'qffif ~ yo'Vernment of India ~~~ Central Electricity Authority ~qlf~~~ Western Regional Power Committee ~ -3, Q;T~ ~ -3imT (~), ~ - 400 093 F-3, MIDC Area, Andheri (East), Mumbai - 400 093 ~ Phone: 022-2822 1681, 2820 0194, 95, 96 ~ Fax: 022-2837 0193 Website: www.wrpc.gov.in E-mail: [email protected] ~ ~~/~~\3Ug 9001-2008 IS/ISO: 9001- 2008 ~"!1iiI No. WRPC/Comml-I/6/Alloc/2018/ 72.~ Date: 25.01.2018 To, The Executive Director, POSOCO WRLDC, F-3, MIDC Area, Andheri (E), Mumbai - 400 093. Sir, Sub: Allocation of 25 MW power to Karnataka from the unallocated power of coal based stations of NTPC for bundling with solar power under National Solar Mission Phase-II Batch-II Tranche- 1- reg. Ref: 1. MbP letter No. 13/6/2017-0M dated 22.12.2017. 2. MoP letter No. 13/6/2017-0M dated 05.07.2017. 3. NTPCletter No. 01/CD/Solar dated 11.01.2018. 4. NTPCletter No. 01/CD/Solar dated 09.01.2018. 1. MOPvide letter under Ref 1(copy enclosed) has intimated allocation of power for allocation of unallocated power of coal-based NTPCstations for bundling with solar power in ratio of (1: 2) (Unallocated power: Solar Power) as envisaged under National Solar Mission Phase-II Batch-II Tranche-I. ,.. 2. MoP vide letter letter under Ref 2 , have allocated 200MW, 300 MW and 200 MW to Andhra Pradesh, Karnataka and' Telangana respectively from the unallocated power of coal based NTPC stations of Eastern and Western Region for bundling with solar power. 3. As per MoP's letter under Ref 1, MoP have allocated 450 MW NTPC thermal unallocated power to Telangana (150 MW) and Karnataka (300 MW) with equivalent reduction from Maharashtra and Madhya Pradesh in proportion to their present allocation for bundling with 900 MW of Solar Power. 4. NTPC vide letter under Ref 3 (copy enclosed) have requested for allocation of 175 MW power to be done to Karnataka from the unallocated quota of NTPC Stations in WR to be bundled with solar power from M/s Param Pujya Solar Energy (100 MW) and M/s Yarrow Infra Structure limited (50MW) M/s TATA Power Renewable Energy private Ltd (150 MW) and M/s ReNew Wind Energy(TN2) Pvt Itd (50MW). NTPChas intimated that the Commissioning Certificates from

Upload: others

Post on 24-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

'qffif ~yo'Vernment of India~~~

Central Electricity Authority~qlf~~~

Western Regional Power Committee~ -3, Q;T~ ~ -3imT (~), ~ - 400 093

F-3, MIDC Area, Andheri (East), Mumbai - 400 093~ Phone: 022-2822 1681, 2820 0194, 95, 96 ~ Fax: 022-2837 0193Website: www.wrpc.gov.in E-mail: [email protected]

~

~~/~~\3Ug9001-2008

IS/ISO: 9001- 2008~"!1iiI

No. WRPC/Comml-I/6/Alloc/2018/ 72. ~ Date: 25.01.2018

To,The Executive Director,POSOCO WRLDC,F-3, MIDC Area, Andheri (E),Mumbai - 400 093.

Sir,

Sub: Allocation of 25 MW power to Karnataka from the unallocatedpower of coal based stations of NTPC for bundling with solarpower under National Solar Mission Phase-II Batch-II Tranche-1- reg.

Ref: 1. MbP letter No. 13/6/2017-0M dated 22.12.2017.2. MoP letter No. 13/6/2017-0M dated 05.07.2017.3. NTPC letter No. 01/CD/Solar dated 11.01.2018.4. NTPC letter No. 01/CD/Solar dated 09.01.2018.

1. MOPvide letter under Ref 1(copy enclosed) has intimated allocation ofpower for allocation of unallocated power of coal-based NTPC stationsfor bundling with solar power in ratio of (1: 2) (Unallocated power:Solar Power) as envisaged under National Solar Mission Phase-IIBatch-II Tranche-I.

,..2. MoP vide letter letter under Ref 2 , have allocated 200MW, 300 MW

and 200 MW to Andhra Pradesh, Karnataka and' Telanganarespectively from the unallocated power of coal based NTPC stationsof Eastern and Western Region for bundling with solar power.

3. As per MoP's letter under Ref 1, MoP have allocated 450 MW NTPCthermal unallocated power to Telangana (150 MW) and Karnataka(300 MW) with equivalent reduction from Maharashtra and MadhyaPradesh in proportion to their present allocation for bundling with 900MW of Solar Power.

4. NTPC vide letter under Ref 3 (copy enclosed) have requested forallocation of 175 MW power to be done to Karnataka from theunallocated quota of NTPC Stations in WR to be bundled with solarpower from M/s Param Pujya Solar Energy (100 MW) and M/s YarrowInfra Structure limited (50MW) M/s TATA Power Renewable Energyprivate Ltd (150 MW) and M/s ReNew Wind Energy(TN2) Pvt Itd(50MW). NTPC has intimated that the Commissioning Certificates from

Page 2: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

Yours faithfully,

~?\\,~\SCA. Balan)

Member Secretary

the above solar power developers have been received Ccopyenclosed).

5. NTPC vide letter under Ref 3 has further informed that thermal powerfor bundling is required to be allocated 30 days from thecommissioning date of capacity. In view of the same 25MW is beingallocated at present.

6. WRPC vide letter no. wrpcjcomml-Ij6jAllocj2018j586 dated17.01.2018 has allocated 200MW respectively to Karnataka from Coalbased stations of NTPC in WR w.e.f 00:00 hrs 19.01.2018.

7. With respect to NTPC letter under Ref 3, in addition to allocationissued at no 6, another allocation of 25 MW is to be allocated toKarnataka from coal based stations of NTPC in WR.

8. Combining allocation at serial no 6 and 7 the total power allocated toKarnataka is 225 MW and this revised allocation of shares and thepercentage allocation of WR are enclosed herewith.

9. The above allocation at serial no.8 would be effective from 00: 00 Hrs.of 28.01.2018.

10.The beneficiaries are required to maintain LC commensurate with theallocated power and adhere to conditions mentioned in MoP ordersunder Ref 1 and Ref 2.

Encl: As above.

Copy TO: ,..1 Member Secretary SRPC 14 Executive Engineer, DNH, Silvassa2 Member Secretary ERPC 15 E 0 (Finance), GUVNL, Vadodara3 Member Secretary NRPC 16 Chief E'1gineer (Comml), CSPDCL,

Raipur4 Chief Engineer (GM), CEA, New Delhi 17 Chief Engineer (PP), MSEDCL, Mumbai5 ED, NRLDC,Katwaria Sarai,New Delhi. 18 Chief Engineer (Comml), MPPMCL,

Jabalpur6 ED, ERLDC, Kolkata 19 GM (Comml), NTPCLtd., Mumbai7 GM, SRLDC, Mumbai 20 AGM (Comml). NPCIL, Mumbai8 Chief Engineer (LD), GETCO, Jambua 21 AGM (Comml), PGCIL, Nagpur9 Chief Engineer (LD), MPPTCL,Jabalpur 22 SME (Electrical), TAPS (3 &4), NPCIL10 Chief Engineer (LD), CSPTCL, Bhilai 23 SME(Electrical), KAPS, NPCIL11 Chief Engineer, LD, MSETCL, Kalwa 24 CE (Elect.), Heavy Water Board, Mumbai12 CEE, Electricity Deptt. Goa 25 SE (0), WRPC, Mumbai13 Executive Engineer, DO, Daman

Page 3: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

KSTPS VSTPS-I VSTPS-II VSTPS-III KGPP GGPP SIPAT-II KAPP TAPP 3&4 KSTPS-7 SIPAT-I VSTPS-IV MSTPS-I VSTPS-V MSTPS-II SSTPP TOTAL2100.00 1260.00 1000.00 1000.00 656.20 657.39 1000.00 440.00 1080.00 500.00 1980.00 1000.00 1000.00 500.00 1320.00 660.00 16153.591790.00 1070.00 850.00 850.00 558.00 558.00 850.00 374.00 918.00 350.00 1683.00 850.00 850.00 425.00 1122.00 561.00 13659.00

Power to be sold outside long term PPA 75.00 75.00310.00 190.00 150.00 150.00 98.20 99.39 150.00 66.00 162.00 75.00 297.00 150.00 150.00 75.00 198.00 99.00 2419.59

Allocation of bundling with solar Power under JNNSM

3.27 2.00 1.58 1.58 1.58 0.79 3.13 1.58 1.58 0.79 2.09 1.04 21.00

Rajgarh solar PV Project to MPPMCL 7.77 4.76 3.76 3.76 3.76 1.88 7.45 3.76 3.76 1.88 4.97 2.48 50.00

Chattisgarh(NVVN Coal Power) 3.89 2.38 1.88 1.88 1.88 0.94 3.72 1.88 1.88 0.94 2.48 1.24 25.00

Andhra Pradesh (NTPC Coal Power) 11.66 7.15 5.64 5.64 5.64 2.82 11.17 5.64 5.64 2.82 7.45 3.72 75.00283.42 173.71 137.14 137.14 98.20 99.39 137.14 66.00 162.00 68.57 271.53 137.14 137.14 68.57 181.02 90.51 2248.59

Specific allocation out of Unallocated share

40.00 28.99 29.31 4.00 102.30

10.00 55.99 56.46 122.45

2.52 2.52

0.76 0.76

0.00 0.00 0.00 0 0 10.00 10.00

12.37 12.63 25.00

Madhya Pradesh 52.63 32.26 25.47 25.47 25.47 11.21 27.50 200.00

Heavy Water Plant of DAE 0.00 0.00

NVVN A/c BPDB 40.00 10.000 15.00 15.00 0 0 20.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00140.78 128.17 96.67 96.67 0.85 0.99 91.67 50.79 124.50 68.57 271.53 137.14 137.14 68.57 181.02 90.51 1685.56

FIRM ALLOCATION IN MW

360.00 230.00 239.00 266.00 187.00 237.00 273.00 125.00 274.00 96.00 540.00 239.92 239.92 93.45 293.80 0.00 3694.09400.00 385.00 273.00 200.00 140.00 117.00 143.00 93.00 180.00 62.50 283.00 256.41 153.69 127.86 211.60 147.94 3174.00210.00 0.00 0.00 105.00 0.00 0.00 158.00 0.00 48.00 75.00 313.00 62.55 62.55 40.20 87.70 79.45 1241.45610.00 410.00 319.00 258.00 204.00 200.00 258.00 137.00 393.00 108.20 510.00 270.48 370.48 148.89 500.20 308.02 5005.27210.00 35.00 12.00 10.00 0.00 0.00 10.00 15.00 11.00 4.50 20.00 11.20 11.20 5.18 14.50 7.55 377.13

0.00 5.00 3.00 5.00 2.00 2.00 4.00 2.00 5.00 1.60 8.00 3.89 3.89 3.87 5.60 7.27 62.12

0.00 5.00 4.00 6.00 25.00 2.00 4.00 2.00 7.00 2.20 9.00 5.55 5.55 5.55 8.60 10.79 102.24

2.72 2.72

WESTERN REGIONAL POWER COMMITTEECALCULATIONS FOR ALLOCATION OF SHARES WITH EFFECT from 00:00 Hrs 28.01.2018

FOR PEAK HOURS (FROM 1800 TO 2200 HOURS)

Installed Capacity ( MW )Firm allocation

Un-allocated share

Maharashtra (NVVN coal power)

Balance un-allocated share

Allocation to DD

Allocation to DNH

Allocation to Powergrid (HVDC-BHD)

Allocation to Powergrid (HVDC-VIN)

BARC Facilities (TAPS-3&4)

Allocation to Goa

Balance un-allocated share

GujaratMadhya PradeshChhattisgarhMaharashtraGOA

DD

DNH

Allocation to PGCIL (HVDC-Champa) 2.72 2.72

1790.00 1070.00 850.00 850.00 558.00 558.00 850.00 374.00 918.00 350.00 1683.00 850.00 850.00 425.00 1122.00 561.00 13659.00

Power to be sold outside long term PPA

JBVNL (Jharkhand) 50.00 50.00

BSPHCL (Bihar) 25.00 25.00

ALLOCATION OF 15% UNALLOCATED SHARE in MW

Gujarat 0.00 % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Madhya Pradesh 11.14 % 14.77 13.44 10.14 10.14 0.14 0.17 9.61 8.47 20.76 7.19 28.48 14.38 14.38 7.19 18.99 9.49 187.74Chhattisgarh % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Maharashtra 24.67 % 32.70 29.77 22.45 22.45 0.31 0.37 21.29 18.76 45.98 15.93 63.07 31.85 31.85 15.93 42.05 21.02 415.80GOA 3.34 % 4.70 4.28 3.23 3.23 0.03 0.03 3.06 1.69 4.15 2.29 9.06 4.58 4.58 2.29 6.04 3.02 56.24DD 2.46 % 3.46 3.15 2.38 2.38 0.02 0.02 2.25 1.25 3.06 1.69 6.68 3.37 3.37 1.69 4.45 2.23 41.46DD - Specific Allocation 40.00 0.00 0.00 0.00 28.99 29.31 0.00 4.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 102.30DNH 34.67 % 48.80 44.43 33.51 33.51 0.29 0.34 31.78 17.61 43.16 23.77 94.13 47.54 47.54 23.77 62.75 31.38 584.33DNH - Specific allocation 10.00 0.00 0.00 0.00 55.99 56.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 122.45Goa - Specific allocation 0.00 0.00 0.00 0.00 12.37 12.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00Madhya Pradesh 52.63 32.26 25.47 25.47 0.00 0.00 25.47 11.21 27.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 200.00Allocation to Powergrid (HVDC-BHD) 2.52 2.52Allocation to Powergrid (HVDC-VIN) 0.76 0.76BARC Facilities (TAPS-3&4) 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00Allocation to MPAKVNL, Indore 0.00 0.00 0.00 0.00Heavy Water Plant of DAE 0.00 0.00

Jammu and Kashmir 5.93 % 8.35 7.60 5.74 5.74 0.05 0.06 5.44 3.01 7.39 4.07 16.11 8.14 8.14 4.07 10.74 5.37 100.00NVVN A/c BPDB 40.00 10.00 15.00 15.00 0.00 0.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00Telangana (NTPC Coal Power) 4.45 % 7.00 6.37 4.81 4.81 0.00 0.00 4.56 0.00 0.00 3.41 13.50 6.82 6.82 3.41 9.00 4.50 75.00Karnataka (NTPC Coal Power) 13.35 % 21.00 19.12 14.42 14.42 0.00 0.00 13.67 0.00 0.00 10.23 40.50 20.46 20.46 10.23 27.00 13.50 225.00

283.41 173.71 137.14 137.14 98.20 99.39 137.14 66.00 162.00 68.57 271.53 137.14 137.14 68.57 181.02 90.51 2248.59

Allocation to PGCIL (HVDC-Champa)

TOTAL

Total

Page 4: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

Total Allocation (Firm + Specific allocation + allocation from balance unallocated share+power to be sold outside long term PPA) in MW

Gujarat 360.00 230.00 239.00 266.00 187.00 237.00 273.00 125.00 274.00 96.00 540.00 239.92 239.92 93.45 293.80 0.00 3694.09

Madhya Pradesh 467.40 430.70 308.61 235.61 140.14 117.17 178.08 112.68 228.26 69.69 311.48 270.79 168.07 135.05 230.59 157.43 3561.74Chhattisgarh 210.00 0.00 0.00 105.00 0.00 0.00 158.00 0.00 48.00 75.00 313.00 62.55 62.55 40.20 87.70 79.45 1241.45Maharashtra 642.70 439.77 341.45 280.45 204.31 200.37 279.29 155.76 438.98 124.13 573.07 302.33 402.33 164.82 542.25 329.04 5421.07

GOA 214.70 39.28 15.23 13.23 12.40 12.66 13.06 16.69 15.15 6.79 29.06 15.78 15.78 7.47 20.54 10.56 458.36

DD 43.46 8.15 5.38 7.38 31.01 31.33 6.25 7.25 8.06 3.29 14.68 7.26 7.26 5.56 10.05 9.49 205.87

DNH 58.80 49.43 37.51 39.51 81.28 58.80 35.78 19.61 50.16 25.97 103.13 53.09 53.09 29.32 71.35 42.16 809.01

2.52 2.52

0.76 0.00 0.00 0.76

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 0.00 10.00

Heavy Water Plant of DAE 0.00 0.00 0.00 0.00

Maharashtra(NVVN coal power) 3.27 2.001 1.58 1.58 1.58 0.79 3.13 1.58 1.58 0.79 2.09 1.04 21.00

Jammu and Kashmir 8.35 7.60 5.74 5.74 0.05 0.06 5.44 3.01 7.39 4.07 16.11 8.14 8.14 4.07 10.74 5.37 100.00

NVVN A/c BPDB 40.00 10.00 15.00 15.00 0.00 0.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00

Rajgarh solar PV Project to MPPMCL 7.77 4.76 3.76 3.76 0.00 0.00 3.76 0.00 0.00 1.88 7.45 3.76 3.76 1.88 4.97 2.48 50.00

Chattisgarh(NVVN Coal Power) 3.89 2.38 1.88 1.88 0.00 0.00 1.88 0.00 0.00 0.94 3.72 1.88 1.88 0.94 2.48 1.24 25.00

2.72 2.72

50.00 50.00

25.00 25.00

Andhra Pradesh (NTPC Coal Power) 11.66 7.15 5.64 5.64 0.00 0.00 5.64 0.00 0.00 2.82 11.17 5.64 5.64 2.82 7.45 3.72 75.00

Telangana (NTPC Coal Power) 7.00 6.37 4.81 4.81 0.00 0.00 4.56 0.00 0.00 3.41 13.50 6.82 6.82 3.41 9.00 4.50 75.00

karnataka(NTPC Coal Power) 21.00 19.12 14.42 14.42 0.00 0.00 13.67 0.00 0.00 10.23 40.50 20.46 20.46 10.23 27.00 13.50 225.00

TOTAL 2100.00 1260.00 1000.00 1000.00 656.20 657.39 1000.00 440.00 1080.00 500.00 1980.00 1000.00 1000.00 500.00 1320.00 660.00 16153.59

Shares in %

KSTPS VSTPS-I VSTPS-II VSTPS-III KGPP GGPP SIPAT KAPP TAPP 3&4 KSTPS 7 SIPAT1 VSTPS-IV MSTPS-I VSTPS-V MSTPS-II SSTPP

Gujarat 17.1429 18.2540 23.9000 26.6000 28.4974 36.0517 27.3000 28.4092 25.3705 19.2000 27.2726 23.9920 23.9920 18.6900 22.2576 0.0000Madhya Pradesh 22.2570 34.1826 30.8606 23.5606 21.3566 17.8228 17.8081 25.6080 21.1355 13.9384 15.7313 27.0794 16.8074 27.0104 17.4686 23.8535Chhattisgarh 10.0000 0.0000 0.0000 10.5000 0.0000 0.0000 15.8000 0.0000 4.4444 15.0000 15.8081 6.2550 6.2550 8.0400 6.6439 12.0371Maharashtra 30.6048 34.9024 34.1455 28.0455 31.1359 30.4789 27.9293 35.3996 40.6459 24.8255 28.9430 30.2335 40.2335 32.9635 41.0794 49.8551GOA 10.2237 3.1172 1.5225 1.3225 1.8894 1.9263 1.3058 3.7942 1.4031 1.3575 1.4676 1.5775 1.5775 1.4935 1.5560 1.6007

WESTERN REGIONAL POWER COMMITTEECALCULATIONS FOR ALLOCATION OF SHARES WITH EFFECT from 00:00 Hrs 28.01.2018

FOR PEAK HOURS (FROM 1800 TO 2200 HOURS)

Allocation to Powergrid (HVDC-BHD)

Allocation to Powergrid (HVDC-VIN)

BARC Facilities (TAPS-3&4)

Allocation to PGCIL (HVDC-Champa)

JBVNL (Jharkhand)

BSPHCL (Bihar)

Constituents

GOA 10.2237 3.1172 1.5225 1.3225 1.8894 1.9263 1.3058 3.7942 1.4031 1.3575 1.4676 1.5775 1.5775 1.4935 1.5560 1.6007DD 2.0697 0.6470 0.5378 0.7378 4.7258 4.7665 0.6255 1.6476 0.7465 0.6573 0.7413 0.7263 0.7263 1.1113 0.7615 1.4381DNH 2.8002 3.9232 3.7512 3.9512 12.3872 8.9449 3.5779 4.4565 4.6443 5.1940 5.2086 5.3090 5.3090 5.8640 5.4056 6.3881

0.2000 0.0000 0.0000 0.00000.0603 0.0000 0.0000 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.9259 0.0000 0.0000 0.0000 0.0000 0.0000Heavy Water Plant of DAE 0.0000 0.0000 0.0000 0.0000Maharashtra(NVVN coal power) 0.1555 0.1588 0.1580 0.1580 0.0000 0.0000 0.1580 0.0000 0.0000 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580Jammu and Kashmir 0.3977 0.6035 0.5735 0.5735 0.0077 0.0089 0.5438 0.6849 0.6839 0.8136 0.8136 0.8136 0.8136 0.8136 0.8136 0.8136NVVN A/c BPDB 1.9048 0.7937 1.5000 1.5000 0.0000 0.0000 2.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000Rajgarh solar PV Project to MPPMCL 0.3701 0.3781 0.3761 0.3761 0.0000 0.0000 0.3761 0.0000 0.0000 0.3762 0.3761 0.3761 0.3761 0.3762 0.3761 0.3761Chattisgarh(NVVN Coal Power) 0.1851 0.1890 0.1881 0.1881 0.0000 0.0000 0.1881 0.0000 0.0000 0.1880 0.1881 0.1881 0.1881 0.1880 0.1880 0.1880

0.272010.00005.0000

Andhra Pradesh (NTPC Coal Power) 0.5552 0.5671 0.5642 0.5642 0.0000 0.0000 0.5642 0.0000 0.0000 0.5642 0.5642 0.5642 0.5642 0.5642 0.5642 0.5642Telangana (NTPC Coal Power) 0.3333 0.5058 0.4806 0.4806 0.0000 0.0000 0.4558 0.0000 0.0000 0.6818 0.6819 0.6818 0.6818 0.6818 0.6819 0.6819Karnataka (NTPC Coal Power) 1.0000 1.5173 1.4419 1.4419 0.0000 0.0000 1.3674 0.0000 0.0000 2.0455 2.0456 2.0455 2.0455 2.0455 2.0456 2.0456TOTAL 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000

Allocation to Powergrid (HVDC-BHD)Allocation to Powergrid (HVDC-VIN)BARC Facilities (TAPS-3&4)

Allocation to PGCIL (HVDC-Champa)JBVNL (Jharkhand)BSPHCL (Bihar)

Note :(i) Allocation from unallocated quota of coal based stations of NTPC for unbundling solar power under JLNNSM (Phase-I) in WR changed as per MOP Letter No.13/06/OM dated 12.02.2013 & NVVN/SO & Comml/JNNSM/Phase-1 dated 25.02.2013

Page 5: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

KSTPS VSTPS-I VSTPS-II VSTPS-III KGPP GGPP SIPAT-II KAPP TAPP 3&4 KSTPS-7 SIPAT-I VSTPS-IV MSTPS-I VSTPS-V MSTPS-II SSTPP TOTAL2100.00 1260.00 1000.00 1000.00 656.20 657.39 1000.00 440.00 1080.00 500.00 1980.00 1000.00 1000.00 500.00 1320.00 660.00 16153.591790.00 1070.00 850.00 850.00 558.00 558.00 850.00 374.00 918.00 350.00 1683.00 850.00 850.00 425.00 1122.00 561.00 13659.00

Power to be sold outside long term PPA 75.00 75.00310.00 190.00 150.00 150.00 98.20 99.39 150.00 66.00 162.00 75.00 297.00 150.00 150.00 75.00 198.00 99.00 2419.59

Allocation of bundling with solar Power under JNNSM

3.27 2.00 1.58 1.58 1.58 0.79 3.13 1.58 1.58 0.79 2.09 1.04 21.00

Rajgarh solar PV Project to MPPMCL 7.77 4.76 3.76 3.76 3.76 1.88 7.45 3.76 3.76 1.88 4.97 2.48 50.00

Chattisgarh(NVVN Coal Power) 3.89 2.38 1.88 1.88 1.88 0.94 3.72 1.88 1.88 0.94 2.48 1.24 25.00

Andhra Pradesh (NTPC Coal Power) 11.66 7.15 5.64 5.64 5.64 2.82 11.17 5.64 5.64 2.82 7.45 3.72 75.00283.42 173.71 137.14 137.14 98.20 99.39 137.14 66.00 162.00 68.57 271.53 137.14 137.14 68.57 181.02 90.51 2248.59

Specific allocation out of Unallocated share

40.00 28.99 29.31 4.00 102.30

10.00 55.99 56.46 122.45

2.52 2.52

0.76 0.76

0.00 0.00 0.00 0.00 0.00 10.00 10.00

12.37 12.63 25.00

Madhya Pradesh 52.63 32.26 25.47 25.47 25.47 11.21 27.50 200.00

Heavy Water Plant of DAE 0.00 0.00

NVVN A/c BPDB 40.00 10.000 15.00 15.00 0 0 20.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00140.78 128.17 96.67 96.67 0.85 0.99 91.67 50.79 124.50 68.57 271.53 137.14 137.14 68.57 181.02 90.51 1685.56

FIRM ALLOCATION IN MW

360.00 230.00 239.00 266.00 187.00 237.00 273.00 125.00 274.00 96.00 540.00 239.92 239.92 93.45 293.80 0.00 3694.09400.00 385.00 273.00 200.00 140.00 117.00 143.00 93.00 180.00 62.50 283.00 256.41 153.69 127.86 211.60 147.94 3026.06210.00 0.00 0.00 105.00 0.00 0.00 158.00 0.00 48.00 75.00 313.00 62.55 62.55 40.20 87.70 79.45 1162.00610.00 410.00 319.00 258.00 204.00 200.00 258.00 137.00 393.00 108.20 510.00 270.48 370.48 148.89 500.20 308.02 4697.25210.00 35.00 12.00 10.00 0.00 0.00 10.00 15.00 11.00 4.50 20.00 11.20 11.20 5.18 14.50 7.55 369.58

0.00 5.00 3.00 5.00 2.00 2.00 4.00 2.00 5.00 1.60 8.00 3.89 3.89 3.87 5.60 7.27 54.85

0.00 5.00 4.00 6.00 25.00 2.00 4.00 2.00 7.00 2.20 9.00 5.55 5.55 5.55 8.60 10.79 91.45

2.72 2.72

WESTERN REGIONAL POWER COMMITTEECALCULATIONS FOR ALLOCATION OF SHARES WITH EFFECT from 00:00 Hrs 28.01.2018

FOR OFF-PEAK HOURS (FROM 0000 TO 1800 HOURS & FROM 2200 TO 2400 HOURS)

Installed Capacity ( MW )Firm allocation

Un-allocated share

Maharashtra (NVVN coal power)

Balance un-allocated share

Allocation to DD

Allocation to DNH

Allocation to Powergrid (HVDC-BHD)

Allocation to Powergrid (HVDC-VIN)

BARC Facilities (TAPS-3&4)

Allocation to Goa

Balance un-allocated share

GujaratMadhya PradeshChhattisgarhMaharashtraGOA

DD

DNH

Allocation to PGCIL (HVDC-Champa) 2.72 2.72

1790.00 1070.00 850.00 850.00 558.00 558.00 850.00 374.00 918.00 350.00 1683.00 850.00 847.28 425.00 1122.00 561.00 13095.28

Power to be sold outside long term PPA

JBVNL (Jharkhand) 50.00 50.00

BSPHCL (Bihar) 25.00 25.00

ALLOCATION OF 15% UNALLOCATED SHARE in MW

Gujarat 0.00 % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Madhya Pradesh 12.87 % 17.13 15.59 11.76 11.76 0.16 0.19 11.15 9.61 23.55 8.34 33.03 16.68 16.68 8.34 22.02 11.01 217.00Chhattisgarh 0.00 % 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00Maharashtra 25.06 % 33.34 30.35 22.89 22.89 0.31 0.36 21.71 18.70 45.84 16.24 64.30 32.47 32.47 16.24 42.87 21.43 422.41GOA 4.44 % 6.25 5.69 4.29 4.29 0.04 0.04 4.07 2.25 5.52 3.04 12.05 6.08 6.08 3.04 8.03 4.02 74.78DD 6.76 % 9.51 8.66 6.53 6.53 0.06 0.07 6.19 3.43 8.41 4.63 18.35 9.27 9.27 4.63 12.23 6.12 113.88

40.00 0.00 0.00 0.00 28.99 29.31 0.00 4.00 0.00 0.00 102.30DNH 27.14 % 38.21 34.79 26.24 26.24 0.23 0.27 24.88 13.79 33.79 18.61 73.70 37.22 37.22 18.61 49.13 24.57 457.49

10.00 0.00 0.00 0.00 55.99 56.46 0.00 0.00 0.00 0.00 0.00 0.00 0.00 122.450.00 0.00 0.00 0.00 12.37 12.63 0.00 0.00 0.00 0.00 0.00 0.00 0.00 25.00

Madhya Pradesh 52.63 32.26 25.47 25.47 0.00 0.00 25.47 11.21 27.50 0.00 0.00 0.00 0.00 0.00 200.002.52 2.520.76 0.76

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 10.000.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00

Jammu and Kashmir 5.93 % 8.35 7.60 5.74 5.74 0.05 0.06 5.44 3.01 7.39 4.07 16.11 8.14 8.14 4.07 10.74 5.37 100.0040.00 10.00 15.00 15.00 0.00 0.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00

Telangana (NTPC Coal Power) 4.45 % 7.00 6.37 4.81 4.81 0.00 0.00 4.56 0.00 0.00 3.41 13.50 6.82 6.82 3.41 9.00 4.50 75.00Karnataka (NTPC Coal Power) 13.35 % 21.00 19.12 14.42 14.42 0.00 0.00 13.67 0.00 0.00 10.23 40.50 20.46 20.46 10.23 27.00 13.50 225.00

262.42 154.59 122.72 122.72 98.20 99.39 123.46 66.00 162.00 58.34 231.03 116.68 116.68 58.34 154.02 77.01 2248.59

Allocation to PGCIL (HVDC-Champa)

TOTAL

DD - Specific Allocation

DNH - Specific allocationGoa - Specific allocation

Allocation to Powergrid (HVDC-BHD)Allocation to Powergrid (HVDC-VIN)BARC Facilities (TAPS-3&4)Allocation to MPAKVNL, Indore Heavy Water Plant of DAE

NVVN A/c BPDB

Total

Page 6: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

Total Allocation (Firm + Specific allocation + allocation from balance unallocated share+power to be sold outside long term PPA) in MW

Gujarat 360.00 230.00 239.00 266.00 187.00 237.00 273.00 125.00 274.00 96.00 540.00 239.92 239.92 93.45 293.80 0.00 3694.09

Madhya Pradesh 469.76 432.85 310.23 237.23 140.16 117.19 179.62 113.81 231.05 70.84 316.03 273.09 170.37 136.20 233.62 158.95 3591.00Chhattisgarh 210.00 0.00 0.00 105.00 0.00 0.00 158.00 0.00 48.00 75.00 313.00 62.55 62.55 40.20 87.70 79.45 1241.45Maharashtra 643.34 440.35 341.89 280.89 204.31 200.36 279.71 155.70 438.84 124.44 574.30 302.95 402.95 165.13 543.07 329.45 5427.68

GOA 216.25 40.69 16.29 14.29 12.41 12.67 14.07 17.25 16.52 7.54 32.05 17.28 17.28 8.22 22.53 11.56 476.90

DD 49.51 13.66 9.53 11.53 31.05 31.38 10.19 9.43 13.41 6.23 26.35 13.16 13.16 8.50 17.83 13.38 278.30

DNH 48.21 39.79 30.24 32.24 81.22 58.73 28.88 15.79 40.79 20.81 82.70 42.77 42.77 24.16 57.73 35.35 682.17

2.52 2.52

0.76 0.76

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 10.00 0.00 0.00 0.00 0.00 10.00

Heavy Water Plant of DAE 0.00 0.00

Maharashtra(NVVN coal power) 3.27 2.00 1.58 1.58 1.58 0.79 3.13 1.58 1.58 0.79 2.09 1.04 21.00

Jammu and Kashmir 8.35 7.60 5.74 5.74 0.05 0.06 5.44 3.01 7.39 4.07 16.11 8.14 8.14 4.07 10.74 5.37 100.00

NVVN A/c BPDB 40.00 10.00 15.00 15.00 0.00 0.00 20.00 0.00 0.00 0.00 0.00 0.00 0.00 100.00

Rajgarh solar PV Project to MPPMCL 7.77 4.76 3.76 3.76 0.00 0.00 3.76 0.00 0.00 1.88 7.45 3.76 3.76 1.88 4.97 2.48 50.00

Chattisgarh(NVVN Coal Power) 3.89 2.38 1.88 1.88 0.00 0.00 1.88 0.00 0.00 0.94 3.72 1.88 1.88 0.94 2.48 1.24 25.00

2.72 2.72

50.00 50.00

25.00 25.00

Andhra Pradesh (NTPC Coal Power) 11.66 7.15 5.64 5.64 0.00 0.00 5.64 0.00 0.00 2.82 11.17 5.64 5.64 2.82 7.45 3.72 75.00

Telangana (NTPC Coal Power) 7.00 6.37 4.81 4.81 0.00 0.00 4.56 0.00 0.00 3.41 13.50 6.82 6.82 3.41 9.00 4.50 75.00

Karnataka (NTPC Coal Power) 21.00 19.12 14.42 14.42 0.00 0.00 13.67 0.00 0.00 10.23 40.50 20.46 20.46 10.23 27.00 13.50 225.00

TOTAL 2100.00 1260.00 1000.00 1000.00 656.20 657.39 1000.00 440.00 1080.00 500.00 1980.00 1000.00 1000.00 500.00 1320.00 660.00 16153.59

Shares in %

KSTPS VSTPS-I VSTPS-II VSTPS-III KGPP GGPP SIPAT KAPP TAPP 3&4 KSTPS 7 SIPAT1 VSTPS-IV MSTPS-I VSTPS-V MSTPS-II SSTPP

17.1429 18.2540 23.9000 26.6000 28.4974 36.0518 27.3000 28.4092 25.3705 19.2000 27.2726 23.9920 23.9920 18.6900 22.2576 0.000022.3694 34.3531 31.0227 23.7226 21.3595 17.8261 17.9617 25.8665 21.3936 14.1683 15.9610 27.3093 17.0373 27.2403 17.6984 24.083310.0000 0.0000 0.0000 10.5000 0.0000 0.0000 15.8000 0.0000 4.4444 15.0000 15.8081 6.2550 6.2550 8.0400 6.6439 12.037130.6351 34.9484 34.1891 28.0892 31.1358 30.4788 27.9707 35.3868 40.6331 24.8874 29.0050 30.2954 40.2954 33.0254 41.1413 49.917110.2974 3.2291 1.6289 1.4289 1.8908 1.9279 1.4067 3.9212 1.5299 1.5084 1.6185 1.7284 1.7284 1.6444 1.7069 1.7516

WESTERN REGIONAL POWER COMMITTEECALCULATIONS FOR ALLOCATION OF SHARES WITH EFFECT from 00:00 Hrs 28.01.2018

FOR OFF-PEAK HOURS (FROM 0000 TO 1800 HOURS & FROM 2200 TO 2400 HOURS)

Allocation to Powergrid (HVDC-BHD)

Allocation to Powergrid (HVDC-VIN)

BARC Facilities (TAPS-3&4)

Allocation to PGCIL (HVDC-Champa)

JBVNL (Jharkhand)

BSPHCL (Bihar)

Constituents

GujaratMadhya PradeshChhattisgarhMaharashtraGOA 10.2974 3.2291 1.6289 1.4289 1.8908 1.9279 1.4067 3.9212 1.5299 1.5084 1.6185 1.7284 1.7284 1.6444 1.7069 1.7516

2.3577 1.0841 0.9531 1.1531 4.7314 4.7729 1.0194 2.1436 1.2418 1.2465 1.3306 1.3155 1.3155 1.7005 1.3508 2.02732.2958 3.1577 3.0238 3.2238 12.3774 8.9336 2.8881 3.5878 3.7769 4.1621 4.1767 4.2771 4.2771 4.8321 4.3737 5.3562

0.2000 0.00000.0603 0.0000

0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.9259 0.0000 0.0000 0.0000 0.0000 0.00000.0000 0.0000 0.0000 0.0000 0.0000

0.1555 0.1588 0.1580 0.1580 0.0000 0.0000 0.1580 0.0000 0.0000 0.1580 0.1580 0.1580 0.1580 0.1580 0.1580 0.15800.3977 0.6035 0.5735 0.5735 0.0077 0.0089 0.5438 0.6849 0.6839 0.8136 0.8136 0.8136 0.8136 0.8136 0.8136 0.81361.9048 0.7937 1.5000 1.5000 0.0000 0.0000 2.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.00000.3701 0.3781 0.3761 0.3761 0.0000 0.0000 0.3761 0.0000 0.0000 0.3762 0.3761 0.3761 0.3761 0.3762 0.3761 0.37610.1851 0.1890 0.1881 0.1881 0.0000 0.0000 0.1881 0.0000 0.0000 0.1880 0.1881 0.1881 0.1881 0.1880 0.1880 0.1880

0.272010.00005.0000

0.5552 0.5671 0.5642 0.5642 0.0000 0.0000 0.5642 0.0000 0.0000 0.5642 0.5642 0.5642 0.5642 0.5642 0.5642 0.56420.3333 0.5058 0.4806 0.4806 0.0000 0.0000 0.4558 0.0000 0.0000 0.6818 0.6819 0.6818 0.6818 0.6818 0.6819 0.68191.0000 1.5173 1.4419 1.4419 0.0000 0.0000 1.3674 0.0000 0.0000 2.0455 2.0456 2.0455 2.0455 2.0455 2.0456 2.0456

100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000 100.0000

GOADDDNHAllocation to Powergrid (HVDC-BHD)Allocation to Powergrid (HVDC-VIN)BARC Facilities (TAPS-3&4)Heavy Water Plant of DAEMaharashtra(NVVN coal power)Jammu and KashmirNVVN A/c BPDBRajgarh solar PV Project to MPPMCLChattisgarh(NVVN Coal Power)Allocation to PGCIL (HVDC-Champa)JBVNL (Jharkhand)BSPHCL (Bihar)Andhra Pradesh (NTPC Coal Power)Telangana (NTPC Coal Power)Karnataka (NTPC Coal Power)TOTAL

Note :(i) Allocation from unallocated quota of coal based stations of NTPC for unbundling solar power under JLNNSM (Phase-I) in WR changed as per MOP Letter No.13/06/OM dated 12.02.2013 & NVVN/SO & Comml/JNNSM/Phase-1 dated 25.02.2013

Page 7: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

Ref: 01/CD/Solar Dt. 11.01.2018

To,

The Member Secretary,

Western Region Power Committee,

F-3, MIDC Area, Marol, Opp. SEEPZ, Central Road, Andheri (East), Mumbai - 400 093 Sub: Allocation of 175 MW thermal power from NTPC stations to be bundled with Solar Power projects in Pavagada Solar Park, Karnataka under National Solar Mission Phase-II, Batch-II-Reg. Sir, This is in reference to MNRE’s scheme of setting up of 15000 MW of Grid-connected Solar PV Power plants through NTPC Ltd. under National Solar Mission from 2014-15 to 2018-19 sanctioned by President of India. ln Tranche-I of Batch-ll, phase-ll of the said "State Specific Bundling Scheme", 3000 MW capacity of solar PV power plants will be set up based on bundling of solar power (3000 MW) with unallocated thermal power (1500 MW) in ratio of 2:1 (in MW terms), for which the required 1500 MW unallocated power to be made available by Ministry of Power (Mop) as per the scheme. Based on NTPC request for the allocation of thermal power for bundling with solar power, MoP-GoI vide its order dated 5th July 2017, has allocated the unallocated power from NTPC thermal power stations. By the said order, 425 MW power has been allocated to Andhra Pradesh. Further, Para 4(iii) of MoP order dated 5th July 2017 (Copy attached as Annexure I), 700 MW has been allocated from the unallocated power of coal based NTPC Station of Eastern and Western Region to the Southern region subject to availability and booking of the transmission corridor of ER-WR-SR. Now MoP vide their order dated 22nd December 2017 (Copy attached as Annexure II), has decided to allocate the remaining 450 MW thermal power to Telangana (150 MW) & Karnataka (300 MW) from the unallocated quota of NTPC Stations in Madhya Pradesh & Maharashtra to bundle with 900 MW solar power. SRPC vide their allocation orders dated 30th November 2017 & 27th December 2017 (Copies attached as Annexure III), has already allocated 125 MW thermal power to Telangana from unallocated quota of NTPC Stations in ER to be bundled with solar power projects in Non solar park Telangana.

Page 8: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

We have received the Commissioning Certificates (Copies attached as Annexure IV) from the solar project developers namely M/s. Yarrow Infrastructure Ltd. for 50 MW project in Block No. 35; M/s. Param Pujya Solar Energy Private Ltd. for 2*50 MW projects in Block No. 28 & 36; M/s. TATA Power Renewable Energy Private Ltd. for 3*50 MW project in Block No. 27, 32 & 34; M/s. ReNew Wind Energy (TN2) Private Ltd. for 50 MW projects in Block No. 33 of Pavagada Solar Park in Karnataka. As per PPA signed with the SPDs, CoD of the project is defined as under: Quote

“Commercial

Operation Date”

[CoD]

Shall mean the 30 days from the actual part commissioning

date of the capacity where upon the SPD starts injecting power

from the part commissioned capacity to the Interconnection

point/ Delivery Point/ Metering point. CoD is intended to match

allocation and availability of thermal power for bundling;

Unquote In view of the above, thermal power for bundling is required to be allocated 30 days from the commissioning date of the capacity. So above projects are required to be allocated thermal power from the dates indicated in the table below:

Company MW Date

Commissioned

Allocation

Required

Allocation

Required

from

Yarrow Infrastructure Ltd. 50 14-Dec-17 25 14-Jan-18

Param Pujya Solar Energy Private

Ltd.

50 15-Dec-17 25 15-Jan-18

50 03-Jan-18 25 03-Feb-18

TATA Power Renewable Energy

private Ltd.

50 14-Dec-17 25 14-Jan-18

50 14-Dec-17 25 14-Jan-18

50 28-Dec-18 25 28-Jan-18

ReNew Wind Energy (TN2) Pvt Ltd. 50 14-Dec-17 25 14-Jan-18

ln view of above, it is requested to allocate 175 MW thermal power to Karnataka from the unallocated quota of NTPC Stations in WR to be bundled with solar power from M/s. Yarrow Infrastructure Ltd. (50 MW), M/s. Param Pujya Solar Energy Private Ltd. (100 MW), M/s. TATA Power Renewable Energy Private Ltd. (150 MW) & M/s. ReNew Wind Energy (TN2) Private Ltd. (50 MW) from their respective dates indicated in the table above as per MoP order dated 5th July 2017 & 22nd December 2017. It may please be noted that to allow execution/implementation of allocation by SRPC, the allocation letter may please be issued two days in advance from the date of allocation.

Thanking you,

Yours Sincerely,

(Ishpaul Uppal)

AGM (Commercial)

Page 9: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

No.l3/6/2017 OMGovernmcDlollndia

Centrnl Electriciry Authori\Scwa Uhawan. R.K- I,uranrNew Delhi

Western Ilcgional Power ComnriIeeF l. MIIIC ,^..a. Marolopp. SEIPZ. Central RoadAndhed (l,.rsolVumbri,400 09i

[as!€rn Rcgional Power Co]nmltrecl.r. ColfClub IloadIollygunjeKolkata,700 031

Subject: Allocrtion of porvcr trom rhe Una ocated power of Coat_based starions of NTI,C lbrbundling with Sotar power under Nationat Sotrr Mission phase _II Barch _IITrnnche-I

Sir.

N-lPC have requesred Ministry ofpower fo.arlocation ofpow€r lbraIocat:on ofunalocatedposer or coal hrseJ N tpC shrron, ror bunlltinE \rith sotar power in mrio ott r,:lfrj"aff"""rea R,**. l: ", ":y*)-i'.:"'l:':sed unde, Ndriu, :tr sotar Mission phase rr Balch rr Tr;nchcJ. NrPC lrrsnrrmated^thsr j000 MW SoiJ p! prolLcrr re ichednted ro be commissioted durinr March. 20t7 tor-!r,a1. 0lE. i.oc_r rhe pt,A crgrred uih r'rc \otir pou,r De\etoorr. rtpc tir. reqr.c.redrorrrroc.l'on,, poqer ti.rn rle Ind|ocJte,r po$e, ol Ccat riced.ra,rol,ol\jpr tur b,rndlinS s,llrSolar power. l'he delaits ofschedure of commissionirlg of Sotar power projc.ir-,ra".NW pl *" ,,.Batch-llTranchc I is at Annerrre-t.

:. -^" .,^1,:.-,1:l.l,n *,nrr0 M,\\ nf.solJr p\. prcjccrs beins sel up and rlre aflocarions of solar polver

a\ p.-fl)c T IrLr['tc\ xpDrovcd b) \4\RI: lrade I lJcr Ns\4 :ct r re j d rr.,ler:

s.No.

Soudrern Regiorr

L In Norlhern Region 240 MW Sotar pV has been commissionedcommlssio"ed bei.ore Septenrber. 20r7. rn Southern Region 8s0 Mwcomnissioned and I100 MW rvirr be commissioned aricr Sept;mber, 20r 7.

100

t250600400

A-*"__,..p-aMost ImmedialeBv Inx / Bv Post

Sfiram Shakri Bhawan, itafi Marg,New Dethi, ttre daled !1J tr-,20t7

Mernber Sccrctary.No(hcrn Regional Powe. Commirleel8/A, Shaheed Jcer Singh Marg

Ncw Delhi,ll0 l6

Member Secrctary.So u thern Regiona I Power C orn mittecNo.29 race Course Cross Roadtsargalorc 560 009

//Ge nerJL Miragcr tCornrnercja )NTPC LimitcdCore-], Floor-77, InstirUliooal Area. Lodhi RoadNerv t)elhi I l0 003

Sol^r PV Caprcity sct-up

650

and s10 Mw will beSolar, PV has bcen

Page 10: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

4. It has, t,rerefore. been decidcd to altocare t500 MW oo$lJNTPr . coil-ha,cd 5rl1tior). r ltre,*p(cti\e re!ro a. I.rde :

ort of unnllocared power of

(i) Alloration fiom the unallocated power of coatbased NTI,C starions in th€ No(hernRegionl

(a) Rrjasthan : j2s Mw(b) tJP : 50 Mw(ii) Allocarion lio thc una ocatcct power of co.t_based N.f.pC sraljons in rhe SouthcmRcgion:

(a) Andhra Pradesh : 42s N{w(iii) Allocaiior from rhe unaltocated poNcr ol coal-bascd N I.pC srarions of Easbnr andU'csr r ReJ.,,. torlc \,,rrl,e , p(!.^i,.

(a) Andhra Pradesh(b) Karnataka(c) Telangaoa

t1. CEA i! req[estcd ro get rhcse a ocarions ]rnplenrenrcd under inrlmatiur ro a concerncd.

: 200 tvtw*: 300 MW*: 200 Mw*

* subject ro lhe availabitirlr and booking of ER WR-SR transmission co.r or byNTPC alter co:nmissioning ofWardha Nizam$ad D/C Iire.

j The ibo\( ,rbieLr rn r-ec ^r nt noqcr -orn ,te urJr pu$er (Jpd"rr)

:^"T.T 1.1.,):: !l r.,c\ora, po$ eJ. D<\ (.rupe, ,slD)Jrr1,,crd,(b\rr,,.ro,,"i".iu,,,,J,.ipo,,.ro flre Den(rrcrJfles unLler rh( NSNI schemt

6 , T rc Jllocrriorr inenlroned ar pdrJ .l Jbove rre made to the bcnefioiaries on behalfof N.t.pC torilrrlrare sale ol bundled lo\er by N lpC. The capaciry a ocared and thc cner€J, scheduled on rhis

:-::",11: 'lyLr b( refleL1ed ds ,Nrpc_cuxt po\,q,in tle Regionat Encrgy eJounts ire,tl ,o u".sslcd b) "re co h.en'eJ i{c.!i-r a jJou<r, orn-rin(e LRt,C,.

7 'l hc orergy accororting for ihe ,t\-Tpc-Sokr powet, sctteduted on intcr regionat bas,5 n,::,apj,p,,":L *l1:l:9.in th-E Rcs,omr r,,c,-qy Accounts issucd by .esp;ciivg:i;c a;:r??c_

rxe LLK( (tFCC) Regutar un5,20 t0 and rhe CFtItC O.der t.or the.letail€d ,.procedu.efor the tn,plemenlation ofthe Mechanism of Rcnewable Resutatu) Fu,,d. *a "", J""j csrCResurations / orders shal be apptied for the inretrrcts,o,,at ,ra".r", i,,a * r,"i,,ri,,g i r

-iiic_sa.,Pnwt .

8 , The bcneicLrrie5 shaI en$re cornptiances with the financiat lrnd commerciat renns,rncrl,r ns r{erdgc tur tellcr ot areJ.r . rd 1.,-Js A a,,gen.nr., ^t Ltrc pu$fr \JJL \.rrcerr ]L(PSA) signcd with N IpC,

'he rarif noriilcario, ,n

""p".t .iN tt C ., .o.r-U"r",r p""", ",,,iu,, ",,tan) other drrecrives / guidelines issued bv the (iove,nne,rr or rnaia r ccnrrai iili;ilii;;,r**,

Commission fiom rinre to rime .

9. In casc of lailure of the beneficiaries adhrrjng to rhe condition\ nre:rrLuneil at para_8 abovr.\ll( i".rh(,igh,r. dr\c1 burdtcdDu$<rar. .r r_r5ortrrrt",,.,-.,"r.,,U11i.,'"i.,,-,,,.,.,",'ell lhr.rtlrPo*(rF\cl rgc?..heDraisior(.o1d.r,ed r.re-tiymerr i((r.ir\ S.ler.re.,.t rtleI 'oveflrrtr1rl or tird.d ,rnd ltre psA .ign(J u;th \ | t,r .

10. 'Ihc above albcations woutd be effecri\c ro the e\rcr)t ot rerrat uummrssioned laDacrr ,n.co,r.en ed su.,,r to$e, proje.,, a, inrirrrec b) rt,e D.sL.,rs .r rte cunc(,ne,l ,,;r"a ; \!il 1,,,;concemed RPC(s).

Yours- laitlrfult!,

,ir:'J*, (D.cuha)tlnd€r Secretary 10 rhe Govemmcnt oftDdja

l:mail: q ntrrrtd. Do!!crnlnic-inlclcfrix: 217t9229

Copy 10:ChiefEnsineer (GM). C[A. Nelv Dethi

Page 11: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

DETAILS OF SOI,AR PV PROJECTS UNDf,R NSM PHASE BA'I'CII.II. TRANCHE.Irorv€r ueve,oper (5Pt)) Prunofd Cormis5ioning Dire

,rrn 5PD- tornr,t br smIi;t.riTls; 500 LonmrssoDed on 3l-M3r- t'7

SPI) rirrmed by SBC Clcan tectr ( Soft 150'6r Mw I L.nm6sioned on 27,Ieb t?J68 MW: Commlssioned on ll-MaFl7

20-Ap.l7Azurc l,oryer lndiaP l-rd 50 Mw, cotrriisioned o;-aM6-

i0 20-ApFl7

::onum FinStrrya [nD.g, Cohnissioncd on I l-Mr.l? 25-rvlay-l?

70 MW: 22 .run-17l0 t lw=mmi$i.el u lt-Mel-20 NIW: Commissioned or 2J-Api-t?

25 M,y-l ?

YodoN lniixsructlrc l.rd ?0 26-Ma!-11

l0 Mw: i0-Ma! 1740 ivlw: l0 Ma)-t?:10 Mw: ls-May-1,

50 20 Mw- conhksio;cd;;iaJ;;r. 28 May-]750 Conmissioned on 07 June-l? 28-Mat-172A ru Mw: comhissioned on io_Ms-17 l2-lull720 comnrissioned on 06-M,v-l? l2 JullT

l'ou' SPDS I'ornred bt Suzton En€€y l2-lul-ll I2-Jul-17

SP Phorovorraic hr Lrd (Shapooijt)

60 Commissioncd onll-MaFtr70 28-sLp l7 28-Srp l7i00

rormeo oy &a.!y Lonsu ants 50

l8 Atrg-17Pirh Pui,. Solar Encrsy pvt t.ld

I8 Aug l7lrvoSPDS lirnred b! ACME Solar 50 l8-Aug-l?Parim Puiya Solar LneBy pll Ltd 50

50 20-Jull?20Jrl-l?

roaumI'rnSu.Ja En.rely r00]\CME Solar Ik dins Pvr L r00TA IA Powcr Ren Diergl r00 20Jul l?

50rA t \ PosLr Rch Enerf,v 50

,ry rorarLnse, rvl Ltd 50 l-,rn-18 2-J..-18

3000

Page 12: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

rlle rro, t.rtorzu L -uMlHt., A4^u-wC-gt00'u2017

i. nrsiln-dqfi{ir lralr{ '

covl(nmcnt ol lndiiraoz rrxnTr

- tr.l inillri otPawcrryq rrti6 qfi. {Sl ir,t- {d} tHi- r r 0 n0 r

Shlnm Sklkriahflwan, Rrfi M.r& N(s Dehi-ii0 001

'lo

Chairpd:on,C.nlral El.ctricit y AuthorilySewa Dhaw.n, R.K. Punm,Nw Delhi.

M ember S€cretary,Wtsl€rn Rcgional Power ComdttceF-3, MIDC Area, Marol09p. SEEPZ, C€nlral RoadAndbcri (East),M umbai-400091

Ccn€ral Manager (Commcrcbl),NTPC LinlitalCor€-3, Floor-7?, ltlsliiutional Are4lrdhi RoadNew D€lhi-ll000l

D zt(lt]- 22rll Dv*hr,'.t, 2t) t1

Easlcor Regional Pow€r ComnirteI4, ColfClub RoadT0lly$nje, Kolkara-700013

M ember Secrel ary,Southcrn Rtgioml Power ComrniltErNo.-29 Rac. Cour.c Cr.lss RondBantslore-s60009

Subj.ct: Allocaiion of Po{er fiom the Un.tlocltcd Powr ot Coat-brled rtatisrr of NTPC for .bundling with Solsr po$rr under Nrrionrl Sotar Mission phase-Il Batch-ll T.rncie-Lreg

Sir,

Ministry ofPower vide tclterdated srh July,20t? vide para - 4 (ii) has allolrtcd 2SO MW,!00 Mw aod 29tMW lo Andhm Pmdesh, Karnala(n and Telangra respeltiv€ly fron llnll,o€t€d power of.od _ based NTPC .ratie:,ol Ea:tcrn and Westerr Region lor busdliog with solar power, where qurntum of rower f.o[l Eas1.r. RBi.a nWes!"m Rcgion was not specified. As per the lclter rereived from NTPC, the tolal powe, requireoalr fo, lrbbundli.g anr icip ated till Derember,20l7, is 500 MW i.e.200 MW for Telugln. ard j00 MW for Karurata#.Z:' , Minisrry ofPower, vide lelrer d eil 27rh Novernber, 201?, hls a,rerdy altocared j0 MW ro T.EaEEa Io!

lundlirg wjrh solrr p ow€r

3" No% it hls bc.n d.cid€it to allocarc remiining4SO M W NTPC rhermlt [ra oc.sred ;owc, to Tda,E5.{:-.OIl W) and Karoahka (300 MW) wilh thc cquivnlcnt rcduction from M.horishtm ind Nl idhya prairlsh i, propon;o, torhEir pr6cni allo..1rion for bundlingwith 900 M W ofSoiar Power

4. T!. tcrms and.ondir:oos ofslocation ordcr d.r!d 5th July.2017 wii rcmain thcsam..

WIPC/SRPC h advissl lo opcmtionulhc th€ attocation in phases deplodhgupon solar capa.ily $hi.i ra$adualy comm;sionsl in T.lrngan. & Karnarakl'

6. CEA ir r.4ucatcd ro gEt thjs atlor.tion impldncnlc.l 0dcr inlifirrioa to 0 conc.|ti.t.

(D.Gqi!)Undcr S.crcli.y ro rh. Corl. of bLi!

Tda'U371 9?:9lrEil op nDailorp o$.r€dajl

C.W to':

Page 13: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

tl\--.," a--.,^-r.r-S$

FAX / SPEED POST

Govertrment of IndiaCentrrl Electricity Autho ty

Soutbem Regional PowerCommitt€e

29, Race Cours€ Cro$ RoadBANGALORf, - 560 OO9

Sub: Allocation of Power from the Unallocated power of coal based stations ofNTPC for bundling with Solar power under National Solar Mission Phase-IlBatch II Tranche -I - Reg.

Ref: L CEA letter No.5/Al/CLA./GMl2o1712047 dated 27.IL2017 enclosingMoP letter No. 13l6/2017- OM dated 27rh November 2017 (copy enclosed)

2. ERPC letter No. ERPC/COMI/cen/Share/20 1 7/81 3 1 -46 (copy enclosed)

3. MoP letter No. 131612017- OM dated 5th July 2017 (copy enclosed)

Sir',

MoP vicle lctter dated 27th November 201? (refered at 1) had de;ided ro allocate 50MW NTPC thermal unaliooated power liom different NTPC thermal power stationsin ER to Telangana for bundling with 100 MW of Solar power,

ERPC vide Letter dated 30rh Noyember 2017 (refened at 2) havc communicated thebreak-up ofshare allocation from ER NTPC Stations.

fiai+ / Date: 30j12017

arso !ffr.&o

?!c!re -qq0-24!!q q, EX..Q90-4?59943;

Ti/No. SP.PC/SEJ54rud'2017- I 8/

*ftq G r5d srB-6{'rr<ftqA-ft{kgtsfrfr

+.r$oo9 560 -

L Chairperson, SRPC & CMD, TSTRANSCO, Hyderabad 14. ManasinE Director TANTRANSCO.Chcnna,2 Direchr rP & (io).'lS lRANSCO. Hvd 15. Director (Dist ibution),TANGEDCO. Chennar3. CMD.TSNPDCL. Waranaal I 6. l)irector(ODn).TANTRANSCO.Chennai.4. CMD, APTR-ANSCO, llyderabad. 17. Secr€tary (Power), Puducherry5. Diredorrcrid & 1'r'.Msmt.)- APIRANSCo. Vza 18. Director (O). PGCIL. curaaon. Harvana6. CMD. APSPDCL.'l nuDati 19. Director (Commercial). NTPC. New Delh;7. Manrsins Director. KPTCL. Bensaluru 20. RED. SRHQ. NTPC. Secunderabad8. Manasina l)irector. PCKL. BenEaluru. 21. Directo. (Powcr), NLC, Neweli1 Qiryglor (Transmission), KPICL, qqnealuru. 22. Directo. rFinance)- NPCIl.. Mu,nbxi

0. aMD. KSEBL. TiruvanathaDuram 21. CEO, NTECL, Chennail. Direclor(Tr.&Syst. Opn.).KSEBL.ThiruvananthaDuram 24 NTPL. Ttrlicorin:. Dirct lon Firancc).KSFDL.Thiruvaralllapuram 25. CEO, POSOCO, New DelhiI Chairman, ]'NEB, Chennai

Page 14: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

The percenl allocation of 50 MW from Centml Gererating Stations (CGS) of ER to

Telangana is given below:

Station Installed Capacity (MW) 7o Share

Falakka-I&Il STPS 1600 0.75I 558

Farakkalll STPS 500 0.731930

Talcher STPS 1000 0.712870

Kahalgaon{ SlPS 840 0.682150

I(ahalgaon-Il STPS 1500 0..163 t t2

Barh STPS 1320 0.675000

MTPS-II, KBUNL 390 0.2'79291

The Percentage Allocation fiom Central Genemting Stations (CGS) of Eastcm

Region will be implemented from 00:00 Hrs of01.12.2017 till fufther orders,

The beneticiaries are required to maintain LC commensurate with the

a:located power' grflfrq,aaou." Faithfully,

;- , \\\ -it(rg 3IFr fi5/ S R tshat

{f{€q €BA /Member Secretary

Page 15: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 16: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 17: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

T,.i,y,r:1.*-fl

irmgE E ddSE €SEE efiil EoDa)d

TARNATAXA SOIIIR FOWER DEVELOPMENT

CORPORATIOI'I LIMITED(JV Companyor(REDL. GoK & SECI. GOI)

KSPDCL/F-Ay2076-77 /

M/s. Yarrow Infrastructure Fvt Limitedsth Floor, TowerB, Wo.ld Mark - 1,Aerocity, New Delhi - 110037.

Sir,

Date:04-01-2018

J iuU' l-sot'lw sotar gencration in block no sS ot M,/s. Yarrow intrastructurc l

. I Pvr Ltd in Pav-r8ada solar park - Com missio ! ing certific-a te - r98.

Powcr Salc greemcnt (PS/l) was siSncd berwccn NTPC Ltd and Distribution

Companies of Rarnaraka 17-05-2016 in which M/s. Yarrow lnfrastructure Pvt Ltd has been

qualified as .leveloper for cstablishing 50 MW solar proje.t at block no. 35 ol Psvagada solar

park Dnder National Solar l.'tission Phase'll, Batch ll, Tranchs I Siate Spccific Bundling S.heme

Thc Power Pu rchase Agreemc.t [PPA) inthis refercnccwas also signcd berween NTPC Ltd and

M/s. Yal-row Infrasrrxct! tc Pvtl,ld on 22 06'2C,16. The said plant has bcen commission€d 14-

12'2017 in ihc presen.c of RT, KPTCL, BESCoM, KSPDCL& M/s Yarrowlnirastructurc Plt Ltd

The commissioning cerlilicate of sald Fowe. planl is herewjth snclos€d for further

Yoursfaititully,

( \//mffififld?l,rB-

KSPDCLPt"'

Phone : 080 2351 5517, Fsx : 080 2351 5518, Web I www'kspdcl'in CIN No I U40107KA2015P1c079223

,d( -d6, f"' ef,z 8e& oori notei-oF. dEBC. DqO di dofi+odtr - 560 024'

2nd Floor, South Block 2. Beeia RaF Seeds Complex, Hebba:, Bellary Road' B€ngaluru 560 024'

Sranrred bv ('antS(,rnner

Page 18: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 19: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 20: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 21: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 22: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 23: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 24: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 25: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 26: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 27: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 28: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 29: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 30: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 31: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 32: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 33: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 34: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 35: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 36: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 37: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 38: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 39: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 40: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 41: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 42: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

Scanned by CamScanner

Page 43: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

Scanned by CamScanner

Page 44: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

Scanned by CamScanner

Page 45: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

Scanned by CamScanner

Page 46: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of

Scanned by CamScanner

Page 47: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 48: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 49: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 50: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of
Page 51: qffif ~ yo'Vernment of India - wrpc.gov.inwrpc.gov.in/htm/Share Allocation/share_alloc_kar225MW_280118.pdf · MOPvide letter under Ref1(copy enclosed) hasintimated allocation of