Curriculum Vitae – AJITH PUTHOOR Position: QA/QC MULTI DISCIPLINE INSPECTOR (OFFSHORE and ONSHORE) QA/QC Pipeline & Piping ( Welding and Painting ) Presently working at: Offshore Brownfield Project with Hyundai Heavy Industries in Qatar Discipline: Welding / Pipeline / Piping and Painting (CSWIP 3.2.2, BGAS PAINTING GRADE- 2, NDT LEVEL-2 in RT, UT, PT, MPT and RTFI) Year of birth: 23-05-1979. Nationality: Indian Marital status: Married. Education: Diploma in Mechanical Engineering. Languages: Malayalam (mother’s tongue), English, Hindi &Tamil. Contacts: [email protected] , [email protected] , Summary of Qualification and Objectives: Career with experiences in Oil and Gas construction Offshore and Onshore, Welding, Piping and Pipline, Offshore and Onshore Installation Construction and Installation: Offshore and Onshore Pipeline Installation. -Structure -Piping. -Diesel Tank. -Pressure Vessel. Welding Inspector CSWIP 3.2.2, Certified Senior Welding Inspector , ASNT NDT Level II In RT/UT/MT/PT/RTFI, Critical Assessment, Development in Joining Technology and Implication for Engineering Services, Process & Fabrication, Quality Management, Welding Consumable and Handling Storage Key qualifications: CSWIP 3.2.2 – Certified Senior Welding Inspector (Certificate Number: 90759, Date of Expiry: 15 May 2019). CSWIP B GAS Painting GRADE 2 (Certificate Number: 91242, Date of Expiry: 4 Sep 2019).

Upload: ajith-puthoor

Post on 07-Jan-2017

395 views

Category:

Documents


5 download

TRANSCRIPT

Page 1: QA- QC INSPECTOR AJITH CV - Copy

Curriculum Vitae – AJITH PUTHOOR Position: QA/QC MULTI DISCIPLINE INSPECTOR (OFFSHORE and ONSHORE)

QA/QC Pipeline & Piping ( Welding and Painting )Presently working at: Offshore Brownfield Project with Hyundai Heavy Industries in Qatar Discipline: Welding / Pipeline / Piping and Painting (CSWIP 3.2.2, BGAS PAINTING GRADE- 2, NDT LEVEL-2 in RT, UT, PT, MPT and RTFI)

Year of birth: 23-05-1979. Nationality: Indian

Marital status: Married.

Education: Diploma in Mechanical Engineering.

Languages: Malayalam (mother’s tongue), English, Hindi &Tamil.

Contacts: [email protected], [email protected],

Summary of Qualification and Objectives:Career with experiences in Oil and Gas construction Offshore and Onshore, Welding, Piping and Pipline, Offshore and Onshore Installation

Construction and Installation:

Offshore and Onshore

Pipeline Installation.-Structure -Piping. -Diesel Tank.-Pressure Vessel.

Welding Inspector CSWIP 3.2.2, Certified Senior Welding Inspector , ASNT NDT Level II In RT/UT/MT/PT/RTFI, Critical Assessment, Development in Joining Technology and Implication for Engineering Services, Process & Fabrication, Quality Management, Welding Consumable and Handling Storage Key qualifications:

CSWIP 3.2.2 – Certified Senior Welding Inspector (Certificate Number: 90759, Date of Expiry: 15 May 2019). CSWIP B GAS Painting GRADE 2 (Certificate Number: 91242, Date of Expiry: 4 Sep 2019). ASNT NDT Level 2 - Radiography. ASNT NDT Level 2 - Radiography Interpreter ASNT NDT Level 2 - ultrasonic testing ASNT NDT Level 2 - Magnetic Particle Test. ASNT NDT Level 2 - Penetrate Test. Internal Welding Inspector Course. Internal Welding Inspector Refresher Course. Welding Consumable Handling & Storage. Quality Assurance “Awareness” ISO 9001-2000. Quality Work Group Program.

Page 2: QA- QC INSPECTOR AJITH CV - Copy

Curriculum Vitae – AJITH PUTHOOR

Employment:Present: QA/QC Welding and Painting Inspector - Hyundai Heavy Industries (FAP Offshore Brownfield Project, Qatar)2013 QA/QC Welding Inspector-Hyundai Heavy Industries ( Barzan Offshore Pipeline Project, Qatar)2012 QA/QC Welding Inspector –NASSER-AL-HAJIRI (SAMCO ACRYLIC ACID PROJECT), (28-03-11 to 15-07-12).

2010 QA/QC Welding Inspector - OMAN PROMAN CONTRACTING&TRADING LLC(METHNOL PROJECT IN PORT

OF SOHAR IN SHUTDOWN JOB) (02-10-10 to 02-11-10).

2008 QA/QC Inspector - CONSOLIDATED CONTRACTORS INTERNATIONAL COMPONY, QATAR (RAS LAFFAN ONSHORE EXPANSION PROJECT QATAR) (20-02-2008 to 20-02-2010).

2005 QA/QC Inspector-CONSOLIDATED CONTRACTORS INTERNATIONAL COMPONY – ABUDHABI (RUWAIS NATURAL GAS LIQUDIFICATION PROJECT) (11-11-2005 to 02-01-2008).

2004 QA/QC NDT Inspector-CONSOLIDATED CONTRACTORS INTERNATIONAL COMPONY, OMAN (OMAN-INDIA FERTILISER PROJECT, SUR) (11-01-2004 to 10-11-2005).

Passport Information:

Passport No.: F 8665982 Date of Expiry :30/06/2017Place of Issue: Abu Dhabi

Academic

DIPLOMA IN MECHANICAL ENGINEERING. CSWIP 3.2 SENIOR WELDING INSPECTOR (90759). CSWIP B GAS PAINTING GRADE 2 (91242). ASNT Level –II UT- DATE OF REISSUE 17-10-2014,DATE OF EXPIRY-16-10-2019 ASNT Level –II MPI-DATE OF REISSUE 17-10-2014,DATE OF EXPIRY-16-10-2019 ASNT Level –II RT-DATE OF REISSUE 14-10-2014,DATE OF EXPIRY-13-10-2019 ASNT Level –II LPT-DATE OF REISSUE 14-10-2014,DATE OF EXPIRY-13-10-2019 ASNT Level- II IN RT FILM INTERPRETATION-DATE OF REISSUE 17-10-

2014,DATE OF EXPIRY-16-10-2019

Personal Strengths:

Good Communication & Presentation Skills. Pro-Active, Energetic & Hard working, Good Computer & Analytical Skills. Believes in a participative style of Management. Ability to Motivate & direct a multi-think group towards achieving common corporate

Page 3: QA- QC INSPECTOR AJITH CV - Copy

Curriculum Vitae – AJITH PUTHOOR goals.

Responsibility: Handled the following responsibilities:

1. Materials Involved along with pipe size: ½” to 72” , A106 Grade B ,APL 5L-Grade B , A335-P1, A335 -P11, A312-TP 304L, A 312 TP316L.

2. Painting experience : Pipe line experience , Piping experience ,familiar with FBE Coating

The work involves co-ordination with the concerned QC Engineers &QC Inspectors to carry out of the NDT Activities for the weldments in the piping system in the field. also preparing the daily NDT Requests and offer it to the NDT crew of various units to carry out of the testing and further activities, coordinating with Engineers and construction foreman to carry out the rectification work for the defects found in the weldments and clear it for further activities to carried out in the system & Monitoring PMI Activities.

Visual Inspection .also to monitor raw materials and dimension for structure and Piping process involve verification of drawings, check material specification Inspection of piping spools, monitor the Heat treatment and also the RT requirement & Fit up joint preparation Inspection

Inspecting the incoming materials with specified requirement. Visual Inspection of fit-up joints prior to the welding. Control the consumables for welding storage/issue/usage. Preparing the welder identify card. Visual testing of root final welding of groove welds. Review of isometric drawing. Preparing and clearing the punch list before hydro testing Arranging and conducting hydrostatic testing according to the client procedure and

inspecting. Reinstatement and co-ordination of test packages. Witnessing positive material (PMI) NDT activities of vendor supplied at all levels in

corporate safety in to each activity. Interpretation of Radiographic as per API 1104; ASME B 31.3; SEC IX.

Carries out routine Non-Destructive testing on piping and Equipment according to established schedules, Carried out daily thickness and survey it with reference Drawings,

Familiar with Base Materials and consumables welding materials conform to the specifications and that welding used as specified for materials.

Implementing Welding procedures are as specified and qualified, and that the welding is performed as per applicable procedures.

Qualified welders, Welding operators, and tack welders to the applicable standards, and that they are qualified to use the welding procedures specified for the work.

Witness testing of the welder test assembles and / or welding operator qualification test assemblies, or supervise these activities when performed by outside agencies.

Prepare reports and verify that records of the welding procedure, the welding procedure qualification, the welder’s welding operator’s and tack welder’s qualification, the control welding materials and the examinations are maintained.

Verify that the joint geometry meet the requirements of the welding procedure and drawings.

Performing of Positive Material Identification (PMI). Co-ordinations the Non-Destructive examinations and review the results. Hydro testing in vessels, piping & pressure vessels.

Page 4: QA- QC INSPECTOR AJITH CV - Copy

Curriculum Vitae – AJITH PUTHOOR Familiar with International codes & standards such as API, ASME. Carries out Ultrasonic flaw testing of welds , Improvements in the preventive maintenance NDT planning. Alloy Identification of Incoming metals and Equipments, Witness welder test with specify standards, Witness and Inspection of All types of Valves (Isolation & Pressure Safety Valves) Visual inspection of Tanks, pressure vessels and Equipment. Witness the Hydro Test Pneumatic Test for Safety Valves heat exchanger & Super

Heater coil. Witnessing the Dimensions check at various stages of Boiler Components like Drum,

Header and Heat exchanger as per Engineers Advice.

Project work: Hyundai Heavy Industries Position : QA/QC Welding and Painting Inspector

Project Name : BARZAN Offshore Pipeline Project and FAP Offshore Project

Period: Aug-4-2012 to Till date

Inspecting the incoming materials with specified requirement.

Visual Inspection of fit-up joints prior to the welding. Control the consumables for welding

storage/issue/usage. Preparing the welder identify card. Visual testing of root final welding of groove welds. Involved in making PQR and WPS Preparing and clearing the punch list before hydro

testing Arranging and conducting hydrostatic testing

according to the client procedure and inspecting. Reinstatement and co-ordination of test packages. Witnessing and review mechanical tests and reports Interpretation of Radiographic as per API 1104; ASME

B 31.3; SEC IX.

Page 5: QA- QC INSPECTOR AJITH CV - Copy

Curriculum Vitae – AJITH PUTHOOR Carries out routine Non-Destructive testing on piping and

Equipment according to established schedules, Carried out daily thickness and survey it with reference Drawings,

Familiar with Base Materials and consumables welding materials conform to the specifications and that welding used as specified for materials.

Implementing Welding procedures are as specified and qualified, and that the welding is performed as per applicable procedures.

Qualified welders, Welding operators, and tack welders to the applicable standards, and that they are qualified to use the welding procedures specified for the work.

Witness testing of the welder test assembles and / or welding operator qualification test assemblies, or supervise these activities when performed by outside agencies.

Prepare reports and verify that records of the welding procedure, the welding procedure qualification, the welder’s welding operator’s and tack welder’s qualification, the control welding materials and the examinations are maintained.

Verify that the joint geometry meet the requirements of the welding procedure and drawings.

Performing of Positive Material Identification (PMI). Co-ordinations the Non-Destructive examinations and review the

results. Hydro testing in vessels. piping pressure vessels. Familiar with International codes & standards such as API, ASME. Carries out Ultrasonic flaw testing of welds , Improvements in the preventive maintenance NDT planning. Alloy Identification of Incoming metals and Equipments, Witness welder test with specify standards, Witness and Inspection of All types of Valves (Isolation & Pressure

Safety Valves)

Page 6: QA- QC INSPECTOR AJITH CV - Copy

Curriculum Vitae – AJITH PUTHOOR Project work:

NASSER AL HAJIRI QA/QC WELDING INSPECTOR – LOCATION : ONSHORE – JUBAIL,SAUDI ARABIAPROJECT NAME : SAMCO ACRYLIC ACID PROJECTPERIOD: 28-March-2011 to 16-July- 2012.

QUALIFIED PROCEDURE :

1. Main Procedure. Inspecting the incoming materials with specified requirement. Visual Inspection of fit-up joints prior to the welding. Control the consumables for welding storage/issue/usage. Preparing the welder identify card. Visual testing of root final welding of groove welds. Review of isometric drawing. Preparing and clearing the punch list before hydro testing Arranging and conducting hydrostatic testing according to the

client procedure and inspecting. Reinstatement and co-ordination of test packages. Witnessing positive material (PMI) NDT activities of vendor

supplied at all levels in corporate safety in to each activity. Interpretation of Radiographic as per API 1104; ASME B 31.3;

SEC IX.

Key Responsibilities and Accountabilities FOR QA/QC WELDING INSPECTOR STRUCTURAL & PIPELINE WPQT, & PIPELINE INSTALLATION :

Checks prior to commencement of Welding Procedure Qualification Record on PWPS to be done and that must be considered first are.

Check condition of welding machine and calibration certificate. Check condition of welding equipment tool and calibration certificate. Check Material Specification, Diameter and Thickness qualification and

Material certificate. Check Condition of welding storage and handling procedure and

consumable certificate. Check Beveling and witness UT lamination check and MPI before fit-up

preparation. Check weather condition, before and during welding. Check Preheat temperature before fit-up preparation. Check and monitor Pre-heat temperature before qualification. Check and monitor welding parameter, Amperage and Voltage Check and monitor Interpass temperature during qualification. Perform a visual check before being sent to Radiography, UT&MPI. Witness and ensure the results of mechanical testing in accordance with

the requirements and specification of the desired. Prepare Test Run-Sheet documentation for PQR and WPS to submit for

client approval.Key Responsibilities and Accountabilities FOR QC WELDING INSPECTOR – PIPELINE WPQT, WQT

Verifying that approved welding procedures, methods and consumables are being used by qualified personnel on all areas of the project.

Verifying that all construction and fabrication activities have been conducted in accordance with procedures and items conform to engineering specifications, design and codes of practice.

Conducting visual inspections of welds and repairs of welds in accordance with procedures and codes of practice.

Monitor Welder repair rates in accordance with job quality requirements. Provide technical guidance for welding sequence and distortion control in

accordance with procedures and job requirements. Prepare and issue progressive inspection reports and inspection release

notes.

Page 7: QA- QC INSPECTOR AJITH CV - Copy

Curriculum Vitae – AJITH PUTHOOR

CONSOLIDATED

Checks prior to commencement of Welding Procedure Qualification Record on PWPS to be done and that must be considered first are.

Check condition of welding machine and calibration certificate. Check condition of welding equipment tool and calibration certificate. Check Material Specification, Diameter and Thickness qualification and

Material certificate. Check Condition of welding storage and handling procedure and

consumable certificate. Check Bevelling and witness UT lamination check and MPI before fit-up

preparation. Check weather condition, before and during welding. Check Preheat temperature before fit-up preparation. Check and monitor Pre-heat temperature before qualification. Check and monitor welding parameter, Amperage and Voltage. Check and monitor Interpass temperature during qualification. Perform a visual check before being sent to Radiography, UT&MPI. Witness and ensure the results of mechanical testing in accordance with

the requirements and specification of the desired. Prepare Test Run-Sheet documentation for PQR and WPS.

Project NameCONSOLIDATED CONTRACTORS INTERNATIONAL COMPONY(RAS LAFFAN ONSHORE EXPANSION PROJECT QATAR),QATARQA/QC INSPECTOR

LOCATION: RAS LAFFAN, QATAR.REASON FOR LEAVING : PROJECT COMPLETIONPERIOD :20-February-2008 to 20-February-2010

Key Responsibilities and Accountabilities FOR QC WELDING INSPECTOR – PQR,WQT

Checks prior to commencement of Welding Procedure Qualification Record on PWPS to be done and that must be considered first are.

Check condition of welding machine and calibration certificate. Check condition of welding equipment tool and calibration certificate. Check Material Specification, Diameter and Thickness qualification and

Material certificate. Check Condition of welding storage and handling procedure and

consumable certificate. Check Bevelling and witness UT lamination check and MPI before fit-up

preparation. Check weather condition, before and during welding. Check Preheat temperature before fit-up preparation. Check and monitor Pre-heat temperature before qualification. Check and monitor welding parameter, Amperage and Voltage. Check and monitor Interpass temperature during qualification. Perform a visual check before being sent to Radiography, UT&MPI. Reading film radiography to prove whether or not there are indications

before being sent for mechanical testing. Witness and ensure the results of mechanical testing in accordance with

the requirements and specification of the desired.

Page 8: QA- QC INSPECTOR AJITH CV - Copy

Curriculum Vitae – AJITH PUTHOOR CONTRACTORS INTERNATIONAL COMPONY, ABUDHABI

PROJECT NAME:RUWAIS NATURAL GAS LIQUDIFICATION PROJECT

QA/QC INSPECTOR & CLIENT REPRESENTATIVE – PIPING, PIPELINE, & TIE-IN FABRICATION AND INSTALLATION :

LOCATION: RUWAIS – ABHUDHABI.REASON FOR LEAVING : PROJECT COMPLETIONPERIOD :11-November-2005 to 02-januaryr-2008

Key Responsibilities and Accountabilities FOR QA/QC INSPECTOR/CLIENT REPRESENTAIVE PIPING, WELDING and PIPELINE

Verifying that approved welding procedures, methods and consumables are being used by qualified personnel on all areas of the project.

Verifying that all construction and fabrication activities have been conducted in accordance with procedures and items conform to engineering specifications, design and codes of practice.

Conducting visual inspections of welds and repairs of welds in accordance with procedures and codes of practice.

Monitor Welder repair rates in accordance with job quality requirements. Provide technical guidance for welding sequence and distortion control in

accordance with procedures and job requirements. Prepare and issue progressive inspection reports and inspection release

notes.

Project NameOMAN INDIA FERTILISER PROJECT, SUR

CONSOLIDATED CONTRACTORS INTERNATIONAL COMPONY,OMAN

QA/QC NDT INSPECTOR :

LOCATION: SUR / MUSCAT.REASON FOR LEAVING : TRANSFERED TO ABHUDHABI PROJECTPERIOD : 11-JANUARY-2004 to 10-NOVEMBER-2005

Key Responsibilities and Accountabilities FOR QA/QC NDT INSPECTOR ONSHORE PIPELINE FABRICATION AND INSTALLATION, WPQT & WQT : (a) Implementation of all required Quality Control Activities established within the Project and respective ITP’s related to Welding Process On site.(b). Approved Non destructive examination certified (NDE) Level II, welding inspector may perform Penetrate Test (PT), Magnetic particle test (MT), Ultrasonic Test (UT) and Radiography test inspection when required.(c). Retain a copy of approved Welding Procedures, a list of Qualified Welders and a list of Welder Identification Numbers.(d). The inspection for qualification of personnel, materials, equipment and Procedures.(e). Witness the preparation of welds for the qualification of the procedure And the welder qualification tests.(f). Witness qualification test of welder in accordance with AS 2885.2/ASME/API Codes, Standards, Specifications and ITP (Inspection and Test Plan).(g). Verify the a register of Qualified Welders is maintained and each welder is assigned an Identification Number.(h). Verify that all field welding is accomplished in accordance with WPS (Welding Procedure Specifications) procedures and by qualified welders and that each welders work is identified by the welders Identification

Page 9: QA- QC INSPECTOR AJITH CV - Copy

Curriculum Vitae – AJITH PUTHOOR Number following International Standards, Project Specification And ITP.(i). Verify that each bead and weld groove is cleaned of all slag and scale.(j). Examined each filed weld visually to ensure it is free of all slag and Spatter, and determine whether it complies with visual requirements.(k). Verify that each weld is numbered properly and marked as per the weld Numbering system.(l). Check welding machine periodically to ensure amperage and voltage are within tolerances specified in the welding procedure specification, this will also include random checking welding parameters used and recording same to ensure compliance to the applicable Welding Procedure Specification (WPS) / Welding Procedure Qualification Record (PQR). Random checks shall be perform on a daily basis and According to the respective ITP.(m). Monitor storage of welding supplies, and reject welding supplies Improperly stored and damaged.(n). Verify that inside of joints of pipe is clean prior to welding.(o). Carrying out receiving inspection, welding inspections, dimensions control, final inspection, pressure test inspection, NDT etc. as required In the specific ITP.(p). The inspection release of vendors / Suppliers items from manufacturer’s Premises.(q). Maintain daily notes and/or records as required, including, but not limited to : Inspection Reports, Notes on Welder Deficiencies, Safety Non-Compliances and any other events pertaining to the work.(r). Report to the inspection and testing activities for preparations of The weekly/monthly reports.(t). The preparation of acceptance or non conformance report.(u). Reporting any non-conformity to the Quality and site QC Managers.(v). Verifying the documentations for certification and “as-built”.(w). Following and comply all the quality, health and safety and Environmental rules according to the project requirements.(x). Attend safety and quality meetings as required.

OTHER RESPONSIBILITIES PWPS, PQR, WPS AND MECHANICAL TESTS.

Vertical, Horizontal Joints fit up and plumpness of the tank, packing, bending Insp.

Visual Inspection of all fit up and welding joints.

RT Co-ordination and film Interpretation as per applicable code.

Co-ordination with NDT Team.

Group dictations for quality improvements.

Welder Qualification according to ASME Sec IX.

Page 10: QA- QC INSPECTOR AJITH CV - Copy

Curriculum Vitae – AJITH PUTHOOR Visual Inspection in columns and vessels, furnace, heat exchangers, drums, cooling tower, air fin

cooler, replacing of piping inspection.

UT Test witness test & Dimensional Inspection.

According to API 1104 Follows Inspection of all fabrication piping spool.

Welder qualification tests According to ASME SEX IX.

Electrode issuance, backing control as per procedure.

Heat traceability inspection (Pre-Heat, Heat input, PWHT).

NDT Record monitoring of quality control dept.

Interpretation of radiographic films as per applied codes.

Daily welding progress report.

Witness of hydro testing.

Preparation of inspection report.