quality control specification
TRANSCRIPT
-
7/29/2019 Quality Control Specification
1/31
CD-FE 00 21/07/10 Final Issue Pasqualato Ditommaso Chiorrini
ValidityStatus
Rev.number
Revision Index
Date DescriptionPrepared
byChecked
byApproved
by
exploration & Pproduction division
Project nameZUBAYR OIL FIELD
DEVELOPMENTPROJECT
Company Document ID
00250600BBQB09623
Job N.
Contractor logo and business name Contractor Document ID2506-ZA-E-09623
Contract N.
Vendor logo and business name Vendor Document ID
Order N.
Facility NameZUBAYR FIELD GENERAL
LocationONSHORE
Scalen.a.
Sheet of Sheets1 of 31
Supersedes N.
Superseded by N.
Document Title
LOGISTIC SUPPORT BASEQUALITY CONTROL SPECIFICATION FOR
WELDING/PIPING/TANKS/VESSELS/STEEL STRUCTUREPlant Area
n.a.Plant Unit
n.a.
Software: Microsoft Word 97-2003 File No. 00250600BBQB09623_CDFE00_32.d
This document is property of Eni S.p.A. Exploration & Production Division.
It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
ENI - IRAQ
ZUBAYR OIL FIELD DEVELOPMENT PROJECT
QUALITY CONTROL SPECIFICATION
FOR WELDING/PIPING/TANKS/VESSELS/
STEEL STRUCTURE
-
7/29/2019 Quality Control Specification
2/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
2 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
REVISION HISTORY
Rev. Date Nr. ofsheets
Description
CD-FE 00 21/07/2010 32 Final Issue
-
7/29/2019 Quality Control Specification
3/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
3 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
INDEX
1 GENERAL .............................................................................................................................................................41.1 Scope and Objective........................................................................................................................................41.2 Terms and definitions ......................................................................................................................................4
2 QUALITY CONTROL PLANNING........................................................................................................................52.1 Information Related to this Document.............................................................................................................52.2 Issuing of QCP and ITP(s)...............................................................................................................................52.3 Construction Contractor responsibility.............................................................................................................62.4 Local Regulations ............................................................................................................................................6
3 APPLICABLE DOCUMENTATION ......................................................................................................................63.1 Specifications Codes and Standards ..............................................................................................................6
4 SITE QUALITY ACTIVITIES.................................................................................................................................64.1 Site welding activities.......................................................................................................................................64.2 Inspection on welding resources.....................................................................................................................74.3 Welding inspection checklists........................................................................................................................10
5 ATTACHMENTS.................................................................................................................................................135.1 ITP (s)............................................................................................................................................................135.2 Forms List......................................................................................................................................................13
-
7/29/2019 Quality Control Specification
4/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
4 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
1 GENERAL
1.1 Scope and Objective
1.1.1 This specification defines the quality control requirements for Construction Contractor for the
execution of welding of Piping / Tank /Vessel / Structural Steel related works to be performed
during construction of logistic support base.
1.1.2 This document is additional to specification n 2506-ZA-E-09610 already delivered to
Construction Contractor and with all other applicable contractual documentation.
1.2 Terms and definitions
PROJECT ZUBAYR OIL FIELD DEVELOPMENT PROJECTCOMPANY Eni S.p.A. Exploration & Production Division
1.2.1 The following terms and definitions are applicable to this document:
ConstructionContractor(s) Organisation(s), including its sub-contractors to whom any part of the
Works has been subcontracted by Client;
Company Is the party, which requests contract activities/service and pays for them
TPI Third Party Inspection: any organization, authority, person or persons, towhich Construction Contractor has subcontracted the execution ofinspection and or laboratory testing related activities.
Works Means the facilities constituting the Project, including all the construction
services, materials and equipment to be provided by Client to satisfy itsobligations pursuant to the Contract undertaken with the Client.
QMS Quality Management System: part of the organizations managementsystem that focuses on achievement of results, in relation to the qualityobjectives, to satisfy the needs, expectations and requirements of Clientand of any other interested parties, as appropriate.
QCS Quality Control Specification: Company specification for quality controlrequirements.
QCP Quality Control Plan: Construction Contractor plan contain all qualitycontrol requirements. This plan complements and compiles all applicableITP(s).
ITP Inspection and Test Plan: Construction Contractor plan of inspection andtests required by engineering and vendors documents or elsewherespecified. ITP(s) shall provide references to applicable procedures,acceptance criteria, documentation, quality records and inspectionattendance to be performed, in chronological order, from initialinspection, throughout final inspections and mechanical completion.ITP(s) and relevant forms shall be issued as QCP enclosures.
MDT Inspection report Form, attached to the ITP. They shall be used duringchecks and inspections /tests and signed by the involved parties, as perrelevant QC code.
RFI Request for Inspection: Written notification to be issued by ConstructionContractor in order to allow all parties involved to perform their inspection
and test witness as planned in the applicable ITP;
QA Quality Assurance: Part of quality management focused on providingconfidence that quality requirements will be fulfilled;
-
7/29/2019 Quality Control Specification
5/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
5 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
QC Quality Control: Part of quality management focused on fulfilling qualityrequirements;
NCR Non Conformity Report: Document recording a non-fulfilment of arequirement;
Non Conformity The non-fulfilment of specified requirements;
Special Process A process, the results of which are highly dependent on the control of theprocess or the skill of the operator and in which the specified qualitycannot be readily determined by inspection or test on the product;
Calibration Comparison of a measurement and test equipment with a referencestandard or with another one provided with better tolerance in order todetect or to measure possible inaccuracies and to document or eliminatethem.
1.2.2 Any other terms related to quality and not listed above shall conform to section 3 Term and
Definition of ISO 9000:2005 Quality Management System Fundamentals and vocabulary.
2 QUALITY CONTROL PLANNING
2.1 Information Related to this Document
2.1.1 This document includes the ITP(s) and forms, listed under paragraph 5.1 and 5.2, for
performing as minimum the inspection, tests and certification during site activities related to
welding.
2.1.2 The ITPs are separated in two following groups:
1. General ITP(s) include the initial necessary checks and verification to be performed but
not limited to documentation, personnel and equipment, material receiving, climatic
conditions, etc..
2. Specific ITP(s) include inspection and tests directly related to construction items and or
part of the Works that can be identified and tracked through engineering drawings.
2.2 Issuing of QCP and ITP(s)
2.2.1 Construction Contractor shall endorse and reissue this document Quality Control
Specification (QCS) as Quality Control Plan (QCP), improving the enclosed ITPs in
accordance to the scope of work, project requirements and completing the information
requested on clause 3.1 and the ITPs columns Reference document & Acceptance CriteriaConstruction Contractor will number the QCP in accordance to the project numbering systemprovided by Company.
2.2.2 If during Works Construction Contractor will need additional ITP/ ITP phase for further test and
checks with the relevant QC Codes, the same shall be numbered adding an alphanumeric
suffix to the preceding available QC Code. New QC Codes shall be submitted and approved
by Company.
2.2.3 Construction Contractor during the execution of the Works shall revise and update, as and
when required, the QCP(s) and relevant ITP(s) to incorporate any other pertinent
requirements set forth in engineering specifications, standards, design codes, recommended
practices, safety design, referred hereafter or included elsewhere in the contractual and
vendors documents.
2.2.4 Before starting of Works, the QCP containing the ITPs applicable for the project items andworks, shall be submitted by the Construction Contractor for Company review and approval.
-
7/29/2019 Quality Control Specification
6/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
6 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
2.3 Construction Contractor responsibility
2.3.1 Construction Contractor in order to meet all the contractual requirements will prepare and
update any other necessary QCP(s) and ITP(s), and quality procedures which include all
inspections, examinations and tests required to verify the quality of the Works. The above
documents shall be timely submitted to Company for review and approval in order to ensure
their availability in approved status prior to starting of the welding works.
2.3.2 Construction Contractor will perform and record all inspections, examinations and tests
required and shall carry out all the works necessary for the preparation of inspections,
examinations and tests, including adequate scaffolding for safely witnessing the inspection.
2.3.3 Construction Contractor will provide, for the execution of testing, inspection and
measurements all necessary equipment, tools and shall make available the applicable
international Standards and Codes.
2.3.4 Construction Contractor will issue inspections, examinations and tests reports immediately
after the completion of each inspection activity. All reports shall be approved and signed off by
Construction Contractor authorized personnel prior to submission to Company for review orapproval, as appropriate.
2.3.5 Company or other Parties signature on inspection, examination and test reports does not
release the Construction Contractor from his responsibilities.
2.3.6 Construction contractor shall have at his own charge the filing of the relevant QCP form
certificate on dedicated Dossiers, at the time required, the Construction Contractor will deliver
to Company hard copies and PDF file of the dossiers.
2.4 Local Regulations
2.4.1 Inspections and tests required by local law and regulation shall be strictly adhered to,
documented by Construction Contractor and shall take precedence over this specification
2.4.2 When local law and local regulations are different from the applicable design codes,Construction Contractor shall inform COMPANY for the necessary actions.
3 APPLICABLE DOCUMENTATION
3.1 Specifications Codes and Standards
3.1.1 Contractual Specification:
3.1.2 Project Specifications:TO BE UPDATE BY EPC CONTRACTOR
3.1.3 Codes and Standards:
- Applicable Codes and Standards are those referred in the above specification and inengineering documentation.
- API 650 for TANK- AWS D1.1 for Steel structures- ASME B31.3- ASME V- ASME IX- ASME II Part C
4 SITE QUALITY ACTIVITIES
4.1 Site welding activities
4.1.1 Table 1 outlines welding related activities which are required to be carried out by Construction
Contractor in a controlled manner:
-
7/29/2019 Quality Control Specification
7/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
7 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
TABLE 1
Welding documents control (Welding summary list/Weld map / WPS / WPQR / Work Instructions)
PWHT procedure control
Welding personnel
Inspection, testing and examination personnel
Welding and allied process equipment
Welding consumables
Materials (base metals and consumables) identification and traceability
Welding execution
Post weld heat treatment execution
Welding related inspection and testing
Quality records
4.2 Inspection on welding resources
4.2.1 Construction Contractor will provide resources such as: working facilities, welding equipment
tools, consumables, weather protection and any other special equipments suitable to the
specific work to be performed. Welding resources and welding activities are outlined in Table
2
TABLE 2
ToolsEquipment (2)
ReferenceConstructionContractor action (1)
Welding quality control
Working facilitiesConstructionContractorprocedure
Visual inspection
- Check on that warehouse shall be dry,clean and protected by weather condition.- Check on different working areas forstorage, working tools, welding consumables,working and welding activities according toparent material (carbon steel, stainless steel,nonferrous material, etc).- Check on identification of non destructiveexamination area.
- Check on identification of scrap area.
Handling equipmentand cranes
Manufacturerdata sheet
Visual inspection - Check on efficiency and safety system
Equipment foridentification andtraceability
Manufacturerrecommendation /certification
Visual inspection
- Check on availability- Check on certificates
-
7/29/2019 Quality Control Specification
8/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
8 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
ToolsEquipment (2)
ReferenceConstructionContractor action (1)
Welding quality control
Welding powersource and othermachines
Manufacturerrecommendations /certification
Visual inspection and test
- Check on the availability of weldingmachine, cables, amperometer, voltmeter,etc.- Check on calibration of all parameters thatcan affect production quality- Check on certificates
Welding, cutting gasand allied system
Manufacturerrecommendations /certification
Visual inspection
- Check on availability, efficiency andcleaning of purging and trailing gas system- Check on cylinder identification/marking- Check on efficiency, calibration andcleaning of gas flow meter, gas hoses, etc.- Check on certificates
Equipment for jointpreparation, cuttingand gouging
Manufacturerrecommendations /certification
Visual inspection and test
- Check on availability of cutting tools, cuttingtorch and similar.- Calking tool efficiency- Test efficiency
Fit-up equipment(jigs and fixtures)
Project specification Visual inspection
- Check on availability of yokes, jigs, pipecouplers, connecting spacers, etc- Check on presence of different area inwarehouse for fit-up equipment in terms of:pipe base metal chemical composition, etc.- Check on certificates- Check on identification and marking
Weldingconsumables(electrodes, fillerwires and fluxes)
Manufacturerrecommendations /certification /
Visual inspection
- Check on that Welding consumableswarehouse is dry, clean and protected byweather condition.- Check on presence of different area inwarehouse for consumables in terms of:
storage, conditioning and scrap;
type, size and classification.- Check on batch/lot certificates- Check on filler metal marking- Check on implementation of manufacturerrecommendations for storage, drying, re-conditioning and handling
Warehouse andportable ovens
Manufacturerrecommendations /certification
Visual inspection and test
- Check on the availability of ovens.- Check on certificates, marking- Test temperature calibration
Welding machiningand handle tools
Manufacturerrecommendations /certification
Visual inspection
- Check on availability of brushing, grindingtools, etc.- Check on presence of different area inwarehouse for tools in terms of: type /material- Check on identification and marking
-
7/29/2019 Quality Control Specification
9/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
9 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
ToolsEquipment (2)
ReferenceConstructionContractor action (1)
Welding quality control
Weather protection Project specification Visual inspection
- Check on availability of proper protection forthe part to be welded and for welders/operators function of weather conditions andwelding process/ consumables
Equipment for visualexamination
Manufacturerrecommendation /certification
Visual inspection and test
- Check on availability of gauges, calliper,magnifier lens, mirror, borescopes, artificiallighting, etc.- Check on certificates and calibration- Test efficiency
Equipment forradiographicexamination
Manufacturerrecommendation /certification
Visual inspection and test
- Check on availability of X-ray machines,-ray sources, radiographic film, intensifying
screens, wire IQI, hole IQI, densitometer,etc.- Check on certificates and calibration- Test efficiency
Equipment forultrasonicexamination
Manufacturerrecommendation /certification
Visual inspection and test
- Check on availability of pulse-echoinstrument, TOFD, probes, couplant,calibration blocks, etc- Check on certificates and calibration- Test efficiency
Equipment for liquidpenetrant
examination
Manufacturerrecommendation /
certification
Visual inspection and test
- Check on the availability and efficiency ofpenetrant, emulsifiers, solvents and cleaningagents, etc.
- Check on certificates- Test efficiency
Equipment formagnetic particleexamination
Manufacturerrecommendation /certification Visual inspection and test
- Check on availability of electromagnet orsimilar, magnetic particles, lightingequipment.- Check on certificates and calibration- Test efficiency
Equipment forhardness checks,Positive materialidentification, Ferritemeasurements
Manufacturerrecommendation /certificationPMI specification
Visual inspection and test(if required)
- Check on availability of instruments- Check on certificates, calibration andmarking- Test efficiency
Special equipments(like Eddy currentequipment, Oxygenmeter, etc)
Manufacturerrecommendation /certification
Visual inspection and test(if required)
- Check on availability of instruments- Test efficiency
-Check on certificates, calibration andmarking
Equipment forpreheating, postheating and post-weld heat treatment
Manufacturerrecommendation /certification
Visual inspection and test
- Check on the availability of thermocouples,heating elements, electrical generator,temperature indicating-crayons, insulationand cables.- Availability check of oven- Check on certificates, calibration andmarking- Test efficiency
Personnelprotective
equipment
Manufacturerrecommendations /
certification
Visual inspection
- Check on availability and efficiency
Notes:
-
7/29/2019 Quality Control Specification
10/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
10 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
1. Construction Contractor will issued and submit to Company Welding Supervisor for approval written
procedures detailing welding material and equipment receiving, storage, handling, preservation and
maintenance. All procedures will be in accordance with the manufacturers recommendations (if any).
2. All item will be tested or monitored at specified intervals during progress of work as required by ASME
B31.3 & ASME V and by accepted procedure. Relevant testing and measurement records will be
maintained at site by Construction Contractor and be made available at all time to Company upon
request. Construction Contractor shall demonstrate at all time all applicable and approved welding
procedures has been followed as well as proper sequence of inspection or testing and shall ensure
identification and traceability of material and equipment from receiving throughout all installation.
4.3 Welding inspection checklists
4.3.1 Table 3 lists minimum welding inspection checklists to be developed implemented by
Construction Contractor in accordance with the enclosed ITP(s)
-
7/29/2019 Quality Control Specification
11/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
11 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
TABLE 3
WORK PHASE DESCRIPTION OF INSPECTION/CHECKS
Pre-Welding Inspection - Check presence of approved WPS- Check removal of protective coating from bevel end.
- Check conformity of base materials in compliance with the WPS
- Check materials identification and transfer of material ID. All
materials must be marked as to its material composition before
starting of welding operations.
- Verify joint preparation (angle, gap, landing, etc.) and tack welds
(presence, correctness).
- Verify consumables materials per WPS (type, size, etc.) and
Brand/Manufacturer (if required).
- Check handling, storage & re-conditioning of electrodes- Check calibration of welding machines (only for automatic machine)
- Verify correct alignment in reference to the specification
- Verify if weather conditions are acceptable for welding
- Verify NDT performed on cut fittings or for cut bevel pipe prior to
welding
- Check segregation of SS materials and relevant tools from carbon
steel materials and alloyed materials- Check that consumables are reconditioned conforming to supplier
recommendation.
In-Process Welding Inspection- Check wind barriers as required- Check remote current control utilized- Check proper grounding and polarity- Check protection of external coating- Check removal internal clamp after completition 100% of the root
pass- Check removal external clamp after the execution 60% of the root
pass- Check removal of tack welds (if required)
- Check and verify pre-heating as per standard requirements (WPS
procedure, applications, temperature diagrams, etc)
- Check fulfilment of WPS variables
- Check heat input/run out of length (if required)
- Check monitoring of interpass temperature
- Check grinders for SS materials not contamined with CS material
- Verify weave not exceeding 3X diameter electrode (as required byWPS)
- Verify correct application of shielding and internal purging gas (if
required)
- Visual inspection of each pass
- Check back-gouging (if applicable): method, surface appearance
and NDT application.
- Verify consumables and rod ovens
- Verify quivers and rod ovens are in use and at temperature
- Verify rebake ovens are properly set and used
-
7/29/2019 Quality Control Specification
12/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
12 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
Post-Welding Inspection- Visual Inspection (weld profile, size, reinforcement, visual defects,
etc)- Verify weld and welder ID markings- Check Postheat (when required)- Check PWHT (when required)- Check Hardness testing (when required)- Check NDT- Verify welding/quality records, weld table/map and daily weld
summary sheet- PMI of alloy welds
-
7/29/2019 Quality Control Specification
13/31
Revision Index
ValidityStatus
Rev.
Logo and business nameof Document owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
2506-ZA-E-09623CD-FE 00
Sheet ofSheets
13 / 31
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
5 ATTACHMENTS
5.1 ITP (s)
5.1.1 General ITP for Initial Inspection:ITP N WL-0001 Document review and material receiving
5.1.2 Specific ITP for construction:ITP N WL - 0101 Welding of: piping components, saddles and supports- pressure vessel
storage tank Steel Structure
5.2 Forms List
5.2.1 Inspection and test report forms:MDT.WL.CDQ.0132 Positive material identification report
MDT.WL.CDQ.0133 Register sheet of approved WPS/WPQRMDT.WL.CDQ.0134 Register sheet of approved Welders and Welding OperatorsMDT.WL.CDQ.0135 Register sheet of approved NDE OperatorsMDT.WL.CDQ.0136 Register sheet of approved Welding ProceduresMDT.WL.CDQ.0141 Radiographic examination reportMDT.WL.CDQ.0142 Liquid penetrant examination Daily reportMDT.WL.CDQ.0143 Ultrasonic examination Daily reportMDT.WL.CDQ.0144 Ultrasonic examination Daily report for laminationMDT.WL.CDQ.0145 Summary of Welds - Ndt (Weekly Report)MDT.WL.CDQ.0150 Alignment and welding visual inspection daily reportMDT.WL.CDQ.0160 Welding summary listMDT.DT.CDQ.0610 Golden weld
-
7/29/2019 Quality Control Specification
14/31
Revision Index
ValidityStatus
Rev.
Logo and business name ofDocument owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
002506-ZA-E-09623CD-FE 00
Sheet ofSheets
14 / 31
ORGANIZATION CODE
CC Construction Contractor CO Company Commissioning P PerformQC QC Construction Contractor TP Laboratory/Third party S SurveillaSP Company Supervision CL Client R Review
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
ITP N WL-0001 DISCIPLINE
CIVIL GENERALTitle: DOCUMENT REVIEW AND MATERIAL CONSUMABLE
RECEIVING
QC CODE DescriptionReferenceDocument
AcceptanceCriteria
QualityRecords/
Document CC QC
WL 0001 01 Before commencement the Project works review
and approval of following documents:
-Welding Summary List
-WPS/PQR
Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures
-API 650 forTANK-AWS D1.1 forSteel structures
ASME IXASME B31.3
Register list of
WPS and PQR
used in Project
MDT.WL.CDQ.0
133
P H
WL 0001 02 Welder and Welding operator certifications WPQRProject SPC..-API 650 forTANK
-AWS D1.1 forSteel structures
ASME IXASME B31.3 Register List
MDT.WL.CDQ.0
134
P H
WL 0001 03 NDEs personnel qualifications:
1. Magnetic particle Test
2. Penetrant Test
3. Radiographic Test
4. Ultrasonic Test
5. Visual Test
Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures
ASME IXASME B31.3ASME V
Register List
MDT.WL.CDQ.0
135
P H
WL 0001 04 PWHT working station verification-Project SPC..-API 650 forTANK
-AWS D1.1 forSteel structures
ASME B31.3Qualification/
certification
P H
-
7/29/2019 Quality Control Specification
15/31
Revision Index
ValidityStatus
Rev.
Logo and business name ofDocument owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
002506-ZA-E-09623CD-FE 00
Sheet ofSheets
15 / 31
ORGANIZATION CODE
CC Construction Contractor CO Company Commissioning P PerformQC QC Construction Contractor TP Laboratory/Third party S SurveillaSP Company Supervision CL Client R Review
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
ITP N WL-0001 DISCIPLINE
CIVIL GENERALTitle: DOCUMENT REVIEW AND MATERIAL CONSUMABLE
RECEIVING
QC CODE DescriptionReferenceDocument
AcceptanceCriteria
QualityRecords/
Document CC QC
WL 0001 05 Procedures review:1. Procedure for Storage, Drying,
Reconditioning, Handling andScrapping of Welding Consumables.
2. Procedure for Weld Identification andWeld Traceability (original, modifiedand repaired welds)
3. Weld Repair Method4. Production Weld Hardness Testing
Procedure*5. Post Weld Heat Treatment Procedure*6. Positive Material Identification
Procedure*7. Procedure for Control of Welding
Consumables8. Penetrant Test9. Magnetic Particle Test10. Radiographic Test11. Ultrasonic Test12. Visual Test13. Ferrite Test*
Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures
ASME IXASME B31.3ASME V
MDT.WL.CDQ.0
136
Files
P H
WL 0001 06 Receiving inspection and verification of welding
consumables and theirs certificates
Project SPC..-API 650 forTANK
-AWS D1.1 forSteel structures
ASME II Part C
ASME B31.3
Register of
consumable
received,Manufacture
Certificates
P H
-
7/29/2019 Quality Control Specification
16/31
Revision Index
ValidityStatus
Rev.
Logo and business name ofDocument owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
002506-ZA-E-09623CD-FE 00
Sheet ofSheets
16 / 31
ORGANIZATION CODE
CC Construction Contractor CO Company Commissioning P PerformQC QC Construction Contractor TP Laboratory/Third party S SurveillaSP Company Supervision CL Client R Review
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
ITP N WL-0001 DISCIPLINE
CIVIL GENERALTitle: DOCUMENT REVIEW AND MATERIAL CONSUMABLE
RECEIVING
QC CODE DescriptionReferenceDocument
AcceptanceCriteria
QualityRecords/
Document CC QC
WL 0001 07 Welding measurement devices: Calibration,
Verification
Project SPC
ISO 10012
Manufacturer
RecommendationASME B31.3ASME V
Calib.CertificatesRegister list
P H
WL 0001 08 Weekly reporting of NDTProject SPC..-API 650 for
TANK-AWS D1.1 forSteel structures
As per contractorinstruction
ASME B31.3ASME V
MDT.WL.CDQ.
0145
H
-
7/29/2019 Quality Control Specification
17/31
Revision Index
ValidityStatus
Rev.
Logo and business name ofDocument owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
002506-ZA-E-09623CD-FE 00
Sheet ofSheets
17 / 31
ORGANIZATION CODE
CC Construction Contractor CO Company Commissioning P PerformQC QC Construction Contractor TP Laboratory/Third party S SurveillaSP Company Supervision CL Client R Review
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
ITP N WL-0101 DISCIPLINE
CIVILTitle: WELDING OF: PIPING COMPONENTS, SADDLES ANDSUPPORTS- PRESSURE VESSEL STORAGE TANK SteelStructure
QC CODE Descript ion
ReferenceDocument
AcceptanceCriteria
Quality Records/Document CC Q
WL 0101 01 Alignment and welding visual inspection reportProject SPC..-API 650 forTANK-AWS D1.1 forSteel structures
Approved WPSsASME B31.3
MDT.WL.CDQ.0150
P
WL 0101 02 Golden WeldProject SPC
Approved WPSs
ASME B31.3
Approved WPSs
MDT.WL.CDQ.0610
P
WL 0101 03 - Selection of Weld seams position (Tank)
- Control of Welded Joints, selection for NDE (a)- In-Process NDE Inspection (b)
Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures
-API 650 forTANK
-AWS D1.1 forSteel structure- ASME B31.3- ASME V
WSL
MDT.WL.CDQ.0160
P
WL 0101 04 Non-Destructive Examination Evaluation: resultsevaluation
Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures
- ASME VMDT.WL.CDQ.0141and/orMDT.WL.CDQ.0142and/orMDT.WL.CDQ.0143
MDT.WL.CDQ.0144
P
-
7/29/2019 Quality Control Specification
18/31
Revision Index
ValidityStatus
Rev.
Logo and business name ofDocument owner
e & p division
Company DocumentIdentification
00250600BBQB09623
Owner DocumentIdentification
002506-ZA-E-09623CD-FE 00
Sheet ofSheets
18 / 31
ORGANIZATION CODE
CC Construction Contractor CO Company Commissioning P PerformQC QC Construction Contractor TP Laboratory/Third party S SurveillaSP Company Supervision CL Client R Review
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
ITP N WL-0101 DISCIPLINE
CIVILTitle: WELDING OF: PIPING COMPONENTS, SADDLES AND
SUPPORTS- PRESSURE VESSEL STORAGE TANK SteelStructure
QC CODE Descript ion
ReferenceDocument
AcceptanceCriteria
Quality Records/Document CC Q
WL 0101 05 Application of Post Weld Heat Treatment
Hardness Testing Application and Results
Project SPC..-API 650 forTANK-AWS D1.1 forSteel structures
- ASME B31.3- ASTM E 92
WSLMDT.WL.CDQ.0160
Certification Testresult
P
WL 0101 06 Positive Material Identification (PMI) of depositedweld for alloyed materials (where applicable)
Project SPC 00-GA-E-60901
- ASME B31.3 MDT.WL.CDQ. .0132 P W
WL 0101 07 Final Welding Inspection:
Check Welding Summary Report, Weld Map andall quality records (NDT, PMI, FERRITE,PWHT, HARDNESS, REPAIR).
Project SPC..
-API 650 forTANK-AWS D1.1 forSteel structures
- ASME B31.3
-AWS D1.1- API 650
WSL
MDT.WL.CDQ.0160
P
-
7/29/2019 Quality Control Specification
19/31
CLIENT JOB UNIT
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
POSITIVE MATERIAL IDENTIFICATION (PMI) REPORTDOCUMENT/SPECIFICATION:
PAGE OF
INSPECTION
Pmi Elements AcceptableLine number
Spoolnumber Heat number
Yes Not
INSPECTION NOTIFICATION
REFERENCE
NOTES:
RFI N
QC CONSTRUCT.
CONTRACTORSP TP CLIENT
NAME NAME NAME NAME
SIGNATURE SIGNATURE SIGNATURE SIGNATURE
Date Date Date Date
Form code: MDT.WL.CDQ.0132
-
7/29/2019 Quality Control Specification
20/31
CLIENT JOB UNIT
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
REGISTER SHEET OF APPROVED WPS/WPQR
REFERENCE TO CODE: PAGE OF
WPS N WPQR N QUALIFICATION RANGE APPROVED DATE
INSPECTION NOTIFICATION
REFERENCE
NOTES:
RFI N
QC CONSTRUCT.CONTRACTOR
SP CLIENT
NAME NAME NAME NAME
SIGNATURE SIGNATURE SIGNATURE SIGNATURE
Date Date Date Date
Form code: MDT.WL.CDQ.0133
-
7/29/2019 Quality Control Specification
21/31
CLIENT JOB UNIT
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
REGISTER SHEET OF APPROVED WELDERS AND WELDING OPERATORS
DOCUMENT/SPECIFICATION:
PAGE OF
WELDER NAME WELDER STAMP APPROVED RANGE APPROVED DATE
INSPECTION NOTIFICATIONREFERENCE
NOTES:
RFI N
QC CONSTRUCT.
CONTRACTORSP CLIENT
NAME NAME NAME NAME
SIGNATURE SIGNATURE SIGNATURE SIGNATURE
Date Date Date Date
Form code: MDT.WL.CDQ.0134
-
7/29/2019 Quality Control Specification
22/31
CLIENT JOB UNIT
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
REGISTER SHEET OF APPROVED NDE OPERATORS
DOCUMENT/SPECIFICATION:
PAGE OF
OPERATOR NAME QUALIFIED FORQUALIFICATION
NUMBERAPPROVED DATE
INSPECTION NOTIFICATION
REFERENCE
NOTES:
RFI N
QC CONSTRUCT.CONTRACTOR
SP CLIENT
NAME NAME NAME NAME
SIGNATURE SIGNATURE SIGNATURE SIGNATURE
Date Date Date Date
Form code: MDT.WL.CDQ.0135
-
7/29/2019 Quality Control Specification
23/31
CLIENT JOB UNIT
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
REGISTER SHEET OF APPROVED QC PROCEDURES
TAG/ITEM or ISO DWG.: PAGE OF
CHECK AVAILABILITY OF QC PROCEDURES
PROCEDURESYES NO N/A
1. Procedure for Storage, Drying, Reconditioning, Handling
and Scrapping of Welding Consumables
2. Procedure for Weld Identification and Weld Traceability
(original, modified and repaired welds)
3. Weld Repair Method
4. Production Weld Hardness Testing Procedure
5. Post Weld Heat Treatment Procedure
6. Positive Material Identification Procedure
7. Procedure for Control of Welding Consumables
8. Penetrant Test
9. Magnetic Particle Test
10. Radiographic Test
11. Ultrasonic Test
12. Visual Test
13. Ferrite Test
14. Welding Procedures
INSPECTION NOTIFICATION
REFERENCE
NOTES: N/A = NOT ACCEPTABLE
RFI N
QC CONSTRUCT.
CONTRACTORSP CLIENT
NAME NAME NAME NAME
SIGNATURE SIGNATURE SIGNATURE SIGNATURE
Date Date Date Date
Form code: MDT.WL.CDQ.0136
-
7/29/2019 Quality Control Specification
24/31
CLIENT JOB UNIT
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
RADIOGRAPHIC EXAMINATION REPORT
DOCUMENT/SPECIFICATION:
PAGE OF
JUDGEMENT (1);FILM
PROGR.N
WELDN
FILMLOCATION
DRW/ISO/SPOOL
NTAG / LINENUMBER
MATERIALDIAM.
[]THICK.[mm]
WELDERSTAMP
A NX NR RX NT EX
(1)
A = ACCEPTABLE; NX = UNACCEPTABLE RADIOGRAPHY; NR = TO B E REPAIRED; RX = RADIOGRAPHY TO BE REPEATED; NT = TO BE CUT;EX = EXAMINATION TO BE EXTENDED
NOTES: INSPECTION NOTIFICATION REFERENCE
RFI N
QC CONSTRUCT.
CONTRACTORSP TP CLIENT
NAME NAME NAME NAME
SIGNATURE SIGNATURE SIGNATURE SIGNATURE
Date Date Date Date
Form code: MDT.WL.CDQ.0141
-
7/29/2019 Quality Control Specification
25/31
CLIENT JOB UNIT
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
LIQUID PENETRANT EXAMINATION DAILY REPORT
DOCUMENT/SPECIFICATION:
PAGE OF
As welded As rolled As Forged As castSURFACECONDITION
Ground Brushed Machined As bent
Conformance to processes of :CLEANING, PENETRANT APPLICATION / REMOVAL, DRYING, DEVELOPER APPLICATION ,PENETRATION TIME
JUDGEMENT (1);TAG/LINENUMBER
DRW/ISO/SPOOL WELDNUMBER
MATERIALA NR RX NT EX
(1)
A = ACCEPTABLE; NR = TO BE REPAIRED; RX = TO BE REPEA TED; NT = TO BE CUT;EX = EXAMINATION TO BE EXTENDED
NOTES: Attach list of w elds examinatedINSPECTION NOTIFICATION REFERENCE
RFI N
QC CONSTRUCT.
CONTRACTORSP TP CLIENT
NAME NAME NAME NAME
SIGNATURE SIGNATURE SIGNATURE SIGNATURE
Date Date Date Date
Form code: MDT.WL.CDQ.0142
-
7/29/2019 Quality Control Specification
26/31
CLIENT JOB UNIT
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
ULTRASONIC EXAMINATION DAILY REPORT
DOCUMENT/SPECIFICATION:
PAGE OF
JUDGEMENT(1)TAG / LINE / SPOOL N WELD N
DIAM.
[]THICK.SS
[mm]MATERIAL
A NA EX
A = ACCEPTABLE; NA = NOT ACCEPTABLE EX = EXAMINA TION TO BE EXTENDED
NOTES: INSPECTION NOTIFICATION REFERENCE
RFI N
QC CONSTRUCT.
CONTRACTORSP TP CLIENT
NAME NAME SIGNATURE SIGNATURE
SIGNATURE SIGNATURE
Date Date Date Date
Form code: MDT.WL.CDQ.0143
-
7/29/2019 Quality Control Specification
27/31
CLIENT JOB UNIT
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
ULTRASONIC EXAMINATION DAILY REPORT FOR LAMINATION
DOCUMENT/SPECIFICATION:
PAGE OF
Progres.number
Weldnumber
PipeNumber
MaterialWall t hk.
(mm)
Location ofindication
(mm)
Type ofindication
Evaluation(1)
A NR NC
A NR NC
A NR NC
A NR NC
A NR NC
A NR NC
A NR NC
A NR NC
A NR NC
A NR NC
A NR NC
NDE procedure: Code/Standard: Drawing:
Legend:(1) A= Acceptable NR= Not acceptable (to be repaired) NC= Not acceptable (to be cut out)
INSPECTION NOTIFICATION REFERENCENOTES:
RFI N
QC CONSTRUCT.
CONTRACTORSP TP CLIENT
NAME NAME NAME NAME
SIGNATURE SIGNATURE SIGNATURE SIGNATURE
Date Date Date Date
Form code: MDT.WL.CDQ.0144
-
7/29/2019 Quality Control Specification
28/31
CLIENT JOB UNIT
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
SUMMARY OF WELDS - NDT (WEEKLY REPORT )DOCUMENT/SPECIFICATION:
PAGE OF
WELDING PROCESS: Actual week Total previ ous
WITH RT WITH UT RT + UT WITH RT WITH UT RT + UT
EXISTING WELDS n.
EXECUTED WELDS n .
CHECKED n.
ACCEPTED n:
REPAIRS n.
CUT n.
RT REFUSED n.
DEFECT TO REPAIR n.
Lack of penetration n.
Lack of fusion (in root) n.
Root concavity n.
Overlap n.
Porosity cluster n.
Undercut n.
Undercut (in root) n.
Slag inclusion n.
Wormholes n.Cold lap n.
Crack n.
Crater crack n.
Gas inclusion n.
Excess weld metal n.
Excessive penetration n.
Poor restart n.
DEFECT TO CUT n.
Crack n.
Stray flash or arc strike n.
Summary defect n.
Welds not accepted by RT n.
Welds not accepted by UT n.
THE LAST FOUR POSITIONS REFER EXCLUSIVELY TO THE WELDS CHECKED USING BOTH METHODS (RT+UT)
INSPECTION NOTIFICATION REFERENCENOTES:
RFI N
QC CONSTRUCT. CONTRACTOR SP CLIENT
NAME NAME NAME NAME
SIGNATURE SIGNATURE SIGNATURE SIGNATURE
Date Date Date Date
Form code: MDT.WL.CDQ.0145
-
7/29/2019 Quality Control Specification
29/31
CLIENT JOB UNIT100
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
ALLIGNAMENT AND WELDING VISUAL INSPECTION REPORT
DOCUMENT/SPECIFICATION:
TAG NUMBER (FOR TANK / VESSEL/ STEEL STRUCTURE):
PAGE OF
REPORT
FOR TANK/VESSEL
STEELSTRUCTURE
FOR PIPING.
PLATE TOPLATE N
NOZZLEN
TAG / ELEMENT LINE NUMBER SPOOL NUMBER
WELD N.
ALIIGNEMENT:- PIPE To PIPE-/PIPE to FLANGE
- PLATE to -PLATE-BEAM To BEAM-NOZZLE
VISUAL WELD
STATUS
A NR NT A NR NT
A NR NT A NR NT
A NR NT A NR NT
A NR NT A NR NT
A NR NT A NR NT
A NR NT A NR NT
A NR NT A NR NT
A NR NT A NR NT
A NR NT A NR NT
A NR NT A NR NT
A NR NT A NR NT
A NR NT A NR NT
A NR NT A NR NT
A = ACCEPTABLE; NR = TO BE REPAIRED; NT = TO BE CUT
INSPECTION NOTIFICATION REFERENCENOTES:
RFI N
QC CONSTRUCT. CONTRACTORSP CLIENT
NAME
NAME NAME NAME
SIGNATURE
SIGNATURE SIGNATURE SIGNATURE
Date
Date Date Date
Form code: MDT.WL.CDQ.0150
-
7/29/2019 Quality Control Specification
30/31
CLIENT JOB UNIT100
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
This document is property of Eni S.p.A. Exploration & Production Division.It shall neither be shown to Third Parties not used for purposes other than those for which it has been sent.
WELDING SUMMARY LISTLINE No. SPOOL No.
Weld MATERIAL Control NDT
WPS Description
Type of
MaterialWeld NoWelder
Stamp
NPS
i nch Thick mm RT 1Mark Item Piece No Heat No VTTest Pack Manufacturer U
TANK/VESSEL/STEEL STRUCTURE TAG:
Result
RT 2 Result
Result
PT / MT Result
Form code: MDT.WL.CDQ.0160
To be done in excel sheet
-
7/29/2019 Quality Control Specification
31/31
CLIENT JOB UNIT100
e & p division PLANT LOCATIONONSHORE
QC CODE
Construction Contractor
PROJECT TITLE
ZUBAYR OIL FIELD DEVELOPMENT
REPORT N
GOLDEN - WELD
DOCUMENT/SPECIFICATION:
PAGE OF
Connection progressive: Km
Reference document: Drawing Plant
Section:
Date: Start: h Finish: h
PIPELINE CHARACTERISTICS
Nominal pipe Size NPSWall-thickness (mm)Type of Base-metalType of coating
TIE-IN CHECK
Check of welding temperature Acceptable Not acceptable
Check of Lamination bevel ends Acceptable Not acceptable
Check of alignment of sections to be connected Acceptable Not acceptable
Check of min/max temperature Acceptable Not acceptable
Check of joint coating Acceptable Not acceptable
CHECK OF MECHANICAL INFORMATIONS REPORTED ON PIPE BOOK
Joint N: WPS: Type of Weld: Buttweld Filletweld
Welders Stamp: Type of Fillermetal:
NDT Inspection Report N
VT Date: Time: h Acceptable Not acceptableRT Date: Time: h Acceptable Not acceptableUT Date: Time: h Acceptable Not acceptableNDT Repair Inspection Repair Date: Repair WPS:
VT Date: Time: h Acceptable Not acceptableRT Date: Time: h Acceptable Not acceptableUT Date: Time: h Acceptable Not acceptable
Types of Components: Piece N Describt. Piece N Describt.Straight Pipe / Straight Pipe Straight Pipe / Field Bend
Field Bend / Field Bend Fitting Hot formed Bend / Straight pipe
Fitting Hot formed Bend / Field Bend Pup piece length (if welded)
INSPECTION NOTIFICATION
REFERENCENOTES:
RFI N
QC CONSTRUCT.
CONTRACTORSP CLIENT
NAME NAME NAME NAME
SIGNATURE SIGNATURE SIGNATURE SIGNATURE
Date Date Date Date
Form code: MDT.WL.CDQ.0610