Page 1: PWRI Quarterly Meeting Tentative Agenda

PWRI Quarterly MeetingTentative Agenda

PWRI Quarterly MeetingTentative Agenda

December 11-14 - Houston, Texas

Page 2: PWRI Quarterly Meeting Tentative Agenda

PurposePurpose

• To review ongoing contractor work and to critique planned activities. The last meeting in The Hague focused particularly on Tasks 2, 3, and 4 - Matrix Injection, Soft Formations and Stimulation. In addition, an Economics Task was initiated.

• This meeting, while reviewing all Tasks, will focus on Tasks 2, 3, 4 and 6 - Matrix Injection, Soft Formations and Horizontal Wells.

• To review ongoing contractor work and to critique planned activities. The last meeting in The Hague focused particularly on Tasks 2, 3, and 4 - Matrix Injection, Soft Formations and Stimulation. In addition, an Economics Task was initiated.

• This meeting, while reviewing all Tasks, will focus on Tasks 2, 3, 4 and 6 - Matrix Injection, Soft Formations and Horizontal Wells.

Page 3: PWRI Quarterly Meeting Tentative Agenda

• 8:45 - Convene at Chevron’s Facility• 9:00 - Welcome/Opening Remarks: Paul Jones• 9:10 - Summary- Financial Status of the

Project: J. McLennan• 9:20 - Summary - All Tasks: John McLennan

• 8:45 - Convene at Chevron’s Facility• 9:00 - Welcome/Opening Remarks: Paul Jones• 9:10 - Summary- Financial Status of the

Project: J. McLennan• 9:20 - Summary - All Tasks: John McLennan

Monday, December 11Monday, December 11

Page 4: PWRI Quarterly Meeting Tentative Agenda

• 10:30 - Surface Systems: Alastair Simpson

• 10:45 - Break

• 11:00 - Soft Formations (Completions Skin): Tony Settari

• 11:45 to 1:15 - Lunch

• 1:15 - Soft Formations (Damage Model)

• 2:45 - Break

• 3:00 - Soft Formations (Other Data): Tony Settari

• 3:45 - Wrap up: Facilitators- T. Settari, J-L. Detienne

• 5:00 - Adjourn and agree on plans for any follow-on Evening events

• 10:30 - Surface Systems: Alastair Simpson

• 10:45 - Break

• 11:00 - Soft Formations (Completions Skin): Tony Settari

• 11:45 to 1:15 - Lunch

• 1:15 - Soft Formations (Damage Model)

• 2:45 - Break

• 3:00 - Soft Formations (Other Data): Tony Settari

• 3:45 - Wrap up: Facilitators- T. Settari, J-L. Detienne

• 5:00 - Adjourn and agree on plans for any follow-on Evening events

Monday, December 11Monday, December 11

Page 5: PWRI Quarterly Meeting Tentative Agenda

• 8:45 -Convene at Chevron’s Facility

• 9:00 - Tasks 2 and 4: Matrix Injection, Stimulation Ahmed Abou-Sayed

• Day is devoted to Tasks 2 and 4 - integrated format based on “The Toolbox”

– Data Management Tool

– Wellbore Hydraulics Tool

– Soft Formations Completions Tool

– Radial Damage Model

– Multilayer Injection Tool(s)

– Multilateral Injection Tool

• 8:45 -Convene at Chevron’s Facility

• 9:00 - Tasks 2 and 4: Matrix Injection, Stimulation Ahmed Abou-Sayed

• Day is devoted to Tasks 2 and 4 - integrated format based on “The Toolbox”

– Data Management Tool

– Wellbore Hydraulics Tool

– Soft Formations Completions Tool

– Radial Damage Model

– Multilayer Injection Tool(s)

– Multilateral Injection Tool

Tuesday, December 12Tuesday, December 12

Page 6: PWRI Quarterly Meeting Tentative Agenda

– Fracture Growth Model – Damage Accumulation Model

– Stimulation/Mitigation Selection Model

– Stress changes due to poro- and thermoelastic effects

– Economics Model

– Multilateral Injection Tool

– Fracture Growth Model

• Lunch - 12:00 - 1:15 p.m.

• 4:30 - Wrap Up - Facilitators

• 5:00 - Adjourn and coordinate dinner

– Fracture Growth Model – Damage Accumulation Model

– Stimulation/Mitigation Selection Model

– Stress changes due to poro- and thermoelastic effects

– Economics Model

– Multilateral Injection Tool

– Fracture Growth Model

• Lunch - 12:00 - 1:15 p.m.

• 4:30 - Wrap Up - Facilitators

• 5:00 - Adjourn and coordinate dinner

Tuesday, December 12Tuesday, December 12

Page 7: PWRI Quarterly Meeting Tentative Agenda

• 8:45 -Convene at Chevron’s Facility

Horizontal Injectors - Focus for the Entire Day

• 9:00 - Horizontal Well Injectivity: Tony Settari

• 10:00 - Horizontal Well Injectivity: Ahmed Abou-Sayed

• 10:45 - Break

• 11:00 - Horizontal Well Injectivity - Continued

• 11:45 - Lunch

• 1:00 - Case Study - Horizontal Injector: T. Settari

• 2:00 - Wrap Up: Facilitators, T. Settari, L. Murray

• 5:00 - Adjourn and agree on plans for any follow-on evening events.

• 8:45 -Convene at Chevron’s Facility

Horizontal Injectors - Focus for the Entire Day

• 9:00 - Horizontal Well Injectivity: Tony Settari

• 10:00 - Horizontal Well Injectivity: Ahmed Abou-Sayed

• 10:45 - Break

• 11:00 - Horizontal Well Injectivity - Continued

• 11:45 - Lunch

• 1:00 - Case Study - Horizontal Injector: T. Settari

• 2:00 - Wrap Up: Facilitators, T. Settari, L. Murray

• 5:00 - Adjourn and agree on plans for any follow-on evening events.

Wednesday, December 13Wednesday, December 13

Page 8: PWRI Quarterly Meeting Tentative Agenda

• 8:45 -Convene at Chevron’s Facility

• 9:00 - Sponsors Only - Closed Door Session Agenda Items could include:

– Location and timing of next meeting.– What action needs to be taken to ensure

appropriate deliverables are met within the time available.

– What changes in direction are required - fine (or heavy duty) tuning?

– Most phases of the contract are scheduled to end early 2001. The project is oversolicited. What should be done with remaining funds?

• 8:45 -Convene at Chevron’s Facility

• 9:00 - Sponsors Only - Closed Door Session Agenda Items could include:

– Location and timing of next meeting.– What action needs to be taken to ensure

appropriate deliverables are met within the time available.

– What changes in direction are required - fine (or heavy duty) tuning?

– Most phases of the contract are scheduled to end early 2001. The project is oversolicited. What should be done with remaining funds?

Thursday, December 14Thursday, December 14

Page 9: PWRI Quarterly Meeting Tentative Agenda

PWRI Financial StatusPWRI Financial Status

December 11-14 - Houston, Texas

Page 10: PWRI Quarterly Meeting Tentative Agenda

First InstallmentSponsorsInvoiced Received

AGIP 50,000 50,000BP 50,000 50,000Canadian Petroleum 21,642 21,642Chevron 50,000 50,000Conoco 50,000 50,000Elf 50,000 50,000Kerr-McGee 50,000 50,000

Maersk 50,000 50,000Marathon 50,000 50,000Mobil 50,000 50,000Norsk Hydro 50,000 50,000Pan Canadian 50,000 50,000Petrobras 50,000 50,000Phillips 50,000 50,000Shell 50,000 50,000Statoil 50,000 50,000Total 771,642 771,642

First Installment Second Installment Third InstallmentInvoiced Invoiced Received Invoiced Received

50,000 50,000 50,000 50,00050,000 50,000 50,000 50,000

- - - -50,000 50,000 50,000 50,00050,000 50,000 50,000 50,00050,000 50,000 50,000 50,00050,000 50,000 50,000 50,000

50,000 50,000 50,000 50,00050,000 50,000 50,000 50,00050,000 50,000 50,000 50,00050,000 50,000 50,000 50,00050,000 50,000 50,000 50,00050,000 50,000 50,000 50,00050,000 50,000 50,000 50,00050,000 50,000 50,000 50,00050,000 50,000 50,000 50,000

750,000 750,000 750,000 750,000

Produced Water Re-Injection Project Financial SummaryNovember 30, 2000

Produced Water Re-Injection Project Financial SummaryNovember 30, 2000

Page 11: PWRI Quarterly Meeting Tentative Agenda

Produced Water Re-Injection Project Financial SummaryNovember 30, 2000

Produced Water Re-Injection Project Financial SummaryNovember 30, 2000

Anticipated ProjectTotal:

2,271,642 (15 sponsors for 3 years +$21,642.00 from Canadian Petroleum)

Accounts Receivable: 0

Cash Received: 2,271,642

GRI Fee (pro rata from 1 J uly 1998) 107,090

GRI Travel and Meeting Expenses 6,431

Randy Seright Travel Expenses 503

Bank Wire Transfer Fees 129

Unbudgeted Travel (Prior to 9/00) 17,153

September Travel(Invoices received prior to 10/31)

5,987

Total Project Cost 1,387,760

Page 12: PWRI Quarterly Meeting Tentative Agenda

Produced Water Re-Injection Project Financial SummaryNovember 30, 2000

Produced Water Re-Injection Project Financial SummaryNovember 30, 2000

Contractor Total Cost ofProject

Total Cost thru11/ 30/ 2000

AmountRemaining

Duke Engineering/Taurus 285,249 233,082 52,167e-First (Phalanx) 113,300 111,350 1,950Heriot-Watt University 239,808 243,033 <-3,225>TerraTek 354,313 275,907 78,406Triangle Engineering 148,700 111,095 37,605V.I .P.S. 50,000 50,000 0Advantek International 342,369 226,000 116,369GRI 119,263 113,521 5,742Total Subcontract Cost 1,653,002 1,363,988 289,014

Page 13: PWRI Quarterly Meeting Tentative Agenda

Produced Water Re-Injection Project Financial SummaryNovember 30, 2000

Produced Water Re-Injection Project Financial SummaryNovember 30, 2000

Contractor Contract$

Travel andODC

EstimatedFutureTravel

Total

Duke $271,396 $3,853 - $275,249Triangle $138,700 - $10,000 $148,700TerraTek $337,996 $6,317 $10,000 $354,313Heriot Watt $223,045 $16,763 - $239,808Phalanx $113,300 - - $113,300VIPS $50,000 - - $50,000Advantek $317,000 $5,369 $20,000 $342,369GRI $110,200 $6,431 $116,631Taurus - - $10,000 $10,000Misc. (Bank fees,non-contractor travel)

$632 $2,000 $2,632

Total $1,561,637 $39,365 $52,000 $1,653,002Anticipated Revenue - - - $2,271,642Anticipated Balance atCompletion

- - - $618,640

Page 14: PWRI Quarterly Meeting Tentative Agenda

Task SummaryTask Summary

December 11-14 - Houston, Texas

Page 15: PWRI Quarterly Meeting Tentative Agenda

• Collection, collation and empirical evaluation of field information.

• Collection, collation and empirical evaluation of field information.

Task 1: Monitoring Deliverables

Task 1: Monitoring Deliverables

• [DONE]• [DONE]

Page 16: PWRI Quarterly Meeting Tentative Agenda

• Summary of the physical mechanisms affecting injectivity, propagation and containment.

• Summary of the physical mechanisms affecting injectivity, propagation and containment.

Task 1: Monitoring Deliverables

Task 1: Monitoring Deliverables

• In Progress• In Progress

Page 17: PWRI Quarterly Meeting Tentative Agenda

• Review and evaluation of currently available monitoring and well performance procedures for definition of matrix injection effectiveness and/or fracture growth and morphology.

• Review and evaluation of currently available monitoring and well performance procedures for definition of matrix injection effectiveness and/or fracture growth and morphology.

Task 1: Monitoring Deliverables

Task 1: Monitoring Deliverables

• Fracture Models• Monitoring Methods

• Fracture Models• Monitoring Methods

Page 18: PWRI Quarterly Meeting Tentative Agenda

• Testing of available tools against field data sets and empirical determinations, where possible.

• Testing of available tools against field data sets and empirical determinations, where possible.

Task 1: Monitoring Deliverables

Task 1: Monitoring Deliverables

• Included in Best Practices as Examples

• Included in Best Practices as Examples

Page 19: PWRI Quarterly Meeting Tentative Agenda

• Definition of limitations and required improvements in monitoring and predictive procedures.

• Definition of the merits of improving specific tools and/or monitoring protocols.

• Definition of limitations and required improvements in monitoring and predictive procedures.

• Definition of the merits of improving specific tools and/or monitoring protocols.

Task 1: Monitoring Deliverables

Task 1: Monitoring Deliverables

• First is [DONE]• Ready for

second• Models• Tools

• First is [DONE]• Ready for

second• Models• Tools

Page 20: PWRI Quarterly Meeting Tentative Agenda

• Best Practices• Best Practices

Task 1: Monitoring Deliverables

Task 1: Monitoring Deliverables

• Fracture Models• Monitoring Methods

• Fracture Models• Monitoring Methods

Page 21: PWRI Quarterly Meeting Tentative Agenda

• Acquisition and processing of field and public-domain information.

• Acquisition and processing of field and public-domain information.

Task 2: Matrix Injection Deliverables

Task 2: Matrix Injection Deliverables

• Data Evaluation [DONE]

• Literature Review [DONE by HWU]

• Summary of Models [DONE by HWU]

• Data Evaluation [DONE]

• Literature Review [DONE by HWU]

• Summary of Models [DONE by HWU]

Page 22: PWRI Quarterly Meeting Tentative Agenda

• Information Management

• Information Management

Task 2: Matrix Injection Deliverables

Task 2: Matrix Injection Deliverables

• Advantek will demonstrate Toolbox shell.

• Advantek will demonstrate Toolbox shell.

Page 23: PWRI Quarterly Meeting Tentative Agenda

• Analysis• Analysis

Task 2: Matrix Injection Deliverables

Task 2: Matrix Injection Deliverables

• Mostly applicable to Task 3.

• Mostly applicable to Task 3.

Page 24: PWRI Quarterly Meeting Tentative Agenda

• Protocols• Best Practices

• Protocols• Best Practices

Task 2: Matrix Injection Deliverables

Task 2: Matrix Injection Deliverables

• Coreflooding guidelines [DONE by HWU]

• Thermal Properties• Synthesize• Toolbox• Analog to PEA-23

correlation?

• Coreflooding guidelines [DONE by HWU]

• Thermal Properties• Synthesize• Toolbox• Analog to PEA-23

correlation?

Page 25: PWRI Quarterly Meeting Tentative Agenda

• Acquisition and processing of field and public-domain information.

• Acquisition and processing of field and public-domain information.

Task 3: Soft Formations Deliverables

Task 3: Soft Formations Deliverables

• ELF 3, Statoil Heidrun, Marathon Brae, Phillips, Kerr McGee and public Shell data [DONE].

• Update comparison table of soft formation data sets.

• Analyze Brage data.

• ELF 3, Statoil Heidrun, Marathon Brae, Phillips, Kerr McGee and public Shell data [DONE].

• Update comparison table of soft formation data sets.

• Analyze Brage data.

Page 26: PWRI Quarterly Meeting Tentative Agenda

Task 3: Soft Formations Deliverables

Task 3: Soft Formations Deliverables

• Determine physical and chemical mechanisms impacting completion, forecasting and injection management.

• Incorporate in Best Practices.

• Determine physical and chemical mechanisms impacting completion, forecasting and injection management.

• Incorporate in Best Practices.

• Development of a simple but realistic damage model. [DONE]

• Applied to a number of data sets. [DONE]

• Stress calculation spreadsheet tool. [DONE]

• Development of a simple but realistic damage model. [DONE]

• Applied to a number of data sets. [DONE]

• Stress calculation spreadsheet tool. [DONE]

Page 27: PWRI Quarterly Meeting Tentative Agenda

Task 3: Soft Formations Deliverables

Task 3: Soft Formations Deliverables

• Review of current PWRI well performance capabilities in soft formations, above and below fracture initiation pressures.

• Review of current PWRI well performance capabilities in soft formations, above and below fracture initiation pressures.

• DONE• DONE

Page 28: PWRI Quarterly Meeting Tentative Agenda

Task 3: Soft Formations Deliverables

Task 3: Soft Formations Deliverables

• Exercise models• Assess applicability • If possible, calibrate

existing modeling capability for PWRI in soft formations above and below fracture initiation and/or propagation pressures.

• Exercise models• Assess applicability • If possible, calibrate

existing modeling capability for PWRI in soft formations above and below fracture initiation and/or propagation pressures.

• Spreadsheet model for progressive damage in matrix flow [DONE].

• Applied to five wells of the Shell GOM data and to two ELF3 wells [DONE].

• Spreadsheet model for progressive damage in matrix flow [DONE].

• Applied to five wells of the Shell GOM data and to two ELF3 wells [DONE].

Page 29: PWRI Quarterly Meeting Tentative Agenda

Task 3: Soft Formations Deliverables

Task 3: Soft Formations Deliverables

• Best Practices• Best Practices • Completions Selection Worksheet [DONE]

• Injectivity (skin) of completions [DONE]

• Synthesize

• Completions Selection Worksheet [DONE]

• Injectivity (skin) of completions [DONE]

• Synthesize

Page 30: PWRI Quarterly Meeting Tentative Agenda

• Acquisition and consolidation of field data with special emphasis on methods for preventing and/or removing damage accumulation.

• Acquisition and consolidation of field data with special emphasis on methods for preventing and/or removing damage accumulation.

Task 4: Stimulation/Mitigation Deliverables

Task 4: Stimulation/Mitigation Deliverables

• [DONE]• [DONE]

Page 31: PWRI Quarterly Meeting Tentative Agenda

• Acquisition• Acquisition

Task 4: Stimulation/Mitigation Deliverables

Task 4: Stimulation/Mitigation Deliverables

• Toolbox• Toolbox

Page 32: PWRI Quarterly Meeting Tentative Agenda

• Analysis• Analysis

Task 4: Stimulation/Mitigation Deliverables

Task 4: Stimulation/Mitigation Deliverables

• All available field data have been analyzed.

• Toolbox shell• Analogs and averages• Data management

• All available field data have been analyzed.

• Toolbox shell• Analogs and averages• Data management

Page 33: PWRI Quarterly Meeting Tentative Agenda

• Well Testing• Well Testing

Task 4: Stimulation/Mitigation Deliverables

Task 4: Stimulation/Mitigation Deliverables

• Task 1• Real-time damage

model

• Task 1• Real-time damage

model

Page 34: PWRI Quarterly Meeting Tentative Agenda

• Damage Effects and Agents

• Damage Effects and Agents

Task 4: Stimulation/Mitigation Deliverables

Task 4: Stimulation/Mitigation Deliverables

• Real-time damage model

• Real-time damage model

Page 35: PWRI Quarterly Meeting Tentative Agenda

• Review of available stimulation and mitigation techniques

• Review of available stimulation and mitigation techniques

Task 4: Stimulation/Mitigation Deliverables

Task 4: Stimulation/Mitigation Deliverables

• Tie in with Task 5.• Newsletter article• Ongoing

• Tie in with Task 5.• Newsletter article• Ongoing

Page 36: PWRI Quarterly Meeting Tentative Agenda

• Economics• Economics

Task 4: Stimulation/Mitigation Deliverables

Task 4: Stimulation/Mitigation Deliverables

• To be presented by Advantek

• To be presented by Advantek

Page 37: PWRI Quarterly Meeting Tentative Agenda

• Best Practices• Best Practices

Task 4: Stimulation/Mitigation Deliverables

Task 4: Stimulation/Mitigation Deliverables

• Ongoing• Integrated with

Toolbox• Surface Systems

• Ongoing• Integrated with

Toolbox• Surface Systems

Page 38: PWRI Quarterly Meeting Tentative Agenda

• Acquire, review and process existing field data, experimental data and public domain knowledge on the effect of variations in rock properties on injection well vertical sweep.

• Acquire, review and process existing field data, experimental data and public domain knowledge on the effect of variations in rock properties on injection well vertical sweep.

Task 5: Layered Formations Deliverables

Task 5: Layered Formations Deliverables

• Ongoing• Incorporate Workshop

in Best Practices• Monitoring and

Testing

• Ongoing• Incorporate Workshop

in Best Practices• Monitoring and

Testing

Page 39: PWRI Quarterly Meeting Tentative Agenda

• Detailed determination of the effect of differential damage.

• Identify techniques to quantify PWRI in layered formations.

• Detailed determination of the effect of differential damage.

• Identify techniques to quantify PWRI in layered formations.

Task 5: Layered Formations Deliverables

Task 5: Layered Formations Deliverables

Page 40: PWRI Quarterly Meeting Tentative Agenda

• Layered Formations Workshop

• Define Best Practices and summarize available options to minimize the impact of rock property variations on injectivity.

• Layered Formations Workshop

• Define Best Practices and summarize available options to minimize the impact of rock property variations on injectivity.

Task 5: Layered Formations Deliverables

Task 5: Layered Formations Deliverables

• Workshop [“DONE”]• Best Practices - Ongoing

• Workshop [“DONE”]• Best Practices - Ongoing

Page 41: PWRI Quarterly Meeting Tentative Agenda

Task 6: Horizontal Injectors Deliverables

Task 6: Horizontal Injectors Deliverables

• Sub-Task 6.1: Acquisition of Available Data

• Sub-Task 6.1: Acquisition of Available Data

• BP Amoco and Maersk

• BP Amoco and Maersk

Page 42: PWRI Quarterly Meeting Tentative Agenda

Task 6: Horizontal Injectors Deliverables

Task 6: Horizontal Injectors Deliverables

• Sub-Task 6.2: Empirical Correlations/ Physical Behavior

• Sub-Task 6.2: Empirical Correlations/ Physical Behavior

Page 43: PWRI Quarterly Meeting Tentative Agenda

Task 6: Horizontal Injectors Deliverables

Task 6: Horizontal Injectors Deliverables

• Sub-Task 6.3: Wellbore Hydraulics, Injectivity and Flow/Pressure Regimes.

• For input into Best Practices/Toolbox

• Sub-Task 6.3: Wellbore Hydraulics, Injectivity and Flow/Pressure Regimes.

• For input into Best Practices/Toolbox

• Theoretical aspects of flow in horizontals, with emphasis on methods for simulation. [DONE]

• Theoretical aspects of flow in horizontals, with emphasis on methods for simulation. [DONE]

Page 44: PWRI Quarterly Meeting Tentative Agenda

Task 6: Horizontal Injectors Deliverables

Task 6: Horizontal Injectors Deliverables

• Sub-Task 6.4: Matrix vs. Single vs. Multiple Fracturing

• Sub-Task 6.4: Matrix vs. Single vs. Multiple Fracturing

• V.I.P.S. simulation • Sensitivities

• V.I.P.S. simulation • Sensitivities

Page 45: PWRI Quarterly Meeting Tentative Agenda

Task 6: Horizontal Injectors Deliverables

Task 6: Horizontal Injectors Deliverables

• Sub-Task 6.5: Thermal and Poroelastic Effects

• Sub-Task 6.5: Thermal and Poroelastic Effects

Page 46: PWRI Quarterly Meeting Tentative Agenda

Task 6: Horizontal Injectors Deliverables

Task 6: Horizontal Injectors Deliverables

• Sub-Task 6.6: Economics

• Sub-Task 6.6: Economics

• Merged with Economics Task

• Merged with Economics Task

Page 47: PWRI Quarterly Meeting Tentative Agenda

Task 6: Horizontal Injectors Deliverables

Task 6: Horizontal Injectors Deliverables

• Sub-Task 6.7: Guidelines for Best Practice and Diagnostic Tools

• Sub-Task 6.7: Guidelines for Best Practice and Diagnostic Tools

Page 48: PWRI Quarterly Meeting Tentative Agenda

Progress Since September

• Finalize PC version specifications• Initial PC version• Additional refinement of data entry

utility

Progress Since September

• Finalize PC version specifications• Initial PC version• Additional refinement of data entry

utility

Task 7: DatabaseTask 7: Database

Page 49: PWRI Quarterly Meeting Tentative Agenda

PC Version

• PC version and Internet version complete in Feb 2001.

• You will use your Internet browser to run it, and it will work exactly the same as the internet version.

• It will include a greatly simplified data entry program.

PC Version

• PC version and Internet version complete in Feb 2001.

• You will use your Internet browser to run it, and it will work exactly the same as the internet version.

• It will include a greatly simplified data entry program.

Task 7: DatabaseTask 7: Database

Page 50: PWRI Quarterly Meeting Tentative Agenda

PC Version System Requirements

• Windows 95, 98, NT 4.0, or 2000• Personal Web Server (PWS). PWS is

free and readily available.• Microsoft Access 97 or 2000.• 32 Mb of RAM (128 is recommended)• 200 Mb of hard disk space

PC Version System Requirements

• Windows 95, 98, NT 4.0, or 2000• Personal Web Server (PWS). PWS is

free and readily available.• Microsoft Access 97 or 2000.• 32 Mb of RAM (128 is recommended)• 200 Mb of hard disk space

Task 7: DatabaseTask 7: Database

Page 51: PWRI Quarterly Meeting Tentative Agenda

Database Change

The Internet Version currently runs with an Oracle database server. The new Internet version and the PC version use Microsoft Access. The reasons for the change are:

Database Change

The Internet Version currently runs with an Oracle database server. The new Internet version and the PC version use Microsoft Access. The reasons for the change are:

Task 7: DatabaseTask 7: Database

Page 52: PWRI Quarterly Meeting Tentative Agenda

Consequences of Database Change

• Modifications are required to the application as well as the data entry program.

• Some functionality is not yet available with the new database. This includes unit conversions.

Consequences of Database Change

• Modifications are required to the application as well as the data entry program.

• Some functionality is not yet available with the new database. This includes unit conversions.

Task 7: DatabaseTask 7: Database

Page 53: PWRI Quarterly Meeting Tentative Agenda

Database Change

1. The amount of data stored in the database is smaller than originally anticipated.

2. Oracle is difficult to manage without a lot of experience, and therefore is not a good

solution for the PC version.3. Allows for one program to maintained for

both the Internet and PC.4. Access is cheap and easy to manage.

Database Change

1. The amount of data stored in the database is smaller than originally anticipated.

2. Oracle is difficult to manage without a lot of experience, and therefore is not a good

solution for the PC version.3. Allows for one program to maintained for

both the Internet and PC.4. Access is cheap and easy to manage.

Task 7: DatabaseTask 7: Database

Page 54: PWRI Quarterly Meeting Tentative Agenda

What Does it Look Like? What Does it Look Like?

Task 7: DatabaseTask 7: Database

Page 55: PWRI Quarterly Meeting Tentative Agenda

Task 8: Field Validation

Task 9: Economics

Task 8: Field Validation

Task 9: Economics