Page 1: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

PV Design Basics

Aaron Liggett

Applications Engineer

Jan. 27, 2017

San Diego, CA

Page 2: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

PV Design Basics

The fundamentals of PV design; session will provide a basic understanding of photovoltaic (PV) design.

What’s to come:

• Common practices

• String sizing

• Design considerations

• Safety

Page 3: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Typical Grid Tied Solar System

Top Down Process

• Modules

• DC cabling

• Racking

• Inverter

• Monitoring

• Interconnection

Note: When grid power is lost the PV system will disconnect.

Page 4: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Why Sizing and Design is Important

• Do not want to exceed 100% yearly offset

• Visually appealing

• Compensate for customers needs/requests

• Comply with NEC and HOA requirements

• Safety

Page 5: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

System Design Process

Customers usage:

• Yearly energy usage can be found on utility bill.

Things to Consider:

• Inefficiencies in home

‒ Old appliances

‒ Lack of insulation

Page 6: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

System Design Process

• Total usage for the year is 10,298kWh

• Project address:

‒ 123 Main St.

Anytown, CA 95661

• Information needed for analysis:

‒ Azimuth

‒ Tilt angle

‒ Shade

‒ Customer requests

‒ System size that will fit on roof • Remember FSB!!

• Ground mount

Page 7: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

PVWatts

• Now that we know the household usage proceed to PVWatts

• Input site information

‒ Module type

‒ Array type

‒ System losses

‒ Tilt

‒ Azimuth • http://tools.solmetric.com/Tools/RoofAzimuthTool

Page 8: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

PVWatts

• 1kW of solar will produce roughly 1,260kWh per year

• Take this value and divide it by the total household usage

10,298kWh/1,260kWh≈8kW solar array needed

But what can actually fit on the roof?..

Page 9: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Roof Sizing

• ALWAYS account for Fire Setbacks (FSB)

‒ Roof Access—Residential with Single Ridge

‒ (IFC 605.11.3.2.2)

Single ridge needs two 3’ pathways on array faces along edge of load bearing exterior wall.

• After FSBs we can

only fit 18 modules

Note: FSB vary depending on structure;

please reference the IFC and consult your

local AHJ.

Page 10: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Verifying Structure

• Lag screw length required

‒ Plywood decking, skip sheathing

• Life of roof

• Snow load

• No fire damage or broken/damaged rafters

• Confirm structure is adequate

‒ Can reference span tables

‒ Typ. Array will add 3-5 psf to roof

‒ www.solarabcs.org/permitting

Page 11: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Racking Selection

• UL 2703 for Bonding

‒ NEC Article 250 and 690 Part V

• Follow Panel manufacture spec. for mounting

• Type of roofing

‒ Comp, Tile, Standing seam etc.,

Design tools• actcouncil.org Source for wind and

snow loads

• SnapNrack Configurator

Don’t forget to add extra

attachments for conduit routing!

Page 12: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Characteristics of Solar Modules

• PV module voltage has an inverse relationship with temperature, which means that at lower temperatures, PV modules’ voltage raises and at higher temperatures, PV modules’ voltage falls from its nameplate rating.

Temperature Effects

Page 13: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

String Sizing Max. Voltage

REC280TP

• Module Voc 39.2V

• Temp Coef. Voc -0.31%

o All found on module data sheet

• Lowest record temp. -3°C

o SolarABC interactive map

Note: Residential system are not to exceed 600 VDC per NEC 690.7 (c)

𝑉𝑜𝑐 + 𝑅𝑒𝑐𝑜𝑟𝑑 𝑙𝑜𝑤 − 25 ∗ 𝑇𝑒𝑚𝑝 𝑐𝑜𝑒𝑓 ∗ 𝑠𝑡𝑟𝑖𝑛𝑔 𝑙𝑒𝑛𝑔ℎ𝑡

Required Information Formula

Page 14: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

String Sizing Max. Voltage

𝑉𝑜𝑐 + 𝑅𝑒𝑐𝑜𝑟𝑑 𝑙𝑜𝑤 − 25 ∗ 𝑇𝑒𝑚𝑝 𝑐𝑜𝑒𝑓 ∗ 𝑠𝑡𝑟𝑖𝑛𝑔 𝑙𝑒𝑛𝑔𝑡ℎ

• Convert temp coefficient from %/°C to V/°C

39.2*-0.31%= -0.122 V/°C

• Input all information

39.2 + −3 − 25 ∗ −0.122 ∗ 939.2 + −28 ∗ −0.122 ∗ 9

39.2 + 3.416 ∗ 942.62 ∗ 9

= 383.6𝑉 < 600V

Calculations

Page 15: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

String Sizing Min. Voltage

REC280TP

• Module Vmp 31.9V

• Temp Coef. Vmp -0.39%

o All found on module data sheet

• Location high temp. 28°C

o SolarABC

o Use rise adder for cell temp

Note: Be sure that Min string voltage is above inverter Min operating voltage.

𝑉𝑚𝑝 + (𝑀𝑎𝑥 𝑡𝑒𝑚𝑝 + 𝐴𝐷𝐷𝐸𝑅) − 25 ∗ 𝑇𝑒𝑚𝑝 𝑐𝑜𝑒𝑓∗ 𝑠𝑡𝑟𝑖𝑛𝑔 𝑙𝑒𝑛𝑔ℎ𝑡

Required Information Formula

Page 16: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

String Sizing Min. Voltage

𝑉𝑚𝑝 + (𝑀𝑎𝑥 𝑡𝑒𝑚𝑝 + 𝐴𝐷𝐷𝐸𝑅) − 25 ∗ 𝑇𝑒𝑚𝑝 𝑐𝑜𝑒𝑓 ∗ 𝑠𝑡𝑟𝑖𝑛𝑔 𝑙𝑒𝑛𝑔𝑡ℎ

• Max temp 28°C+25°C= 53°C

o Use Vmp coefficient -0.39%/°C or -0.124

• Input all information

31.9 + 53 − 25 ∗ −0.124 ∗ 931.9 + 28 ∗ −0.124 ∗ 9

31.9 − 3.472 ∗ 928.43 ∗ 9

= 255.8𝑉 > inverter startup voltage

More Calculations

Page 17: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Selecting an Inverter

Inverter Data

DC input information• 5.04kW DC • 383.6V Max • 255.8V Min• ≈1:1 DC/AC ratio

AC information is provided• 30A OCP for 240V • NEC 690.8(B)(1)

Page 18: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

BOS placement

• Don’t place inverters in direct sunlight w/o shade covers

• Confirm with AHJ and utility for special requirements

• Verify if Rapid Shutdown is required NEC 690.12

• Working spaces NEC Table 110.26(A)(1)

Considerations

Page 19: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Interconnection

• Breaker tie-in

o 120% rule

• NEC 2014 705.12(D)(2)

• Install breaker opposite to main breaker.

o 100% rule

• Supply side connection

o Requires service-rated disco

• Min. 60 amp rating

o Equipment must have AIC rating sufficient for the max. available fault current

o IPC, double-lugged panels

Interconnection Methods

Page 20: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

System Conclusion

• (2) strings of (9) REC280TP modules o Min 255.8 VDC Max 383.6 VDC

o PV STC DC size 5.04kW

• (1) Fronius Primo 5.0-1o DC/AC ratio ≈1:1

o OCP- 30A breaker

• Offset

o 5.04kW*1260kWh=6,350kWh/yr

o ≈61.7%

Final Design

Page 21: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Module Level Electronics

Microinverters SolarEdge String

Cost $$$ $$ $

Rapid Shutdown o

Shade mitigation -

Module level monitoring -

Variable string lengths oo

Max DC Voltage 60 350 600

Strings with varing tilt and azimuth -

o Requires more equipment

oo Variable string lengths possible with multiple MPPTs

Page 22: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Safety

• Always comply with OSHA regulations

• Only a qualified person should perform electrical work

• Green Job Hazards

o Fall

o Electrical shock

o Heat/cold stress

• Always wear proper PPE

• Hazardous materials on site

o Asbestos

• Vermiculite

• Siding

Green Job Hazards

https://www.osha.gov/dep/greenjobs/solar.html

Page 23: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Resources and References

• NABCEP

o Reference Guide

• Imagine Solar

• Solar Living Institute

• USGBC

• National Electric Code (NEC)

o CEC

• IFC

• IBC

• AEE Catalog

• UL

Learn More References

Page 24: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Office: (916) 559-8823Mobile: (916) 806-4896

[email protected]

Aaron Liggett

Questions?

Page 25: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

Lumber Grade Stamp

Page 26: PV Design Basics - aeesolar.com · Typical Grid Tied Solar System Top Down Process • Modules • DC cabling • Racking • Inverter • Monitoring • Interconnection Note: When

String Sizing Max. Voltage Using NEC Table 690.7

• Module Voc: 39.2

• Max low temp: -3°C

39.2*1.12=43.9VDC/module

43.9*9(string length)= 395VDC