PUTS Reports details.doc Page 1 of 2 Reports 1. Consumption Reports These reports provide information about the total and specific consumption of fluxes and alloys in the particular steel plant unit. The reports summarize the consumption figures on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days). Reports are also provided on maximum, minimum, average, std. deviations of specific consumptions with corresponding comparison thereof with variations in output parameters. The reports are also reported as trends, generated from on the above information. 2. Delay Reports These reports categorize, summarize and provide information on the various delays (and their cause allocation) suffered in the particular steel plant unit on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days). The reports are also reported as trends, generated from on the above information. 3. Productivity Reports This report summarizes the level of production that is achieved by the plant per unit of various definable input parameters. Reports include productivity on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days). Reports are also provided on the total and specific process/activity durations for various production steps. The reports are also reported as trends, generated from on the above information. 4. Quality Deviation Reports These reports summarize the deviations and the degree of deviations of actual steel output quality parameter values with respect to target quality parameter values. These reports are available on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days). Reports are also provided on degree of quality deviations with corresponding comparison thereof with variations in one or multiple input parameters. The reports are also reported as trends, generated from on the above information. 5. Availability Reports These reports provide information on the overall and specific up-times and idle periods of individual equipment of the plant as well as the total plant unit. These reports are available on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days). The reports are also reported as trends, generated from on the above information. 6. Energy and Utilities Usage Reports These reports provide information about the total and specific consumption of energy and various utility components (water, gases etc.) in the particular steel plant unit. The reports summarize the consumption figures on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days). Reports are also provided on maximum, minimum, average, std.

Upload: sensudip1966

Post on 23-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: PUTS Reports Details

PUTS Reports details.doc Page 1 of 2

Reports

1. Consumption Reports

These reports provide information about the total and specific consumption of fluxes and alloys in the particular steel plant unit. The reports summarize the consumption figures on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days). Reports are also provided on maximum, minimum, average, std. deviations of specific consumptions with corresponding comparison thereof with variations in output parameters.

The reports are also reported as trends, generated from on the above information.

2. Delay Reports

These reports categorize, summarize and provide information on the various delays (and their cause allocation) suffered in the particular steel plant unit on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days).

The reports are also reported as trends, generated from on the above information.

3. Productivity Reports

This report summarizes the level of production that is achieved by the plant per unit of various definable input parameters. Reports include productivity on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days). Reports are also provided on the total and specific process/activity durations for various production steps.

The reports are also reported as trends, generated from on the above information.

4. Quality Deviation Reports

These reports summarize the deviations and the degree of deviations of actual steel output quality parameter values with respect to target quality parameter values. These reports are available on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days). Reports are also provided on degree of quality deviations with corresponding comparison thereof with variations in one or multiple input parameters. The reports are also reported as trends, generated from on the above information.

5. Availability Reports

These reports provide information on the overall and specific up-times and idle periods of individual equipment of the plant as well as the total plant unit. These reports are available on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days). The reports are also reported as trends, generated from on the above information.

6. Energy and Utilities Usage Reports

These reports provide information about the total and specific consumption of energy and various utility components (water, gases etc.) in the particular steel plant unit. The reports summarize the consumption figures on a crew-wise, shift-wise, daily, weekly, monthly basis or over any selectable period of time (< last 90 days). Reports are also provided on maximum, minimum, average, std.

Page 2: PUTS Reports Details

PUTS Reports details.doc Page 2 of 2

deviations of specific consumptions with corresponding comparison thereof with variations in output parameters.

The reports are also reported as trends, generated from on the above information.

7. Operations Visibility Report – Retrospective vs. Current

These reports enable plant management to compare particular operational parameters between current period and one or more previous periods. The parameters compared may include aggregate consumption and usage of fluxes, alloys, energy and/or utilities, category wise delays, idle-times, plant availabilities, plant usage etc.. These reports also offer maximum, minimum, average, std. deviations etc. of the operational parameters with corresponding comparison thereof with variations in input and/or output parameters.

The reports are also reported as trends, generated from on the above information.

8. Operations Performance Report – Retrospective vs. Current

These reports enable plant management to compare particular specific performance parameters between current period and one or more previous periods. The parameters compared may include any specific consumption and usage of fluxes, alloys, energy and/or utilities, quality deviations etc.. These reports also offer maximum, minimum, average, std. deviations etc. of the specific operational parameters with corresponding comparison thereof with variations in input and/or output parameters.

The reports are also reported as trends, generated from on the above information.