quality and iv&v plan excel

Upload: janaka-wempathi

Post on 07-Apr-2018

265 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/3/2019 Quality and IV&v Plan EXCEL

    1/18

    Project Title:

    Proponent Secretary:

    Prepared by:

    Activity Scheduled Date

    A.Product Testing

    Quality and Independent Verificati

    Provide basic information about the project including: Project Title The proper name us

    acronym that will be used for the project; Proponent Secretary The Secretary to whom t

    enterprise project; Proponent AgencyThe agency that will be responsible for the managem

    Date/Control Number The date the plan is finalized and the change or configuration item con

    1. Product Testing Overview

    Provide a general description of the plans for testing the product(s) developed by the project.

    2. Product Testing Schedule

    Define the specific schedule for testing activities and identify the person responsible for the act

  • 8/3/2019 Quality and IV&v Plan EXCEL

    2/18

    Team Member

    Activity Scheduled Date

    Describe the Resources needed to execute the scheduled testing activities. Cross-reference this

    4. Testing Resource Requirements

    3. Project Team Responsibilities

    Describe the Product Testing Responsibilities of the Project Team in general and the specific t

    organizational breakdown structure, resource plan, and schedule.

    General Responsibilities:

  • 8/3/2019 Quality and IV&v Plan EXCEL

    3/18

  • 8/3/2019 Quality and IV&v Plan EXCEL

    4/18

    Project Working Title:

    Proponent Agency:

    Date / Control Number:

    n and Validation Plan

    d to identify this project; Project Working Title The working name or

    he proponent agency is assigned or the Secretary that is sponsoring an

    ent of the project; Prepared byThe person(s) preparing this document;

    trol number assigned.

    vity. Integrate the Product Test Schedule with the Project Schedule.

    Responsible Person(s)

  • 8/3/2019 Quality and IV&v Plan EXCEL

    5/18

    information with project resource plan and schedule.

    Resources Required

    am member assignments. Cross-reference this information with the

    Specific Task

  • 8/3/2019 Quality and IV&v Plan EXCEL

    6/18

  • 8/3/2019 Quality and IV&v Plan EXCEL

    7/18

    A. Project Audit

    Activity Scheduled Date

    1. Project Audits Overview

    Provide a general description of the plans for auditing the project. Identify what is audited, who cond

    2. Project Audit Schedule

    Define the specific schedule for Project Audit and identify the person responsible for the activity. Integ

    Schedule.

  • 8/3/2019 Quality and IV&v Plan EXCEL

    8/18

    Team Member

    Activity Scheduled Date

    4.Project Audit Resource Requirements

    Describe the resources needed to execute the scheduled audit activities. Cross-reference this informati

    Describe the Project Audit responsibilities of the Project Team in general and the specific team membe

    this information with the organizational breakdown structure, resource plan, and schedule.

    General Responsibilities:

    Sp

    3. Project Team Responsibilities

  • 8/3/2019 Quality and IV&v Plan EXCEL

    9/18

  • 8/3/2019 Quality and IV&v Plan EXCEL

    10/18

    Responsible Person(s)

    cts the audit and when the audit are conducted.

    rate the Project Audit Schedule with the Project

  • 8/3/2019 Quality and IV&v Plan EXCEL

    11/18

    Resources Required

    on with project resource plan and schedule.

    r assignments for project audit. Cross-reference

    cific Task

  • 8/3/2019 Quality and IV&v Plan EXCEL

    12/18

  • 8/3/2019 Quality and IV&v Plan EXCEL

    13/18

    Activity Scheduled Date

    Define the specific schedule for Independent Verification and Validation of the project and identify the

    Independent Verification and Validation Schedule with the Project Schedule.

    A. Independent Verification and Validation

    1. Independent Verification and Validation Overview

    Provide a description of the plans for Independent Verification and Validation of the project.

    2. Independent Verification and Validation Schedule

  • 8/3/2019 Quality and IV&v Plan EXCEL

    14/18

    Team Member

    Activity Scheduled Date

    3. Project Team Responsibilities

    Describe the resources needed to execute the scheduled for Independent Verification and Validation ac

    information with project resource plan and schedule.

    4. Independent Verification and Validation Resource Requirements

    Sp

    Describe the for Independent Verification and Validation Responsibilities of the Project Team in gener

    as acceptance test and audit. Cross-reference this information with the organizational breakdown stru

    General Responsibilities:

  • 8/3/2019 Quality and IV&v Plan EXCEL

    15/18

  • 8/3/2019 Quality and IV&v Plan EXCEL

    16/18

    Responsible Person(s)

    person responsible for the activity. Integrate the

  • 8/3/2019 Quality and IV&v Plan EXCEL

    17/18

    Resources Required

    tivities of the project. Cross-reference this

    cific Task

    l and the specific team member assignments such

    ture, resource plan, and schedule.