KERALA IRRIGATION INFRASTCTURE
DEVELOPMENT CORPORATION
2 –days Workshop on
Quality Management in
Construction and Testing of
Materials
Date: 9th and 10th August 2016
Venue: Hotel The Capital,
Thiruvananthapuram
1
![Page 2: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/2.jpg)
Quality Management in Road Construction
Presented by
T. SANTHOSH KUMAR
M. Tech (Transportation), MIE (India)
Chartered Engineer (India)
Rtd Director (I&QC), PWD
Kerala
2
![Page 3: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/3.jpg)
What is quality?
Quality is a measure of excellence or a
state of being free from defects,
deficiencies and significant variations.
Quality is brought about by strict and
consistent commitment to certain
standards, that will ensure the uniformity
of a product, in order to satisfy specific
customer or user requirements.
3
![Page 4: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/4.jpg)
Quality Management System (QMS)
QMS - Definition….
QMS is a set of policies, processes and
procedures required for planning and
execution in an organisation.
QMS ensures that an organisation, product
or services is consistent
****
ISO: 9001-2008 is QMS tool developed by
the International Organisation for
Standardisation.
4
![Page 5: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/5.jpg)
Quality Management System (QMS)
4 components…..
Quality Planning
Quality Assurance
Quality Control
Quality Improvement
5
![Page 6: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/6.jpg)
Quality Assurance & Quality control
QA/QC
The terms “quality assurance” and
“quality control” are often used
interchangeably to refer to ways
of ensuring the quality of a
service or product.
The terms, however, have
different meanings.
6
![Page 7: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/7.jpg)
Quality Assurance (QA)
Quality Assurance
It refers to the planned and systematic
activities implemented in a quality system so
that quality requirements for a product or
service will be fulfilled.
Examples of quality assurance activities:
Process checklists, project audits, methodology
statements, standards development etc.
Quality Assurance activities are determined
before the production work begins.
7
![Page 8: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/8.jpg)
Quality Control (QC)
Quality Control refers to the evaluation
techniques and activities used to fulfill
the requirements for quality end product.
Quality Control can be termed as a
process that is used to ensure a certain
level of quality in a product or service.
Quality Control activities are performed
during & after the product is developed.
8
![Page 9: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/9.jpg)
Seven basic tools of quality?
Fishbone Diagrams: To find out the root cause
of the problem.
Histograms: Plotting of the data.
Pareto Analysis: data of problems occurrence
are collected and prioritised.
Flowcharts: Shows the events in each stage of
the production process.
Check sheets: The data collection of problems
by counting or measuring.
Scatter Plots: Plot of paired data (2 variables)
for analysis.
Control Charts: By plotting the data marking the
upper & lower control limits.
9
![Page 10: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/10.jpg)
Pre-requisites of Quality Control
Construction drawings, specifications and
detailed estimates.
Sufficient trained staff with testing
facilities for exercising proper QC.
Periodical appraisal of the QC data. This
will be helpful in guiding the construction
process as well as effecting
improvements in construction techniques.
Updating the knowledge of the project
team by on job training.
10
![Page 11: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/11.jpg)
11
![Page 12: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/12.jpg)
Get all the drawings/documents.
Keep a full set of drawings at site.
12
![Page 13: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/13.jpg)
13
Materials Selection
![Page 14: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/14.jpg)
The borrow area for embankment material shall be
selected after careful sampling and testing
14
![Page 15: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/15.jpg)
Requirements of soil for construction purposes
Plasticity Index (PI), Maximum Dry Density (MDD)
& Optimum Moisture Content (OMC),
Natural moisture content (NMC),
CBR (Important for subgrade),
Deleterious content – Organic material,
Free Swelling Index – For road embankment.
Gradation/sand content (If specified).
IS: 2720
15
![Page 16: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/16.jpg)
Frequency of testing of borrow material
Ref: Chapter 2-Earthwork: IRC Special Publication # 11
Sl. No. Test Code
Minimum
desirable
frequency
1 Gradation*/Sand
content
IS: 2720
(Part 4)
1-2 tests per
8000 m3
2 Plasticity Index (PI) IS: 2720
(Part 5)
1-2 tests per
8000 m3
3 Proctor test
(Compaction)
IS: 2720
(Part 8)
1-2 tests per
8000 m3
4 CBR (On a set of 3
specimens)
IS: 2720
(Part 16)
One test per
3000 m3
5 Deleterious contents IS: 2720
(Part 27) As required.
6 Natural moisture
content
IS: 2720
(Part 2)
One test per
250 m3
16
![Page 17: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/17.jpg)
17
Each size of aggregates shall be separately stacked
with the size indicated
![Page 18: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/18.jpg)
Frequency of testing of aggregates
Ref: Table 900-3 of MoRTH Specifications
Sl.
No. Test Code
Minimum desirable
frequency
1 Gradation IS: 2386
(Part 1)
1 test per 200 m3 (WMM)
to 1000 m3 (WBM).
2
Aggregate Impact
Value/Los Angeles
Abrasion Value
IS: 2386
(Part 4) 1 test per 1000 m
3
3 Flakiness &
Elongation Indices
IS: 2386
(Part 1) 1 test per 500 m
3
4 Atterberg Limits IS: 2720
(Part 5) 1 test per 200 m
3
5 Water absorption IS: 2386
(Part 3) One test per each source.
6 Stripping test IS: 6241 One test per each source.
18
![Page 19: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/19.jpg)
24
Ensure!
Good Quality Cement is used!
![Page 20: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/20.jpg)
Cement
Generally OPC grade cement is used for
construction purposes.
The grades of OPC available are…
33 Grade (IS: 269), 43 Grade (IS: 8112)
& 53 Grade (IS: 12269).
Pozzolana Portland Cement PPC
(IS: 1489-Part 1) is also used in construction.
Ensure that only good quality cement is used!
Cement shall be stored at site very carefully.
20
![Page 21: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/21.jpg)
Strength loss is about 20% after 3 months
& 30% after 6 months from the date of
manufacture. From the manufacturing date, the
age of the raw cement can be estimated.
Quality certificates for each batch of
cement shall be obtained from the
manufacturer or dealer and kept as record.
Effort should be made to test the cement before
put into use, for major works.
For small works, where usage of cement is
limited, testing of cement can be omitted.
21
Loss of strength of stored cement
![Page 22: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/22.jpg)
Potable water is recommended by BIS for
using in making of concrete.
IS: 456 give stipulations for water to be used for making
concrete. Testing of water, for determining the chemical and
other constituents in it, is done as per IS: 3025.
22
![Page 23: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/23.jpg)
Recommended frequency for testing water
Sl.
No. Test Code
Minimum desirable
frequency
1 Suspended
matter
IS: 3025
(Part 17)
1 test for each source
- every three months.
2 Organic
contents
IS: 3025
(Part 16) -Do-
3 Inorganic
contents
IS: 3025
(Part 19) -Do-
4 Sulphates
(As SO2)
IS: 3025
(Part 24) -Do-
5 Chlorides
(As Cl)
IS: 3025
(Part 32) -Do-
6 pH value IS: 3025
(Part 11) -Do-
23
![Page 24: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/24.jpg)
Effort should be made to test the steel
periodically and for each lot supplied.
Testing of reinforcement steel
Tensile strength and bending stress are
the most important tests to be done.
Weight per metre length and cross
sectional area are two tests which can
be done even at site itself.
24
![Page 25: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/25.jpg)
25
Viscosity graded bitumen conforming to IS: 73 is
used in bituminous construction.
Bituminous materials are used for providing tack
coat and priming of granular surfaces.
The tests to be done on bitumen are Ductility,
Softening Point, Penetration & Viscosity.
Bitumen
![Page 26: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/26.jpg)
Selection of bitumen
The type of VG bitumen to be selected is based on
lowest and highest daily mean air temperature which
can be obtained from the Indian Meteorological
Organisation (IMO).
Lowest daily
mean air temp
in °C
Highest daily mean air temperature in °C
Less than
20°C 20°C to 30°C
More than
30°C
More than
-10°C VG-10 VG-20 VG-30
-10°C or lower VG-10 VG-10 VG-20
26
![Page 27: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/27.jpg)
Frequency of testing bitumen
Sl.
No. Test Code
Minimum desirable
frequency
1 Ductility IS: 1208 1 test for each supply.
2 Softening point IS: 1203 1 test for each supply.
3 Penetration IS: 1203 1 test for each supply.
4 Viscosity IS: 1206
Part-II 1 test for each supply.
27
![Page 28: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/28.jpg)
QC in embankment construction
Clause 305 of MoRTH Specifications
28
![Page 29: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/29.jpg)
Typical cross section of pavement layers….
Compacted Subgrade - 500 mm
Sub-base Course - 100 mm to 300 mm
Base Course - 50 mm to 100 mm
Wearing Course - 25 mm to 50 mm
Natural ground or fill
29
![Page 30: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/30.jpg)
Prepare earthwork schedules indicating the number of
layers to filled at each cross-section.
Check the ground material – if it is good for
fill or subgrade. Samples of in-situ material shall be
taken and tested, well in advance.
Determine the MDD & OMC of the in-situ material in
the laboratory - as per IS: 2720 (Part 8).
The MDD requirements of soil are given in table 300-1
of MoRTH Specifications.
Also check if any unsuitable material exists
500 mm below the subgrade.
Preliminaries……..
30
![Page 31: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/31.jpg)
Compact the original ground to the required
density, after scarifying to 150 mm depth.
The compacted layer shall be tested by sand-
replacement method as per IS: 2720 Part 28 to
check the percentage compaction.
Density requirement are given in table 300-2 of
MoRTH Specifications.
MoRTH specifications stipulate 95% density
for fill & 97% for subgrade/shoulders.
Compaction of original ground
31
![Page 32: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/32.jpg)
Rock fill embankment is adopted where the
existing foundation condition for forming the
embankment is poor (Clause 313 of MoRTH).
Ground improvement using pre-fabricated vertical
drain (PVD) which is adopted in weak soil
conditions is given in Clause 314.2 of MoRTH.
Guidelines for strengthening weak foundations
using rammed stone columns is given
in Clause 314.3 of MoRTH.
Poor embankment foundations
32
![Page 33: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/33.jpg)
Layer of fine material
on top of rock fill.
33
Construction of rock fill embankment
Clause 313 of MoRTH Specifications
![Page 34: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/34.jpg)
Sometimes, geotextiles are required to be
incorporated into the soil layers.
Types of geosynthetics/geofabrics, their
properties and usage of can be obtained from
Section 700 of MoRTH Specifications.
Geofabrics made of natural fibres such as coir or
jute is called natural geotextile.
Geosynthetics
34
![Page 35: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/35.jpg)
A trial section of 50 m to 150 m length is
recommended to be constructed before you start
with the embankment forming.
This will help to check the adequacy &
efficiency of the compacting equipment
as well as the work force.
Trial section
3535
![Page 36: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/36.jpg)
Non-bituminous bases and sub-bases
Section 400 of MoRTH Specifications
36
![Page 37: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/37.jpg)
Water Bound Macadam (WBM) - Clause 404
of MoRTH Specifications: Now a days, this is
not preferred in highways or major road
pavement layers.
Granular Subbase (GSB) - Clause 401 of
MoRTH Specifications: This is basically a
drainage layer protecting the subgrade from
moisture damages.
Non-bituminous pavement layers
37
![Page 38: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/38.jpg)
Wet Mix Macadam (WMM) - Clause 406 of
MoRTH Specifications: WMM is preferred
over WBM and constructed as per IRC: 109.
Crusher Run Macadam (CRM) - Clause 407
of MoRTH Specifications.
Non-bituminous pavement layers
38
![Page 39: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/39.jpg)
WMM is prepared in a mixing plant and
paved using paver finisher.
CRM is directly brought to site from the
crusher and spread using a grader.
WMM & CRM
The maximum compacted layer thickness
allowed is 200 mm.
39
![Page 40: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/40.jpg)
DLC subbase is provided in concrete pavement.
Clause 601 of MoRTH Specifications provides
the guidelines in designating, making and
placing zero slump DLC.
The aggregate grading requirement is given in table
600-1 of MoRTH Specifications.
The maximum size of aggregate is 26.5 mm and 75%
to 95% shall pass 19 mm IS sieve.
The amount of fines is 10% maximum.
Dry lean concrete subbase
40
![Page 41: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/41.jpg)
Bituminous bases and surface courses
Section 500 of MoRTH Specifications
41
![Page 42: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/42.jpg)
97
Bituminous base courses……
1. Bituminous Macadam (BM) –
Clause 504 of MoRTH Specifications
&
2. Dense Bituminous Macadam (DBM) -
Clause 505 of MoRTH Specifications.
The major pavement layer courses coming
under bituminous base courses are…..
Details of all pavement layers are available in the
MoRTH Specifications 5th
revision (2013).
![Page 43: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/43.jpg)
Bituminous surface courses……..
The surface courses include:
1. Open graded/close graded premixed
surfacing – Clause 510 & 508.
2. Single or two coat surface dressing –
Clause 509.
3. Seal coat over premixed surfacing –
Clause 511.
4. Bituminous Concrete (BC) – Clause 507.
5. Stone Matrix Asphalt (SMA) – Clause
515.
6. Semi-dense Bituminous Concrete (SDBC)
etc.
43
![Page 44: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/44.jpg)
Priming & tacking are two essential
procedures involved in the construction
of pavement layers.
Prime coat (Clause 502) is done over
granular surfaces to minimise seepage of
water into subgrade.
Bitumen cutbacks MC30 or Emulsion SS1
are used for priming.
Prime coat
44
![Page 45: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/45.jpg)
45
Primed carriageway portion of a subbase
layer constructed with cement treated
aggregate mix.
The shoulder construction in progress.
![Page 46: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/46.jpg)
Tack coat helps to develop proper bond
between the old and new layers.
Tack coat (Clause 503) is done over
existing bituminous surfaces before
a new layer is placed.
VG10 bitumen or Emulsion RS1
can be used for tack coat.
Where subzero temperature condition
exists, cutback RC70 is recommended.
Tack coat
46
![Page 47: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/47.jpg)
Tack coat applied on a base layer with emulsion
47
![Page 48: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/48.jpg)
The rate of application of primer is given
under tables 500-3 & 500-4 of MoRTH
Specifications.
[0.6 kg to 1.2 kg per m2]
Rate of application of tack coat is given
under table 500-5 of MoRTH Specifications.
[0.2 kg to 0.35 kg per m2]
Use pressure sprayer for applying
prime/tack coat.
The rate of spread of binder can be
verified by tray test.
Application of prime coat & tack coat
48
![Page 49: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/49.jpg)
Steps to ensure
quality in
bituminous layer
construction
49
![Page 50: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/50.jpg)
1. Grading curve of the aggregates combined shall
be carefully prepared.
50
100.0
83.7
73.1
66.4
56.2
43.0
30.0
18.7
13.0
8.5
0
20
40
60
80
100
120
0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0
UPPER CONTROL LIMIT
LOWER CONTROL LIMIT
![Page 51: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/51.jpg)
Get the bituminous mix design from a
competent authority using the materials
intended to be used for the work.
The Job Mix Formula (JMF) shall be
approved by the Engineer.
2. Bituminous mix design
51
![Page 52: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/52.jpg)
3. Plant & machineries shall be installed properly
and thoroughly checked for its accuracy &
efficiency to produce the required mix.
52
![Page 53: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/53.jpg)
4. Follow the manufacturing and rolling temperatures for
bituminous mixes given below:
Bitumen
grade
Bitumen
temp oC
Aggregate
temp oC
Mix temp
oC
Laying
temp oC
*Rolling
temp oC
VG40
160-170
160-175
160-170
150 Min
100 Min
VG30
150-165
150-170
150-165
140 Min
90 Min
VG20
145-165
145-170
145-165
135 Min
85 Min
VG10
140-160
140-165
140-160
130 Min
80 Min
*Rolling should be completed before the layer temperature
falls below these minimum values.
53
![Page 54: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/54.jpg)
54
Avoid over heating of the mix!
Durability of bituminous layer is related to
oxidation of the bitumen in the mix.
The mix shall not be heated to the maximum,
if the haulage is short.
The difference in temperature between
aggregate and binder shall not exceed 14°C.
5. Mixing temperature
![Page 55: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/55.jpg)
6. Check the temperature of the mix in the
truck on arrival and during paving operations,
regularly.
55
![Page 56: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/56.jpg)
Thoroughly clean the surface to be paved
with power broom/jet air.
Use sensor paver to carry out the paving.
Take field samples of the paved mix &
prepare Marshall test specimens for
determining the density, binder content, air
voids etc in the laboratory.
7. Paving
56
![Page 57: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/57.jpg)
8. Provide adequate compaction arrangements.
57
![Page 58: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/58.jpg)
9. Check the layer thickness during paving
58
![Page 59: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/59.jpg)
10. Compact the layer to 92%-94% of maximum density.
59
11. Collect mix samples from paving location and determine the
Marshal properties of the bituminous mix in the laboratory.
12. Take core samples from the compacted layer next day, after the
mix is well set & cold, to verify the field densities achieved.
![Page 60: Quality Mangement in Construction Web copy](https://reader034.vdocuments.us/reader034/viewer/2022051521/586a25291a28abc92d8bca46/html5/thumbnails/60.jpg)
END OF PRESENTATION..
on
Quality management in road
construction
Thank you all…….