    PVModuleEligibilityListingProcedure Updated3/26/09

    TheCaliforniaSolarInitiative(CSI)isforallmarketsegmentswiththeexceptionofNew

    ResidentialConstruction. TherequirementforPVmoduleeligibilityislistingtoUL1703which

    canbeperformedbythefollowingNationallyRecognizedTestingLaboratories(NRTL): UL,

    CSA,andIntertek(formerlyETL).

    TheprocessforaddingPVmodulesforCSIisasfollows:

    1. ThemanufacturergetstheirproductcertifiedtoUL1703. UL,CSA,andIntertekaretheNRTLswhocancurrentlyperformthistesting.

    PrivatelabelingofPVmodules:SomebusinesseswishtoprivatelabelPVmodulesforanothermanufacturer. Suchproductswillbeacceptedaseligibleshouldtheapplicationformbesubmittedwitha

    MultipleListeeletterfromthelistingagency(theNRTL). TheMultipleListeeprocessishowthelisting

    agency

    certifies

    private

    labeled

    products.

    The

    Multiple

    Listee

    letter

    is

    evidence

    of

    certification

    of

    the

    producttoUL1703.

    2. ThemanufacturerfillsouttheEnergyCommissionequipmentapplicationform,foundhere:http://gosolarcalifornia.org/equipment/documents/EQUIPMENT_REQUEST.DOC

    Note:STCPower,NOCT,PowerTemperatureCoefficient,andcellapertureareaareusedbytheEnergy

    CommissiontocalculatethemodulesPTCrating.Additionaltestreportsarenotrequiredto

    substantiatemanufacturerreportedvalues. Further,additionalPTCtestingisnotrequired;the

    Commissionassumes

    that

    the

    NOCT

    and

    Power

    Temperature

    Coefficient

    values

    are

    the

    result

    of

    appropriatetesting. IfamanufacturerdoeswishtoperformseparatePTCtesting,thatvaluemaybe

    reportedontheformandsubstantiatedwithatestreportonhowthevaluewasobtained.

    3. EmailacopyoftheUL1703CertificationLetterandtheEnergyCommissionequipmentapplicationformtoDariaMashnik.

    AlistingusingthismethodisvalidonlyuntilJuly1,2009. AfterJuly1,2009,inordertobe

    eligibleforincentiveinCalifornia,allPVmodulesmusthavebothlistingtoUL1703byaNRTL

    andadditionalperformanceparametertestingbyanILACaffiliatedlaboratory. SeeNSHPrequirementsbelowfordetails. TherewillbenograndfatheringforanyPVmodulesthathave

    beenpreviouslylistedaseligibleusingthemethodabove(UL1703only). Anymoduleswhich

    havenotcompletedtheadditionalperformanceparametertestingbyJuly1,2009willbe

    removedfromeligibilityforincentive.

    http://gosolarcalifornia.org/equipment/documents/EQUIPMENT_REQUEST.DOChttp://gosolarcalifornia.org/equipment/documents/EQUIPMENT_REQUEST.DOCmailto:[email protected]?subject=CEC%20PV%20Module%20Listingmailto:[email protected]?subject=CEC%20PV%20Module%20Listingmailto:[email protected]?subject=CEC%20PV%20Module%20Listingmailto:[email protected]?subject=CEC%20PV%20Module%20Listinghttp://gosolarcalifornia.org/equipment/documents/EQUIPMENT_REQUEST.DOC
  • 8/8/2019 Pv Eligibility Procedure

    2/6

    PVModuleEligibilityListingProcedure Updated3/26/09

    ModulesremovedfromeligibilityfornotacquiringtheperformanceparametertestingbyJuly

    1,2009mayreapplyforeligibilityoncetheperformanceparametertestinghasbeenperformed

    byanILACaffiliatedlaboratory.

    The

    PV

    module

    eligibility

    list

    is

    updated

    monthly

    on

    the

    first

    of

    the

    month.

    The

    cut

    off

    date

    for

    themonthlyupdateisthe15thdayoftheprecedingmonth;alldocumentationmustbe

    submittedbeforethisdate.

  • 8/8/2019 Pv Eligibility Procedure

    3/6

    PVModuleEligibilityListingProcedure Updated3/26/09

    TheNewSolarHomesPartnership(NSHP)isfortheNewResidentialConstructionmarket

    segment. TherequirementsofPVmoduleeligibilityarelistingtoUL1703byaNRTLand

    additionalperformanceparametertestingatanInternationalLaboratoryAccreditation

    Cooperation(ILAC)affiliatedlaboratory. ThefollowingisanonexhaustivelistofILAC

    affiliated

    laboratories:

    Bodycote(Canada) Metrology&TestingCenterofChinaElectronicsTechnologyGroupCorporationNo.

    18thResearchInstitute(China)

    Fraunhofer ISE,InstitutfrSolareEnergiesysteme(Germany) PIPhotovoltaikInstitutBerlinAG(Germany) TV(Germany) VDE(Germany) ElectronicsTest&DevelopmentCentre(Bangalore,India)61215ONLY

    European

    Solar

    Test

    Installation

    (Italy)

    EurotestLaboratoriSrL(Italy) JET(Tokyo,Japan) TVRheinlandJapan(Yokohama,Japan) CIEMATPVlabDER(Spain) FundacionCenerCIEMAT(Spain)61215ONLY FloridaSolarEnergyCenter(USA) IntertekTestingServicesNA,Inc.(USA) (formerlyknownasETL) TVRheinlandPTL,LLC(USA) (formerlyknownasASUPTL) ULPhotovoltaicTechnologyCenterofExcellence(USA)

    TheprocessforaddingequipmentforNSHPisasfollows:

    1. ThemanufacturergetstheirproductcertifiedtoUL1703. UL,CSA,andIntertekaretheNRTLswhocancurrentlyperformthistesting.

    2. ThemanufacturergetsadditionalperformanceparametertestingcompletedbyanILACaffiliatedlaboratoryaslistedabove. Detailedinformationonthetestscanbe

    foundontheequipmentrequestformdiscussedinStep3below. Theadditionalperformanceparametertestingrequiredisshownbelow:

  • 8/8/2019 Pv Eligibility Procedure

    4/6

    PVModuleEligibilityListingProcedure Updated3/26/09

    Crystallinemodules Thinfilmmodules

    IEC61215Sections: IEC61646Sections:

    10.2 MaximumPowerDetermination 10.2 MaximumPowerDetermination

    10.4 MeasurementofTemperatureCoefficients

    10.4 MeasurementofTemperatureCoefficients

    10.5 MeasurementofNOCT 10.5 MeasurementofNOCT

    10.6 PerformanceatSTCandNOCT 10.6 PerformanceatSTCandNOCT

    10.7 PerformanceatLowIrradiance 10.7 PerformanceatLowIrradiance

    10.18 LightSoaking

    Note:SpecialtestsetupisrequiredforNOCTdeterminationofBIPVmodules. BIPVNOCT

    determinationsetupisasfollows:

    Tiltangle:thetestBIPVmodulesshallbepositionedsothattheyaretiltedat23o5o(5:12roofpitch)tothehorizontal.

    Configuration:thetestBIPVmodulesshallbelocatedinthemiddleofanarraythatisatleastfourfeethighandfourfeetwide.Thearrayshallbesurroundedonallsideswithaminimumof

    threefeetofthebuildingsystemforwhichtheBIPVsystemisdesignedtobecompatible,andthe

    entireassemblyshallbeinstalledandsealedasspecifiedbythemanufacturerforanormal

    installation.

    Substrateandunderlayment:thetestBIPVmodulesshallbeinstalledonasubstrateoforientedstrandboardwithaminimumthicknessof15/32inchthatiscoveredby#30roofingfeltwitha

    minimumR

    10

    continuous

    insulation

    under

    and

    in

    contact

    with

    the

    oriented

    strand

    board

    and

    includeanyothermanufacturerrecommendedunderlayments.

    3. ThemanufacturerfillsouttheEnergyCommissionequipmentapplicationform,foundhere:http://gosolarcalifornia.org/equipment/documents/EQUIPMENT_REQUEST.DOC

    4. EmailacopyoftheUL1703CertificationLetter,theILAClaboratorytestreport,andtheEnergyCommissionequipmentapplicationformtoDariaMashnik.

    ThePVmoduleeligibilitylistisupdatedmonthlyonthefirstofthemonth. Thecutoffdateforthemonthlyupdateisthe15thdayoftheprecedingmonth;alldocumentationmustbe

    submittedbeforethisdate.

    http://gosolarcalifornia.org/equipment/documents/EQUIPMENT_REQUEST.DOChttp://gosolarcalifornia.org/equipment/documents/EQUIPMENT_REQUEST.DOCmailto:[email protected]?subject=CEC%20PV%20Module%20Listingmailto:[email protected]?subject=CEC%20PV%20Module%20Listingmailto:[email protected]?subject=CEC%20PV%20Module%20Listingmailto:[email protected]?subject=CEC%20PV%20Module%20Listinghttp://gosolarcalifornia.org/equipment/documents/EQUIPMENT_REQUEST.DOC
  • 8/8/2019 Pv Eligibility Procedure

    5/6

    PVModuleEligibilityListingProcedure Updated3/26/09

    Groupingofmodulesforperformanceparametertestingpurposes

    FortestingandreportingofperformancevaluesbyanILACaccreditedlaboratory,familiesof

    similarmodulesmaybegroupedtogethertoreducetherequirednumberoftests.

    Multiplemodelnumbersmaybeincludedinagroup,providedthatthemodelsareidentical

    except

    for

    the

    STC

    power

    rating.

    Identical

    applies

    to

    all

    of

    the

    following,

    but

    is

    not

    limited

    to:

    allmaterials,processes(includingcellprocess),celltechnology,cellsize,encapsulationsystem,

    superstrate,backsheet/substrate,cellinterconnectionmaterialsandtechniques,andinternal

    electriccircuitry.

    Foreachgroup,thefollowingtestsshallbeperformedonamodelnumberthathasaSTC

    powerratingthatiswithin95percent(roundedtothenearestWatt)ofthehighestSTCpower

    ratinginthegroup:

    1.Nominal

    Operating

    Cell

    Temperature

    (NOCT)

    determination

    2. Temperaturecoefficientofshortcircuitcurrent3. Temperaturecoefficientofopencircuitvoltage4. Temperaturecoefficientofmaximumpowercurrent5. Temperaturecoefficientofmaximumpowervoltage6. Temperaturecoefficientofmaximumpower

    Eachgroupcanbefurthercategorizedintosubgroupswhereonemodelnumberwillhave

    furthertestingperformed.Allmodelnumbersincludedinthesubgroupshallhavethesame

    numberofcells.ThesubgroupmaycontainmodelnumberssuchthatthehighestSTCpower

    ratinginthesubgroupis105percent(roundedtothenearestWatt)ofthesubgroupstestedmodelnumbersSTCratingandthelowestSTCpowerratinginthesubgroupis95percent

    (roundedtothenearestWatt)ofthesubgroupstestedmodelnumbersSTCrating. Thetested

    modelnumberineachsubgroupshallbetestedfor:

    AtSTC:

    1. Shortcircuitcurrent2. Opencircuitvoltage3. Currentatmaximumpower4. Voltageatmaximumpower5. Maximumpower

    AtmaximumpowerandNOCT:

    1. Current2. Voltage

  • 8/8/2019 Pv Eligibility Procedure

    6/6

    PVModuleEligibilityListingProcedure Updated3/26/09

    Atmaximumpowerandlowirradiance:

    1. Current2. Voltage

    Example: IfamanufacturerhasafamilyofidenticalmoduleswithSTCpowerratingsof

    160W,165W,170W,175W,180W,185W,190W,195W,and200W,thefollowing

    testingisrequired. Forthe190Wmodule,NOCTdeterminationandtemperature

    coefficienttestingshallbeperformed. Theresultsfromthesetestsareapplicabletothe

    entiregroupofmodules. Subgroupscanthenbecreatedasfollows:

    185W,190W,195W,and200W

    170W,175W,and180W

    160Wand165W

    Forthe190W,175W,and160Wmodules,thespecifiedvoltage,current,andmaximum

    powertestingatthefollowingconditionsshallbeperformed: STC,NOCT,andlow

    irradiance. Theresultsfromthesetestsareapplicabletothemodulesintherespective

    subgroup.