmapped and 1st order drainage features

Site-specific EPL Conditions

Elements Conditions Unmapped Drainage Lines EPL does apply

Drainage Feature Protection See HPOM for widths

Inherent Hazard Class 2

Dispersible Soils No

Seasonality Harvesting Exclusions No

Seasonality Burning Exclusions No

Log Dumps Refer relevant conditions for IHL

Snig Tracks Refer relevant conditions for IHL

Roads See Schedule 5 of EPL Booklet

Slope limits for harvesting Refer to Schedule 4B3 of EPL

Drainage Feature Protection Filter strips (EPL) Protection Zones (EPL) Operational Zones (EPL) Exclusion Zones (FL) Buffer Zones (FL) Special Operational Zones (FL) Protection Zones -hard (TSL) and Protection Zones -soft (TSL) must be retained along all drainage lines prescribed streams and watercourses within the net planned area of the compartments at minimum widths as stated in the Table below Table 1 Minimum filter strip protection zone and operational zone widths for mapped and unmapped drainage lines prescribed streams and watercourses in native forests in Inherent Hazard Level 1 amp 2 (metres ndash measured along the ground surface) Stream Order EPL Filter Strip

FL Exclusion Zone TSL Protection

(hard)

EPL Protection Zone FL Buffer Zone TSL Protection

(soft)

EPL Operational Zone

FL Special Operational Zone

Unmapped 5 5 10 1st order 5 5 10 2nd order 5 15 10 3rd order 5 25 10 4th order or greater

5 45 10

Note TSL Protection zones (hard amp soft) are contained within the EPL Filter strip amp FL Buffer zone which have the greater level of protection Log Dump Location 14 log dumps are indicated on the HPOM Field location of log dumps must utilise the most level site available consistent with the location indicated on the HPOM Inherent

HP_BB_2399_14_v4 12-07-17 12

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 16: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

hazard level 2 Conditions 26 27 28 30 31 and 33 of Schedule 4 of the EPL must apply

The timber south of 23996 Road must go to dump 1 and south of Tower Road to dump 2 3 or 5 To access this timber snigging along Tower Road is not permitted due to excessive riling and saturation of the road surface

Drainage Feature Crossings No snig track crossings and 9 road crossings (C1- C9) are approved for use on drainage features (Refer to HPOM) Road crossing details are contained in Attachment 2 of this Plan Mass Movement Compartment 2399 is not in an area identified as having a potential for mass movement No specific prescriptions relating to mass movementsnigging are required

Suitability of existing log dams and gully stuffers There are no known log dams or gully stuffers on snig track or road crossings in the compartments Condition 47 of Schedule 4 of the EPL must apply Post Log Burning Control Lines

To assist the post log burning crews prevent fire from entering areas to be excluded from burning control line construction must be undertaken concurrently with harvesting Where possible snig tracks patterns should be designed to double as control lines Control lines must be located as close as reasonably practical to the feature to be excluded from burning The HC must assess the areas harvested snig track network and existing roads to determine if there are sufficient control lines in place and where required instruct the contractor to construct additional mineral earth control lines to supplement these The HC must record instances where it was not possible to construct a suitable control line close to the feature to be excluded and recommend harvest areas which should be excluded from the post log burning operation due to inadequate control lines The table below lists critical boundaries in compartment 2399 Where possible design snig track patterns so they double as bare earth containment lines as close as possible to these boundaries Where this is not practical it is NOT necessary to construct a bare earth break along boundary of the exclusion the practice of no direct ignition will be followed

Critical boundary Completed Yes No

Rocky outcrop amp ridge and headwater

Note bull Private property and EEC is a critical boundary to the north of compartment 2399 however is separated from the burn area by multiple roads There is no need to consider control lines for these features at during harvesting bull State Forest Plantation is a critical boundary to the south of compartment 2399 As there are adequate control lines (roads and moistrunning drainage lines) along this boundary between the proposed burn area and this critical boundary there is no need to consider control lines for these features during harvesting The proposed burn area is south of Kellyrsquos Road 23991 Road and 23994 Road therefore control lines between the northern edge of the harvest area area (RU1) and excluded forest (RU2) are not required

HP_BB_2399_14_v4 12-07-17 13

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 17: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

Pre-Operational Briefing

I acknowledge that I have received a copy of the Harvesting Plan for Compartment 2399 in Tallaganda State Forest and that I have been briefed on the conditions of the Plan and understand the supervision and operational control requirements as explained to me by the HS or hisher delegate

Position Name Signature Date

Post Harvest Mapping Features Confirmation Checklist Feature Planning

Updates Reason (ErrorNew)

GIS update tool completed

Harvesting Updates

Comments

Soil Regolith No Rainforest No Rocky outcrops Yes New Yes Wetlands No Cultural Heritage No Existing Roads Yes Error Yes New Roads No Heath No Powerlines etc No Other (state what it is)

HC Feature Usage Record

Dates of commencement and cessation of logging Date of commencement of logging_____________

Date of cessation of logging __________________

DUMP USAGE RECORD bull Record the commencement and completion of harvesting at each dump

bull Record the occurrence of temporary stopping of harvesting at each dump

Dump number

Start date

Finish date

Track drainage

completed within 2 days

(yesno)

Date of temporary cessation

Temporary track drainage completed

within 5 days (yesno)

Date resumed

HP_BB_2399_14_v4 12-07-17 14

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 18: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

At completion of snig trackdump track drainage must be completed within 2 days unless soil is saturated

At temporary cessation of snig track use track drainage must be completed within 5 days unless soil is saturated

Situations where drainage could not be completed due to saturated soils must be recorded in HCFT Notes

HCFT Notes

Date Event Signed

HP_BB_2399_14_v4 12-07-17 15

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 19: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

HP_BB_2399_14_v4 12-07-17 16

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 20: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 17

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 21: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 18

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 22: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 19

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 23: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

HCFT Notes (continued)

Date Event Signed

HP_BB_2399_14_v4 12-07-17 20

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 24: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

Clearance Certificate

COMPARTMENTS 2399 Tallaganda STATE FOREST

To HC

I request approval for me to move my logging crew and all associated machinery from the above-mentioned area to the next compartment in accordance with Section 35 of the Forest Practices Code

I certify that (a) all permanent roads trails and mitre drains have been cleared of harvesting debris (b) butt damage to retained trees has been kept to acceptable limits (c) all trees marked for removal have been felled (d) utilisation limits have been satisfactorily met (e) stump heights conform to requirements (f) all hanging trees have been felled and brought down (g) all log dumpsites have been satisfactorily restored as required (h) harvesting debris is not accumulated around retained trees (i) all accumulated litter has been disposed of properly (j) all filter and buffer strip requirements have been complied with (k) all snig track extraction track and temporary logging road drainage has been installed

satisfactorily and other required rehabilitation work has been completed (l) all necessary repairs to damaged roads signs fences and other structures have been carried

out (m) _______ (insert quantity) rubber flaps have been recovered in a satisfactory condition

and reported to Roading Coordinator for collection (n) all machinery equipment and vehicles have been checked and are free of noxious weeds

diseases and pests

I believe that I have met all my obligations under the conditions of the Contractors Licence the EPL and TSL which apply to the compartment just completed as stated in this Harvesting Plan SignatureNamehelliphelliphellipDate

Contractor

As a result of inspections of the logging operations made in accordance with this Harvesting Plan I am satisfied that to the best of my knowledge the contractor responsible for this harvesting operation has satisfactorily completed all work and approval is given for herhim to remove herhis machinery and equipment and leave the areacommence operations in another compartment

This clearance does not release the contractor from any obligation to undertake any remedial work if subsequent deficiencies are shown to result from inadequate practices during the harvesting operation which are found during any inspections of the area made within 12 months of the date of this post-harvesting inspection

Last inspection was made on (Date)

Signed (Date) HC

HP_BB_2399_14_v4 12-07-17 21

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 25: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

Post Logging Information

Record any circumstances of significance relating to the harvesting of this compartment Please draw or include any annotations on the attached operation scale map Summary of silvicultural treatment

Treatment type Area (ha) subject to treatment

(HC estimate)

Number of AGS gaps created

Comments

Australian Group Selection Single Tree Selection ThinningSpacing Post Harvest Silviculture Actual area harvested (record on attached HPOM)Give reasons for harvestable areas that were not harvested (eg Too steep defective timber) Make reference to map

Post Logging Basal Area sweeps Sample point

GPS (GDA 94) Pre-harvest (B) BA m2ha

Postshyharvest(A) BA

m2ha

Difference (D) (B ndash A) m2ha

BA removed DB x100

Comments

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Total averages

Comply with maximum STS BA removal of 45 or Thinning BA removal of 60 YN

Possible next cut (tick appropriate boxes)

Main product type Anticipated volume H M L

Girders Veneer Polespiles Quota SmallsThinnings Salvage Pulpwoodchipwood

Time to next harvest 0 to 5 years 5 to 10 years 10 to 20 years 20 to 30 years 30 plus years

HP_BB_2399_14_v4 12-07-17 22

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 26: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

ATTACHMENT 2 ROADING PLAN

Summary of Roading Requirements

Feature Details Works Required

Existing roads to be used 12020m10 Yes New roads to be constructed 100m1 Yes Existing crossings used 9 Yes New crossings to be constructed 0 NA Length of road gt10deg 0m NA Borrow pits and gravel pits 0 NA Mass movement prescriptions apply No NA Dispersible soil conditions apply No NA Seasonality provisions apply No NA

Note Maintenance works not completed by Roading Coordinator must be recorded and passed onto the HC for completion during harvesting and documentation

The start and finish dates of all maintenance and construction must be recorded on the individual roading sheets along with other relevant changes or explanations

All rubber flaps on minor forest roads must be removed and replaced with trafficable rollover banks on completion of operation

CHECKLIST OF WORKS REQUIRED ON ROADS amp CROSSINGS

RoadCrossing Name Works Required Date Started

Date finished

Signature

Lowden Road (2950m) Grade pavement and minor clearing Open existing mitres Clean pipes (13 plus 2 at crossings) Pipes are marked in field and shown on roading map

RCHC Comments

Main Range Fire Trail (3630m)

Grade pavement and minor clearing Open existing mitres and spoons Clean pipes (20 plus 6 at crossings) Install RUs x 15 (includes 1 on C5 2 on C6 and 1

HP_BB_2399_14_v4 12-07-17 23

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 27: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

on C9) and new mitre x 1 Install silt trap at 1 RU outlet and 1 existing mitre outlet (the details of this are in notes for crossing C5) where the outlets are close to drainage features New mitres RU and existing pipes are marked in field and shown on roading map Carry out works in accordance with site specific prescription attached to roading plan (near intersection with Lowden Road)

RCHC Comments

Main Range Fire Trail and Lowden Road intersection Pipe Spacing

Along Lowden Road in the vicinity of the intersection with Main Range Fire Trail the drainage spacing does not comply with the EPL The table drain on the cut side of Lowden Road is scoured Between a set of mitres west of the intersection and an existing pipe east of the intersection water is running 230m between drainage structures (note this is made up of 60m or road drainage from Main Range Fire Trail and 180m of road drainage from Lowden Road) Refer to Roading Map 2 of 2 for works required to rehabilitate the existing scour and to prevent further scourreduce length of flow Works include -One new pipe -RolloversRubber Flaps on Main Range Fire Trail and other feeder roads -Work on existing mitre drains -Installation for checking devices (rock) in the scoured section of the table drain Note there are two options for where to place the new pipe The first option is the preferred option however due to the box cut in the road may not be achievable In this instance use option 2 and notify the harvest planner who will write a site specific prescription and amend this harvest plan RCHC Comments

Coxes Creek Road (100m)

Grade pavement Note road drainage spacing has been assessed and complies with EPL RCHC Comments

Kellyrsquos Road (2700m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 24

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 28: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

Realignment to straighten at intersection with Tower RoadCpt 23993 Roads and also at intersection with 239913 Road Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23993 Rd (900m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23994 Rd (800m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Open existing pipes (3 located during planning marked in field and shown on roading map others likely to be found during clearing) install additional RUrsquos to EPL spacing RCHC Comments

Cpt 23995 Rd (160m) Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer) Gravel as required Clean 1 existing pipe Note at the planning stage the pipe was blocked causing water to run over road and was causing scour to fill batter Once pipe is cleaned the fill batter must be rehabilitated by reshaping and then seedmulch or by installing rockseedmulch Install additional RUs to EPL spacing RCHC Comments

Cpt 23997 Rd (340m) East section Gradereshape pavement minor clearing Open mitres remove 1 rollover and consider installing a RU in place of the rollover to prevent water discharging onto Lowden Road (however EPL drainage spacing is met with existing mitres so RU is optional) West section Gradereshape pavement Roadside clearing (heavy vegetation most of length will require dozer)

HP_BB_2399_14_v4 12-07-17 25

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 29: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

Open existing pipes (none identified at planning however some likely to be found during clearing) install additional RUrsquos to EPL spacing Both sections Gravel as required RCHC Comments

Cpt 239913 Road Gradereshape pavement Roadside clearing (340m) Gravel as required

Clean 3 existing pipes and open spoons Pipes are marked in field and shown on roading map Install additional RUs to EPL spacing RCHC Comments

Tank Road (100m) Gradereshape pavement and minor clearing work Install RU to EPL spacing RCHC Comments

C1 C2 C3 C5 amp C6 See crossing diagrams attached to plan

C4 727943E 6066430N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C7 728456E 6068109N Mapped 1st

order drainage line occurs as a drainage depression in the field 500mm pipeno headwall Class 2 Fisheries Licence

Clean pipe and install 125mm rock at outlet Ensure rock is covering section where water is undermining the pipe Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

HP_BB_2399_14_v4 12-07-17 26

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 30: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

aquatic habitat Class 4 fish passage class unlikely fish habitat C8 728510E 6068248N Mapped 1st order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

C9 728572E 6068471N Mapped 1st

order drainage line occurs as a drainage depression in the field 450mm pipeno headwall Class 2 Fisheries Licence aquatic habitat Class 4 fish passage class unlikely fish habitat

Clean pipe and install 125mm rock at outlet Install dissipater at pipe outlet to prevent further scouring Crossing is on drainage depression 5-30m drainage is not required Minimise disturbance and clearing and seedmulch any disturbed areas No instream works are associated with this crossing RCHC Comments

Note for Kellys 23993 23994 23995 23997 239913 and Tank road drainage spacing was not assessed at planning stage the RC must ensure road is appropriately drained to EPL specification

NEW ROAD CONSTRUCTION

Road Specific Conditions Road Name

Road

Len

gth

(m)

Max

widt

h of

road

pris

m

(m)

Max

road

gra

de (l

engt

h ro

ad gt

10 d

egre

es)

Max

grou

nd sl

ope (

lengt

h ro

ad gt

30 d

egre

es)

Estim

ated

Max

heig

ht o

f cu

t fi

ll bat

ters

(m)

Estim

ated

Max

leng

th o

f ba

tters

(m)

Mass

mov

emen

t

disp

ersib

le so

ils

Fina

l roa

d us

e

Resp

onsib

ility

Star

t Dat

e

Fini

sh D

ate

239914 Rd

100 m

7m 9ordm 18ordm 15m 70m No Retain FCNSW

HP_BB_2399_14_v4 12-07-17 27

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 31: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

I

lot16

i

bull

Harvest Plan Roadlng Map 1 of 2 l Forestry

Compartment 2399 ~ Corporation

State Fol86t TALLAGANDANo 577 t r1 ~ Southam IFDA- South Caeal - ft

Map stielllt BOMBAY (8827-38) amp BENDDURA(882MN) - ~

1~1 -

1-1 I Seale 110000 Contour lntarval 1 Om

l9emHI (R8ferto HPOll tDrflll llgendl+ New R~Flllp + New Pipe+ Emtlng Pipe + New Min Crain

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 32: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

bullbullbullbull bull bull bullbull

Harvest Plan Roadlng Map 2 of 2 middot~ Forestry Compartment2398 ~ Corporatron

State Forest TAUAGANDANo 577 tl )Scutllbullm IFOA- South C-1 ft

Map Sheet BOMBAY (8827-3S) amp BENDOURA (882amp4N) - A Br-Halon 1-t I

ecm 1750 Conlolll lnlbullrvll tDm

middot

I

On Ille cutskiamp ofLowden Road Ille table chin 11 _1911 on

either1ide ofIlle inte-6on with Main Range Flra lhll -

Thill mileoutlltadirec11y onto 241812 Road water lram 11111 drain bull eontinui1111 P81lthbull minand

2418

New P8 Option A E 1t149lo th1V11gh box cut end 111181 a 1181111 P8middot The RC maychDD10 llllgtmove llll1 pipe 2040m oqlorWMI oflllie point to1118 moat Ideal llllcatllln H 111 notptiplcaly PD881ble to Install m 6dlwpipe In lht bax cut UIO New Pipe Option B

1 Thbullmlnliledoq~ ~~-------~----- lnatall RU erRvllr (which la lrllfllciltlle br truck9) level with lho9 milrw Exlavatafd8epen 111-mnr dram to mlnlmlM Illewater ftowln11 overIlle edge ofthe mitrebullend into 1118 1111118 dlllln fit lallllden Road

ElllU18 this P8 la d-llftd l08d i1nped to lfildivelrchannel Wiiier Into this P8 (Rllher than mntinue pulp9 elld down Ille road)

middotmiddotmiddotmiddotmiddotmiddotmiddot

~ ~

~ t

Fklw flllllI thlamp feeder road 11 contrldn11 to the table drain 1CDUr on Lowden Road Aamp 111111 road II ncl NqUlred lbr haulage lnstal a nAlvwu cloM A PQMllll lg Mein Range Fire Trail

bull

I I

middotshy

bull

NowPipe Option B Ifoption Anot1881111118 ~stall new P8 here in 1llil inamptMce contact the ha-t planner Illgt obllh a elta IPllCIamp pnltCription

bull

Eldllhll pipe (181 m hm thil pipe tu fulthlllt mitle Exmoda EPL spedng)

ll -

-

-

~SiRoad

In~ctiecldng etme (ivck) lllang the -urad ctian of

~draft l

bull

-)

I I

lot14 LEQEJID

bull lnMd rodfAbldd~ampMee

0 EldOlabull + - shybull --- 1111 _ 0 _+ DllMlhll shy

-- -middot-shyElI-- (mllari)-- bullrFshy-- -shyo -11-r

111 ForeetCpt ~

SForeetCpt lM1amp

~~-----

(

I I

I

I

LoWdenRoad

I (

(

(

d-1118 l08d caullng 1111119bull 1tlio optbns 818 lllven Itoption 1 Is not poeslble 111111emtnt optlan z 1 Rebuld thismitn1 and diactWBler awaylram 241812 lOlld onto 8 atallle llUrlace

2 INllll bull rvllvvw 80VW 24182 Road to diwilt the mitle drain flow acrau1118 road and onto alable surface

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 33: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

~p BB 399 14_ DlAFT

CROSSING NAME C1 (mapped 3rc order drainage line -Coxes Gully) 1NaterNay C aEsi1cat1on Fish Passage Class -Moderate Fish haitat L bull red 0 4li) lttesi ~ F sllenes Licence AqmiddotJal1c Hsbitai ( ~ gt) L (_No bull)frlaquo--~- -Uef~) re9 l41 J Assessors Name Kate Haltor rossing Type Existni 750mnI oipe and rock headwall

Feawres Works lAs por EPL Schedule 5) PlantMaterials Slruc1 Jre Glean p pe if required (appeared 10 be

u1bloc1lteltI a11d lowing treely dur rg assessllenl

~ed and Banks Nil-vegetaed and stat le NA Erosion and Sed llent Cgtntrol Seedmulch on disturbed areas Seecimulch

Rock oullel prolecllon 1s adequate-Disposal of excess spoi Outside Sream Fxclus1on 7oreshy Ba~hoelG1atlir consolidate nto rood ia1cmcnt

Soil ~tabifsilion within 20m Seedlmulch on distLrbed areas Seed1mJcr Road drainage tl il 5-30m lnstai qu on both apprcacheE BackhoeGmdFr bull ype

-J~~ gtbullk ~~ ~ f I _ W-bull shybull outle control

ex gt-t ~J (I 1125gt Cbull~) table drain creck1n9 devicos kgtl -q~ C- tor

~~+G II s-it i- r e~ cbullbullJ ~~

lJate ot Assessrnert 2l3i15 inal Cross11g Use Retan

23deglq Is Rd ~deg-vJ (f CgtS~1)

~ fgti~lr-cks

j

Date middotvvork Sta1ea

Dae Work Finished

Soi stablisaion mist be competed within 5 days

Recomiddotd 1mplementatic n date heremiddot

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 34: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

HP_BB_2399_1 4 DRA IT

CROSSING NAME C2 (mapped 2d ord er drainage line - note actual location of DL is 1ivest of where mapped) Watenvay Classification Fish Passage Class 3 -millil)a fis t habita lsheries Licence Ac1citic Hab tal (_ lciii~ middot z_ ( fvb ~M lJC1lltS

Assessors Name Kate Halton Crossing Type Existing 500mm pipe and sandbag heidwal Features

- Works (As per EPL Schedule 5) PlantfMaterials I SlruciLre Clean oioe

Bed and Ban~s Nil-vegetated ar d s1able NA Erosion and Sec1me1 Conrol Seedmulch c1 d1slurlgted areas Seedrr1lch

Rock oulet ~roec1 on is adequate LJ sposal o1 exltcss spc ii Outs oe Stream Exclus1n Zo1eshy Bae~roeJG-acer

mnsolidatEl irto road p~vemert Soil S1abi lisatio1 witlrin 20m SeeOlmulch on distJrbed area_ Seedlmulch Roac drsinage wi1htn 5 30m Ncrth side not rcqured (roao slopes BackroeJGrnder

TypP away)

I outlet con~rol table crain checking dev ces

South-ins ta I new mitres either site cf road (willti silt traps)

Date of ksessment 2512 15 Final Cross ng Use Reta in =shy~

j

l -3 1 t ~~ ~ I

(

l~J d V ~~

-r-_(

Dale Work Sarlecl

Dale Work Finished

So I stabtlisaticn must be completed w Im 5 days

Recrd i11oelleiltill0n cote here

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 35: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

HP RR 2199_14_rgtRAFT

CROSSING NAME C3 (mapped 2no order drainage line) Viaterway Classification Fish Passage Class 3 -rninuna1 rsh tiabilat Fsher iesllcen ceAq Jat cl-fab1~at (bsS z_ ClXJ 11s~- pp c 1~5 (flt_~)

E Assessors Name Kate HI crossma Tvoe x1 r_g da ton st1 525mm p pean d h ea wa II Works (As per EPL Schedule 5) Pla ntMaterialsFeatures-

Struciumiddote Jean oioe Bed and 3anks NA1111-veketated anc sable tros1on ancl ~ed 1renl tonlrol Seeflmulcli oo dibullurhP11 arecis Seecimulch

lm131 aoditicnol 125mm rock al OJtel to suoolemen exist nci rock

Disposa cf excess spoi Bacllhoe1Gradt1 consolidate mto road oa errent

So I Stat I saton within 20m

Outside Stream Exe usior Zoneshy

SeedmLlch on dislwbed areas Seedm 1 Jlcl

~oad drainage w1tti1n 5-30m North side r ot required (rao sloies Gackhoe1Grader

bull Type I ewayj OUI et C01fmiddotol South-eas s1oe not required (water lab o drain C1ecking devices flOVlS down Palerang Road h hisbull

w thin 1Cm of drainage li1e) Sou1h-west s de tlillze eic1st1ng m Ire (install sil11rap at mitre outle1 wt-ich is at 5m I I

Cate or A~sessmertmiddot 252115 Fined Crossi19 Use Retain

-~O

- c(

middot- Srmiddot +f o

Date Work Staied

Dat~ Work F11ished

Soil st~ihsat on must be compleled within dabulls

Record inilerrentation oate here

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 36: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

-- -

HP BB_2399_l4_DRAFT

CROSSING NAME C5 mapped 2nc order drainage line) Waterway Classification Fish Passa9e Class 3 -minimal fis h habitat C~SOC~i-~ ~-3 ) Fisheries Licence Aquatic Hablat bullLC5~ Z- - ~ ~ ~~vUltlt~5

c -ojS ~) Assessors Namemiddot Kate Halton Crossina Tvoe Existing 750mm pipe and rock headwall Features Works (As per EPL Schedule~ P lantlMate rl als Struclure Clean pipe Bed and Banks Nil-veae~ted a1d stable NA lrosion and Sed1menl Control Scedimulch 011 clis ltrocd cmias SeediITulch

Cement followed ay rock a1 culle probullbullidcs ~dcautc scour orotcction

Dispose 1 or excess spoil Outside Stream Exclusion Zoneshy 6ackhoelG middotacer ccnsolidate imo road pavemert

Soil Stabilisation within 20m Seedmulch on disturbed areas Seedlmulch Road drainag e bullbullrtrin 5-30m BackhoeGrad erNorth side ncmiddotl req J red (road slipes

awaymiddot) bull outle1 control bull - Pe

South-Install RU at 2Bm (as marked r table drain crecking devictis feld) Ensure silt trap is installed at lhe outlet of this RU wnich is close to an unmappec drainage lir e whicr runs parallel Lo the road ThA ex1s11ng rnre 14m from 1hA fature on thu S()Uth cast side shouC have slit trap installed a1 out el as this mitre is tJo~a lo a 131 omiddotder draina11e lin ih ich runs [lt11iil el lo ihe ioad- I

(

Date of AssessTient 2312 15 Final Crossing Use rletain

[l P-n~ ~( _middot1

Date Work Sta1edmiddot Date Work Finishedmiddot

Soil stab lisalion mvst be compctcd wiJ1in 5 days

Record implemertatlon date here

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here

Page 37: QUEANBEV'AN MANAOEMENT AREA S-.. For.I: Comparlment … · operation also complies with Clause 22 of the IFOA. Attachment 1: Site Safety Plan prescribes safety requirements and Medical

------

HP_BB_2WJ 14_DRAFT

CROSSING NAME C6 (mapped 2~order drainage line) Waterway Classification F sh Passambull Class 2-Moderale F sh habitat clt~1~ +vt~Fisheries Licen=e Aquati Habira1 C055 L Jo middot5~uV~~5

~_ V olts -gtE A Name Kate HIa on crossma li1 voe )(IStlnQ 600 h d IIssessors rr oioe no ea wa

Features Works As per EPL Schedule 5) PlantMaterials Stnclura C~ean ~iPeuro Bed md Binks Nil-veg~tted nd slihle NA

I

Remove 1 dangerous hung up tree on south east side of crossing

EtOSJOI and Sedment ContrOI Seedltnulcn on 1sturbed areas Seedfmulh Install 20Cmm rock al oJt et -

Disposal ol eircess spoq Otts ce Streerr Exclusion Zone- BackhoeiGradebull

I - -

conSJ idate into road oovemenl Soil Stabilisation wiri n 20m I Seedlmulcr on disturbed areas middot Seecmulcl Road drainaie w thin 5-3011 Install RU or both approaches BackhceiGrad er

anywhere between 5-30m)bull fype Ccnsitler sill lrips al RU oullels table drain cl-scking devi res

bull cutlet control (depeooing on final RU lor-atioo and pro xim ty lo drainage feature and f they are craining onto stablelvegetated sur(ace or net) Ensure Id mitre which is 14 from drainage lirie on south east side (whicti Is ow closed) snot reopened as it has LI resulted in erosion into the drainage Iim1 Install 200nm rock in eroded area

(

c

Da~e Work Started

(tl-i- ~-e

lti euro 1r l

Dite of Fssessment 2312115 Final Crossing Use Retiin

Date Work Finished

Soll slab lisalion mmiddotJst be competed withI 5 cays

Record implemenlalion date here