GLO: Purpose of Meeting PURPOSE OF MEETING 1. REVIEW FINAL PREFERRED PLAN 2. SHARE YOUR THOUGHTS (TURN IN SURVEY CARDS AND/ OR STICKY NOTES AT TABLES) 3.GOAL: FINALIZE THE PLAN TO BEGIN CONSTRUCTION OF NATURAL CHANNEL IN LATE 2016 AND BEGIN PARK REDESIGN CONSTRUCTION IN LATE 2017 AND BE READY FOR USE LATE 2018. La finalidad de la reunión 1. REVISAR EL PLAN PREFERIDO DEFINITIVO 2. COMPARTIR SUS IDEAS (ENTREGUE LAS TARJETAS SOBRE LA ENCUESTA Y/O NOTAS ADHESIVAS ENCIMA DE LAS MESAS) 3. OBJETIVO: FINALIZAR EL PLAN PARA COMENZAR LA CONSTRUCCIÓN DEL CANAL NATURAL A FINALES DE 2016, Y EMPEZAR LA CONSTRUCCIÓN DEL REDISEÑO DEL PARQUE A FINALES DE 2017 Y ESTAR LISTO PARA USO A FINALES DEL 2018. OPEN HOUSE JUNE 21, 2016 For more information go to denvergov.org/plattetoparkhill Para mayor información acerca del proyecto visite denvergov.org/plattetoparkhill.com

Upload: lamkhanh

Post on 26-Sep-2018

217 views

Category:

Documents


1 download

TRANSCRIPT

GLO: Purpose of Meeting

PURPOSE OF MEETING1. REVIEW FINAL PREFERRED PLAN

2. SHARE YOUR THOUGHTS (TURN IN SURVEY CARDS AND/ OR STICKY NOTES AT TABLES)

3.GOAL: FINALIZE THE PLAN TO BEGIN CONSTRUCTION OF NATURAL CHANNEL IN LATE 2016 AND BEGIN PARK REDESIGN CONSTRUCTION IN LATE 2017 AND BE READY FOR USE LATE 2018.

La fi nalidad de la reunión1. REVISAR EL PLAN PREFERIDO DEFINITIVO

2. COMPARTIR SUS IDEAS (ENTREGUE LAS TARJETAS SOBRE LA ENCUESTA Y/O NOTAS ADHESIVAS ENCIMA DE LAS MESAS)

3. OBJETIVO: FINALIZAR EL PLAN PARA COMENZAR LA CONSTRUCCIÓN DEL CANAL NATURAL A FINALES DE 2016, Y EMPEZAR LA CONSTRUCCIÓN DEL REDISEÑO DEL PARQUE A FINALES DE 2017 Y ESTAR LISTO PARA USO A FINALES DEL 2018.

OPEN HOUSEJUNE 21, 2016

For more information go to denvergov.org/plattetoparkhillPara mayor información acerca del proyecto visite denvergov.org/plattetoparkhill.com

GLO: The Project OPEN HOUSEMAY 19, 2016

The Globeville Landing Outfall (GLO) project includes a redesign of Globeville Landing Park combined with a new storm water open channel connecting to the South Platte River. This project provides the surrounding neighborhoods with a unique opportunity to help improve the park uses and landscapes.

The park currently has one small visible drainage outfall. The existing outfall moves storm water from a large pipe into a steep, fenced, concrete culvert that is no longer considered best practice for moving storm water safely and in clean condition to the river.

The old culvert will be removed and a natural open channel with plants and vegetation will be built that will move storm water safely from both the existing outfall pipe and a second outfall pipe that will be added in the Denver Coliseum parking lot. The open channel will provide opportunities to help naturally clean storm water.

The GLO project provides a unique opportunity to re-envision the current park to improve its use, connectivity, and appeal to the surrounding communities, as well as address concerns that the current park is perceived as unsafe due to limited visibility.

For more information go to denvergov.org/plattetoparkhill

GLO: El Proyecto OPEN HOUSEMAY 19, 2016

El proyecto The Globeville Landing Outfall (GLO) incorpora una remodelación de Globeville Landing Park en combinación con nuevo canal abierto de aguas pluviales que conecta al río South Platte. Este proyecto ofrece a los vecinos cercanos una oportunidad única para ayudar a mejorar los usos del parque y los paisajes.

El parque actualmente cuenta con una pequeña vía de desagüe visible. El desagüe existente transporta las aguas pluviales desde una gran tubería hasta una alcantarilla de concreto, empinada y cercada, la cual ya no se considera como la mejor práctica para transportar, de forma segura, las aguas pluviales y en condiciones limpias hacia el río.

Se eliminará la vieja alcantarilla y se construirá un canal abierto natural con plantas y vegetación, el cual va a transportar de forma segura las aguas pluviales tanto de la tubería de desagüe existente como de la segunda tubería de desagüe que se añadirá en el estacionamiento del Denver Coliseum. El canal abierto ofrecerá oportunidades para ayudar a limpiar las aguas pluviales de forma natural.

El proyecto GLO ofrece una oportunidad única para replantear el parque actual para mejorar su uso, conectividad, y encanto para las comunidades cercanas, así como abordar las preocupaciones sobre el parque, ya que se considera peligroso debido a la visibilidad limitada.

Para obtener más información visite denvergov.org/plattetoparkhill

GLO: Existing Conditions & AmenitiesGLO: Condiciones existentes e instalaciones

SOUT

H PL

ATT

E RI

VER

WASHING

TON STREET

BNSF

RAILROAD

FUTU

RE RTD

NORTH

METR

O FASTR

ACKS

INTERSTATE 70

ARKINS COURT

1

2

3

4

1

2

34

GLO: Public Engagement Key Themes & Processes

Public engagement identifi ed key themes and infl uenced design of preferred park concept

• Active play area - a playground, climbing wall, and basketball court• Grassy, informal play areas - open grassy areas for pickup soccer and football, with visibility to see children

• Outdoor seating/shade structures/grills - areas for gatherings• Enjoyment of Nature - bridges over natural channel and viewing overlooks

• Access to the river - clear access to the river, space on the bank to enjoy water

• Safety - improve the park’s perceived sense of isolation and unsafe conditions

• Connectivity between neighborhoods and park - improved park access by foot, bicycle, and car

• Restroom and water fountain - in close proximity to the play area

One-on-onemeetings

Oct.2015

Apr.2016

Nov.-Dec.2015

May2016

Jan.2016

Aug.-Sept.2015

Feb.-Mar.2016

Stakeholder Working Group meeting

Platte to Park Hill public meeting

Youth input via SPREE/Greenway activity with Garden Place youth

GLO public workshop

Site tours

Project Time Line

Platte to Park Hill public meeting

Youth input session, Stapleton Recreation

Center

Parent meeting, Garden Place Elementary

Focus group, Stapleton Recreation Center

For public input meeting summaries please go to the website at: denvergov.org/plattetoparkhill

OPEN HOUSEJUNE 21, 2016

GLO Open House, review 3 concept plans, Holy

Transfi guration of Christ Church

Stakeholder surveys

GLO Open House, review single concept plan

Youth meeting, RNO leader meeting, parent meeting

June2016

GLO: Compromiso público en los temas y procesos principales

El compromiso público identifi có los temas principales e infl uyó en el diseño sobre el concepto de parque preferido

• Un área de juego activo - un parque infantil, un muro de escalada, y una cancha de básquetbol

• Zona para juegos informales cubierta de césped - áreas verdes abiertas para jugar fútbol y fútbol americano, con visibilidad que permita ver a los niños

• Asientos al aire libre/estructuras que generen sombra/parrillas - zonas para encuentros

• Disfrutar de la naturaleza - puentes sobre el canal natural y miradores• Acceso al río - libre acceso hacia el río, un lugar en la orilla para disfrutar del agua

• Seguridad - el parque actual parece un lugar alejado e inseguro• Conectividad entre los vecindarios y el parque - mejorar el acceso al parque para los peatones, los ciclistas y los automóviles

• Servicios baños y una fuente de agua - muy cerca del área de juego.

Reunionesindividuales

oct.2015

abr.2016

nov.-dic.2015

mayo2016

junio2016

enero2016

agosto- set. 2015

feb.-marzo2016

La reunión con el grupo de trabajo de las partes interesadas

Reunión pública Platte to Park Hill

La opinión de los jóvenes a través de la actividad SPREE/Greenway con Garden Place

Taller público de GLO

Visitas del lugar

Cronogram

a del proyecto

Reunión pública Platte to Park Hill

Sesión sobre la opinión de los jóvenes, Stapleton

Recreation Center

Reunión de padres, Garden Place Elementary

Grupo de discusión, Stapleton Recreation Center

Plática pública de GLO, repasar los tres planes

de concepto, Iglesia Holy Transfi guration.

Encuestas de los partidos interesados

Plática pública de GLO, repasar el único plan de concepto

Reunión con los jóvenes, organizaciones de residentes en vecindarios (RNO), reunión con

padres de familia.

Para obtener los resúmenes sobre las reuniones de la opinión pública, por favor visite el sitio web: denvergov.org/plattetoparkhill

OPEN HOUSEJUNE 21, 2016

GLO: Precedent & Material Images OPEN HOUSEJUNE 21, 2016

Informal bluegrass lawn

Active/ Nature play (2-5 yrs.)

Active/ Nature play (5-12 yrs.)

Bouldering wall

River access

Shade structures

Passive activities

Existing Concrete Channel• Limited stormwater capacity / control• Poor ecological function• Limited plant diversity• Limited wildlife habitat

Proposed Open Channel Concept• Improve water quality• Improve stormwater management• Increase plant diversity• Increase wildlife habitat• Improve ecological function• Improve park aesthetics

El canal del concreto existente

• La capacidad y control limitado de las aguas pluviales.

• Función ecológica carente.• • • Limitación en el hábitat de la fauna.

La propuesta del concepto de un canal abierto • Mejorar la calidad del agua.• Mejorar el control de las aguas pluviales.• • Aumentar el hábitat de la fauna.• Mejorar la función ecológica.• Mejorar la estética del parque.

GLO: Stormwater ManagementGLO: El control de aguas pluviales

Study Areas

Areas of Reduced Flooding

Current Flow of Water

Superfund Site Open Channel Drainage Design

What we will accomplish: • Improve the environment, provide habitat, and

recreation• Create an attractive, safe, effective stormwater

conveyance by installing a protective liner • Safely remove and dispose of waste

For additional information contact:NDCC – Celia Vanderloop (720 865 5458)DEH – Lisa Farrell (720 865 5439)EPA – Dania Zinner (303 312 7122)CDPHE – Fonda Apostolopoulos (303 692 3411) NOVEMBER 17,2013Oo

What we have now:• Historical smelter – arsenic and lead in soil and groundwater• Historical fill area – trash, methane, odors, contaminants in

groundwater• Unattractive, mostly unusable industrial space in an area

prone to flooding

What we are doing:• Working with EPA/CDPHE on a removal action to:

• Investigate site conditions• Create a plan to effectively remove waste• Engineer a Stormwater conveyance that is effective,

protective, useful and aesthetically pleasing

PRESENT POTENTIAL CHANGES

Property History1903 (Smelter closed) > 1952 (Denver Coliseum) > 1999 (NPL listing) > 2007 (ASARCO bankruptcy) > 2010 (RI/FS) > 2015 (Open Channel Removal Action)