qma acs newsletter vol i issue 1
DESCRIPTION
The QMA Architectural Conservation Section (QMA - ACS) is happy to send you the first newsletter of this year. It includes the major activities of the month as follow: The restoration section held the wood treatment workshop at the old palace with the cooperation of ZRS co. The Restoration section started the rescue of Al-Ruwais Mosque. And in the process of preparing the restoration project.TRANSCRIPT
The restoration section held the wood treatment
Workshop at the old palace with the cooperation
of ZRS co.
RESTORATION SECTION NEWSLETTER 1/2013
WOOD TREATMENT WORKSHOP – OLD PALACE
AL-RUWAIS MOSQUE RESCUE
.
The Restoration section started the rescue of Al-
Ruwais Mosque. And in the process of preparing the
restoration project
January, 2013 VOL 1 ISSUE 1
Wood treatment workshop – old palace
Al-Ruwais Mosque Rescue
Workshop was divided into two parts:
Theoretical part:
1) It was explained type of timber in the
ceiling of the old palace and the type of
infection where the infection was from
termites and burrowing beetle wood.
2) And also to explain the different
treatment methods and why treatment
was chosen with foam agent specifically
for the case of ceiling of the old palace
where this method insure the penetration
of the Microsene material for the largest
incursion deep inside the wood and the
survival of the active substance for the
longest possible period, ensuring future
protection up to 10 years.
3) The explanation of the device used in the
treatment with foam agent and its
components and the optimal mode of
operation for the best results.
4) Execution steps are explained from the
preparation of material and the mixture
into how the application and device
control
Wood Treatment Workshop
Wood treatment workshop – old palace
The workers were trained how to use the foaming machine.
Applying the foam-treatment
JANUARY, 2013 VOL 01 ISSUE 01
MONTH, YEAR VOL # ISSUE #
Delete box or place a cption here.
Delete box or place a caption here.
Continue newsletter text here. Continue newsletter text
here. Continue newsletter text here. Continue newsletter
text here. Continue newsletter text here. Continue
newsletter text here. Continue newsletter text here.
Continue newsletter text here. Continue newsletter text
here. Continue newsletter text here. Continue newsletter
text here.
Continue newsletter text here. Continue newsletter text
here. Continue newsletter text here. Continue newsletter
text here. Continue newsletter text here. Continue
newsletter text here.
Continue newsletter text here. Continue newsletter text
here. Continue newsletter text here. Continue newsletter
text here. Continue newsletter text here. Continue
newsletter text here. Continue newsletter text here.
Continue newsletter text here. Continue newsletter text
here. Continue newsletter text here. Continue newsletter
text here. Continue newsletter text here. Continue
newsletter text here. Continue newsletter text here.
Continue newsletter text here.
HEADLINE SUBHEAD. SUBHEAD.
SUBHEAD. SUBHEAD.
JANUARY, 2013 VOL 01 ISSUE 01
Al-Ruwais Mosque Rescue
Before
While working
After we have done the emergency securing process
now we have to follow up and do these steps:
• Securing the previous work.
• To complete the supporting process to the rest
of the walls and openings ”doors and windows”
• Ceiling propping
• Minerate propping.
• Original plaster consolidation.
Stone and mortar consolidation
Al-Ruwais Mosque Rescue
Emergency propping process.
HEADLINESUB-HEAD
JANUARY, 2013 VOL 01 / ISSUE 01
Restoration Section
The Guardians of Qatar Heritage
RESTORATION SECTION NEWSLETTER 1/2013
WOOD TREATMENT WORKSHOP – OLD PALACE
AL-RUWAIS MOSQUE RESCUE