Page 1: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Putting the FUTURENET

methodology into practice

Page 2: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Summary

Users’ viewpoints

Who are they?

What might they want?

Potential uses

Including a topical possibility

Futurenet Outputs

Three examples

0

1

2

3

4

5

6

7

8

0 50 100 150 200 250 300 350 400 450 500

De

lay

(min

ute

s)

Distance from start (km)

Page 3: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Using FUTURENET Outputs

Three viewpoints:

Users of the System

Travellers, Freight hauliers

Policymakers

National and Local Government

Planners, Regulators, IIC(…?)

• Infrastructure managers

– Controllers, Maintainers

– Construction planners

Page 4: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Policymaker

Interest in long term strategies

e.g. where to prioritise investment, and when to invest

A long term need

30 to 50 years? (qv: IIC…)

FUTURENET simulations

Forecasts, outcomes

Range of inputs => options’ analyses

Quantification of future resilience

Articulate concepts

Visualisations provide tools to influence Decision Makers

Improved science and data over time

Confidence in Policy decisions in face of eg: uncertainty

Do we invest in

better weather

forecasting or

do we build in

flood resilience?

With the lead time for

building new

infrastructure in the

UK? We’re stuck with

Bouncy Castles!

Cowley Bridge Junction, Dec 2012

Page 5: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Infrastructure manager

Interested in impact of weather

on specific infrastructure, on levels of service

Immediate to short term need

Today’s disruption, tomorrow’s

maintenance priority?

Futurenet simulations

Detailed assessment of local effects

v/v different weather events

Predict disruption – reroute traffic?

Learn and improve current data – better future resilience

Targetted plans

Service recovery, Maintenance, Renewal

Priorities => better vfm for constrained budgets

This is today’s

priority because of

all the rain we got

last week.

Never seen it this

deep on the M6

before!

If they’d used

Futurenet, they’d

have cleared this

drain over three

weeks ago.

I’ve seen the

maps…

Page 6: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Traveller, Freight haulier

Interested in journey modal choice?

Cost Timing Comfort Predictability Emissions Utility??

An immediate need (as opposed to…)

Futurenet simulations

An enabler towards the informed User

Calculation of journey resilience of a route

Cost/ Time/ Quality can be analysed

Informed travellers can optimise travel plans

Feedback into Policy decisions

* NOT available in your App Store.

It’s just an idea…for now…

This

Futurenet

App saved

me 45

Minutes!*

Page 7: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

FUTURENET methodology

How does

this translate

into an aid to

the User?

Three

Examples of

Outputs…

Page 8: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

FUTURENET example outputs

Journey resilience

Rain-related delays

Seasonal v annual

Motorway example

Corridor analyses

Weather event sequences

Multi-node, multi asset

Motorway example

• Delay projections

– Weather event-related

delays

– Rail network example

#

#Propagation probability

Birminghampoints.csv Events

percentage

0.000000 - 0.778210

0.778211 - 2.334630

2.334631 - 6.614786

6.614787 - 14.007782

14.007783 - 21.789883

21.789884 - 31.517510

31.517511 - 84.046693

M6

Motorway

Rail Line

A Road

Minor Road

Low Resilience

High Resilience

N

0 1,500 3,000750 Meters

Page 9: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Journey resilience approach

• Example from Prof. Dixon’s presentation:

Page 10: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Journey resilience projections • Simplified model run between

Glasgow and London, using

relationships between rain, flow and

speed

• Simulated journeys under baseline

climate and under medium

emissions for the 2050s and 2080s

• Simulated one journey a day for 30

years

• Repeated this 100 times for each

emission scenario to give a range of

different climate outcomes

• Calculated the percentage change in

failed journeys (30 minute threshold)

compared to baseline

• Determined the different trends in

summer and winter transport

disruption

0

1

2

3

4

5

6

7

8

0 50 100 150 200 250 300 350 400 450 500

De

lay

(min

ute

s)

Distance from start (km)

0.00

50.00

100.00

150.00

200.00

250.00

300.00

350.00

0 100 200 300 400 500

Pre

cip

ita

tio

n (

mm

)

Distance from London (km)

Baseline

10%

2050s CentralEstimate

90%

Cross section of baseline and projected 2050s

summer rainfall totals for London-Glasgow route

Example of simulated journey

Page 11: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

0

10

20

30

40

50

60

70

80

90

100

-30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170

Cu

lmu

lati

ve p

rob

ab

ilit

y (

%)

Percentage change (%)

Cumulative distribution function for percentage

change for rain-related journey failures

2050s medium emissions

(winter)

•90% of model runs indicate

increase in failed journeys

•Central estimate of 27%

increase

•10% of model runs indicate

increase greater than 65

Page 12: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

0

10

20

30

40

50

60

70

80

90

100

-30 -20 -10 0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170

Cu

lmu

lati

ve p

rob

ab

ilit

y (

%)

Percentage change (%)

2080s high emissions (winter)

•Central estimate of 52%

increase

•10% of model runs indicate

increase greater than 107%

Cumulative distribution function for percentage

change for rain-related journey failures

Page 13: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

-30

-20

-10

0

10

20

30

40

50

60

baseline 2050s 2080s

Perc

en

tag

e c

han

ge

medium emissions

high emissions

Winter

Percentage change of rain-related journey failures relative to

baseline for 2050s and 2080s (central estimates)

Page 14: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

-30

-20

-10

0

10

20

30

40

50

60

baseline 2050s 2080s

Perc

en

tag

e c

han

ge

medium emissions

high emissions

medium emissions

high emissions

Summer

Winter

Percentage change of rain-related journey failures relative to

baseline for 2050s and 2080s (central estimates)

Page 15: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Journey resilience projections

• Demonstrates the seasonality of

climate change

• Net change in rain-related journey

failures negligible over Year

• However, there are large projected

divergences in seasonal failure rates

• Can be repeated for other failure

types e.g. rail buckling

• With addition of greater level of

infrastructural, geological and

hydrological data it may be possible

to identify critical links and locations

This links to other projects such as the

Network Rail funded REWARD project

which are looking at critical locations

where delays have a propensity to

propagate widely Plume plot for projected journey failures

Cumulative distribution function for projected

journey failures

Page 16: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Example uses:

• Response planning

• Medium term

improvement plans eg:

drainage

• Short term maintenance

planning

Immediate use by

Infrastructure Managers

and Policymakers

Development required to

enable targetting of

resources, information to

end users

Using resilience projections

Resilience projections:

Predict trends over

seasons, now and into the

future

Identifies seasonal

differences for rainfall

Help to focus

On critical parts of the

infrastructure system

Provide baseline data

Thresholds, inputs can be

varied, to assess different

futures and user needs

Page 17: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Delay Propagation

Example similar to Prof. Baker’s animation

Two ‘event’ sites shown

Tebay, Cumbria, West Coast Main Line

Birmingham New Street

Illustrate wide dispersal of delays

Note limitations

Recording of delays v line closures

Result of 1960s Optimisation??

Redundancy removed => poor Resilience??

Page 18: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

#

#Propagation probability

Birminghampoints.csv Events

percentage

0.000000 - 0.778210

0.778211 - 2.334630

2.334631 - 6.614786

6.614787 - 14.007782

14.007783 - 21.789883

21.789884 - 31.517510

31.517511 - 84.046693

Probabilistic delay propagation 1

Birmingham New Street incidents

• Probability of

delays projected

across network

• Wide spread

Page 19: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

#

#

Propagation probability

Penrith3.csv Events

percentage

0.000000 - 2.380952

2.380953 - 7.142857

7.142858 - 11.904762

11.904763 - 15.476190

15.476191 - 19.047619

19.047620 - 30.952381

30.952382 - 78.571429

Probabilistic delay propagation 2

Tebay-Penrith incidents

• Wider spread than

those centred on

Birmingham New

Street

Page 20: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Example uses:

•Prioritising long term

infrastructure investment

•Response planning –

location of kit

•Resilience planning

Infrastructure Managers

and Policymakers

Using delay projections

Delay projections:

Can identify the most critical

parts of network

Quantified impacts

Visualisation - a powerful

persuader

Joint planning – system

wide

Beneficiaries might not be

those that incur costs

Regulators can step-in

Fosters joined-up thinking

Page 21: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Corridor analyses

Motorway example

Scaleable

Route

Section

Weather v Resilience

Quantified

Visualisations

Fly-through

Data can be interrogated

Motorway

Rail Line

A Road

Low Resilience

High Resilience

N

Page 22: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

All 2050 (LMH) taken into account

16 WESQs for Garstang 2050 selected

Below four examples showing variations in weather years

02_029 used for further examples

Weather Event Sequencing (WESQs)

Page 23: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Resilience v Weather and Futures

Scaled weather

from UKCP09

Weather generator

Future traffic, Dingwall

et al

Capacity v Demand

White space =

Resilience

Page 24: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Corridor section and resilience for one node

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

1 25

49

73

97

121

145

169

193

217

241

265

289

313

meinhours,gridlinesperday

norm

alisedindicatorsofdeman

dandcap

city

resilienceplotfornode906,north-boundtrafficfortwoweeksin2013

normalisedcapacityreduc on

normaliseddemand

0.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

1 25

49

73

97

121

145

169

193

217

241

265

289

313

meinhours,gridlinesperday

norm

alisedindicatorsofdeman

dandcap

city

resilienceplotfornode906,north-boundtraffictwoweeksin2050M

normalisedcapacityreduc on

normaliseddemand

Page 25: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Add serviceability and ultimate limit states

Imbalance between demand

and physical capacity drives

resilience

Plot into one graph

Still just for one node

1 25 49 73 97 121 145 169 193 217 241 265 289 3130.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

1.10

1.20

meinhours,onegridlineperday

norm

alisedresilience

resilienceplot,node906,north-boundtraffic,2013

normaliseddemand

ul matelimitstate

serviceabilitylimitstate2

serviceabilitylimitstate1

1 25 49 73 97 121 145 169 193 217 241 265 289 3130.00

0.10

0.20

0.30

0.40

0.50

0.60

0.70

0.80

0.90

1.00

1.10

1.20

meinhours,onegridlineperday

norm

alisedresilience

resilienceplot,node906,south-boundtraffic,2050M

normaliseddemand

ul matelimitstate

serviceabilitylimitstate2

serviceabilitylimitstate1

Page 26: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

A day in the life of node 906

Hourly

sequence

Capacity v

demand

change as

situation is

stressed by

weather event

Into and out of

SLS/ ULS

2013 Plot

Aggregate into

‘tartans’

Page 27: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Multi-node, multi-temporal assessments

physical capacity and resilience tartans

Resilience 2013 north-bound

resilience 2050M north-bound

Taking forecasted physical capacity reduction (WESQ 02_029) as basis, and using annual

demand forecasts for 2013 and 2050M, and expression of resilience can be achieved

Capacity 2050 (WESQ 02_029)

Page 28: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

DNA of individual processes CRFs Snow

Drain

Overland flow

Swell/shrink

Rutting/road condition

Spray

Starts to work down to asset

and component level

Page 29: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Illustrations of possible outputs

local v. regional scale

M6

Motorway

Rail Line

A Road

Minor Road

Low Resilience

High Resilience

N

0 1,500 3,000750 Meters

Motorway

Rail Line

A Road

Low Resilience

High Resilience

N

Local Regional

Page 30: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Scale of Resilience

Site specific resilience Aggregated resilience

Page 31: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Illustrations of possible outputs –

resilience N- v. S- bound

M6

Motorway

Rail Line

A Road

Minor Road

Low Resilience

High Resilience

N

0 1,500 3,000750 Meters

Page 33: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Example uses:

• Prioritising long term

infrastructure investment

• Medium term

improvement plans eg:

resilience building

• Planning down to asset

or even component level

Immediate use by

Infrastructure Managers

and Policymakers

Potential use by Users

Using corridor analyses

Corridor analyses:

Can identify the most critical

parts of network down to

asset/ component level

Quantified impacts

Scaleable

Route or Section

Visualisation - a powerful

persuader

Easy to see the vulnerable

nodes

Not just pretty pictures – the

data can be interrogated

Page 34: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Potential? Great Western Route in Devon?

Tiverton – Exeter

Cowley Bridge

Junction

Exeter St David’s

Exe Estuary

Dawlish Sea

Walls

© Google Maps 2013

What should the priorities be?

What’s the business case?

Sea level rise?

Increased storminess?

Heat and track

buckles?

Fluvial floods?

Impact on network?

Page 35: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Summary

Users’ viewpoints

Who are they?

What might they want?

Potential uses

Including a topical possibility

Futurenet Outputs

Three examples

0

1

2

3

4

5

6

7

8

0 50 100 150 200 250 300 350 400 450 500

De

lay

(min

ute

s)

Distance from start (km)

Page 36: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey

Thank you

John Dora

36

John Dora Consulting Limited www.johndoraconsulting.eu

Page 37: Putting the FUTURENET methodology into practice › wp-content › pdfs › FUTURENET-M… · Futurenet simulations Futurenet An enabler towards the informed User Calculation of journey