quality control specification

Upload: -

Post on 14-Apr-2018

216 views

Category:

Documents


0 download

TRANSCRIPT

  • 7/29/2019 Quality Control Specification

    1/31

    CD-FE 00 21/07/10 Final Issue Pasqualato Ditommaso Chiorrini

    ValidityStatus

    Rev.number

    Revision Index

    Date DescriptionPrepared

    byChecked

    byApproved

    by

    exploration & Pproduction division

    Project nameZUBAYR OIL FIELD

    DEVELOPMENTPROJECT

    Company Document ID

    00250600BBQB09623

    Job N.

    Contractor logo and business name Contractor Document ID2506-ZA-E-09623

    Contract N.

    Vendor logo and business name Vendor Document ID

    Order N.

    Facility NameZUBAYR FIELD GENERAL

    LocationONSHORE

    Scalen.a.

    Sheet of Sheets1 of 31

    Supersedes N.

    Superseded by N.

    Document Title

    LOGISTIC SUPPORT BASEQUALITY CONTROL SPECIFICATION FOR

    WELDING/PIPING/TANKS/VESSELS/STEEL STRUCTUREPlant Area

    n.a.Plant Unit

    n.a.

    Software: Microsoft Word 97-2003 File No. 00250600BBQB09623_CDFE00_32.d

    This document is property of Eni S.p.A. Exploration & Production Division.

    It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    ENI - IRAQ

    ZUBAYR OIL FIELD DEVELOPMENT PROJECT

    QUALITY CONTROL SPECIFICATION

    FOR WELDING/PIPING/TANKS/VESSELS/

    STEEL STRUCTURE

  • 7/29/2019 Quality Control Specification

    2/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    2 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    REVISION HISTORY

    Rev. Date Nr. ofsheets

    Description

    CD-FE 00 21/07/2010 32 Final Issue

  • 7/29/2019 Quality Control Specification

    3/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    3 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    INDEX

    1 GENERAL .............................................................................................................................................................41.1 Scope and Objective........................................................................................................................................41.2 Terms and definitions ......................................................................................................................................4

    2 QUALITY CONTROL PLANNING........................................................................................................................52.1 Information Related to this Document.............................................................................................................52.2 Issuing of QCP and ITP(s)...............................................................................................................................52.3 Construction Contractor responsibility.............................................................................................................62.4 Local Regulations ............................................................................................................................................6

    3 APPLICABLE DOCUMENTATION ......................................................................................................................63.1 Specifications Codes and Standards ..............................................................................................................6

    4 SITE QUALITY ACTIVITIES.................................................................................................................................64.1 Site welding activities.......................................................................................................................................64.2 Inspection on welding resources.....................................................................................................................74.3 Welding inspection checklists........................................................................................................................10

    5 ATTACHMENTS.................................................................................................................................................135.1 ITP (s)............................................................................................................................................................135.2 Forms List......................................................................................................................................................13

  • 7/29/2019 Quality Control Specification

    4/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    4 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    1 GENERAL

    1.1 Scope and Objective

    1.1.1 This specification defines the quality control requirements for Construction Contractor for the

    execution of welding of Piping / Tank /Vessel / Structural Steel related works to be performed

    during construction of logistic support base.

    1.1.2 This document is additional to specification n 2506-ZA-E-09610 already delivered to

    Construction Contractor and with all other applicable contractual documentation.

    1.2 Terms and definitions

    PROJECT ZUBAYR OIL FIELD DEVELOPMENT PROJECTCOMPANY Eni S.p.A. Exploration & Production Division

    1.2.1 The following terms and definitions are applicable to this document:

    ConstructionContractor(s) Organisation(s), including its sub-contractors to whom any part of the

    Works has been subcontracted by Client;

    Company Is the party, which requests contract activities/service and pays for them

    TPI Third Party Inspection: any organization, authority, person or persons, towhich Construction Contractor has subcontracted the execution ofinspection and or laboratory testing related activities.

    Works Means the facilities constituting the Project, including all the construction

    services, materials and equipment to be provided by Client to satisfy itsobligations pursuant to the Contract undertaken with the Client.

    QMS Quality Management System: part of the organizations managementsystem that focuses on achievement of results, in relation to the qualityobjectives, to satisfy the needs, expectations and requirements of Clientand of any other interested parties, as appropriate.

    QCS Quality Control Specification: Company specification for quality controlrequirements.

    QCP Quality Control Plan: Construction Contractor plan contain all qualitycontrol requirements. This plan complements and compiles all applicableITP(s).

    ITP Inspection and Test Plan: Construction Contractor plan of inspection andtests required by engineering and vendors documents or elsewherespecified. ITP(s) shall provide references to applicable procedures,acceptance criteria, documentation, quality records and inspectionattendance to be performed, in chronological order, from initialinspection, throughout final inspections and mechanical completion.ITP(s) and relevant forms shall be issued as QCP enclosures.

    MDT Inspection report Form, attached to the ITP. They shall be used duringchecks and inspections /tests and signed by the involved parties, as perrelevant QC code.

    RFI Request for Inspection: Written notification to be issued by ConstructionContractor in order to allow all parties involved to perform their inspection

    and test witness as planned in the applicable ITP;

    QA Quality Assurance: Part of quality management focused on providingconfidence that quality requirements will be fulfilled;

  • 7/29/2019 Quality Control Specification

    5/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    5 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    QC Quality Control: Part of quality management focused on fulfilling qualityrequirements;

    NCR Non Conformity Report: Document recording a non-fulfilment of arequirement;

    Non Conformity The non-fulfilment of specified requirements;

    Special Process A process, the results of which are highly dependent on the control of theprocess or the skill of the operator and in which the specified qualitycannot be readily determined by inspection or test on the product;

    Calibration Comparison of a measurement and test equipment with a referencestandard or with another one provided with better tolerance in order todetect or to measure possible inaccuracies and to document or eliminatethem.

    1.2.2 Any other terms related to quality and not listed above shall conform to section 3 Term and

    Definition of ISO 9000:2005 Quality Management System Fundamentals and vocabulary.

    2 QUALITY CONTROL PLANNING

    2.1 Information Related to this Document

    2.1.1 This document includes the ITP(s) and forms, listed under paragraph 5.1 and 5.2, for

    performing as minimum the inspection, tests and certification during site activities related to

    welding.

    2.1.2 The ITPs are separated in two following groups:

    1. General ITP(s) include the initial necessary checks and verification to be performed but

    not limited to documentation, personnel and equipment, material receiving, climatic

    conditions, etc..

    2. Specific ITP(s) include inspection and tests directly related to construction items and or

    part of the Works that can be identified and tracked through engineering drawings.

    2.2 Issuing of QCP and ITP(s)

    2.2.1 Construction Contractor shall endorse and reissue this document Quality Control

    Specification (QCS) as Quality Control Plan (QCP), improving the enclosed ITPs in

    accordance to the scope of work, project requirements and completing the information

    requested on clause 3.1 and the ITPs columns Reference document & Acceptance CriteriaConstruction Contractor will number the QCP in accordance to the project numbering systemprovided by Company.

    2.2.2 If during Works Construction Contractor will need additional ITP/ ITP phase for further test and

    checks with the relevant QC Codes, the same shall be numbered adding an alphanumeric

    suffix to the preceding available QC Code. New QC Codes shall be submitted and approved

    by Company.

    2.2.3 Construction Contractor during the execution of the Works shall revise and update, as and

    when required, the QCP(s) and relevant ITP(s) to incorporate any other pertinent

    requirements set forth in engineering specifications, standards, design codes, recommended

    practices, safety design, referred hereafter or included elsewhere in the contractual and

    vendors documents.

    2.2.4 Before starting of Works, the QCP containing the ITPs applicable for the project items andworks, shall be submitted by the Construction Contractor for Company review and approval.

  • 7/29/2019 Quality Control Specification

    6/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    6 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    2.3 Construction Contractor responsibility

    2.3.1 Construction Contractor in order to meet all the contractual requirements will prepare and

    update any other necessary QCP(s) and ITP(s), and quality procedures which include all

    inspections, examinations and tests required to verify the quality of the Works. The above

    documents shall be timely submitted to Company for review and approval in order to ensure

    their availability in approved status prior to starting of the welding works.

    2.3.2 Construction Contractor will perform and record all inspections, examinations and tests

    required and shall carry out all the works necessary for the preparation of inspections,

    examinations and tests, including adequate scaffolding for safely witnessing the inspection.

    2.3.3 Construction Contractor will provide, for the execution of testing, inspection and

    measurements all necessary equipment, tools and shall make available the applicable

    international Standards and Codes.

    2.3.4 Construction Contractor will issue inspections, examinations and tests reports immediately

    after the completion of each inspection activity. All reports shall be approved and signed off by

    Construction Contractor authorized personnel prior to submission to Company for review orapproval, as appropriate.

    2.3.5 Company or other Parties signature on inspection, examination and test reports does not

    release the Construction Contractor from his responsibilities.

    2.3.6 Construction contractor shall have at his own charge the filing of the relevant QCP form

    certificate on dedicated Dossiers, at the time required, the Construction Contractor will deliver

    to Company hard copies and PDF file of the dossiers.

    2.4 Local Regulations

    2.4.1 Inspections and tests required by local law and regulation shall be strictly adhered to,

    documented by Construction Contractor and shall take precedence over this specification

    2.4.2 When local law and local regulations are different from the applicable design codes,Construction Contractor shall inform COMPANY for the necessary actions.

    3 APPLICABLE DOCUMENTATION

    3.1 Specifications Codes and Standards

    3.1.1 Contractual Specification:

    3.1.2 Project Specifications:TO BE UPDATE BY EPC CONTRACTOR

    3.1.3 Codes and Standards:

    - Applicable Codes and Standards are those referred in the above specification and inengineering documentation.

    - API 650 for TANK- AWS D1.1 for Steel structures- ASME B31.3- ASME V- ASME IX- ASME II Part C

    4 SITE QUALITY ACTIVITIES

    4.1 Site welding activities

    4.1.1 Table 1 outlines welding related activities which are required to be carried out by Construction

    Contractor in a controlled manner:

  • 7/29/2019 Quality Control Specification

    7/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    7 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    TABLE 1

    Welding documents control (Welding summary list/Weld map / WPS / WPQR / Work Instructions)

    PWHT procedure control

    Welding personnel

    Inspection, testing and examination personnel

    Welding and allied process equipment

    Welding consumables

    Materials (base metals and consumables) identification and traceability

    Welding execution

    Post weld heat treatment execution

    Welding related inspection and testing

    Quality records

    4.2 Inspection on welding resources

    4.2.1 Construction Contractor will provide resources such as: working facilities, welding equipment

    tools, consumables, weather protection and any other special equipments suitable to the

    specific work to be performed. Welding resources and welding activities are outlined in Table

    2

    TABLE 2

    ToolsEquipment (2)

    ReferenceConstructionContractor action (1)

    Welding quality control

    Working facilitiesConstructionContractorprocedure

    Visual inspection

    - Check on that warehouse shall be dry,clean and protected by weather condition.- Check on different working areas forstorage, working tools, welding consumables,working and welding activities according toparent material (carbon steel, stainless steel,nonferrous material, etc).- Check on identification of non destructiveexamination area.

    - Check on identification of scrap area.

    Handling equipmentand cranes

    Manufacturerdata sheet

    Visual inspection - Check on efficiency and safety system

    Equipment foridentification andtraceability

    Manufacturerrecommendation /certification

    Visual inspection

    - Check on availability- Check on certificates

  • 7/29/2019 Quality Control Specification

    8/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    8 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    ToolsEquipment (2)

    ReferenceConstructionContractor action (1)

    Welding quality control

    Welding powersource and othermachines

    Manufacturerrecommendations /certification

    Visual inspection and test

    - Check on the availability of weldingmachine, cables, amperometer, voltmeter,etc.- Check on calibration of all parameters thatcan affect production quality- Check on certificates

    Welding, cutting gasand allied system

    Manufacturerrecommendations /certification

    Visual inspection

    - Check on availability, efficiency andcleaning of purging and trailing gas system- Check on cylinder identification/marking- Check on efficiency, calibration andcleaning of gas flow meter, gas hoses, etc.- Check on certificates

    Equipment for jointpreparation, cuttingand gouging

    Manufacturerrecommendations /certification

    Visual inspection and test

    - Check on availability of cutting tools, cuttingtorch and similar.- Calking tool efficiency- Test efficiency

    Fit-up equipment(jigs and fixtures)

    Project specification Visual inspection

    - Check on availability of yokes, jigs, pipecouplers, connecting spacers, etc- Check on presence of different area inwarehouse for fit-up equipment in terms of:pipe base metal chemical composition, etc.- Check on certificates- Check on identification and marking

    Weldingconsumables(electrodes, fillerwires and fluxes)

    Manufacturerrecommendations /certification /

    Visual inspection

    - Check on that Welding consumableswarehouse is dry, clean and protected byweather condition.- Check on presence of different area inwarehouse for consumables in terms of:

    storage, conditioning and scrap;

    type, size and classification.- Check on batch/lot certificates- Check on filler metal marking- Check on implementation of manufacturerrecommendations for storage, drying, re-conditioning and handling

    Warehouse andportable ovens

    Manufacturerrecommendations /certification

    Visual inspection and test

    - Check on the availability of ovens.- Check on certificates, marking- Test temperature calibration

    Welding machiningand handle tools

    Manufacturerrecommendations /certification

    Visual inspection

    - Check on availability of brushing, grindingtools, etc.- Check on presence of different area inwarehouse for tools in terms of: type /material- Check on identification and marking

  • 7/29/2019 Quality Control Specification

    9/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    9 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    ToolsEquipment (2)

    ReferenceConstructionContractor action (1)

    Welding quality control

    Weather protection Project specification Visual inspection

    - Check on availability of proper protection forthe part to be welded and for welders/operators function of weather conditions andwelding process/ consumables

    Equipment for visualexamination

    Manufacturerrecommendation /certification

    Visual inspection and test

    - Check on availability of gauges, calliper,magnifier lens, mirror, borescopes, artificiallighting, etc.- Check on certificates and calibration- Test efficiency

    Equipment forradiographicexamination

    Manufacturerrecommendation /certification

    Visual inspection and test

    - Check on availability of X-ray machines,-ray sources, radiographic film, intensifying

    screens, wire IQI, hole IQI, densitometer,etc.- Check on certificates and calibration- Test efficiency

    Equipment forultrasonicexamination

    Manufacturerrecommendation /certification

    Visual inspection and test

    - Check on availability of pulse-echoinstrument, TOFD, probes, couplant,calibration blocks, etc- Check on certificates and calibration- Test efficiency

    Equipment for liquidpenetrant

    examination

    Manufacturerrecommendation /

    certification

    Visual inspection and test

    - Check on the availability and efficiency ofpenetrant, emulsifiers, solvents and cleaningagents, etc.

    - Check on certificates- Test efficiency

    Equipment formagnetic particleexamination

    Manufacturerrecommendation /certification Visual inspection and test

    - Check on availability of electromagnet orsimilar, magnetic particles, lightingequipment.- Check on certificates and calibration- Test efficiency

    Equipment forhardness checks,Positive materialidentification, Ferritemeasurements

    Manufacturerrecommendation /certificationPMI specification

    Visual inspection and test(if required)

    - Check on availability of instruments- Check on certificates, calibration andmarking- Test efficiency

    Special equipments(like Eddy currentequipment, Oxygenmeter, etc)

    Manufacturerrecommendation /certification

    Visual inspection and test(if required)

    - Check on availability of instruments- Test efficiency

    -Check on certificates, calibration andmarking

    Equipment forpreheating, postheating and post-weld heat treatment

    Manufacturerrecommendation /certification

    Visual inspection and test

    - Check on the availability of thermocouples,heating elements, electrical generator,temperature indicating-crayons, insulationand cables.- Availability check of oven- Check on certificates, calibration andmarking- Test efficiency

    Personnelprotective

    equipment

    Manufacturerrecommendations /

    certification

    Visual inspection

    - Check on availability and efficiency

    Notes:

  • 7/29/2019 Quality Control Specification

    10/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    10 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    1. Construction Contractor will issued and submit to Company Welding Supervisor for approval written

    procedures detailing welding material and equipment receiving, storage, handling, preservation and

    maintenance. All procedures will be in accordance with the manufacturers recommendations (if any).

    2. All item will be tested or monitored at specified intervals during progress of work as required by ASME

    B31.3 & ASME V and by accepted procedure. Relevant testing and measurement records will be

    maintained at site by Construction Contractor and be made available at all time to Company upon

    request. Construction Contractor shall demonstrate at all time all applicable and approved welding

    procedures has been followed as well as proper sequence of inspection or testing and shall ensure

    identification and traceability of material and equipment from receiving throughout all installation.

    4.3 Welding inspection checklists

    4.3.1 Table 3 lists minimum welding inspection checklists to be developed implemented by

    Construction Contractor in accordance with the enclosed ITP(s)

  • 7/29/2019 Quality Control Specification

    11/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    11 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    TABLE 3

    WORK PHASE DESCRIPTION OF INSPECTION/CHECKS

    Pre-Welding Inspection - Check presence of approved WPS- Check removal of protective coating from bevel end.

    - Check conformity of base materials in compliance with the WPS

    - Check materials identification and transfer of material ID. All

    materials must be marked as to its material composition before

    starting of welding operations.

    - Verify joint preparation (angle, gap, landing, etc.) and tack welds

    (presence, correctness).

    - Verify consumables materials per WPS (type, size, etc.) and

    Brand/Manufacturer (if required).

    - Check handling, storage & re-conditioning of electrodes- Check calibration of welding machines (only for automatic machine)

    - Verify correct alignment in reference to the specification

    - Verify if weather conditions are acceptable for welding

    - Verify NDT performed on cut fittings or for cut bevel pipe prior to

    welding

    - Check segregation of SS materials and relevant tools from carbon

    steel materials and alloyed materials- Check that consumables are reconditioned conforming to supplier

    recommendation.

    In-Process Welding Inspection- Check wind barriers as required- Check remote current control utilized- Check proper grounding and polarity- Check protection of external coating- Check removal internal clamp after completition 100% of the root

    pass- Check removal external clamp after the execution 60% of the root

    pass- Check removal of tack welds (if required)

    - Check and verify pre-heating as per standard requirements (WPS

    procedure, applications, temperature diagrams, etc)

    - Check fulfilment of WPS variables

    - Check heat input/run out of length (if required)

    - Check monitoring of interpass temperature

    - Check grinders for SS materials not contamined with CS material

    - Verify weave not exceeding 3X diameter electrode (as required byWPS)

    - Verify correct application of shielding and internal purging gas (if

    required)

    - Visual inspection of each pass

    - Check back-gouging (if applicable): method, surface appearance

    and NDT application.

    - Verify consumables and rod ovens

    - Verify quivers and rod ovens are in use and at temperature

    - Verify rebake ovens are properly set and used

  • 7/29/2019 Quality Control Specification

    12/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    12 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    Post-Welding Inspection- Visual Inspection (weld profile, size, reinforcement, visual defects,

    etc)- Verify weld and welder ID markings- Check Postheat (when required)- Check PWHT (when required)- Check Hardness testing (when required)- Check NDT- Verify welding/quality records, weld table/map and daily weld

    summary sheet- PMI of alloy welds

  • 7/29/2019 Quality Control Specification

    13/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business nameof Document owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    2506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    13 / 31

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    5 ATTACHMENTS

    5.1 ITP (s)

    5.1.1 General ITP for Initial Inspection:ITP N WL-0001 Document review and material receiving

    5.1.2 Specific ITP for construction:ITP N WL - 0101 Welding of: piping components, saddles and supports- pressure vessel

    storage tank Steel Structure

    5.2 Forms List

    5.2.1 Inspection and test report forms:MDT.WL.CDQ.0132 Positive material identification report

    MDT.WL.CDQ.0133 Register sheet of approved WPS/WPQRMDT.WL.CDQ.0134 Register sheet of approved Welders and Welding OperatorsMDT.WL.CDQ.0135 Register sheet of approved NDE OperatorsMDT.WL.CDQ.0136 Register sheet of approved Welding ProceduresMDT.WL.CDQ.0141 Radiographic examination reportMDT.WL.CDQ.0142 Liquid penetrant examination Daily reportMDT.WL.CDQ.0143 Ultrasonic examination Daily reportMDT.WL.CDQ.0144 Ultrasonic examination Daily report for laminationMDT.WL.CDQ.0145 Summary of Welds - Ndt (Weekly Report)MDT.WL.CDQ.0150 Alignment and welding visual inspection daily reportMDT.WL.CDQ.0160 Welding summary listMDT.DT.CDQ.0610 Golden weld

  • 7/29/2019 Quality Control Specification

    14/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business name ofDocument owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    002506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    14 / 31

    ORGANIZATION CODE

    CC Construction Contractor CO Company Commissioning P PerformQC QC Construction Contractor TP Laboratory/Third party S SurveillaSP Company Supervision CL Client R Review

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    ITP N WL-0001 DISCIPLINE

    CIVIL GENERALTitle: DOCUMENT REVIEW AND MATERIAL CONSUMABLE

    RECEIVING

    QC CODE DescriptionReferenceDocument

    AcceptanceCriteria

    QualityRecords/

    Document CC QC

    WL 0001 01 Before commencement the Project works review

    and approval of following documents:

    -Welding Summary List

    -WPS/PQR

    Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures

    -API 650 forTANK-AWS D1.1 forSteel structures

    ASME IXASME B31.3

    Register list of

    WPS and PQR

    used in Project

    MDT.WL.CDQ.0

    133

    P H

    WL 0001 02 Welder and Welding operator certifications WPQRProject SPC..-API 650 forTANK

    -AWS D1.1 forSteel structures

    ASME IXASME B31.3 Register List

    MDT.WL.CDQ.0

    134

    P H

    WL 0001 03 NDEs personnel qualifications:

    1. Magnetic particle Test

    2. Penetrant Test

    3. Radiographic Test

    4. Ultrasonic Test

    5. Visual Test

    Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures

    ASME IXASME B31.3ASME V

    Register List

    MDT.WL.CDQ.0

    135

    P H

    WL 0001 04 PWHT working station verification-Project SPC..-API 650 forTANK

    -AWS D1.1 forSteel structures

    ASME B31.3Qualification/

    certification

    P H

  • 7/29/2019 Quality Control Specification

    15/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business name ofDocument owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    002506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    15 / 31

    ORGANIZATION CODE

    CC Construction Contractor CO Company Commissioning P PerformQC QC Construction Contractor TP Laboratory/Third party S SurveillaSP Company Supervision CL Client R Review

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    ITP N WL-0001 DISCIPLINE

    CIVIL GENERALTitle: DOCUMENT REVIEW AND MATERIAL CONSUMABLE

    RECEIVING

    QC CODE DescriptionReferenceDocument

    AcceptanceCriteria

    QualityRecords/

    Document CC QC

    WL 0001 05 Procedures review:1. Procedure for Storage, Drying,

    Reconditioning, Handling andScrapping of Welding Consumables.

    2. Procedure for Weld Identification andWeld Traceability (original, modifiedand repaired welds)

    3. Weld Repair Method4. Production Weld Hardness Testing

    Procedure*5. Post Weld Heat Treatment Procedure*6. Positive Material Identification

    Procedure*7. Procedure for Control of Welding

    Consumables8. Penetrant Test9. Magnetic Particle Test10. Radiographic Test11. Ultrasonic Test12. Visual Test13. Ferrite Test*

    Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures

    ASME IXASME B31.3ASME V

    MDT.WL.CDQ.0

    136

    Files

    P H

    WL 0001 06 Receiving inspection and verification of welding

    consumables and theirs certificates

    Project SPC..-API 650 forTANK

    -AWS D1.1 forSteel structures

    ASME II Part C

    ASME B31.3

    Register of

    consumable

    received,Manufacture

    Certificates

    P H

  • 7/29/2019 Quality Control Specification

    16/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business name ofDocument owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    002506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    16 / 31

    ORGANIZATION CODE

    CC Construction Contractor CO Company Commissioning P PerformQC QC Construction Contractor TP Laboratory/Third party S SurveillaSP Company Supervision CL Client R Review

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    ITP N WL-0001 DISCIPLINE

    CIVIL GENERALTitle: DOCUMENT REVIEW AND MATERIAL CONSUMABLE

    RECEIVING

    QC CODE DescriptionReferenceDocument

    AcceptanceCriteria

    QualityRecords/

    Document CC QC

    WL 0001 07 Welding measurement devices: Calibration,

    Verification

    Project SPC

    ISO 10012

    Manufacturer

    RecommendationASME B31.3ASME V

    Calib.CertificatesRegister list

    P H

    WL 0001 08 Weekly reporting of NDTProject SPC..-API 650 for

    TANK-AWS D1.1 forSteel structures

    As per contractorinstruction

    ASME B31.3ASME V

    MDT.WL.CDQ.

    0145

    H

  • 7/29/2019 Quality Control Specification

    17/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business name ofDocument owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    002506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    17 / 31

    ORGANIZATION CODE

    CC Construction Contractor CO Company Commissioning P PerformQC QC Construction Contractor TP Laboratory/Third party S SurveillaSP Company Supervision CL Client R Review

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    ITP N WL-0101 DISCIPLINE

    CIVILTitle: WELDING OF: PIPING COMPONENTS, SADDLES ANDSUPPORTS- PRESSURE VESSEL STORAGE TANK SteelStructure

    QC CODE Descript ion

    ReferenceDocument

    AcceptanceCriteria

    Quality Records/Document CC Q

    WL 0101 01 Alignment and welding visual inspection reportProject SPC..-API 650 forTANK-AWS D1.1 forSteel structures

    Approved WPSsASME B31.3

    MDT.WL.CDQ.0150

    P

    WL 0101 02 Golden WeldProject SPC

    Approved WPSs

    ASME B31.3

    Approved WPSs

    MDT.WL.CDQ.0610

    P

    WL 0101 03 - Selection of Weld seams position (Tank)

    - Control of Welded Joints, selection for NDE (a)- In-Process NDE Inspection (b)

    Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures

    -API 650 forTANK

    -AWS D1.1 forSteel structure- ASME B31.3- ASME V

    WSL

    MDT.WL.CDQ.0160

    P

    WL 0101 04 Non-Destructive Examination Evaluation: resultsevaluation

    Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures

    - ASME VMDT.WL.CDQ.0141and/orMDT.WL.CDQ.0142and/orMDT.WL.CDQ.0143

    MDT.WL.CDQ.0144

    P

  • 7/29/2019 Quality Control Specification

    18/31

    Revision Index

    ValidityStatus

    Rev.

    Logo and business name ofDocument owner

    e & p division

    Company DocumentIdentification

    00250600BBQB09623

    Owner DocumentIdentification

    002506-ZA-E-09623CD-FE 00

    Sheet ofSheets

    18 / 31

    ORGANIZATION CODE

    CC Construction Contractor CO Company Commissioning P PerformQC QC Construction Contractor TP Laboratory/Third party S SurveillaSP Company Supervision CL Client R Review

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    ITP N WL-0101 DISCIPLINE

    CIVILTitle: WELDING OF: PIPING COMPONENTS, SADDLES AND

    SUPPORTS- PRESSURE VESSEL STORAGE TANK SteelStructure

    QC CODE Descript ion

    ReferenceDocument

    AcceptanceCriteria

    Quality Records/Document CC Q

    WL 0101 05 Application of Post Weld Heat Treatment

    Hardness Testing Application and Results

    Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures

    - ASME B31.3- ASTM E 92

    WSLMDT.WL.CDQ.0160

    Certification Testresult

    P

    WL 0101 06 Positive Material Identification (PMI) of depositedweld for alloyed materials (where applicable)

    Project SPC 00-GA-E-60901

    - ASME B31.3 MDT.WL.CDQ. .0132 P W

    WL 0101 07 Final Welding Inspection:

    Check Welding Summary Report, Weld Map andall quality records (NDT, PMI, FERRITE,PWHT, HARDNESS, REPAIR).

    Project SPC..

    -API 650 forTANK-AWS D1.1 forSteel structures

    - ASME B31.3

    -AWS D1.1- API 650

    WSL

    MDT.WL.CDQ.0160

    P

  • 7/29/2019 Quality Control Specification

    19/31

    CLIENT JOB UNIT

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    POSITIVE MATERIAL IDENTIFICATION (PMI) REPORTDOCUMENT/SPECIFICATION:

    PAGE OF

    INSPECTION

    Pmi Elements AcceptableLine number

    Spoolnumber Heat number

    Yes Not

    INSPECTION NOTIFICATION

    REFERENCE

    NOTES:

    RFI N

    QC CONSTRUCT.

    CONTRACTORSP TP CLIENT

    NAME NAME NAME NAME

    SIGNATURE SIGNATURE SIGNATURE SIGNATURE

    Date Date Date Date

    Form code: MDT.WL.CDQ.0132

  • 7/29/2019 Quality Control Specification

    20/31

    CLIENT JOB UNIT

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    REGISTER SHEET OF APPROVED WPS/WPQR

    REFERENCE TO CODE: PAGE OF

    WPS N WPQR N QUALIFICATION RANGE APPROVED DATE

    INSPECTION NOTIFICATION

    REFERENCE

    NOTES:

    RFI N

    QC CONSTRUCT.CONTRACTOR

    SP CLIENT

    NAME NAME NAME NAME

    SIGNATURE SIGNATURE SIGNATURE SIGNATURE

    Date Date Date Date

    Form code: MDT.WL.CDQ.0133

  • 7/29/2019 Quality Control Specification

    21/31

    CLIENT JOB UNIT

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    REGISTER SHEET OF APPROVED WELDERS AND WELDING OPERATORS

    DOCUMENT/SPECIFICATION:

    PAGE OF

    WELDER NAME WELDER STAMP APPROVED RANGE APPROVED DATE

    INSPECTION NOTIFICATIONREFERENCE

    NOTES:

    RFI N

    QC CONSTRUCT.

    CONTRACTORSP CLIENT

    NAME NAME NAME NAME

    SIGNATURE SIGNATURE SIGNATURE SIGNATURE

    Date Date Date Date

    Form code: MDT.WL.CDQ.0134

  • 7/29/2019 Quality Control Specification

    22/31

    CLIENT JOB UNIT

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    REGISTER SHEET OF APPROVED NDE OPERATORS

    DOCUMENT/SPECIFICATION:

    PAGE OF

    OPERATOR NAME QUALIFIED FORQUALIFICATION

    NUMBERAPPROVED DATE

    INSPECTION NOTIFICATION

    REFERENCE

    NOTES:

    RFI N

    QC CONSTRUCT.CONTRACTOR

    SP CLIENT

    NAME NAME NAME NAME

    SIGNATURE SIGNATURE SIGNATURE SIGNATURE

    Date Date Date Date

    Form code: MDT.WL.CDQ.0135

  • 7/29/2019 Quality Control Specification

    23/31

    CLIENT JOB UNIT

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    REGISTER SHEET OF APPROVED QC PROCEDURES

    TAG/ITEM or ISO DWG.: PAGE OF

    CHECK AVAILABILITY OF QC PROCEDURES

    PROCEDURESYES NO N/A

    1. Procedure for Storage, Drying, Reconditioning, Handling

    and Scrapping of Welding Consumables

    2. Procedure for Weld Identification and Weld Traceability

    (original, modified and repaired welds)

    3. Weld Repair Method

    4. Production Weld Hardness Testing Procedure

    5. Post Weld Heat Treatment Procedure

    6. Positive Material Identification Procedure

    7. Procedure for Control of Welding Consumables

    8. Penetrant Test

    9. Magnetic Particle Test

    10. Radiographic Test

    11. Ultrasonic Test

    12. Visual Test

    13. Ferrite Test

    14. Welding Procedures

    INSPECTION NOTIFICATION

    REFERENCE

    NOTES: N/A = NOT ACCEPTABLE

    RFI N

    QC CONSTRUCT.

    CONTRACTORSP CLIENT

    NAME NAME NAME NAME

    SIGNATURE SIGNATURE SIGNATURE SIGNATURE

    Date Date Date Date

    Form code: MDT.WL.CDQ.0136

  • 7/29/2019 Quality Control Specification

    24/31

    CLIENT JOB UNIT

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    RADIOGRAPHIC EXAMINATION REPORT

    DOCUMENT/SPECIFICATION:

    PAGE OF

    JUDGEMENT (1);FILM

    PROGR.N

    WELDN

    FILMLOCATION

    DRW/ISO/SPOOL

    NTAG / LINENUMBER

    MATERIALDIAM.

    []THICK.[mm]

    WELDERSTAMP

    A NX NR RX NT EX

    (1)

    A = ACCEPTABLE; NX = UNACCEPTABLE RADIOGRAPHY; NR = TO B E REPAIRED; RX = RADIOGRAPHY TO BE REPEATED; NT = TO BE CUT;EX = EXAMINATION TO BE EXTENDED

    NOTES: INSPECTION NOTIFICATION REFERENCE

    RFI N

    QC CONSTRUCT.

    CONTRACTORSP TP CLIENT

    NAME NAME NAME NAME

    SIGNATURE SIGNATURE SIGNATURE SIGNATURE

    Date Date Date Date

    Form code: MDT.WL.CDQ.0141

  • 7/29/2019 Quality Control Specification

    25/31

    CLIENT JOB UNIT

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    LIQUID PENETRANT EXAMINATION DAILY REPORT

    DOCUMENT/SPECIFICATION:

    PAGE OF

    As welded As rolled As Forged As castSURFACECONDITION

    Ground Brushed Machined As bent

    Conformance to processes of :CLEANING, PENETRANT APPLICATION / REMOVAL, DRYING, DEVELOPER APPLICATION ,PENETRATION TIME

    JUDGEMENT (1);TAG/LINENUMBER

    DRW/ISO/SPOOL WELDNUMBER

    MATERIALA NR RX NT EX

    (1)

    A = ACCEPTABLE; NR = TO BE REPAIRED; RX = TO BE REPEA TED; NT = TO BE CUT;EX = EXAMINATION TO BE EXTENDED

    NOTES: Attach list of w elds examinatedINSPECTION NOTIFICATION REFERENCE

    RFI N

    QC CONSTRUCT.

    CONTRACTORSP TP CLIENT

    NAME NAME NAME NAME

    SIGNATURE SIGNATURE SIGNATURE SIGNATURE

    Date Date Date Date

    Form code: MDT.WL.CDQ.0142

  • 7/29/2019 Quality Control Specification

    26/31

    CLIENT JOB UNIT

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    ULTRASONIC EXAMINATION DAILY REPORT

    DOCUMENT/SPECIFICATION:

    PAGE OF

    JUDGEMENT(1)TAG / LINE / SPOOL N WELD N

    DIAM.

    []THICK.SS

    [mm]MATERIAL

    A NA EX

    A = ACCEPTABLE; NA = NOT ACCEPTABLE EX = EXAMINA TION TO BE EXTENDED

    NOTES: INSPECTION NOTIFICATION REFERENCE

    RFI N

    QC CONSTRUCT.

    CONTRACTORSP TP CLIENT

    NAME NAME SIGNATURE SIGNATURE

    SIGNATURE SIGNATURE

    Date Date Date Date

    Form code: MDT.WL.CDQ.0143

  • 7/29/2019 Quality Control Specification

    27/31

    CLIENT JOB UNIT

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    ULTRASONIC EXAMINATION DAILY REPORT FOR LAMINATION

    DOCUMENT/SPECIFICATION:

    PAGE OF

    Progres.number

    Weldnumber

    PipeNumber

    MaterialWall t hk.

    (mm)

    Location ofindication

    (mm)

    Type ofindication

    Evaluation(1)

    A NR NC

    A NR NC

    A NR NC

    A NR NC

    A NR NC

    A NR NC

    A NR NC

    A NR NC

    A NR NC

    A NR NC

    A NR NC

    NDE procedure: Code/Standard: Drawing:

    Legend:(1) A= Acceptable NR= Not acceptable (to be repaired) NC= Not acceptable (to be cut out)

    INSPECTION NOTIFICATION REFERENCENOTES:

    RFI N

    QC CONSTRUCT.

    CONTRACTORSP TP CLIENT

    NAME NAME NAME NAME

    SIGNATURE SIGNATURE SIGNATURE SIGNATURE

    Date Date Date Date

    Form code: MDT.WL.CDQ.0144

  • 7/29/2019 Quality Control Specification

    28/31

    CLIENT JOB UNIT

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    SUMMARY OF WELDS - NDT (WEEKLY REPORT )DOCUMENT/SPECIFICATION:

    PAGE OF

    WELDING PROCESS: Actual week Total previ ous

    WITH RT WITH UT RT + UT WITH RT WITH UT RT + UT

    EXISTING WELDS n.

    EXECUTED WELDS n .

    CHECKED n.

    ACCEPTED n:

    REPAIRS n.

    CUT n.

    RT REFUSED n.

    DEFECT TO REPAIR n.

    Lack of penetration n.

    Lack of fusion (in root) n.

    Root concavity n.

    Overlap n.

    Porosity cluster n.

    Undercut n.

    Undercut (in root) n.

    Slag inclusion n.

    Wormholes n.Cold lap n.

    Crack n.

    Crater crack n.

    Gas inclusion n.

    Excess weld metal n.

    Excessive penetration n.

    Poor restart n.

    DEFECT TO CUT n.

    Crack n.

    Stray flash or arc strike n.

    Summary defect n.

    Welds not accepted by RT n.

    Welds not accepted by UT n.

    THE LAST FOUR POSITIONS REFER EXCLUSIVELY TO THE WELDS CHECKED USING BOTH METHODS (RT+UT)

    INSPECTION NOTIFICATION REFERENCENOTES:

    RFI N

    QC CONSTRUCT. CONTRACTOR SP CLIENT

    NAME NAME NAME NAME

    SIGNATURE SIGNATURE SIGNATURE SIGNATURE

    Date Date Date Date

    Form code: MDT.WL.CDQ.0145

  • 7/29/2019 Quality Control Specification

    29/31

    CLIENT JOB UNIT100

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    ALLIGNAMENT AND WELDING VISUAL INSPECTION REPORT

    DOCUMENT/SPECIFICATION:

    TAG NUMBER (FOR TANK / VESSEL/ STEEL STRUCTURE):

    PAGE OF

    REPORT

    FOR TANK/VESSEL

    STEELSTRUCTURE

    FOR PIPING.

    PLATE TOPLATE N

    NOZZLEN

    TAG / ELEMENT LINE NUMBER SPOOL NUMBER

    WELD N.

    ALIIGNEMENT:- PIPE To PIPE-/PIPE to FLANGE

    - PLATE to -PLATE-BEAM To BEAM-NOZZLE

    VISUAL WELD

    STATUS

    A NR NT A NR NT

    A NR NT A NR NT

    A NR NT A NR NT

    A NR NT A NR NT

    A NR NT A NR NT

    A NR NT A NR NT

    A NR NT A NR NT

    A NR NT A NR NT

    A NR NT A NR NT

    A NR NT A NR NT

    A NR NT A NR NT

    A NR NT A NR NT

    A NR NT A NR NT

    A = ACCEPTABLE; NR = TO BE REPAIRED; NT = TO BE CUT

    INSPECTION NOTIFICATION REFERENCENOTES:

    RFI N

    QC CONSTRUCT. CONTRACTORSP CLIENT

    NAME

    NAME NAME NAME

    SIGNATURE

    SIGNATURE SIGNATURE SIGNATURE

    Date

    Date Date Date

    Form code: MDT.WL.CDQ.0150

  • 7/29/2019 Quality Control Specification

    30/31

    CLIENT JOB UNIT100

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.

    WELDING SUMMARY LISTLINE No. SPOOL No.

    Weld MATERIAL Control NDT

    WPS Description

    Type of

    MaterialWeld NoWelder

    Stamp

    NPS

    i nch Thick mm RT 1Mark Item Piece No Heat No VTTest Pack Manufacturer U

    TANK/VESSEL/STEEL STRUCTURE TAG:

    Result

    RT 2 Result

    Result

    PT / MT Result

    Form code: MDT.WL.CDQ.0160

    To be done in excel sheet

  • 7/29/2019 Quality Control Specification

    31/31

    CLIENT JOB UNIT100

    e & p division PLANT LOCATIONONSHORE

    QC CODE

    Construction Contractor

    PROJECT TITLE

    ZUBAYR OIL FIELD DEVELOPMENT

    REPORT N

    GOLDEN - WELD

    DOCUMENT/SPECIFICATION:

    PAGE OF

    Connection progressive: Km

    Reference document: Drawing Plant

    Section:

    Date: Start: h Finish: h

    PIPELINE CHARACTERISTICS

    Nominal pipe Size NPSWall-thickness (mm)Type of Base-metalType of coating

    TIE-IN CHECK

    Check of welding temperature Acceptable Not acceptable

    Check of Lamination bevel ends Acceptable Not acceptable

    Check of alignment of sections to be connected Acceptable Not acceptable

    Check of min/max temperature Acceptable Not acceptable

    Check of joint coating Acceptable Not acceptable

    CHECK OF MECHANICAL INFORMATIONS REPORTED ON PIPE BOOK

    Joint N: WPS: Type of Weld: Buttweld Filletweld

    Welders Stamp: Type of Fillermetal:

    NDT Inspection Report N

    VT Date: Time: h Acceptable Not acceptableRT Date: Time: h Acceptable Not acceptableUT Date: Time: h Acceptable Not acceptableNDT Repair Inspection Repair Date: Repair WPS:

    VT Date: Time: h Acceptable Not acceptableRT Date: Time: h Acceptable Not acceptableUT Date: Time: h Acceptable Not acceptable

    Types of Components: Piece N Describt. Piece N Describt.Straight Pipe / Straight Pipe Straight Pipe / Field Bend

    Field Bend / Field Bend Fitting Hot formed Bend / Straight pipe

    Fitting Hot formed Bend / Field Bend Pup piece length (if welded)

    INSPECTION NOTIFICATION

    REFERENCENOTES:

    RFI N

    QC CONSTRUCT.

    CONTRACTORSP CLIENT

    NAME NAME NAME NAME

    SIGNATURE SIGNATURE SIGNATURE SIGNATURE

    Date Date Date Date

    Form code: MDT.WL.CDQ.0610