QAD Planning and Scheduling Workbenches
Brent Shooltz – Sr. Business Systems Analyst – MFGMMUG - 09/27/2010
QAD Proprietary Slide 2 of 50
Agenda
Master Scheduler’s ChallengesProduction Scheduler’s Challenges“Demo”Availability StatusQ&A
QAD Proprietary Slide 4 of 50
Master Scheduler’s Challenge
Finance
Engineering
Executives
Manufacturing
Sales
There’s too much cash tied up in inventory!
There’s a new product introduction scheduled for the fall! But we need more time for design!
Service levels are down. I need more inventory! Whatever it takes to keep the customer happy!
ROI must improve; the stockholders are not happy!
There are too many changes! Provide fixed schedules and the correct parts and delivery will improve.
QAD Proprietary Slide 5 of 50
Master Scheduling Flow TodayMaster Scheduling Capacity Requirements Planning
QAD Proprietary Slide 6 of 50
Production Scheduler’s Challenge
Finance
MaterialsManufacturing
Sales
High variances to “plan” (extra setup, downtime, labor), you need to optimize your production schedule.
You can’t change the schedule on short notice and expect the materials to be available.
Drops in a new high priority order due tomorrow, which order can be moved?
Labor / machine resources not available for 2nd shift –what are you going to do about this?
QAD Proprietary Slide 12 of 50
Solution Components
Period - > Month - > Week - > Day - > Shift - > Interval - > hour
Production Planned
Production Scheduled
Production Dispatched
Production ReportedDemand received
MRP MSW PSW Base Base
CAC
MSW/PSW/CAC Together- Consolidation of 50 maintenance, report and inquiry programs- New capabilities (production scheduling, integrated component checking)
Click For Next Point
QAD Proprietary Slide 13 of 50
Capacity FrameDisplays capacity information per selected resource in the Schedule Grid- Balance your planned and required capacity.
Supply/Demand FrameProvides demand & supply information per selected item in the Schedule Grid.- Primary information used for scheduling decision making.
Schedule GridThe primary context of the workbench. - View and modify your production schedules for each item.
Click For Next Point
QAD Proprietary Slide 14 of 50
User selects the item row in Schedule Grid.
Supporting PanelsEnables master scheduling action and decision making.
Represents over 30 maintenance programs and reports!
QAD Proprietary Slide 15 of 50
PSW Screen Overview Click
Production Order BrowseLocate un-sequenced production orders by attributes (red/yellow) (large/small).
Production Order Sequence GridSchedule and sequence production orders by item attributes.- Create a schedule by (release date, shift, sequence)
Production Order MaintenanceView and maintain all order details.
- Drag & Drop the orders to the desired position on the Sequence Grid.
Production Order BrowseSearch & group data per user specification
QAD Proprietary Slide 16 of 50
PSW With CAC IntegrationClick
Order Component (Bom) FrameIdentify the components with shortages, scheduled receipts, partial issues.
Order Component StatusBefore releasing to shop floor, verify all component are available.
- Select a Component and drill down further into MRP and Inventory Details
QAD Proprietary Slide 18 of 50
Master Scheduling Workbench Value
Reduces master scheduling time and complexityCompresses manufacturing responseProvides ability to create an “optimized” master scheduleEnables to be proactive
QAD Proprietary Slide 19 of 50
Production Scheduling Workbench Value
Reduces production scheduling time and complexityIncreases shop floor optimizationProvides ability to create an “optimized”production scheduleRemoves need for spreadsheets
QAD Proprietary Slide 20 of 50
Availability StatusStandard Edition (SE)– Three Early Adopters
• Superior Essex– Environment : 2008 SE (Discrete)
• Superior Industries– Environment : 2008 SE (Repetitive)
• Cascade Engineering– Environment : 2008 SE (Repetitive)
– Criteria for SE General Availability• One out of three early adopters live• No remaining critical issues for other two early adopters
Enterprise Edition (EE)– Released with 2010.1EE
• Available to customers current on QAD maintenance