qcf326_bolt torque report

2
PROJEC : TWO ADDITIONAL CRUDE TANKS PROJECT QUALITY CONTROL FORM QCF 326 OWNER : BINH SON REFINING AND PETROCHEMICAL Co.Ltd  PROJ. N : SUBCONTRACTOR : SYSTEM TEST PACK NO : AREA/ISOMETRIC NUMBER : SHT N O  : DWG N O  : JOINT REFERENCE/LOCATION : SPEC N O  : FLANGE DETAILS (SIZE/RATING/TYPE) : GASKET DETAILS (TYPE/SIZE/MAT=L) : BOLT SIZE :  N O . OF BOLTS : BOLTING MATERIAL : REQUIRED TORQUE :  N O . OF STEPS : WRENCH MANUFACTURER : SERIAL NUMBER : CALIBRATION DATE : TIGHTENING SEQUENCE : REMARKS : SIGNED : THE ABOVE BOLT TORQUE RECORD HAS BEEN SATISFACTORILY VERIFIED IN ACCORDANCE WITH THE SPECIFICATIONS.  Name Name  Signature Signature  Date Date 8455003 CONTRACTOR OWNER  BOLT TORQUE REPORT DATE  NAME SUBCONTRACTOR 

Upload: masoodibrahim12

Post on 18-Oct-2015

122 views

Category:

Documents


0 download

DESCRIPTION

DETAILS

TRANSCRIPT

APROJECT:TWO ADDITIONAL CRUDE TANKS PROJECTQUALITY CONTROL FORMQCF326OWNER:BINH SON REFINING AND PETROCHEMICAL Co.LtdBOLT TORQUE REPORTPROJ. NO:8455003SUBCONTRACTOR :SYSTEM TEST PACK NO :AREA/ISOMETRIC NUMBER :SHT NO :DWG NO :JOINT REFERENCE/LOCATION :SPEC NO :FLANGE DETAILS (SIZE/RATING/TYPE) :GASKET DETAILS (TYPE/SIZE/MAT=L) :BOLT SIZE :NO. OF BOLTS :BOLTING MATERIAL :REQUIRED TORQUE :NO. OF STEPS :WRENCH MANUFACTURER :SERIAL NUMBER :CALIBRATION DATE :TIGHTENING SEQUENCE :REMARKS :SIGNED :SUBCONTRACTORNAMEDATETHE ABOVE BOLT TORQUE RECORD HAS BEEN SATISFACTORILY VERIFIED IN ACCORDANCE WITH THE SPECIFICATIONS.CONTRACTOROWNERNameNameSignatureSignatureDateDate