PV B tt i S ih S t PV Batterie Speicher Systeme Franz Baumgartner ZHAW, IEFE, Winterthur, Switzerland www.zhaw.ch/~bauf see also www.researchgate.net ebw Energie Bewegt Winterthur, 22.09.2016, Casino Theater Winterthur US 1956 Content 1 Lernrate der Photovoltik - Kosten 1. Lernrate der Photovoltik Kosten 2. Lernrate der Li-Batterie - Kosten 3. Markt der Autarkie Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ 4. Trends and Stromtarife Ref. L. Kazmerski, WCPSEC Kyoto, Japan 2014

Upload: others

Post on 06-Jul-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

PV B tt i S i h S tPV Batterie Speicher Systeme

Franz Baumgartner

ZHAW, IEFE, Winterthur, Switzerland

www.zhaw.ch/~bauf see also www.researchgate.net

ebw Energie Bewegt Winterthur, 22.09.2016, Casino Theater Winterthur US 1956Content1 Lernrate der Photovoltik - Kosten1. Lernrate der Photovoltik Kosten2. Lernrate der Li-Batterie - Kosten3. Markt der Autarkie

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/

4. Trends and StromtarifeRef. L. Kazmerski, WCPSEC Kyoto, Japan 2014

Page 2: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Start of the Industrialisation 100 years agoHenry Ford: Production & Labor Innovations

Ford was dedicated to the production of an efficient and reliable automobile that would be affordable for everyone; the result was the Model T, starting in O t b 1908October 1908.

Practice techniques of mass production revolutionize industry3600

Fords T-Model cost reduction1909

• use of large production plants 0 207n

1958

$)

• standardized

• interchangeable parts

y = 26439 x -0.207

Learning RateLR=1-2-0.207 = 0.13

$ (in

1923

1918

• interchangeable parts

• and the moving assembly line

LR 1 2 0.13900

10 100 1000 10000thousand units cumulative shipments

Mass production cut down on the time required to produce an automobile, which allowed costs to stay low (in 1918 US market share about 50%)

thousand units cumulative shipments

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/

allowed costs to stay low. (in 1918 US market share about 50%).

Slide 2.

Page 3: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Industrielle Lernrate der PV bei LR = 20%cr-Si Technology

y = 5 4822x-0 32

gyIAEA, PV PS Technology Roadmap 2014

1976

y = 5.4822x-0.32

LR=1-2-0.32 = 0.20 cr. Si

20162024

CdTe LR=0.16

ITRPV 20150.33$/W

S. Nowak et al; IEA, PVPS, Technology Roadmap, Edition 2014G.C. Nemeth, 2006, Energy Policy (34), p3218; discussed LR 0.17 and 0.26

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 3.

, , gy y ( ), p ;C. Harmon, 2010, IASA Laxenburg Austria, Interim Report IR-00-014, Experience Curves of Photovoltaic TechnologyP. Verlinden, CTO Trina, EUPVSEC 2016, parallel session IEA PVPS (CdTe data)

Page 4: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Die Antriebsbatterie

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 4.

Page 5: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Kostenaufteilung der KomponentenPV Modul versus Li BatteriePV Modul versus Li-Batterie

100% junction box

80%90%

glassAl frame

battery mgt.

batterypackage

j

50%60%70%

of c

osts

Electronics/DivM h P k i

laminationp gmounting

30%40%50%

Shar

e o Mech Packaging

Cell processingCell material

cathodeanodepoly Si

10%20%

anodeelectrolyteseperatorhousing

p y

wafering

0%PV Module Li Battery

Lithi i B tt i f H b id d All El t i V hi l th U S V l Ch i

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 5.

Lithium-ion Batteries for Hybrid and All-Electric Vehicles: the U.S. Value ChainMarcy Lowe, Saori Tokuoka, Tali Trigg and Gary Gereffi, October 5, 2010,Center on Globalization, Governance & Competitiveness, Duke University

see also Althaus, IWS, 2014-03 for LiNiMnCoO Batteries

6 inch poly cr. Si Module, 0.51$/Wp prize (20% margin?)2016 june, http://pvinsights.com/

Page 6: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Treiber der Kostenreduktion von Batterien

CostsMaterial, labor costs Costs270$/kWh Cheaper EV’s

new products

Material, labor costs

Prod. Yieldnew productsPV home batt.Quality

Production MarktesCO2

Oil, GasProductionTechnology

Li Ion

MarktesGrowth 50%?

20 GWh/a

Oil, Gas

Autarky

Li-Ion 20 GWh/aInvestment DecisionInvestment Decision

in new GWh Fabs

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 6.

Page 7: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

2020 TESLA’s full capacity to be reached

CN

ASO

NI

PAN

Web visited Juni 2016 - https://www.teslamotors.com/gigafactory

Tesla broke ground on the Gigafactory in June 2014 outside Sparks, Nevada, and we expect to begin cell production in 2017. By 2020, the Gigafactory will reach full capacityand produce more lithium ion batteries annually than were produced worldwide in 2013. 35

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 7.

more than 35 GWh of battery cells and 50 GWh of battery packs, but CTO JB Straubel, 2015

Feb 2016http://electrek.co/2016/02/24/

Page 8: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Investments in battery fabs

Investment cumulated till 2015, Ref. Roland Berger, 2016 and others

• $ 1.60 bn / 500 000? EVs (35GWh/a)/ Panasonic Tesla(Ref: Feb. 9, 2016, www.businessinsider.com; Model S @ 90kWh, Model 3 @ 60kWh); ? 5$/kWh invest cells over 10 years depr.5$/kWh invest cells over 10 years depr.

• $ 1.50 bn / 420 000 Evs (?10GWh) / ASEC Nissan/Renault

• $ 0.85 bn / 400 000 EVs / LG Chem GM, Daimler

• $ 0 50 bn / (25GWh/a) /Daimler Kamiz /(LG Chem) Mercedes$ 0.50 bn / (25GWh/a) /Daimler Kamiz /(LG Chem) Mercedes(Ref: Mar. 3, 2016, A. Rueckemann, Daimler, Bad Stafelstein, OTTI

18 500€+Li Battery Leasing

OK for battery cellsnot for battery pack

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 8.

http://www.autoblog.com/2015/10/08/gm-li-ion-battery-cost-per-kwh-already-down-to-145/

Li Battery LeasingGermany 20167.6€cent/km or 0.43€/kWh

not for battery packGoldman Sachs Global Investment Research Nov 2015

Page 9: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Globale EV Marktprognose – BEV&PHEVin 2016 über 1Mio EV´s im Einsatz (ca. 0.1%) // BEV +1%/a Neuwagenin 2016 über 1Mio EV s im Einsatz (ca. 0.1%) // BEV 1%/a Neuwagen

0.7% EV/Neuwagen

10% EV/Neuwagen

0 7% EV/Neuwagen0.7% EV/Neuwagen

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/Global EV Outlook 2016, IEA, www.iea.org

ca. 13 Mio EV´s global im Betrieb prognostiziert für 2020 ca. 2Mio BEV´s Neugwagen im Jahr 2020

Page 10: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Neue Elektroautos

• VW will ab 2025 ca. 2 bis 3 Mio EV verkaufen, 30 Modelle) >200GWh, )2025 soll 20 bis 25% des Umsatzes elektrisch sein (FAZ 2016-06)

Ford akt elle 6 EVs bis 2020 dann 20 EVs im Angebot• Ford aktuelle 6 EVs bis 2020 dann 20 EVs im Angebot4 500 Mio $ Investition angekündigt

• GM BOLT 37 500$ /383km, Markteinführung 2016!bisher VOLT/Ampera EV-Hybrid

• Tesla Model 3; 35 000$ / 346km, Markteinführung 2017e!

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 10.

Press, 15. Sept 2016

Page 11: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Learning Curve Li-Ion Battery Packs

2025 1/4 EV

400

2007 2015300$/kWh

2025; 1/4 cars EVeach 50kWh

30 Mio x 50kWh=1500GWh/400

2017

1.2Mio EVEVs batterymarket leaders

1500GWh/a

2030

200

$/kW

h 2017market leadersLR=0.06 [1]y = 357.31x-0.087

LR=1-2-0.087 = 0.06

100 Mio cum EV´sParis EV

declaration COP21200

LR = 0.1050 000 German PV

h b tt i 5kWh

100

LR = 0.15EPRI US, 2015W. Hofmann, 2015

2025home batteries 5kWh

0.25GWh

1000.01 0.1 1 10 100 1000 10000

GWh cum. 20205Mio EV

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 11.

[1] B. Nykvist, M. Nilsson; «Rapidly Falling costs of battery packs for electric vehicles»,Stockholm Environment Institute & KTH Royal Institute of Technology, Stockholm; Nature Climate Change; 9th Feb 2015

5Mio EV

Page 12: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Intersolar June 2016

PV BatteryMercedes

PV BatteryChinaMercedes ChinaBYD17 years battery y ymanufacture experience LiFePo0.3GWh MWh Batteries service in EVs, Buses and ESSz.B. China Southern Grid 3MW/12MWH

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 12.

Page 13: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Intersolar Juni 2016 EV und PV BatteryBMW u Solarwatt – the same owner Klatten

Selling price inc. taxesSelling price inc. taxes5500€ / 4.4kWh = 1250 €/kWh

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 13.

no inverter – mounting?

Page 14: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Marketing der Tesla Powerwall

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 14.

Page 15: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Tags - ladenNacht entladenNacht - entladen

TAGSS l t iSolarstrom in die Batterie

NACHTS6.3kWSolar

Strom aus der Batterie

6.3kWh

MiDiMo

TelsaBatterie

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 15.

Page 16: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Nur 6% des Wochenstroms kommt vom Netz

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 16.

Page 17: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

22% des Juni-Stroms kam vom Netz

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 17.

Page 18: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Measurements in Aug 2015 – sunny day 4 6kWh Li Speicher 8kWp PV lake of Constance D4.6kWh Li-Speicher, 8kWp PV, lake of Constance, D

Self cons.cons./PV

Standard5 5000kWh

20% to 35%1 1 1900kWh5 5000kWh 1.1 - 1900kWh

Heat pumphot water

+16%+900kWhel

Cafe Heat pumproom heat.

-

Batter +22%BatterykWh/kWp

+22%1200kWh

E-vehicle +9% to +25%2000kWh10 000km/a

500-2000kWh

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/18 F. Baumgartner, 2015 Nov, electrosuisse,

151105 Energien der Zukunft: erneuerbare Energien - Electrosuisse

Page 19: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

PV H b tt iPV + Hausbatterie

hohe Autonomie imhohe Autonomie im

Apr Mai Jun Jul Aug SepApr, Mai, Jun, Jul, Aug, Sep

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 19.

Page 20: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Grobe Kostenabschätzung relevante Parameterrelevante Parameter

• Investitionskosten pro kWh Nennkapazität1000 Fr

• Von Batterie pro kWh Nennkapazität• Von Batterie pro kWh Nennkapazitätbei 250 Jahres Vollzyklengelieferter kWh pro Jahr 250kWhgelieferter kWh pro Jahr 250kWh

li f t üb 10 J h 2500kWh• geliefert über 10 Jahre 2500kWh

• Kostenanteil ohne Zins, Betrieb1000Fr/2500kWh = 0.4Fr/kWh

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 20.

Page 21: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Energieflüsse und Kennzahlen

F. Baumgartner, chapter 6, PV BOS components inverterPearsall, N. (Scheduled for 2016 publication)

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 21.

The Performance of Photovoltaic Systems: Modelling, Measurement and Assessment, London, Elsevier.

Page 22: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

1 Stunden Batterie : 6kWh bei 6kWp PV

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 22.F. Baumgartner, N. Pearsall, PV Performance, Wiley, 2016

Page 23: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

1/2 Stunden Batterie : 3kWh bei 6kWp PV

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 23.F. Baumgartner, N. Pearsall, PV Performance, Wiley, 2016

Page 24: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Energieflüsse und Kennzahlen - Kosten

Invest.1300€/kWh

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 24.

F. Baumgartner, N. Pearsall, PV Performance, Wiley, 2016

Page 25: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Will ich auch haben, ,

wenn der Preis stimmt!wenn der Preis stimmt!

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 25.

Page 26: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Fronius Symo Hybrid PV+Storageist gleichzeitig Photovoltaik- und Batteriewechselrichter, 3phasig für, 3, 4 bis 5kW

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 26.

http://www.fronius.com/cps/rde/xchg/fronius_international/hs.xsl/83_20054_ENG_HTML.htm?inc=108602.htm#.VexktEa6ThE

Page 27: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

PV home battery – cost estimation per kWhSingle Family house solution: PV Li-battery + Power Electronics – inverter + installationF. Baumgartner, June 2016 in Germany

Typ. 850€/kWh Li-Battery 6kWh+ Inverter (price hardware for installer)remaining Battery price about 700€/kWh (about twice of Tesla Powerwall 350$/kWh pricing)

annual full cycles 250 10 years of operation; component -10%/a

per kWh , per kW costs2016

costs2020

costs2025

annual full cycles 250, 10 years of operation; component -10%/a

p pLi-battery + BMS @ 6kWh 300 € 197 € 122 € housing 100 € 66 € 41 € power electronics 100 € 66 € 41 €power electronics 100 € 66 € 41 € Total hardware 500 € 328 € 204 €Overhead, software, sales (20%) 200 € 66 € 41 €

t i t f t t 700 € 394 € 244 €

0.08€/kWhPlug in

components price at factory gate 700 € 394 € 244 €site installation 200 € 163 € 133 € total costs incl. Installation (-5%/a) 900 € 557 € 377 €

AC batterysupermarket,

economic rating cap. v. PVn / per kWh 0.36 € 0.22 € 0.15 €

PV Inverter 150€/kW <20kW, LR 0.19% from 1990 to 2013;

internet

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 27.

www.agora-energiewende.de , FhG ISE, 059/01-S-2015/EN; Publication: February 2015Li-Battery, cost reduction 8%/a, P. Nyquist, Nature, Feb 2016

Page 28: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

725 $/kWh NEC all inclusive @ 200kWh

Sept 2016

NEC Energy Solutions

modular storage system the

Distributed Energy Storage Solution

(DSS) 50 t 200kWh(DSS). 50 to 200kWh

Combining batteries, inverters and

control systems in modular systemscontrol systems in modular systems

that can be installed and operated

in a standard way across multiplein a standard way across multiple

sites.

Start 2017 spring in US

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 28.

2016-09-06 http://www.greentechmedia.com/articles/read/nec

Start 2017 spring in US

Page 29: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

PV Batterie Kosten und Ausblick- Schweiz60

Electricity bill 2025

50ENERGY

PV Production-5%/a CAGR 400 Fr / year grid

+150Fr

0

18

40

alts

kund TAXES +

GRID Battery kWh-10%/a CAGR

max. 1000kWh/a

0

30

4 H

aush

a

Grid& winter

BRD 2016

36 5

12

7.220

p/kW

h H

4

36

153.2

0 8

5

10

98

10

Rp

8.8 8.215

7

0.8

0

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/

2013 CH H4 household

2014 CH ZH H4 household

2016 PV + Batt 2025 PV + Batt 2035 PV + Batt off-grid?

see F. Baumgartner, 2015 Nov, ETG EE Jahrestagung, Electrosuisse151105 Energien der Zukunft: erneuerbare Energien - Electrosuisse

Page 30: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

https://weiterbildung.zhaw.ch/

Ph l ik d B i i h• Photovoltaik und Batteriespeicher

• Netze – Smart Grid

• Bewirtschaftungskonzepte

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 30.

Page 31: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

PV-Batterie Testlabor ZHAW IEFE Winterthur

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 31.

M. Räber et al.; ZHAW IEFE, electrosuisse bulletin, 3/2016

Page 32: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Sicherheit – wird zentral sein nicht nur Preis

Normen / Vorschriften / Leitfäden

• DIN EN 62619 für nur Li-Ionen- Batterieteil nicht Power Electr.

• DIN EN 50272 für Blei- und Nickel-Cadmium Batterien entw.

• DIN EN 62109 PV Power electronics incl PV System• DIN EN 62109, PV Power electronics incl. PV System

• BRD Projekt SAFTEYFIRST: KIT Karlsruhe, ISE Freiburg, ZSW Stutt.

• Sicherheitsleitfaden aus 2014 von BRD, BSW, KIT…http://www pv-magazine de/fileadmin/uploads/PDFs/Checklisten/Sicherheitsleitfaden Li-Ionen Hausspeicher pdfhttp://www.pv magazine.de/fileadmin/uploads/PDFs/Checklisten/Sicherheitsleitfaden_Li Ionen_Hausspeicher.pdf

2016 Jan, Steckborn, LiPoGUTSCH, KIT, 2015

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/ Slide 32.

20 Minuten, Schweiz am 2016-09-14

Page 33: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Fazit und AusblickBatterien ist die Schlüsseltechnologien für den globalen Elektroautomarkt- think BIG not local , die Masse senkt Preise!

• PV hat die Kostensenkung in den letzten Jahrzehnten demonstriert

• Einige Halbleiter-Technologie-Konzerne sind gescheitert –Einige Halbleiter Technologie Konzerne sind gescheitert Si Dünnschicht (Oerlikon, Toyo El., AMAT mit larger jumbo sizes!)

• Giga-Wh Fabs für Batterien sind nötig (Panasonic-Tesla, LG Ch)G g g ( , G C )Risiko (ramp up, Finanzen, Qualität…A123 ist gescheitert!)

• Heute könnte die günstige Autobatterie den PV Markt anreizen und zu einer g ghöheren Unabhängigkeit im Gebäude führen

• Getrieben wird die Kostenreduktion der PV Home Batterie1) von Massenproduktion Autobatterie – PV ist Tritt-Brett-Fahrer2) Reduktion der BOS Kosten (BMS, Gehäuse, Elektro, Montage..)

• Kaufen wir also mehr EVs ! - Reichweiten über 250km sind verfügbar

• Die PV Homespeicher sind dabei lachende Dritte

Franz Baumgartner, 22.06.2016; EUPVSEC Munich; www.zhaw.ch/~bauf/

• CO2 Emission der Li-Batterie in der Gebäudebilanz wird verbessert werden (PV)Slide 33

.

Page 34: PV Btt iBatterieSihSpeicher StSysteme › customer › files › ... · 2018-12-04 · C. Harmon, 2010, IASA LaxenburgAustria, Interim Report IR-00-014, Experience Curves of Photovoltaic

Danke für die Aufmersamkeitfi d www zhaw ch/ bauf and reasearchgate netfind more www.zhaw.ch/~bauf and reasearchgate.net PV plants built in collaboration with ZHAW IEFE Winterthur

60kWp, AXA Winterthur 650kW, Lonza AG, Waldshut 50kW – LE / dhpp, p

90kW, Solar Wings60kW, Solar Wings, Tenna10kW, EKZ60kW, Werkhof, WintiSolarspar, Klimafond