Global Solar Installations
U.S. projects European Projects Asian Projects
1MW
Livermore, CA
120kW
Santa Clara, CA
80kW
Anaheim, CA
.5 MW
Phoenix, AZ
1.15 MW
La Mirada, CA
1MW
Vrapice, Czech Republic
1.1 MW
Kaohsiung Taiwan
1.5 MW
Taichung, Taiwan
300KWCzech Rep.
Confidential 4
MW Solar System Block Diagram
1 - 64.8kWp 60kW Inverter
2 - 64.8kWp 60kW Inverter
8 - 64.8kWp 60kW Inverter
259 kWp Modular Block
259 kWp Modular Block
259 kWp Modular Block
259 kWp Modular Block
310Wp Panels, 19 Panels per
string, 11 Strings per Inverter
500kW AC
Combiner
500kW AC
Combiner
UTILITY
GRID
1MVA
Transformer
SCADA
(Monitoring
&
Control)
Confidential 6
MW Solar System (Modular) design
1. Vertical module layout saves up to 22.6% of racking material.
2. For 1MWp modular design, capacity to area ratio is 9.2Wp/sqft (total area includes
road area is 112,612 sqft)
Confidential 8
Modular design benefits No DC combiner boxes, less cable / wiring and reduced DC losses
More efficient system and extra power generation
Inverter mounted on Racking, NO additional space for Inverter
Easy & Quick maintenance and NO system down time.
Optimized Modular system blocks of 250kW Blocks and Design
Each 250kW Blocks utilizes area of 25220 SqFt
Total Area needed for 1 MWp system is 107344 SqFt (2.47 Acres)
Ground mount PV Panel density ; 9.7 W/SqFt
Modular 250kW blocks can be expanded to ‘N’ number of blocks
Each 250kW blocks having 4 sub-groups of 64kWp
Optimized Tilt angle selected based on site co-ordinates
Standard ground mount system tilt angles 10, 15, 20, 25 and 30 Deg.
Inter-row spacing optimized based on shade effects and duration
Racking system material and hardware selected based on site conditions
Racking materials designed to withstand 90 MPH Wind speed
Ground screw design can accommodate different kind of soil condition
Smart Inverters with Utility SCADA communication
Built-in AC/DC disconnect and No DC combiners needed
Smart control features (Active/Reactive/Ramp)
Weather station (Wind, Temperature and Irradiation) measurements
UV resistant PV cables and Conduit run power cables
Underground Cable trenches and routing
Vandal protection secured Surveillance
Remote site power management, Cloud based System monitoring
250kW Block
Confidential 9
Benefits
Multi Mega Watt Project Development Experience
Commercial and Utility Scale projects
In-house Products and Quality control
Modular System Blocks and Design
Easy Expansion and quick deployment
Smart Utility SCADA communication option
Easy control smart features (Active/Reactive/Ramp) option
Easy and Quick Installation and less variances
No upfront Engineering cost, predefined engineering
In-house components, better reliability and warranty service
Very Short Payback (3 Years to 6 Years), depends on Incentive
and Tax benefits.
Confidential 10
1000 to 2800mm Size
Screw extension
Easy & Quick installation
Easy shipping/ Storage
Less labor / cost
Reliable and long lasting
Good for all soil type
Ground Screw details
Confidential
Renewable Hybrid Energy Solutions
Telecom cell Site
Off-shore Oil Platform
Oil Pump Jack/Mining
Remote VillageWater Pump
Market Applications
Military
Radar/TV Stations
Micro-grid Control Panel
Battery Mgmt. System
Solar System
Utility Power
Generator
Battery Bank
Remote App Monitoring
Fuel cell
Wind TurbineWind
Controller
Dump load
Resources
Utility Substations125Vdc
48Vdc
ORION – the Web GUI
– Nice graphical
design
– Simple and
intuitive menu
structure
18
• Open/close a submenu by clicking the menu title
Confidential
AT&T Micro grid and Cooling Solutions
Benefits to the customer:
Payback 2 year
US $43K annual fuel saving and US $10.6K annual
maintenance of one generator.
45 tons/years of Reduction of CO2 emissions.
Solutions: G2 Microgrid + Hybrid Cooling
Location: Highway Mexico-Puebla km41
Load: 2.4kW @ 48Vdc,
3.4kW @ 220Vac Air-conditioners.
Solar: 12kW Battery: 62.4.8kWh
Completion time: March, 2014
Solar + Diesel generator
Confidential
Micro grid Solutions for TELEFONICA
MEXICO
Benefits to the customer:
US26K annual fuel saving and US$10K annual maintenance of
generator
2 tons of Reduction of CO2 emissions.
Remove Diesel generator to another site.
Delta Turn-key Project: G2 Microgrid
Location: Tuliman, Mexico
Load: 760W@48Vdc
Solar: 6kW Battery: 28.8kWh
Completion time: Dec., 2013
Confidential
22
Telecom Hybrid Energy System
(Europe and Africa)
200+ systems deployed succesfully
within 3 years.
Togo
Tunisia
Sierra Leone
Somalia
Ghana
South Africa
Kenya
Cameroon
Spain
Greece
Germany
Poland
Italy
Mexico
Confidential
Solar PV Hybrid solution for Telecom (5.25 kWp , BSNL Bangalore (India)
Reference Projects (India)
Confidential
25 different sites of Solar PV Hybrid solution for Telecom (10 kWp , GTL (India)
Reference Projects (India)
Confidential
East Coast Island (China)
– Solar panel: 15KWp
– Wind turbine: 10KWp
– Genset : 25KW
– Battery : 4000AH
– Customer: China Mobile
– Start operating: Dec. 2008
An-Hui Province (China)
– Solar panel : 2.6KWp
– Battery: 1200AH
– Customer : NSN South Africa
– Start Operating: Nov. 2009
Reference Projects (China)
Confidential
Chungli site (Taiwan)
– Solar panel: 2.64KWp
– Wind turbine: 1KWp
– Genset : 3KW
– Battery : 200AH
– Start operating: Dec. 2009
South Africa BTS site
– Solar panel : 2.6KWp
– Battery: 1200AH
– Customer : NSN South Africa
– Start Operating: Nov. 2009
Reference Projects (Taiwan & South Africa)
Confidential
Gurgaon (India)
– Solar panel: 1.38KWp
– TPS DPR4000&PSC3
– MPPT Charger
– Battery : 600AH
– Start operating: Oct. 2010
Kalanderpur (India)
– Solar panel : 10KWp
– MPPT Charger
– Customer : Viom
– Start Operating: Apr. 2010
Reference Projects (India)