  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    1/15

    Oman Refineries and Petrochemicals Company

    Sohar Refinery Improvement Project

    Sultanate of Oman

    Contract No. 2129

    !ocument "itle# Installation Of $lectrical Po%er

    & Control Ca'les

    !ocument No# S()))(**2)(1+ Rev )

    ,o' No # 12)-+ ,I()2)22

    QUALITY CONTROL PROCEDURE 

    INSTALLATION OF ELECTRICAL POWER & CONTROL CABLES

    DOCUMENT NO. : S   - 0 0 0 - 5 5 2 0 - 1 7 6

    OMAN REFINERIES AND PETROCHEMICALS COMPANYSOHAR SULTANATE OF OMAN

    ) 1th /e' 2)1* ISS0$! /OR CONS"R0C"ION R N 34

    5 )+th ,an 2)1* ISS0$! /OR R$6I$7 R N 34

    REV DATE DESCRIPTIONORIGINAL

    BY

    CHECKED

    BY

    APPROVED

    BY

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 1 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    2/15

    TABULATION OF REVISED PAGES

    DESCRIPTION OF REVISION REV REMARKS

    ISS0$! /OR R$6I$7 5 /IRS" ISS0$

    ISS0$! /OR CONS"R0C"ION )  NO CO33$N"S /RO3 ORPIC

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 2 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    3/15

    CONTENTS

    1.0 PURPOSE...................................................................................................!2.0 SCOPE.......................................................................................................!!.0 DEFINITIONS " ABBRE#IATIONS.........................................................................!$.0 REFERENCES...............................................................................................$5.0 RESPONSIBILITY & AUTHORITY.........................................................................$6.0 DESCRIPTION OF ACTI#ITIES............................................................................$6.1 General Requirements.................................................................................46.2 Material Inspection Prior to Installation.............................................................46.3 Pre-Installation Test....................................................................................56.4 Cable Installation Inspection..........................................................................56.5 .C !"eat" Inte#rit$ Test o% M&'(& Cables.........................................................66.6 Cable Glan)in# an) Termination.....................................................................*

    6.* Cable +ointin#...........................................................................................,6., Insulation Resistance an) Continuit$ Test...........................................................6. (i#" &olta#e Test.......................................................................................6.1 Inspection / Test !tatus..............................................................................16.11 Testin# / Measurin# 0quipment.....................................................................116.12 !a%et$...................................................................................................117.0 RECORDS..................................................................................................11*.1 ist o% &eri%$in# ocuments ITRs..................................................................11%.0 APPENDICES..............................................................................................12,.1 Gui)eline %or Cable Repair at !ite ppen)i-1.................................................12

    1.0 PURPOSE

    1.1 T"e purpose o% t"is proce)ure is to )e%ine t"e inspection an) testin# met"o)acceptance criteria %or t"e installation o% electrical po7er / control cables an)t"e responsibilit$ o% construction an) 8ualit$ Control personnel 7it" re#ar) tot"is proce)ure.

    2.0 SCOPE

    2.1 T"is 8ualit$ Control Proce)ure )e%ines t"e8ualit$ Control acti9ities t"e inspection an)tests pertainin# to t"e installation o% electrical po7er / control cables up to an)inclu)in# 33 :&.

    2.2 T"is proce)ure co9ers 7or; up to an)

    inclu)in# mec"anical completion.

    !.0 DEFINITIONS " ABBRE#IATIONS

    Compan$ < =RPIC-=M>

    =0C or Contractor < aelim Petro%ac +oint &enture P+& - =man

    Pro?ect < !o"ar Re%iner$ Impro9ement Pro?ects-=man

    8CP < 8ualit$ Control Proce)ure

    ITP

    ITR

    <

    <

    Inspection / Test Plan

    Inspection Test Recor)

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 3 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    4/15

    8C < 8ualit$ Control

    PP0 < Personal Protecti9e 0quipment

    R@I < Request %or Inspection

    & < &olts

    :& < :ilo &olts

    C < irect Current

    M&'(& < Me)ium &olta#e'(i#" &olta#e

    P'G < Public ))ress' General larm

    IP < In#ress Protection

    A <&olta#e bet7een con)uctor an) eart" or metallicscreen

    (!!0 < (ealt" !a%et$ !ecurit$ an) 0n9ironment

    $.0 REFERENCES

    S-000-5!%0-001 RE# ! SPECIFICATION FOR ELECTRICAL FACILITIES

    5.0 RESPONSIBILITY & AUTHORITY

    5.1 T"e !ite 0lectrical 0n#ineer'!uper9isor s"allbe responsible %or ensurin# t"at 0lectricalPo7er / Control cables are installe) to anacceptable stan)ar) o% 7or;mans"ip an) inaccor)ance 7it" applicable )ra7in#s an)speci%ications as 7ell as ma;in# request %orinspection R@I to 8ualit$ epartment at

    eac" sta#e o% 7or; as per t"e applicable ITPrequirements.

    5.2 T"e 0lectrical 8C Inspector s"all beresponsible %or 9eri%$in# t"at 7or; carrie)out is complete correct an) meets t"especi%ie) requirements.

    5.3 T"e 8C 0n#ineer or "is )esi#nee s"all beresponsible %or ensurin# t"at all inspectionsan) tests are 7itnesse) base) on appro9e)ITP recor)e) on applicable !(R-@RM-8Aliste) in *.1 an) si#ne) o%%.

    6.0 DESCRIPTION OF ACTI#ITES

    6.1 '(')*+ R',)'/'(

    6.1.1ll material recei9e) at site s"all be inspecte) upon receipt in accor)ance 7it"

    Construction Mana#ement Proce)ure %or Material Recei9in#.

    6.1.2 T"e !ite 0lectrician un)er t"e super9ision o% 0lectrical !uper9isor s"allcon)uct all tests an) t"e test s"all be 7itnesse) an) results recor)e) b$ 0lectrical8C Inspector.

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 4 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    5/15

    6.1.3 B"ere )ama#e to cable )rum an)'or cable is obser9e) )urin# materialc"ec;in# !ubcontractor s"all #enerate a ama#e ReportD )escribin# t"e)e%iciencies accor)in# to Material Recei9in# proce)ure.

    6.1.4 T"e test s"all be recor)e) as )e%ine) "erein an) 7itnesse) b$!ubcontractor Petro%ac an) Compan$ as in)icate) in t"e ITP. Prior to issuin# t"ereport %orms t"e inspection items s"all be si#ne) b$ t"e 0lectrical 8C Inspector.

    6.2 M*')*+ I('34( P)4) 4 I(*++*4(

    6.2.1 Prior to remo9al to site cable )rums s"all be inspecte) %or p"$sical

    )ama#e.6.2.2 B"ere )ama#e to cable )rum is obser9e) t"e cable )rum s"all be opene)

    an) t"e cable inspecte).

    6.2.3 !"oul) t"e cable be )ama#e) t"is 7ill be recor)e) an) reporte) on aama#e Report.

    6.! P)'-I(*++*4( T'6.3.1 Cables s"all be inspecte) an) teste) on t"e cable )rums prior to remo9al to

    t"e 7or; site. Test 9olta#e s"all be as %ollo7s<

    Cables rate) up to 6& < 5 &olts C %or 1 minute

    Cables rate) abo9e 6& an) up to 1& < 1 &olts C %or 1 minute

    M&'(& Cables < 5 &olts C %or 1 minute

    6.3.2 T"e continuit$ o% eac" core screen an) armour s"all be c"ec;e).6.3.3 T"e insulation resistance o% po7er an) control cables s"all be con)ucte)

    be%ore installation bet7een cores an) bet7een in)i9i)ual cores an) eart" orarmourin#'screen as applicable. Con)uctors metallic s"eat" armour an) screens7"ic" are not un)er test s"all be #roun)e) )urin# t"e test.

    6.3.4 B"ere cables %itte) 7it" a pullin# e$e abo9e tests 6.3.2 / 6.3.3 s"all becon)ucte) i% an$ )ama#es obser9e) onl$.

    6.3.5 %ter completion o% t"e tests cable en)s s"all be seale) to pre9ent t"ein#ress o% moisture.

    6.3.6 T"e cable )rums s"all be mar;e) as teste) an) inspecte).6.3.* Inspection an) test results s"all be recor)e) on !(R-@RM-8A-0-11E.

    6.$ C*+' I(*++*4( I('34(6.4.1 Prior to la$in# cables in trenc"es t"e )imensions o% t"e trenc"es s"all be

    c"ec;e) a#ainst t"e appro9e) )ra7in#s. Particular attention s"all be pai) to t"erequirement %or be))in# o% clean san). uct ban;s un)er#roun) slee9es an) roa)crossin#s s"all be inspecte) an) cleare) prior to cable pullin#.

    6.4.2 8C Inspector 0lectrical s"all ensure t"at trenc"es are clean an) %ree %rom%orei#n )ebris an) s"all inspect 7"ere cables are lai) in trou#"s or )ucts.

    6.4.3 B"ere cables are lai) on tra$s or rac;s t"ese s"all be inspecte) b$ 8CInspector 0lectrical to ensure t"e routin# is complete an) %ree %rom an$ s"arpe)#es or obstacles.

    6.4.4 Cable manu%acturerFs installation instruction s"all be strictl$ %ollo7e) an)7"ere applicable climatic con)itions s"all be consi)ere) prior to pullin# t"e cable

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 5 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    6/15

    to a9oi) ris; o% )ama#e to outer s"eat" o% t"e cable in lo7 or "i#" ambienttemperature )epen)in# on cable t$pe.

    6.4.5 B"ere cable )rum sc"e)ule is a9ailable t"e site super9isor s"all ensuret"at t"e in)i9i)ual cable len#t"s are ta;en %rom t"e )esi#nate) )rum.

    6.4.6T"rou#"out t"e cable pullin# process t"e !ite 0lectrical !uper9isor s"all ensure t"at

    un)ue stress is not applie) to t"e cable. B"ere a cable 7inc" is use) t"emanu%acturerFs permissible pullin# tension 9alues s"all be a)"ere) to.

    6.4.* su%%icient number o% 7or;men an) rollers s"all be use) to pre9ent t"e)ama#e o% t"e cable bein# pulle) at t"e corners an) cross-sections 7"ere t"ecable c"an#es its )irection.

    6.4., @or all cables t"e )irection o% pullin# s"all be as in)icate) b$ t"e arro7on t"e cable )rum.

    6.4. B"ere cables o% )i%%erent 9olta#e le9els an)'or ser9ice are run in parallelse#re#ation s"all be in accor)ance 7it" t"e speci%ication an) t$pical electricalinstallation )ra7in#s.

    6.4.1 0nsure t"at sin#le core cables %ee)in# t"ree p"ase loa)s are installe) intre%oil %ormation. n$ ot"er %ormation s"all be appro9e) b$ Petro%acen#ineerin#.

    6.$.11 Cables s"all be i)enti%ie) properl$ accor)in# to 0n#ineerin#ocuments'Pro?ect speci%ication.

    6.4.12 An)er#roun) cable s"all be inspecte) prior to trenc" bac; %illin# to ensure

    %ollo7in#<a Cable se#re#ation bet7een )i%%erent 9olta#e le9els instrument' P'G' Telecomm

    cables etc.b Cable arran#ement satis%actor$ ben)in# ra)ius )ressin# an) routin# as per applicable

    )ra7in# an) no p"$sical )ama#e.c I)enti%ication mar;ers pro9i)e) at speci%ie) inter9als route c"an#es at )uct ban;s

    an) eac" ben)s etc.) !in#le core cable suppl$in# t"ree p"ase loa)s are in tre%oil %ormation or as speci%ie) b$

    en#ineerin#.e ll cable entries are seale) o%% 7it" an appro9e) sealant.

    % B"ere cables are to be installe) in a multi-la$er cable trenc" eac" la$er s"all beinspecte) b$ 0lectrical 8C inspector to ensure cable arran#ement an) t"ic;ness o% san) bet7een'o9er t"e cables.

    6.4.13 Prior to release t"e trenc" %or %inal bac;%illin# b$ ci9il trenc" s"all beinspecte) to ensure t"ic;ness o% so%t san) %illin# o9er t"e cable properinstallation o% 7arnin# tape an) protection tiles etc.

    6.4.14In a))ition to 6.4.12- a to ) abo9e#roun) cables s"all be inspecte) to ensure

    %ollo7in#<

    a !pare space is a9ailable in eac" tra$ an) tra$s are not o9er %ille).

    b Protecte) %rom s"arp e)#es o% cable tra$s.

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 6 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    7/15

    c Correct t$pe o% tie 7raps or clamps use) at speci%ie) inter9als.

    6.4.15Inspection results s"all be recor)e) on !(R-@RM-8A-0-12E !(R-@RM-8A-0-

    14E !(R-@RM-8A-0-16 an) !(R-@RM-8A-0-1, as applicable.

    6.5 D.C S'* I(')8 T' 49 M#"H# C*+'

    6.5.1 B"ere an a%ter installationF test o% t"e o9er s"eat" is per%orme) a 9olta#eo% 4 :& C per millimetre o% speci%ie) t"ic;ness o% etru)e) o9er s"eat" s"all beapplie) 7it" a maimum o% 1 :&C bet7een t"e un)erl$in# metallic la$ers an) t"e#roun) %or a perio) o% 1 minute. ll metallic la$ers screen metallic s"eat"armour etc. un)er t"e o9er s"eat" s"all be connecte) to#et"er.

    6.5.2 T"e minimum a9era#e t"ic;ness s"all be use) to calculate t"e test 9olta#e.

    6.5.3 @or t"e test to be e%%ecti9e it is necessar$ t"at t"e #roun) ma;es #oo)

    contact 7it" all o% t"e outer sur%ace o% t"e o9er s"eat". con)ucti9e la$er on t"eo9er s"eat" or moist bac;%ill can assist in t"is.

    6.5.4 >o brea;)o7n o% t"e o9er s"eat" s"all occur )urin# t"e test.

    6.5.5 Test results s"all be recor)e) on !(R-@RM-8A-0-1*E.

    6.6 C*+' +*(( *( T')/(*4(

    ll #lan)in# an) termination acti9ities s"all be carrie) out b$ eperience)competent electricians 7it" correct tools. @or M&'(& cables it s"all be carrie)out onl$ b$ a 8uali%ie)'Certi%ie) electrician %or a speci%ie) 9olta#e le9el' t$pe o% termination in accor)ance 7it" manu%acturerFs instructions.

    Cable s"all be teste) as in 6. be%ore an) a%ter cable #lan)in# to ensure inte#rit$o% cable insulation. 0lectrician in9ol9e) is %ull$ responsible %or t"is in processtestin# acti9it$.

    6.6.1   C*+' +*((

    a Cable #lan)in# s"all be )one as per manu%acturerFs instructions.

    b Cable #lan)s s"all be selecte) to suit t"e t$pe o% cable an) termination bo'enclosure an) s"all be o% t"e appropriate t$pe o% protection. e.#. 0F)F- 0FeF.

    c 0%%ecti9e eart" continuit$ s"all be ensure) bet7een t"e cable armour'brai) an) t"e#lan) eart" ta# or metallic eart" plate.

    ) Cable #lan) material s"all be as per installation )etails an) pro?ect speci%ication.

    e >on-ma#netic #lan) an) #lan) plate s"all be use) %or #lan)in# sin#le core cables.

    % T"e entire bo)$ o% a cable s"all enter a #lan) an) t"e outer s"eat" o% t"e cable s"allnot be remo9e) be%ore enterin# t"e 7aterproo% seal.

    # I% speci%ie) at out)oor locations t"e cable #lan)s s"all be pro9i)e) b$ s"rou) an)s"all be %itte) 7it" t"e close %ittin# s"rou) completel$ enclosin# t"e #lan).

    " Cable #lan)s on equipment in t"e plant s"all be mounte) at t"e bottom to pre9entin#ress o% 7ater. B"ere cable #lan)s are installe) in t"e si)e 7all o% equipment t"ecable s"all enter %rom belo7 t"e cable entr$ le9el. Cable comin# %rom top s"all %irst)rop to belo7 t"e #lan) le9el. Top entr$ s"all be strictl$ a9oi)e).

    i Glan)s bet7een non-classi%ie) areas s"all be as speci%ie) in t"e ?ob )escription

    speci%ication. Particular care s"oul) be pai) to t"is requirement.

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 7 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    8/15

    ? Glan)s terminatin# in unt"rea)e) enclosures s"all be pro9i)e) 7it" eart" continuit$b$ attac"ment o% eart" continuit$ bon)s.

    ; &eri%$ proper )ressin# o% cables at bot" en)s an) supports pro9i)e) as require).

    l 0nsure t"at correct IP 7as"er pro9i)e) 7"ere9er applicable to maintain IP ratin# o% t"e enclosure.

    m B"ere cables are terminate) b$ #lan)s into non-metallic enclosures "a9in# t"rea)e)entries an) internal eart" continuit$ plates or metallic enclosures "a9in# clearance"oles a loc;nut an) serrate) 7as"er s"all be use) to #uarantee t"e eart" continuit$bet7een t"e #lan) bo)$'cable armour an) t"e enclosure. B"ere applicable 9eri%$ti#"tness o% loc; nut.

    n 0nsure t"at #lan) components are properl$ assemble) as instructe) b$ manu%acturerti#"tene) an) seals are not )ama#e).

    o 0nsure t"at correct t"rea) t$pe is use) an) t"rea) en#a#ement is satis%actor$. e.#. inan 0 ) enclosure minimum %i9e %ull t"rea) en#a#ement require) %or parallel t"rea)san) 7renc" ti#"t %or taper t"rea)s.

    p Inspection results s"all be recor)e) on !(R-@RM-8A-0-16 or !(R-@RM-8A-0-1, as applicable.

    6.6.2   C*+' T')/(*4(

    a Bit"in equipment terminal boes an a)equate cable core tail s"all be pro9i)e) toenable eac" cable core to be connecte) to an$ terminal o% t"e enclosure.

    b @or multi-core terminal in boes a su%%icient len#t" o% cable tail s"all be le%t to allo7%or re-ma;in# an) termination o% eac" core.

    c Cable tails o% con)uctors an) 7ires s"all be %itte) 7it" compression t$pe terminalconnectin# lu#s. Bire'terminal lu#s or t"imbles s"all be o% t"e correct t$pe an) siHe%or eac" con)uctor. Crimpin# o% t"e o9er'un)ersiHe) lu# is not permitte).

    ) ll connections at t"e cable termination s"all be mec"anicall$ an) electricall$ %irman) s"all be protecte) a#ainst mec"anical )ama#e or an$ 9ibration liable to occur.

    e Cable con)uctor s"all be i)enti%ie) accor)in# to t"e terminal bloc; )ra7in#s. T"emet"o) o% i)enti%ication is as speci%ie) in t"e ?ob speci%ication an) installation)ra7in#s. Pro?ect cable colour co)e s"all be strictl$ %ollo7e).

    % 0nsure con)uctors are insulate) not touc"in# 7it" t"e cable entr$ component.

    # &eri%$ cable )ressin# insi)e t"e enclosure.

    " !pare cores o% t"e cables s"all be strippe) an) terminate) at t"e spare terminals an)lin;e) to eart".

    i &eri%$ screen's"iel) 7ires are properl$ insulate)'terminate) or cut o%% base) onapplicable )ra7in#s.

    ? olte) connections abo9e 1mm siHe s"all be torque) 7it" calibrate) torque 7renc".Torque 9alue s"all be as per manu%acturerFs publis"e) )ata.

    ; Inspection results s"all be recor)e) on !(R-@RM-8A-0-16 or !(R-@RM-8A-0-1, as applicableJ in a))ition !(R-@RM-8A-0-15 s"all be %ille) %or me)ium9olta#e cables.

    6.7 C*+' ;4((

    6.*.1 Cable ?oints are #enerall$ not recommen)e) "o7e9er cable ?ointsma$ be necessar$ i% cable manu%acture) len#t" is s"orter t"an actualroute len#t". n$ ot"er situations arise %or a cable ?oint s"all be

    appro9e) b$ Petro%ac en#ineerin#.

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 8 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    9/15

    6.*.2 Cable ?ointin# process s"all be carrie) out as per ?oint ;itmanu%acturerFs instructions b$ a quali%ie)'certi%ie) electrician %or aspeci%ie) 9olta#e le9el' t$pe o% ?oint.

    6.*.3 e%ore startin# cable ?ointin# processa C"ec; to ensure t"at t"e ;it supplie) %its t"e cable inclu)in# ?oint ;it t$pe an)

    ratin#.b Re%er t"e ;it label an) t"e title o% t"e installation instruction manual.c Care%ull$ rea) an) %ollo7 t"e steps in t"e installation instruction manual supplie)

    7it" ?oint ;it.) 0nsure t"at all special tools are a9ailable at site inclu)in# #as torc".e &eri%$ t"at ?oint c"amber is a)equatel$ protecte) %rom )ust 7in) an) 7"ere

    applicable temperature is maintaine).

    6.*.4 Cable s"all be teste) as in 6. be%ore an) a%ter cable splicin#.6.*.5 +oint i)enti%ication ta#'mar;er s"all be pro9i)e) as per pro?ect

    requirement.

    6.*.6 Cable ?oint location s"all be mar;e) on s-built )ra7in#.6.*.* Inspection an) test results s"all be recor)e) on !(R-@RM-8A-0-

    15.

    6.% I(+*4( R'*(3' *( C4((8 T'

    6.,.1 Insulation resistance bet7een eac" core an) bet7een cores an) eart" orarmourin#'screen as applicable s"all be c"ec;e). Con)uctors 7"ic" arenot un)er test s"all be #roun)e) )urin# t"e test. Continuit$ o% in)i9i)ualcore an) armour'screen as applicable s"all be c"ec;e).

    6.,.2 @or all un)er#roun) cables test s"all be per%orme) a%ter la$in# an) be%ore

    bac;%illin# an) 7"ere applicable be%ore an) a%ter completion o% splice?oints.

    6.,.3 Po7er an) control cables rate) up to 6& s"all be teste) at 5&C %orone minute an) cables rate) 6& to 1& s"all be teste) at 1&C %orone minute.

    6.,.4 M&'(& cables s"all be teste) at 5&C %or one minute.

    6.,.5 P"ase sequence o% po7er cables s"all be 9eri%ie).

    6.,.6 Test s"all be repeate) a%ter #lan)in# at bot" en)s 7it" cable en)sprepare) lu#s crimpe) but not connecte) to relate) equipment. o7

    &olta#e po7er cables ma$ be connecte) at substation en) 7it" isolators;ept open )urin# t"e test.

    6.,.* Insulation resistance %or satis%actor$ installation s"all not be lo7er t"anManu%acturerFs recommen)e) 9alues or applicable pro?ect speci%ication.

    6.,., Test results s"all be recor)e) on !(R-@RM-8A-0-13E an) !(R-@RM-8A-0-16 as applicable.

    6.< H #4+*' T'

    6..1 %ter completion o% ?ointin# #lan)in# an) en) terminations t"e cables s"all be IR

    an) continuit$ teste) as mentione) in 6.,.

    6..2 Prior to commencin# t"e "i#" 9olta#e test t"e area s"oul) be e%%ecti9el$ rope)

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 9 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    10/15

    o%% to eclu)e unaut"oriHe) entr$ an) Bor; Permit s"all be issue).

    6..3 T"e tests s"all be con)ucte) as per t"is )ocument or as recommen)e) b$ cablemanu%acturer 7itnesse) an) results recor)e) b$ !ite 8C 0lectricalInspector.

    6..4 Test 9olta#es s"all be a C 9olta#e equal to 4A or  as speci%ie) b$ cablemanu%acturer.

    6..5 T"e test 9olta#e s"all be applie) to eac" con)uctor 7it" all ot"er con)uctorss"orte) to armour s"iel)s an) eart".

    6..6 T"e initial test 9olta#e 1K o% %inal test 9olta#e s"all be applie) to t"e cablean) t"e 9olta#e allo7e) to stabiliHe.

    6..* T"e applie) 9olta#e s"all be increase) #ra)uall$ in 1K steps until %inal test9olta#e is reac"e) an) t"e 9olta#e an) lea;a#e current recor)e) at eac"

    step a%ter stabiliHation.

    6.., T"e %inal test 9olta#e s"all be applie) %or 15 minutes an) t"e lea;a#e current9alues recor)e) at 5 minute inter9als inclu)in# ambient temperaturean) relati9e "umi)it$. >o brea;)o7n o% t"e insulation resistance s"oul)occur.

    6.. B"en eac" test is complete t"e cable potential s"all be )isc"ar#e) usin# a "otstic; an) rubber insulate) #lo9es rate) %or t"e test 9alues. %ter)isc"ar#e t"e cable s"all be c"ec;e) a#ain %or resi)ual 9olta#e potentialan) le%t #roun)e) %or a time inter9al at least equal to t"e amount o% time test 9olta#e 7as applie) to assure complete )isc"ar#e.

    6..1 Insulation Resistance test s"all be repeate) as in 6., a%ter "i#" 9olta#e test.

    6..11 %ter completion o% t"e tests t"e cable en)s s"all be seale) to pre9ent t"ein#ress o% moisture.

    6..12 T"e test results s"all be recor)e) on !(R-@RM-8A-0-1,.

    6.10 I('34( & T' S*

    6.1.1 Inspection an) Testin# s"all becarrie) out base) on t"is)ocument an) applicable appro9e)ITPs.

    6.1.2 Inspection an) Test results s"all berecor)e) on rele9ant !(R-@RM-8A in)icate) on t"e applicableITPs an) s"all be si#ne) o%% b$ allparties in9ol9e) 7it"out an$ )ela$.

    6.1.3 Inspection an) Test status o% eac"ta##e) items s"all be maintaine)b$ 8C )epartment to ensure t"atall acti9ities mentione) in ITPs arecomplete) an) recor)e) onrele9ant !(R-@RM-8As.

    6.1.4 Inspection an) Test status o% non-

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 10 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    11/15

    ta##e) items i% an$ s"all beseparatel$ controlle) an)maintaine) to ensure t"ecompletion o% 7or; as per ITP.

    6.1.5 Inspection an) Test status controls"eet s"all be use) as a #ui)elineto monitor outstan)in#7or;'inspection'test etc.

    6.11 T'( & M'*)( E,/'(

    6.11.1 ll testin# / measurin# equipments"all be mec"anicall$ an) electricall$ in#oo) con)ition.

    6.11.2 ll testin# / measurin# equipment

    s"all "a9e a 9ali) calibration certi%icate an)stic;er in)icatin# t"e calibration )ate an)net )ue )ate.

    6.11.3 Testin# / measurin# equipments"all be "an)le) b$ competentelectricians'tec"nicians.

    6.11.4 Manu%acturerFs instruction manuals"all be a9ailable at site %or rea)$ re%erence.

    6.11.5 ll testin# / measurin# equipments"all be perio)icall$ calibrate)'9ali)ate)

    monitore) an) controlle).

    6.11.6 Calibration recor)s s"all bemaintaine) b$ !ubcontractor 8C an)monitore) b$ Petro%ac.

    6.12 S*9'8

    6.12.1 Installation inspection an) testin# s"all be carrie) out in accor)ance 7it"Pro?ect (!!0 Plan.

    6.12.2 !ite personnel s"all a)"ere to t"e site sa%et$ policies at all times 7it"emp"asis on 7earin# t"e correct PP0 an) equipment appropriate to t"e t$pe o% t"e operation bein# per%orme).

    6.12.3 ll personnel inclu)in# t"ir) parties s"all be sa%et$ in)ucte) prior to entr$on site.

    6.12.4 !a%et$ ris;s in9ol9e) s"all be constantl$ monitore) %or c"an#es in sitecon)itions.

    6.12.5 Prior to commencements o% 7or; e9er$ )a$ t"e super9isor s"all c"ec; all

    equipment an) tools are in #oo) con)ition.

    6.12.6 ll 0lectrical Inspection / Test )escribe) in t"is )ocument s"all be

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 11 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    12/15

    con)ucte) in a sa%e manner an) #oo) en#ineerin# practice.

    6.12.* Precautions s"all be ta;en )urin# tests carrie) out b$ ot"er )isciplines e#<Pneumatic test o% pipin# s$stem

    6.12., urin# material "an)lin# operations sa%e 7or;in# o% cranes an) slin#ss"all be obser9e).

    6.12. B"en require) necessar$ 7or; permit s"all be obtaine) %rom (!!0epartment as per rele9ant proce)ure.

    7.0 RECORDS

    7.1 L 49 #')98( D43/'( =SHR-FRM-QUA>

    N4. ITR N4. D'3)4(

    1 !(R-@RM-8A-0-11EInsulation Resistance an) Continuit$Test Recor)-0lectrical Cable on rume%ore Installation

    2 !(R-@RM-8A-0-12ECable Trenc" an) uct an; Inspectione%ore Cable Pullin#

    3 !(R-@RM-8A-0-13EInsulation Resistance an) Continuit$Test Recor)-0lectrical Cable =nTrenc" e%ore ac;%illin#

    4 !(R-@RM-8A-0-14EInspection o% Cables in Trenc" e%ore@inal ac;%illin#

    5 !(R-@RM-8A-0-15 Cable +ointin#'Termination Certi%icate

    6 !(R-@RM-8A-0-16Inspection an) Test Recor) o%0lectrical Cables a%ter Glan)in# an)Termination L1&

    * !(R-@RM-8A-0-1*E !"eat" Inte#rit$ Test o% M&'(& cables

    , !(R-@RM-8A-0-1,Inspection Insulation Resistance / (i-Pot Test o% M&'(& Cables

    %.0 APPENDICES

    %.1 '+(' 94) C*+' R'*) * S' =A'(?-1>

    ,.1.1 In case o% an$ )ama#e %oun) on cable outer s"eat" it s"all bei)enti%ie) b$ proper mar;in# an) temporaril$ protect t"e )ama#e b$appl$in# sel%-amal#amatin# tape an) t"en insulation tape. ama#e)cable s"oul) not be epose) %or lon# time in or)er to a9oi) in#ress o% moisture.

    ,.1.2 ll repairs i% an$ s"all be carrie) out as per manu%acturerFsinstructions b$ a quali%ie)'certi%ie) electrician. In absence o% 

    manu%acturerFs instructions t"is section s"all be use) as #ui)eline.

    ,.1.3 Cables s"all be teste) as in 6. be%ore an) a%ter repairin#.

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 12 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    13/15

    ,.1.4 !ite Preparation s"all be as %ollo7s<

    all t"e require) materials an) necessar$ tools to carr$ out t"e ?ob s"all bearran#e) in a)9ance.

    b T"e "eat s"rin;able ?ac;et or splicin# ;it s require) s"all be9eri%ie) %or its epir$ )ate be%ore t"e unpac;in# o% t"e ;it. T"e cable t$pesan) siHes 7ill be 9eri%ie) to see t"e compatibilit$ 7it" t"e eistin# )ama#e)cable.

    cT"e cable trenc" in t"e area o% 7or; s"all be 7ell protecte) b$ 7arnin#tapes'si#ns in t"e e9ent t"e 7or; is continue) more t"an a )a$

    ) 0nsure t"e 0lectrician ' Cable ?ointer in9ol9e) in t"e 7or; 7ill bequali%ie) to eecute t"e 7or; in a competent manner maintainin# a "i#"qualit$ cable repair 7or;s.

    e 0nsure t"at t"e 7eat"er con)itions are suitable %or t"e t$pe o% 7or;

    to be )one.% B"ere applicable ensure t"at t"e 7or;men are a)equatel$ brie%e) o% t"e

    7or;in# an) sa%et$ proce)ures in t"e eistin# plant.

    #B"ere applicable ensure t"at %ee)er %or t"e cable is isolate) an) latc"e)to a9oi) electrocution b$ 7or;men.

    ,.1.5 Cable )ama#es s"all be cate#oriHe) as %ollo7s<Category 1< n$ cable 7"ic" "as an eternal / internal )ama#e o% EP0 Insulation

    insulation screen armour an) t"e inner insulation 7ill be classi%ie) asCate#or$-1 )ama#e.

    Category 2: n$ cable 7"ic" "as an eternal / internal )ama#e to P&C insulationan) t"e armour s"all be c"ec;e) 9isuall$ to see i% t"e inner s"eat"

    an) t"e cores "a9e an$ )ama#e. I% %oun) satis%actor$ suc" cable s"allbe teste) %or t"e satis%actor$ insulation resistance an) t"e continuit$test. Apon acceptance o% test 9alues t"is cable 7ill be classi%ie) asCate#or$-2 )ama#e.

    Category 3: n$ cable 7"ic" "as onl$ eternal P&C outer s"eat" )ama#e. T"e cable7ill be 9isuall$ inspecte) care%ull$J it s"all t"en be teste) %or t"esatis%actor$ insulation 9alue an) t"e continuit$ test. !uc" cables 7illbe classi%ie) as Cate#or$-3 )ama#e.

    ,.1.6 Recti%ication o% cable )ama#e s"all be carrie) out as %ollo7s base) oncate#or$ o% )ama#e.

    Cate#or$ 1< T"is t$pe o% )ama#e s"all be recti%ie) b$ cuttin# t"at portion o% t"e

    )ama#e) cable. )) a ne7 piece o% cable similar to t"e eistin# t$pe

    an) ratin# an) ma;e a suitable splice ?oint b$ usin# appro9e) slicin#

    ;it.

    Cate#or$ 2< T"ese cables s"all be repaire) b$ usin# a splice ;it eclu)in# t"e

    strai#"t %errules to recreate t"e outer protection. (o7e9er i% t"e

    cable )oes not satis%$ t"e inspection'test t"is cable s"all %ollo7 t"e

    cate#or$-1 proce)ure o% repair.

    Cate#or$ 3< T"ese cables 7ill be repaire) b$ sel%-amal#amatin# tape on t"e outer

    s"eat" o% cable or b$ "eat s"rin;able ?ac;et.

    ,.1.* Cable repair location s"all be mar;e) on s-built )ra7in#.

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 13 of 13

  • 8/17/2019 QCP-S-000-5520-176 Rev a (Elect.power & Control Cable)

    14/15

    ,.1., Inspection / Test results s"all be recor)e) on !(R-@RM-8A-0-15

     SHR-FRM-QUA-002 Rev 3_06-11-14 Page 14 of 13