As of Jun 28, 2017
QA&QC Activitiesfor Manufacturing Procedure For the butt weld fitting
-Based on DNV.GL Report(Pipeline Fittings Quality Assurance Technical Paper, PP179886)
QA&QC Activitiesfor Manufacturing Procedure For the butt weld fitting
-Based on DNV.GL Report(Pipeline Fittings Quality Assurance Technical Paper, PP179886)
2Quality Policy
QualityTK Corp
Transparency透明性
-All manufacturing process shall be clearly
transparent
Traceability追跡性
-All manufacturing process shall be traceable
Training敎育訓鍊
-All TK members shall be regularly & properly trained & educated
Investment投資
-Continuous investment can ensure continuous
quality improvement
Quality Culture品質文化
(*)-TK shall build his own
quality culture
Jump TK (*)Quality culture building campaign co-work with JGC, Japanese EPC
3Case Summary
National Energy Board Amended Safety Advisory
NEB SA 2016-01A2
TK Corporation Fittings Case
In September 2012, a fitting manufactured by TK Corporation (TK) was deformed during a hydrostatic test conducted by a pipeline operator at a pump station on a provincially regulated pipeline. As a result, further testing was conducted on additional TK manufactured fittings which resulted in the pipeline operator being unable to identify which fittings potentially did not meet specifications. An engineering assessment was conducted to determine the criteria for replacing over 400 of the fittings.
The pipeline operator that discovered the issue advised other pipeline operators and instituted revisions to internal engineering standards as well as quality assurance procedures. In addition, manufacturers and distributors were provided with improved guidance on the operator’s requirements for materials.
The Board has been informed by TK that once it learned of the hydrostatic test failure, it conducted an investigation into the manufacturing process of its high strength welded fittings and, based upon its findings, it made improvements to its equipment, starting materials and quality assurance programs. TK also confirmed to the Board that it is committed to protecting public safety.
4Activity against Gab between Standards & Regulation
1. Traceability (para 5.4 Manufacturing Traceability)Current industry standards do not require traceability of raw materials such as slabs, plates and welding consumables
(Para5.8 Inspection and Testing Enhancements)Mandate traceability to clearly track each fitting from raw material to finished goods.
Activities for Traceability in TK Corporation
To enhance traceability, TK has maintained below activities
1) Raw material Receiving Inspection
TK’s Receiving Inspection Manager gives HCN (Heat Code Number) to each raw material in addition to Raw material’s Heat Number. HCN will be put on each size (O.D & Wall thickness respectively) per each Raw material’s Heat Number.
2) In-process from Cutting
(1) Color coding
(2) Identification Marking with low stress die stamp
Material Symbol+ Raw Material Heat No. + Traveler Card No. (Bar code No.)
(3) Highlight with paint or paint marker
(4) Bar code label and Work Instruction (traveler card)
(5) Consecutive marking has been done to L6, L650, P9, P11, X65 and others since September of 2012
5Activity against Gab between Standards & Regulation
Big Color coding notice boards are posted in many places(size : 1.2m x 1.8m).
6Activity against Gab between Standards & Regulation
No Process Picture Identification Method
1 TK gives clear identification marking (low stress die stamp) from cutting process of raw material
① Identification Marking with low stress die stamp Material Symbol+ Raw Material Heat No. + Traveler Card No. (Bar code No.)
② Highlight with paint or paint marker③ Color coding④ Bar code label or work instruction(traveler card)⑤ Consecutive marking has been done to L6, L650, P9, P11, X65 and others since September of 2012
Note) 1) Bar code label shall be attached on each single piece of fitting. 2) In case of L6 or higher grade CS or AS, additional consecutive marking is required as L6, L650, P11,
P9, X65 and others.3) Other markings: RT No, Welder ID, MT Operator ID, AV(Alloy Verification)
Cutting raw material
Identification Marking
Rolling
Fit up & Welding
Before forming
⑤① ②
③
④
7Activity against Gab between Standards & Regulation
Job No. Current progress
Item Weight & Quantity
Material Project title
Dimension Color coding
Customer name NDE
Delivery Remaining days
Barcode
Barcode number / date of issue
8Activity against Gab between Standards & Regulation
2. Materials Verification (para 5.6 of Technical Paper, Para 5.8)-Quality safeguards within industry standards are insufficient to identify all potential issues, and the use of sample coupons and/or testing of starting material may not accurately represent the properties of finished products.
-Conduct destructive tests of finished components to verify the accuracy of coupon tests.
To ensure accurately represent the properties of finished products, TK conducts additional test on WPHY material by using not only attached specimen, but also sacrificial fitting and prolongation part test since 2013.
* The results are reported to Top management every week.
Specimen Test
(CSA 9.1.1.1)
Sacrificial fitting Test (Additional)
Prolongation Part Test
(Additional)
For seamless pipes, TK put sacrifice fittings per each HCN for mechanical test.
For welded pipe for hot forming elbow, elliptical forming elbow, elliptical forming tee, TK take prolongation part per each HCN for mechanical test.
CSA 9.1.1.1
Test specimens for mechanical tests shall be representative of finished fitting.
9Activity against Gab between Standards & Regulation
RepresentativeCoupon
4" and below I,T I,(T) (Sacrificial)
5" and above I,T I,T (Sacrificial)
WELDED ALL I,T I.T (Prolongation)
Cold forming SML'S ALL I,T I,T (Sacrificial)
4" and below I,T I,(T) (Sacrificial)
5" and above I,T I,T (Sacrificial)
WELDED ALL I,T I.T (Prolongation)
2-SEAM WELDED ALL I,T - (Specimen attached)
4" and below I,T I,(T) (Sacrificial)
5" and above I,T I,T (Sacrificial)
WELDED ALL I,T - (Specimen attached)
14" and below I,T I,T (Sacrificial)
16" and above I,T I,T (Sacrificial)
WELDED ALL I,T I,T (Prolongation)
12" and below I,T I,(T) (Sacrificial)
14" and above I,T I,T (Sacrificial)
WELDED ALL I,T - (Specimen attached)
* NOTE1. C : CHEMICAL ANALYSIS, I : IMPACT TEST, T : TENSILE TEST 2. Tensile/Yield and Hardness test shall be included.3. Heat treatment of a specimen for receiving inspection shall be carried out according to TK heat treatment specification.4. All tests shall be carried out after heat treatment.5. WPHY "I,(T)" : When taking IMPACT specimen, Tensile strength test shall be carried out if a specimen for tensile test can be taken.6. The hardness test shall be carried out for WPHY, WPL3 and AISI4130 that the quenching is applied.
Elliptical formingSML'S
ITEM Manufacturing Method TYPE SIZE
WPHY (NOTE 1,2,3,4,5,6)
Additional Test
REDUCERSML'S
ELBOW
Hot formingSML'S
TEE
Cold formingSML'S
Elliptical formingSML'S
TK’s standard practice to enhance accuracy of coupon test
10Activity against Gab between Standards & Regulation
3. Heat treatment Control (para 3.1.2 and others of Technical Paper)-The stacking of fittings in the furnace, and use of certain steel support racks effectively increased the overall thickness and mass of the material to be heated and hence the hold time in the furnace.
-A separate issue identified involved the adequacy of quenching following normalization. In this case the temperature of the quenching medium was not monitored and maintained to assure rapid cooling of the products.
To ensure the soundness of products that heat treatment is applied, the below activities have
been implemented from 2013.
1) Prohibit stacking to prevent any of non-uniformity during heating, holding and cooling.
2) Training Program / Periodic training program for heat treatment operators: once a month
3) TK modified heat treatment procedure. Transfer time to quenching bath is specified as 60 seconds.
4) Monitoring system / Monitoring supervisor is checking the status of heat treatment twice a day, and keep the records. The results shall be reported to the top management every day.
5) Self Inspection / Self-inspection procedure was strengthen, and the foreman shall report his results of quality control (Self-Inspection Report) as daily basis to the top management, myself.
6) Hardware investment To prevent rush works, TK is increasing the quantity of furnace TK had 5 heat treatment furnaces ; A) New Normalizing +Quenching furnace (15 tons) was built at May 2012. B) Another new 5 tons Normalizing gas-furnace was built until May 30, 2013 C) Quenching bath control and Monitoring devices were installed.
7) Other existing 15 tons & 7 tons furnaces were upgraded at Sep 30, 2014in
11Activity against Gab between Standards & Regulation
4. Heat treatment Control (para 3.1.2 and others of Technical Paper)-The stacking of fittings in the furnace, and use of certain steel support racks effectively increased the overall thickness and mass of the material to be heated and hence the hold time in the furnace.
-A separate issue identified involved the adequacy of quenching following normalization. In this case the temperature of the quenching medium was not monitored and maintained to assure rapid cooling of the products.
Alarm system to inform that heat treatment is completed Procedures and Work Instructions
Notice Board on Heat treatment
To inform and share what customer requirements are and what kinds of procedures are applied, Work Instruction and Procedures reflecting customer requirements are displayed on the Notice Board which is located very next of furnaces.
According to these Work Instruction and Procedures, heat treatment is being carried out.
12Activity against Gab between Standards & Regulation
Measuring and Monitoring The cooling water temperature(Max. 50deg.C), transfer time toQuenching bath(Max. 60 Second), water quality are Monitored (Display Panel, Check sheet) and maintained from 2013.
Agitating water in the quenching bath to prevent bubbling on product surface
13Activity against Gab between Standards & Regulation
Check point
1. Calibration was done?
2. Effective dates
3. Latest version of applicable procedure
4.Special requirement from TM-IPC-012 applicable ?
5. Recorder
6. Holding time
7. Cooling method
8. TK difference >1” per each lot
9. Gap between products
10. House keeping
11. Un-necessary thing?
12. Correct Work Instruction?
13. Comply with Hold time?
14. Waiting area control
Daily check sheet For Heat treatment
14Activity against Gab between Standards & Regulation
Check point
15. Mixture of material
16. Waiting fittings for 3 days?
17. Waiting specimen for 3 days?
18. Rack material control
19. Hardness check
20. Hardness tester condition
21. Quenching
22. Ferrite No. for all products
23. Recording F NO. on the heat treatment chart
24. Water Cooling within 60 seconds
25. Cooling water temperature
26. Chloride concentration check
Daily check sheet For Heat treatment
Quenching
15EXPERIENCE LIST with improved system
Year Material Grade Size Q'ty (pieces) Customer
2013 WPHY grades 1”~ 64” 7,992 BP and Other 38 customers
2014 WPHY grades 1”~56” 22,182 ARAMCO and other 50 customers
2015 WPHY grades 1/2” ~ 56” 15,368 TOTAL and other 46 customers
2016 WPHY grades 1/2” ~ 60” 13,817 ARAMCO and other 46 customers
2017 WPHY grades 1”~ 64” 794 ADMA-OPCO and other 30 customers
TOTAL 60,153 pieces
TK has supplied High Yield Strength Fittings to the global customers without any quality issues
16
117-12, Noksan Saneop Daero, Gangseo-gu, Busan, KoreaTel : +82 51 970 6600 Fax : +82 51 831 5599Email : [email protected] http://www.tkbend.co.kr
Head Office Export & Import Subsidiary DaeShin Co., Ltd. TK Fitting USA INC.801, Jwadongsunhwan-ro 80, Haeundae-gu, Busan, KoreaTel : +82 51 747 8103~8 Fax : +82 51 747 8444~5Email : [email protected]://www.tkbend.co.kr
16300 Katy Freeway Suite #220, Houston, TX 77094, USATel : +1 713 464 4808 Fax : +1 713 464 5105Email : [email protected]://www.tkbend.co.kr