TRANSCRIPT

Page 1: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to
Page 2: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

This Quarterly Update on Mul modal Transporta on Projects details the informa on for bicycle and pedestrian projects within Leon County that are currently under design, under construc on, or that have been completed within the calendar year. Projects are organized by their implemen ng agency. There are currently five agencies funding and construc ng trans-porta on improvements in Leon County, including the City of Tallahassee, Leon County, Blueprint2000, Capital Region Transporta on Planning Agency, and the Florida Departmentof Transporta on.

For more informa on on the Quarterly Update or any of the projects contained within this report, please contact the Tallahassee-Leon County Planning Department at (850) 891-6400.

I N T R O D U C T I O N

Page 3: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

Quarter 3 | July - September 20152016 Tallahassee-Leon County Multimodal Project Summary

Page 4: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

Roadway Segment Project TypeRoad Side

(If Applicable)Improvement Program

Anticipated Start

DateNotes

FAMU Way Extension - Segment 2 Pinellas Street to Gamble Road Bike/Ped Improvements Both Capital Improvements 2017

FAMU Way Extension - Segment 3 Gamble Road to Lake Bradford Road Bike/Ped Improvements Both Capital Improvements 2018

Lorene Street Madison to St. Augustine Sidewalk Both Capital Improvements 2016 Project includes Boosters segment. Construction by college.

Mitchell Avenue Ann Dr to Betton Road Sidewalk WestCapital Improvements -

Prioritized Sidewalks2017

Palmetto Street MLK to Adams Street Sidewalk NorthCapital Improvements -

Prioritized Sidewalks2016

Weems Road Improvement Phase II CSX to Mahan Drive Multi-use path East Capital Improvements 2018

Weems Road Extension Mahan Drive to Automotive Way Multi-use path West/South Capital Improvements 2018

Yaeger Street East of South Meridian Street Sidewalk North Capital Improvements 2017

Putnam Drive South Monroe Street to Country Club Drive Sidewalk TBDCapital Improvements -

Prioritized Sidewalks2017

Polk Drive South Monroe Street to Orange Avenue Sidewalk TBDCapital Improvements -

Prioritized Sidewalks2017

Paul Russell Road Monday Street to Apalachee Parkway Sidewalk WestCapital Improvements -

Prioritized SidewalksTBD

Railroad Avenue FAMU Way to Gaines Street Sidewalk & Bike Lanes West Capital Improvements TBD

Oakland Avenue South Monroe Street to Meridian Street Sidewalk North/SouthCapital Improvements -

Prioritized Sidewalks2017

Shamrock Drive Shannon Lakes to Tralee Sidewalk North/EastCapital Improvements -

Prioritized Sidewalks2017

Some segments under design while others already under

construction.

Roadway Segment Project TypeRoad Side

(If Applicable)Improvement Program

Anticipated

Completion DateNotes

Downtown - University Protected Bike

Lanes

S. Adams between Madison Street and W

Van Buren StreetProtected Bike Lanes Both Capital Improvements 2016 Phase 2 is awaiting completion of utility upgrades

Shamrock Drive Shannon Lakes to Tralee Sidewalk North/EastCapital Improvements -

Prioritized Sidewalks2017

Some segments under design while others already under

construction.

Seventh Avenue West Monroe Street to Duval Street Sidewalk North Capital Improvements 2017

Sixth Avenue East Thomasville to Mitchell Sidewalk Varies Capital Improvements 2017

Flipper Street Campbell Street to Okaloosa Street Sidewalk West Capital Improvements/

Safe Routes to Schools2017

Lafayette Paseo Indianhead Dr./Service Road Sidewalk South Capital Improvements 2017 Design/ROW Complete

Quarterly Update on Multimodal Projects | City of Tallahassee | Q 3 & 4 (June - December) 2016

STATUS: Under Design as of December 31, 2016

STATUS: Under Construction as of December 31, 2016

Page 5: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

Roadway Segment Project TypeRoad Side

(If Applicable)Improvement Program Completed Date Notes

Downtown - University Protected Bike

Lanes

St. Augustine and Pensacola Street

between S. Macomb Street and S. Adams

Street

Protected Bike LanesN westbound - S

EastboundCapital Improvements 2016 Phase 1 from Macomb to University Drive Complete.

North Ridge Road Sidewalks Creek to Toucan Sidewalk WestStarmetro -

Nova 20102016 Construction complete

FAMU Way Extension - Segment 1 Martin Luther King Jr Blvd to Pinellas Street Bike/Ped Improvements Both Capital Improvements 2016

Gaines Street North Bicycle Boulevard Woodward to Gay Street Bicycle Boulevard N/A Capital Improvements 2016 Const. by Developer - The Railyard at Collegetown LLC

Gaines Street South Bicycle Boulevard Stone Valley Way Alignment Bicycle Boulevard N/A Capital Improvements 2016Const by Developer - North American Properties along ‘Block C’

development

Lonnbladh Road Improvements - Phase II Capital Circle NE to Greer Sidewalk Both Capital Improvements 2016

STATUS: Completed as of December 31, 2016

Page 6: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

Quarter 3 | July - September 20152016 Tallahassee-Leon County Multimodal Project Summary

Page 7: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

Program

Anticipated Start

DateNotes

Chaires Cross Road Green Oak Dr. to Capitola Road Sidewalk West/South Capital Projects N/A

The sidewalk has been completed from Green Oak Drive to the

eastern entrance of the Chaires Elementary School. The

remaining section from the School entrance to CSX Railroad is

under design.

Old St. Augustine Road Old St. Augustine & Blairstone Road

IntersectionIntersection Improvement to add turn lane TBD Capital Projects TBD

Sidewalks will be added. Plans currently at 60%. Currently

working on Utility Coordination

Tharpe Street Capital Circle NW to Ocala Road Bicycle and Pedestrian Improvements Both Capital Projects N/A Construction is unfunded

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

Program

Anticipated

Completion DateNotes

Bannerman Road Thomasville Road to Meridian RoadWidening and Bicycle and Pedestrian

ImprovementsBoth Capital Projects N/A

The first section (800 - 900 feet west of Quail Commons) has

been completed. Remainder of Bannerman improvements will

be funded by new sale tax which goes into effect 2020.

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

ProgramCompletion Date Notes

Old Bainbridge Road Pullen Road Intersection Roundabout with Pedestrian Improvements N/A Capital Projects 2016Sidewalk has been built along Pullen from intersection to 300'

west.

Timberlane Road Deer Lane to Meridian Road Sidewalk South 2016 Completed

Lakeview Drive ImprovementsFrom S. Lake Bradford Road to 3567

Lakeview Drive

Drainage Improvements and Roadway

Reconstruction N/A Capital Improvements 2016 Completed

North Monroe StreetFrom Tallahassee Mall Entrance on North

Monroe Street to south of Lakeshore DriveTurn Lane/Through Lane Addition East Capital Projects 2016

The sidewalk on the east side of the Monroe Street within the

project boundary were reconstructed and improved.

Quarterly Update on Multimodal Projects | Leon County | Q 3 & 4 (June - December) 2016

STATUS: Under Design as of December 31, 2016

STATUS: Under Construction as of December 31, 2016

STATUS: Completed as of December 31, 2016

Page 8: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

Quarter 3 | July - September 20152016 Tallahassee-Leon County Multimodal Project Summary

Page 9: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

Program

Anticipated Start

DateNotes

Magnolia Drive Multi-Use TrailPhase 3 Circle Dr. to Apalachee Parkway

Multi Use Trail West Blueprint 2017 Concept Development is underway

Magnolia Drive Multi-Use TrailPhase 4 S. Meridian St. to S. Monroe St.

Multi Use Trail TBD Blueprint 2017 Concept Development is underway

Magnolia Drive Multi-Use TrailPhase 6 S. Monroe St. to S. Adams St.

Multi Use Trail N&S Blueprint 2017 Concept has been approved, Permitting underway

Capital Circle NWSW - W1Crawfordville Rd. to Orange Ave

Roadway N/A FDOT TBD Construction Plans in development

Capital Circle NWSW - W1Springhill Rd. to Orange Ave

Joint Use Stormwater Facilities N/A Blueprint TBD Design and permitting estimated to be completed by Q3, 2017

Capital Cascades Trail - Segment 3DCleveland St. to Central Drainage Ditch

Multi Use Trail N/A Blueprint TBD Construction Letting Scheduled Spring 2017

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

Program

Anticipated

Completion DateNotes

N2 - Capital Circle Northwest/Southwest North of Orange Avenue to US 90Highway Widening including Bike/Ped

Improvements and Wetland MitigationBoth Blueprint 2017

Notice to Proceed November 21, 2012 - 977 Days Original

Construction Schedule.

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

ProgramCompletion Date Notes

Capital Cascades Trail - Segment 3BMartin Luther King Jr. Boulevard to South

Adams Street

Stormwater Pond/Conveyance and

Bike/Ped ImprovementsBoth Blueprint 2015 Grand Opening Held 10-15-15

Capital Circle NWSW - W1 Crawfordville Rd. to Orange Ave PD&E N/A Blueprint 2016 PD&E Accepted by FHWA January 2016

Capital Cascades Connector Bridge South Adams Street to Gadsden Street Pedestrian Bridge and Multi-Use Trail N/A Blueprint 2016 Grand Opening 16

Capital Cascades Trail - Segment 3CClevelend Street to Martin Luther King Jr.

Boulevard

Stormwater Pond/Conveyance and

Bike/Ped ImprovementsNorth & South Blueprint 2016 Project complete other than permit closeout and as-builts

Quarterly Update on Multimodal Projects | Blueprint2000 | Q 3 & 4 (June - December) 2016

STATUS: Under Design as of December 31, 2016

STATUS: Under Construction as of December 31, 2016

Completed as of December 31, 2016

Page 10: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

Quarter 3 | July - September 20152016 Tallahassee-Leon County Multimodal Project Summary

Page 11: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

Program

Anticipated Start

DateNotes

Capital City to the Sea Trails Leon County segment Environmental/Planning Study N/A N/A 2014 PD&E underway, led by Apalachicola National Forest

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

Program

Anticipated Start

DateNotes

Apalachee Parkway Monroe Street to east of railroad underpassSidewalk construction associated with

roadway resurfacingBoth RMP 2016

Sidewalk construction from the State Capitol at Monroe Street

intersection eastward to join existing sidewalks on service roads

east of railroad underpass

Woodville Highway Gaile Avenue to Leon County Line Transportation Master Plan N/A RMP N/A

Woodville Highway Paul Russell Road to Capital Circle Design for road widening with sidewalks Both RMP 2014

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

Program

Anticipated

Completion DateNotes

Sixth Avenue (East) Monroe Street to Gadsden Street Design/Construction for Bike/Ped

ImprovementsBoth RMP 2017 Construction funded; City of Tallahassee to construct

North Monroe Street Tharpe Street to Seventh Avenue Medians/ Pedestrian Improvements N/A RMP 2017Design complete; construction funded in FY 2017 and

scheduled to begin in late 2016.

Quarterly Update on Multimodal Projects | Capital Region Transportation Planning Agency | Q 3 & 4 (June - December) 2016

STATUS: Under Design as of December 31, 2016

STATUS: Planning Study, PD&E, Pre-Engineering as of December 31, 2016

STATUS: Under Construction as of December 31, 2016

Page 12: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

Quarter 3 | July - September 20152016 Tallahassee-Leon County Multimodal Project Summary

Page 13: Quarter 3 | July - September 2015 2016 Tallahassee-Leon ... · Capital Cascades Trail - Segment 3B Martin Luther King Jr. Boulevard to South ... Woodville Highway Gaile Avenue to

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

Program

Anticipated Start

DateNotes

Orange Avenue Capital Circle SE to Lake Bradford Road Sidewalks TBD Capital Projects 2017 Pre-Construction Underway

SR 10 (US 90)SR 10 (US 90) east of CR 59 to Jefferson

County Line5' Paved Shoulders Both Capital Projects 2017 Pre-Construction Underway

Orange Avenue Lake Bradford to Monroe Street Resurfacing BothResurfacing -

Maintenance2017 Includes sidewalks and pedestrian crossing upgrades

North Monroe Street John Knox Road to Thomasville Road Addition of thru lane East Capital Projects 2018Includes replacement of existing sidewalk (and new sidewalk

where not previously constructed)

Appalachee Parkway Magnolia Drive Intersection Addition of Crosswalk East Intersection 2018

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

Program

Anticipated

Completion DateNotes

Magnolia Drive South Meridian to Pontiac Drive Sidewalk North Capital Projects 2017 Wth Leon County

E Lafayette Street service road CSX RR Tunnel to Seminole Drive Bike Path/Trail South N/A 2017 Under constuction

6th AvenueMonroe Street to Gadsden Street & South

to Beard StreetSidewalks Both Capital Projects 2017 Under construction

7th Avenue Colonial Drive to Gadsen Street Sidewalks North Capital Projects 2017Pre-Construction Underway

North Monroe Street Seventh Avenue to Tharpe StreetRight of Way Acquisition for Pedestrian

Improvements and Raised MediansN/A Capital Projects 2017

Apalachee Parkway Monroe Street to Frontage Roads Sidewalks and Safety Improvements BothResurfacing -

Maintenance2017

Roadway Segment Project TypeRoad Side

(If Applicable)

Improvement

ProgramCompletion Date Notes

Orchard Pond Greenway Road Old Bainbridge Road to Meridian Road New Road Construction N/AState Infrastructure

Bank/Tolls/Private 2016 Project will include bike lanes and a shared use path

Quarterly Update on Multimodal Projects | Florida Department of Transportation | Q 3 & 4 (June - December) 2016

STATUS: Under Design as of December 31, 2016

STATUS: Under Construction as of December 31, 2016

STATUS: Completed as of December 31, 2016