Page 1: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

1

Profiling Working GroupProfiling Working Group

PWG Update Report

By

Brad Bolesof Cirro Energy

ERCOT PWG Vice-Chair

for

COPS Meeting

August 12, 2008

Page 2: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

2

Profiling Working GroupProfiling Working Group

Updated PWG 2008 Goals (ranked by Target Date)

Page 3: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

3

Profiling Working GroupProfiling Working Group

18. Distributive Generation load profiling implementation (PRR756 and LPGRR030)18. Distributive Generation load profiling implementation (PRR756 and LPGRR030)A. Minimum language for 1/1/09 implementationA. Minimum language for 1/1/09 implementationB. Other issues with DRG being resolved on other projectsB. Other issues with DRG being resolved on other projects

1. Implementation of LRS sample selection round two 1. Implementation of LRS sample selection round twoA. Meters installedA. Meters installedB. Ongoing operation of data collection has begun in earnestB. Ongoing operation of data collection has begun in earnestC. Presentation is key document at July PWG meetingC. Presentation is key document at July PWG meeting

4. Review 2007 UFE Analysis (final complete, true-up pending) 4. Review 2007 UFE Analysis (final complete, true-up pending)

A. Presentation is key document at July PWG meetingA. Presentation is key document at July PWG meeting

http://www.ercot.com/content/meetings/pwg/keydocs/2008/0723/UFEAnalysis2007_Final_071408.ppthttp://www.ercot.com/content/meetings/pwg/keydocs/2008/0723/UFEAnalysis2007_Final_071408.ppt

Completed Projects YTDCompleted Projects YTD

Page 4: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

4

Profiling Working GroupProfiling Working Group

10. Review IDR installation procedure language to ensure compliance 10. Review IDR installation procedure language to ensure compliance A. Project pertains to Chapter 18 ProtocolsA. Project pertains to Chapter 18 ProtocolsB. Pending AMR Rule, AMIT and DGTFB. Pending AMR Rule, AMIT and DGTFC. Language might be written into the Resource ID area by DGTFC. Language might be written into the Resource ID area by DGTF

18b. Distributive Generation load profiling implementation issues 18b. Distributive Generation load profiling implementation issuesA. Pending AMR Rule, AMIT and DGTF A. Pending AMR Rule, AMIT and DGTF B. LPGRR being drafted B. LPGRR being drafted

2. 2008 Annual Validation 2. 2008 Annual Validation

A. On scheduleA. On scheduleB. Presentation is key document at July PWG meeting B. Presentation is key document at July PWG meeting

17. Advanced Metering Implementation LPG changes if needed 17. Advanced Metering Implementation LPG changes if neededA. Pending AMR Rule, AMIT and DGTF A. Pending AMR Rule, AMIT and DGTF B. LPGRR being drafted B. LPGRR being drafted

Active ProjectsActive Projects

Page 5: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

5

Profiling Working GroupProfiling Working Group

7. IDR Analysis – 2 issues outstanding from original analysis7. IDR Analysis – 2 issues outstanding from original analysisA. September PWG agenda itemA. September PWG agenda itemB. Pertains to the minimum IDR requirement final recommendations for B. Pertains to the minimum IDR requirement final recommendations for additional study using load research data additional study using load research dataC. AMR Rule, AMIT and DGTF may affect scopeC. AMR Rule, AMIT and DGTF may affect scope

Up-coming ProjectUp-coming Project

Page 6: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

6

Profiling Working GroupProfiling Working Group

5. Examine ways to accommodate extreme events in Settlement process5. Examine ways to accommodate extreme events in Settlement processA. AMR Rule, AMIT and DGTF may affect scope and life of load profilingA. AMR Rule, AMIT and DGTF may affect scope and life of load profiling

14. Review analysis of DLC demonstration programs (Pilot) 14. Review analysis of DLC demonstration programs (Pilot)A. Waiting for CCET A. Waiting for CCET

16. LPGRR language Chapter 15 for consistency with PUCT Load Research Rule 16. LPGRR language Chapter 15 for consistency with PUCT Load Research RuleA. Low PriorityA. Low PriorityB. AMR Rule, AMIT and DGTF may affect scope and life of load profilingB. AMR Rule, AMIT and DGTF may affect scope and life of load profiling

Parked Projects YTDParked Projects YTD

Page 7: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

7

Profiling Working GroupProfiling Working Group

These projects are either on hold per the market request, pending AMR rules, AMIT, These projects are either on hold per the market request, pending AMR rules, AMIT, DGTF, or Advanced Metering saturation, or require considerable time by ERCOT DGTF, or Advanced Metering saturation, or require considerable time by ERCOT Load Profiling Staff. The PWG has tabled these items until further developments Load Profiling Staff. The PWG has tabled these items until further developments warrant activity orwarrant activity or if the COPS and the TAC reconsiders priority. if the COPS and the TAC reconsiders priority.

Not expected to be completed in 2008Not expected to be completed in 2008

Page 8: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

8

Profiling Working GroupProfiling Working Group

LPGRR Drafts in progress

• To change the decision tree to accommodate DRG issues with the Interconnection Agreement and latest DGTF market agreements on IDR metering and Resource ID.

• Change to the decision tree the valid profile ID combinations to comply with PRR766 and NPRR136, Interim Solution for 15-Minute Settlement of Advanced Meters for weather sensitive IDR profiles for Residential.

Page 9: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

9

Profiling Working GroupProfiling Working Group

Page 10: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

10

Profiling Working GroupProfiling Working Group

Page 11: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

11

Profiling Working GroupProfiling Working Group

Page 12: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

12

Profiling Working GroupProfiling Working Group

Page 13: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

13

Profiling Working GroupProfiling Working Group

Page 14: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

14

Profiling Working GroupProfiling Working Group

Page 15: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

15

Profiling Working GroupProfiling Working Group

Page 16: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

16

Profiling Working GroupProfiling Working Group

Page 17: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

17

Profiling Working GroupProfiling Working Group

Page 18: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

18

Profiling Working GroupProfiling Working Group

Page 19: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

19

Profiling Working GroupProfiling Working Group

Page 20: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

20

Profiling Working GroupProfiling Working Group

Page 21: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting

21

Profiling Working GroupProfiling Working Group

Full UFE Presentation at July PWG meetinghttp://www.ercot.com/calendar/2008/07/20080723-PWG

Page 22: PWG Update Report By Brad Boles of Cirro Energy ERCOT PWG Vice-Chair for COPS Meeting