PV Custom FitPV Custom Fit

Ando Kuypers

Program Developer Solliance

Page 2: PV Custom Fit - photovoltaic-conference.com

PV Custom Fit

• Introduction• BIPV in the Netherlands• Production technology for Custom Fit PV• Demonstrator cases

1 augustus 2016 ▪ 2

Page 3: PV Custom Fit - photovoltaic-conference.com

Dutch consequences of climate change from a European perspectiveDutch consequences of climate change from a European perspective

Example Footer text (insert > Footer)

▪ 31 August, 2016

Brandnertal, Austria, 2015Educational hiking routeSolar powered!

Page 4: PV Custom Fit - photovoltaic-conference.com

Dutch consequences of climate change from a European perspectiveDutch consequences of climate change from a European perspective

Example Footer text (insert > Footer)

▪ 41 August, 2016

Brandnertal, AustriaEducational walking routeSolar powered!

Page 5: PV Custom Fit - photovoltaic-conference.com

Dutch counter measures against climate change Space for wind energyDutch counter measures against climate change Space for wind energy

Example Footer text (insert > Footer)

▪ 51 August, 2016

4,5 GW by 2023

Page 6: PV Custom Fit - photovoltaic-conference.com

▪ 6

Present total Dutch energy use 2150 PJ /yr- including conversion losses 2650 PJ /yr

Potential (space) for solar heat 100-300 PJ/yrPotential for photovoltaics 400 PJ/yr- 400 km2 roofs (60% of 650km2 is suited) 66 GWp- 200 km2 civil works- 200 km2 parking lots- Excluding free field space

1 August, 2016

Dutch counter measures against climate change Space for solar energyDutch counter measures against climate change Space for solar energy

Total area the Netherlands: 41.543 km2. So 400 km2 is 1%

Page 7: PV Custom Fit - photovoltaic-conference.com

National action plan photovoltaic energy: from 1,5 GW now towards 100 GWNational action plan photovoltaic energy: from 1,5 GW now towards 100 GW

▪ 7March 8th, 2016

Page 8: PV Custom Fit - photovoltaic-conference.com

High Tech Campus Eindhoven

Solliance Building

FZ JülichImec - Leuven

Solliance:

Eindhoven (NL)Leuven (B)Aachen (D)Triangle

Solliance:

Eindhoven (NL)Leuven (B)Aachen (D)Triangle

Page 9: PV Custom Fit - photovoltaic-conference.com

Solliance research partners

Solliance: a public private partnership in solarSolliance: a public private partnership in solar

Solliance industry partners

Page 10: PV Custom Fit - photovoltaic-conference.com

2020 Ambition2020 Ambition

Demonstrate unique features of thin film PV in real projects

Enable economically feasible zero-energy buildings with thin film solar by introducing technologies for customization

Enable large scale industrial activity for PV integrated products

Page 11: PV Custom Fit - photovoltaic-conference.com

Interreg project PV Custom FitStarted 1-1-2016, duration 3 years, 7 million €Project partners: Solliance + Leuven University + ZUYD

Interreg project PV Custom FitStarted 1-1-2016, duration 3 years, 7 million €Project partners: Solliance + Leuven University + ZUYD

▪ 111 augustus 2016

SOLLIANCE IS A PARTNERSHIP OF EUROPEAN RESEARCH ORGANIZATIONS AND INTERNATIONAL INDUSTRIAL PARTNERS,WORKING IN THIN FILM PHOTOVOLTAIC SOLAR ENERGY

Page 12: PV Custom Fit - photovoltaic-conference.com

Low cost PV

Further increase of PV in our built environment will require more aesthetics or invisability

Low cost PV

Further increase of PV in our built environment will require more aesthetics or invisability

Page 13: PV Custom Fit - photovoltaic-conference.com

Custom size PV at low cost

Series production of integrated BIPV components with free size PV modules

Custom size PV at low cost

Series production of integrated BIPV components with free size PV modules

▪ 131 augustus 2016Karel de Grotelaan, Eindhoven

Page 14: PV Custom Fit - photovoltaic-conference.com

OpportunityOpportunity▪ 14

The Netherlands:7 million houses4 million in rows16000 km(2x Amsterdam – Bejing)

1 augustus 2016

Page 15: PV Custom Fit - photovoltaic-conference.com

City of the Sun, Heerhugowaard, The Netherlands. Foto: KuiperCompagnons.

Page 16: PV Custom Fit - photovoltaic-conference.com

Large scale renovation of existing housing now startingPrefab roof elements - “Stroomversnelling”Large scale renovation of existing housing now startingPrefab roof elements - “Stroomversnelling”

Page 17: PV Custom Fit - photovoltaic-conference.com

Now >1,5 GW PV installed

Of which in 2015: 0,45 GW

Of which thin film: 0,05 GW (>10%)

Thin film PV introduced on Dutch market since 2 years: tripled in 2015, doubling expected in 2016

PV in Netherlands:Relatively high acceptanceof thin film technogy (CIGS)

PV in Netherlands:Relatively high acceptanceof thin film technogy (CIGS)

Density of PV installations (installed Wp)

Page 18: PV Custom Fit - photovoltaic-conference.com

Thin film CIGS:Solar FrontierThin film CIGS:Solar Frontier

CONFIDENTIAL: KIC EIT EFFIC meeting april 25th 2016

▪ 181-8-2016

Powermonitoring of1518 plants

https://solar-frontier.powerdoo.com/en-US/SolarFrontier

Page 19: PV Custom Fit - photovoltaic-conference.com

Solar FrontierSolar Frontier

CONFIDENTIAL: KIC EIT EFFIC meeting april 25th 2016

▪ 191-8-2016

Popularity of CIGS in the Netherlands:Distribution of recent Solar Frontier installations on public website of German SF office

Page 20: PV Custom Fit - photovoltaic-conference.com

Solliance: Equipment development for thin film PVIntegrated system for free form back end interconnectionSolliance: Equipment development for thin film PVIntegrated system for free form back end interconnection

Back-end interconnection

• fully digital: enables free-form modules

• reduced dead-zone without cost increase

• no alignment and cleaning steps needed

• specifically CIGS: reduces P1 shunt loss

Connects mass volume front-end manufacturing with high mix back-end products

Increased design and (or) dimensional flexibility

Page 21: PV Custom Fit - photovoltaic-conference.com

Monolytic interconnection▪ 21May 25th 2016

Page 22: PV Custom Fit - photovoltaic-conference.com

In the classical process cleaning ( ) and alignment ( ) steps are needed

Classic in-process vs Back-end (for any TF-PV)Classic in-process vs Back-end (for any TF-PV)

Page 23: PV Custom Fit - photovoltaic-conference.com

PV CustomFit: Towards low cost free size and shapePV CustomFit: Towards low cost free size and shape

PV value chain

Semi-finished productson glass or foil

Tooling, materials, processes

Base substratesGlass, metal, plastic

Page 24: PV Custom Fit - photovoltaic-conference.com

PV CustomFit: Towards low cost free size and shapePV CustomFit: Towards low cost free size and shape

PV value chain

Finished PV moduleson demand

Semi-finished productson glass or foil

Tooling, materials, processes

Base substratesGlass, metal, plastic

Page 25: PV Custom Fit - photovoltaic-conference.com

PV CustomFit: Towards low cost free size and shapePV CustomFit: Towards low cost free size and shape

PV value chain

BIPV value chain

Finished PV moduleson demand

Semi-finished productson glass or foil

Tooling, materials, processes

Mechanical, electrical& system integration

Application domains

Base substratesGlass, metal, plastic

‘Inactive’ building components

‘Active’ building components

Page 26: PV Custom Fit - photovoltaic-conference.com

Translucent PV for building componentsenabled by similar technical approachTranslucent PV for building componentsenabled by similar technical approach

Translucent OPV: 50%

Page 27: PV Custom Fit - photovoltaic-conference.com

PV Custom Fit: Residential roofs and verandas, light weightroofs for commercial buildings, replacement asbestos roofsPV Custom Fit: Residential roofs and verandas, light weightroofs for commercial buildings, replacement asbestos roofs

Page 28: PV Custom Fit - photovoltaic-conference.com

… solar facades …… solar facades …▪ 281 August, 2016

ZigZag Solar (NL)

Page 29: PV Custom Fit - photovoltaic-conference.com

… and PV in infrastructure: SolaRoad Project… and PV in infrastructure: SolaRoad ProjectEmbedding of crystalline or flexible thin film PV in roads

Realised 2015 with crystalline Si PV(www.solaRoad.nl)

Artist impression envisaged thin film PV future

Page 30: PV Custom Fit - photovoltaic-conference.com

PV CustomFitWith financial support of:

Contact: [email protected](NL) [email protected](B) [email protected]

1 augustus 2016 ▪ 30