quality plan for remedial activities for club ranch ponds
TRANSCRIPT
C
()
REV. NO.
u 1
QUALITY PLAN NO. QP-428-1 PROJECT NOS. 428
QUALITY PLAN
FOR
REMEDIAL ACTIVITIES
FOR
LLUB RANCH PONDS AREA
(NEW EVAPORATILJN PONDS}
FOR
UMETCO MINERALS CORPORATION URAVAN MILL
URAVAN, COLORADO
PREPARED BY CHEN AHO ASSOCIATES, INC.
DENVER, COLORADO
DATE OF ISSUE PURPOSE OF ISSUE
3/19/87 For Submittal to State-~#~~~ l/18/88 For Construction
State Approval ~CfY\JJ iJ. S '~" Date ________ __,~*~r4Z, ...... ~..,../~ ... 7,__ _______ _
C
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428
INDEX
PART I GENERAL
1.0
2.0
3.0
SCOPE OF QUALITY PLAN .
LIST OF QUALITY CONTROL PROCEDURES.
COMPLIANCE REPORTS ...
. . . . .. .. ..
. . . . ~
PART II QUALITY CONTROL/QUALITY ASSURANCE
1.0 SCOPE OF QUALITY CONTROL/QUALITY ASSURANCE. . . 2. 0 QUALITY CONTROL
2. l
2.2
2.3
Personnel. . . . . . . . . . Surface Runoff Control Facilities .
2. 2 . l
2.2.2
2. 2. 3
General . . . . . . . . . Ditch 6 ••.
Compliance Report ..
. •· . . . . . . . .
Site Preparation ...•
2.3.1 Demolition . . . . . . . .
2.3.2
2.3.3
2. 3. 4
2.3.5
Site Survey.
Clearing, Grubbing and Stripping .
Disposition of Materials .
Compliance Report ....•
. . . . . .
. . . . . .
Page No.
l
2
3
4
5
5
5
5
6
6
7
7
7
8
8
8
3.0
2.4
2.6
QUALITY PLAN NO. QP-428-1 PROJECT HO. 428
Earthwork ..•. . .. . . . . 2. 4. l
2.4.2
2.4.3
2.4.4
2.4.5
Excavation .
Preparation of Foundation ..
Materials ...
Placement and Compaction .
Moisture and Density Control
8
9
9
10
10
12
l.4.6 Frequency of Quality Control Tests .. 12
2. 4. 7 Compliance Report.
Leak Detection System ...
13
1 4
Z.5.1 Construction of Leak Detection System. 14
l.t,.2 Compliance Report •. . . . . Synthetic Liner •.
2.6.l Liner Quality.
2.6.2 Field Seams •. •
. . . . . . . .
. . . . . . . . 2.6.2. l
2.6.2.2
Destructive Tests. . . . . . . Nondestructive Tests . .
2. 6. 3 Repairs ....••
2.6.4 Quality Control Report •••
2.6.5 Compliance Report •..••
2.7 Documentation of Quality Control
QUALITY ASSURANCE . . . . . 3 • 1 Personnel ...
QA Activities •.
Documentation .
. . . . . . .
ADDENDUM TO QUALITY PLANS • .
15
15
15
16
16
1 7
18
18
18
18
l 9
19
1 9
19
20
0
0
PART I GENERAL
1 .0 SCOPE OF QUALITY PLAN
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART I Page 1
The Quality Plan presented herein covers the design and con
struction of the New Evaporation Ponds as described in the Final
Plans and Specifications for Remeaial Activities for Club Ranch
Panas Area (l~ew Evaporation Ponds), Specification No. S-428-1,
hereinafter referred to as the Specifications.
The ~uality Plan meets the applicable requirements set forth
in Section 4.l.5 Quality Control/Quality Assurance, Monitoring
Performance Evaluation and Inspection, and in Section A4.2 Club
Ranch Ponds Area in Addendum A of the Uravan Remedial Action Plan
( RAP ) .
The Quality Plan consists of Quality Control/Quality Assur
ance (QC/QA) for the construction of the New Evaporation Ponds.
Monitoring and Performance Evaluation for the New Evaporation
Ponds will be included in the Quality Plan for Remedial Activ
ities for Club Ranch Ponds Area, Quality Plan No. QP-401-1 which
will be submittea at a later date.
0
0
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART I Page 2
Z.0 LlST uF QUALITY CONTROL PROCEDURES
The following Quality Control Procedures are attached and
are made a part of the Quality Plan.
Procedure No.
QC-1
QC-2
QC-4
QC-5
QC-6
QC-7
QC-9
(JC-10
QC-11
QC-19
QC-21
Rev. No.
1
1
0
0
0
0
u
0
0
0
0
Procedure
In-Place Density Tests
Laboratory Standard Compaction Test
Soil Classification for Engineering Purposes
Soils Finer than No. 200 Sieve
Particle Size Analysis
Moisture Content of Soils
Sampling of Aggregates and Soils
Observation of Excavation
Observation of Fill Placement
HOPE Liner Seam Integrity
Gamma Survey using Scintillometers
n
~.U GOMPLIANCE REPORTS
QUALITY PLAN NO. QP-428-1 P R OJ EC T N O • 4 2 8 PART I Page 3
Lompl ;ance Reports shall be prepared by the Quality Control
Officer, for written approval by the Site Manager , and the
on-Site Coordinator (OSC) where noted in the following sections.
Compliance Reports shall be prepared for the following:
Report No.
CR-428-1
CR-428-2
CR-428-3
CR-428-4
CR-4l8-5
Work Items
Construction of Ditch 6
Site Preparation
Earthwork for Pond Construction
Construction of the Leak Detection System
Installation of the synthetic Liners
0
0
QUALITY PLAN NO. QP-428-1 P R OJ EC T N O . 4 2 8 PART II Page 4
PART II ~UALITY CONTROL/QUALITY ASSURANCE
1 .O SCOPE OF QUALITY CONTROL/QUALITY ASSURANCE
QC/QA shall be providea for the following:
(1) Construction of Surface Runoff Control Facilities.
(l) Site preparation including demolition, scintillometer sur
vey, clearing, grubbing and stripping.
(3) Earthwork including excavation, preparation of foundations,
and construction of the embankments and Clayey Base.
(4) Lonstruction of the Leak Detection System.
(b) Installation of the synthetic Liners.
(b) Installation of temporary environmental control measures.
(7) Submission of Documents.
t.O UUALITY CONTROL
Z.l Personnel
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 5
The Quality Control Officer or his designated representative
( hereinafter referred to as the QC Officer) shall verify that the
Work is constructed in accordance with the Specifications as
approved by the State. The key items for Quality Control are
listed in the following sections. Approval of the construction
covered in each of the following sections shall be documented in
Q writing by the QC Officer in accordance with the Quality Control
Procedures listed in this Quality Plan.
0
l.2 Surface Runoff Control Facilities
l.l.l General
The QC Officer shall verify that the area outside the con
struction limits is environmentally protected in accordance with
Part I Section 4.3 of the Specifications.
C
l . l . 2 Ditch 6
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 6
The QC Officer shall verify the following :
t l) Ditch bis constructed at the location and to the construc
tion details shown on Drawing No . P-428-1 . If modifications
of the ditch alignment are required by site conditions, such
realignment is approved by the Site Manager or his desig
nated representative with tne agreement of the OSC .
(2) Cross-sections and grades of the ditch are checked for con
formance with the Specifications . Documentation of the mea
surements and surveys shall be reviewed by the QC Officer.
The following Quality Control Procedures shall be used:
Procedure
Observation of Excavation
Observation of Fill Placement
l . l . 3 Compliance Report
Procedure No.
QC-10
QC-11
A Compliance Report shall be prepared for the construction
of Ditch 6.
0
0
2.3
Z. 3 • 1
Site Preparation
Demolition
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 7
The QC Officer shall verify the following:
ll) The swimming pool and associated facilities are demolished
and/or removed.
(l) The propane tanks are removed and disposed of off-site.
( J) A 11 aebri s and other deleterious materi a 1 s are removed from
the construction site.
2.3.2 Site Survey
The QC Officer shall verify the following:
( l) The sci nti 11 ometer survey is performed to verify that the
soils underlying the New Evaporation Ponds have exposure
rates of 30 uR/hr {corrected/true) or below. Quality Con
tr o 1 Procedure QC - 21 sh a 11 be used .
{l) Tne results of the Scintillometer Survey is documented.
This documentation shall be reviewed and approved by the QC
Officer.
0
l.3.3 Clearing, Grubbing and Stripping
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 8
The QC Officer shall verify that clearing, grubbing and
stripping of the area for the Hew Evaporation Ponds is performed
in accorrtance with the Specifications. Quality Control Procedure
~C-10 snall be usea.
i.3.4 Disposition of Materi al s
The QC Officer shall verify that the materials from demoli
tion. clearing, grubbing and stripping are separated into
scrap/rubble and combustible matter and are stockpiled or dis
posed of as determined by the Site Manager or his designated
representative.
l.3.b Compliance Report
A Compliance Report shall be prepared f or the Site Prepara-
tion.
~.4 Earthwork
The QC Officer will take soil samples and perform moisture-
() density tests, graaations and other tests to ascertain that the
0 QUALITY PLAN NO. QP-428-1 PROJECT UO. 428 PART II Page 9
work is being performed in compliance with the Specifications.
Samples may l.Je taken at the place of excavation, stockpiles, or
on tne fill itself. The (JC Officer will conduct the density and
other tests on the materials and related laboratory testing as
frequently as aeemed necessary, but in no case less frequently
than stated in the Specifications.
l.4.l Excavation
The QC Officer shall verify that the excavation for the New
Q Evaporation Ponds ana Leak Detection System are made to the
lines, grades and dimensions shown on Drawing Uo. P-428-1 and
0
~-4£~-2 ana described in the Specifications. The excavation
shall be observed during construction in accordance with Quality
Control Procedure Q!,;-lCJ. Documentation of the measurements and
surveys snall be reviewed by the QC Officer.
l.4.2 Preparation of Foundation
The QC Officer shall verify that the foundation areas for
the pond embankments ana Clayey Base are prepared in accordance
with the Specifications. Foundation preparation shall be
observea during construction in accordance with Quality Control
C
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 10
Proceaure !Jo. QC-10. The foundations shall be approved by the QC
Officer prior to placement of embankment materials or the Clayey
Base.
2.4.3 Materia ls
Materials for construction of the earthfi 11 embankments and
Llayey Base consist of materials excavated from the construction
area or materials imported from the approved borrow areas. These
soil materials shall be approved by the QC Officer. The follow
ing (Juality Control Procedures shall be used to evaluate borrow
materials:
Procedure
Soil Classification for Engineering
Purposes
Soils Finer than No. 200 Sieve
Particle Size Analysis
Noisture Content of Soils
Sampling of Aggregates and Soils
2.4.4 Placement and Compaction
P r o c e du re !Jo •
QC-4
QC-5
QC-6
QC-7
QC-9
The QC Officer shall verify the following:
0
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 11
( 1) Placement of earthfi 11 for the pond subbase and embankments
and for the C 1 ayey Base is done in accordance with the
Specifications.
(2) The placement of materials meet the following requirements:
{a) The correct type of material is placed.
(b) The material being placed is free of unsuitable mater
; a 1.
(c) The material is placed to the lines and grades desig
nated in the Specifications and on the Drawings.
Factors including materials uniformity, lift thickness, com
pactive effort and load counts of materials placed, shall be
noted . Qua 1 i ty Cont r o 1 test i n g sh a 1 1 be conducted i n accordance
witn tne following 4uality Control Procedures.
Procedure
(1) In-Place Density Tests
(l) Laboratory Standard Compaction
Test
(3) Soil Classification for
Engineering Purposes
(4) Soils Finer than No. 200 Sieve
(5) Particle Size Analysis
(6) Moisture Content of Soils
(7) Sampling of Aggregates and Soils
(8) Observation of Fill Placement
Procedure No.
QC-1
QC-2
QC-4
QC-5
QC-6
QC-7
QC-9
QC-11
0
t.4 . b Moisture and Density Control
QUALITY PLAN NO. QP-428-l PROJECT NO. 428 PART II Page 12
The QC Officer shall verify that the moisture content and
density of the compacted materials are in accordance with the
Specifications and that necessary reworking is performed as
required . The Quality Control Procedures are listed in Section
'-. 4 • 4 •
Z .4 . 6 Frequency of Quality Control Tests
The frequency of the Quality Control Tests for earthwork
shall be as follows:
( 1) The frequency of the field density and moisture tests shall
be not less than one test for each 500 cubic yards of placed
fill material (earthfill or clayey base).
(Z) There shall be at least one field density and moisture test
for each lift of fill material placed and compacted .
(J} Gradations and Atterberg limits {Classification for Engi
neering Purposes) of compacted fill materials shall be per
formed at a frequency of not less than each 1,000 cubic
yards of placed Clayey Base or each 5,000 cubic yards of
compactea earthtill.
0
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 13
(4 ) For fill materials where moisture content tests are corre
lated with optimum moisture content as determined by the
Standard Compaction Tests, frequency of moisture content
tests of compacted fill material shall not be less than one
test for each 500 cubic yards of compacted fill material.
( ~) For fill materials where field density tests of compacted
fill material are correlated with laboratory maximum density
as determined by the Standard Compaction Test, frequency of
field density testing for compacted fill material shall not
be less than one test for each 500 cubic yards of compacted
fill materials.
(6} Frequency of raboratory standard Proctor compaction tests
snall be such that maximum densities are determined for the
range of materials being placed in the fill; however, fre
quency of compaction tests shall not be less than one test
for each 5,000 cubic yards of compacted fill material.
2.4 . 7 Compliance Report
A Compliance Report shall be prepared for the earthwork.
0
C
i.b Leak Detection System
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 14
L.5.1 Construction of Leak Detection System
The QC Officer shall verify the following:
(1) The leak detection drains are constructed in accordance with
tne Specifications and the details shown on Drawing Nos.
P-428-1 and P-428-Z. Excavation of the drainage trenches
snall be surveyea for grade. Documentation of the surveying
shall be reviewed by the QC Officer.
\l) Manufacturer's items including the drain pipe and sump pipe
are as specified.
(3) Placement of the drain materials shall be monitored to
ensure the following requirements are being met:
(a) The correct type of material with the specified grada
tion is being placed
(b) The material being placed is clean and free of unsuit
able material.
(c) The material is being loaded, transported and placed
in a manner which minimizes segregation.
(a) The material is being placed to lines and grades
designated in the Specifications and on the Drawings.
()
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 15
Quality lontrol Procedures to be used are l i s t ed below:
Procedure
(1) Particle Size Analysis
(2) Sampling of Aggregates and Soils
(3) Observation of Fill Placement
l . 5. 2 Compliance Report
Procedure Uo.
QC-6
QC-9
QC-11
A Compliance Report shall be prepared for the construction
of the Leak Detection System.
~.b Synthetic Liner
2.u.l Liner Quality
The QC Officer shall verify the following:
(1) The synthetic Liners are manufactured of new, first quality
products designed and manufactured specifically for the pur
pose of liquid containment.
(2) The liner materials are free of holes, blisters, undispersed
raw materials, or contamination by foreign matter. Any such
de f e c t s h a 11 be rep a i re d u s i n g th e e x t r u d a t e \'I e 1 d i n g t e c h
n i q u e in accordance with the manufacturer's recommendations.
C
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 16
(J ) Certification from the Liner manufacturer documenting that
the Liner meets all the physical property specifications for
tile intendea application has been received and approved.
~.6.2 Field Seams
The QC Officer shall verify the following :
~. 6.l.l Uestructive Tests
(1) Field Fabricated Startup Seam - Seller provides a represent
ative seam fabricated from the same sheet material and using
the same seaming methods as those recommended by the synthe
tic Liner manufacturer . The startup seam is no less than 10
feet (3 m) in length and is provided at the start of each
day's or shift's seaming . Random samples for shear and peel
testing are cut from the startup seam. The startup seam is
allowed to cure or age properly before testing in accordance
with manufacturer's directions .
(l) Field t.ut Out - A minimum of one 2-foot (0.61 m) long sec
tion of the fabricated seam per 500 feet of seam is cut from
the installe<l lining. The cutout section is wide enough to
accommodate peel and shear testing. Random specimens for
peel a n<l shear testing are cut from the
QUALITY PLAN NO. QP-428-1 PROJECT UO. 428 PART II Page 17
samp1e. The resulting hole is patched with an oval-shaped
piece of sheet material and is seamed in accordance with the
manufacturer's instructions. The cutout seam is allowed to
cure or age properly before testing in accordance with the
manufacturer 1 s recommendations.
(3) The integrity of the field seams is determined in accordance
with Qua1ity Control Procedure QC-19.
(4) The location of the seams, the machine used, the operator,
weather conditions and any problems are logged on a daily
basis.
l.b.,.l Nondestructive Tests
A Quality Control Technician employed by Seller inspects all
field seams visually. In addition, the follow i ng test method is
employed for the pond Liners.
Vacuum Box Testing All field seams are inspected for
unbonded areas by applying a vacuum to a soaped section of seam.
This nondestructive test is performed in accordance with Quality
Control Procedure QC-19.
l.b.3 Repairs
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 18
All defective field seams as detected by both destructive
and nonoestructive tests are marked and repaired in accordance
with manufacturer's recommendations.
l.6.4 Quality Control Report
Seller prepares a report of the Quality Control testing pro
gram and submits it to Owner for review and approval prior to
acceptance of the installed Liners.
2.b.~ Lompliance Report
A Compliance Report shall be prepared for the installation
of the synthetic Liner.
~.7 Documentation of Quality Control
Written records shall be maintained for each construction
day covering the subject remedial activities. The written
records and reports shall be in accordance with the respective QC
Procedures and shall include results of all tests conducted. The
originals of all documents shall be maintained in the Uravan Pro
Ject Files.
0
3.0 4UALiTY ASSURANCE
.J.1 Personnel
QUALITY PLAN NO. QP-428-1 PROJECT NO. 428 PART II Page 19
(Jual i ty Assurance consisting of audits and cross checks on
the Qua 1 i ty l.ontrol functions, shal 1 be provided by the Qua 1 i ty
Assurance Officer or his designated representative {hereinafter
referred to as the ijA Officer).
3.2 QA Activities
The QA Officer shall implement the program by performing the
following functions:
(1) Prequalify QC Personnel
(l) QC Technician training
(3) Verification of effectiveness of QC Personnel
(4) Verification of test procedures and results by spot retest
(5) Equipment checks
{b) Review of calculations and documentation.
3.3 ~ocumentation
Each QA Activity shall be documented in writing and shall be
Q kept in the Uravan Project Files.